Alcator C-Mod Run 1090723 Information

Back to runs

Miniproposals
Miniproposal:355
Date Filed:11/12/2003
Title:ICRF Testing & Conditioning
First Author:Steve Wukitch
Session Leader:Steve Wukitch (shots 1-16)

Operators
Session leader(s):Steve Wukitch
Physics operator(s):Ron Parker
Engineering operator(s):Andy Pfeiffer,Bill Cochran,Gary Dekow

Engineering Operator Run Comment
MP355 - ICRF testing and conditoning Session leaders: S. Wukitch/Y. Lin

Session Leader Plans
Entered: Jul 22 2009 10:49:29:760PM
Author: Steve Wukitch
1. Using standard discharge developed Friday (1090722007 or 1090717029 is a good
example except nl04 needs to be increased from 0.6 to 0.7), we will
begin J antenna operation. We will run J separate from D and E
antennas and begin with low power pulses. After evaluating the state
of J antenna from an operational standpoint, we will seek to increase
the power to 2 MW.

2. Discharge target is 1 MA, 5.4 T with moderate shaping and 1 cm outer
gap. If time permits we will change plasma current and density to
condition the antenna and other surfaces.

Physics Operators Plans
Entered: Jul 22 2009 03:30:02:797PM
Author: Ron Parker
Engineering setup for Wednesday 2009/07/23

MP355 - ICRF testing and conditoning

Session leaders: S. Wukitch/Y. Lin
Physics operator: R. Parker

Standard overnight ECDC (begin after Matt finishes calibrating foil bolometers) and 60 C bake

Run will start at 09:00 and end at 17:00.

Power systems as on 1090717029 (Bt=5.4T, Ip=0.9 MA, nl04=0.9-1e20 m-2)

A-coil configuration: +Dtop -Dbot -Jtop +Jbot; Enabled (standard
configuration)

Gas Setup:
fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
leave NINJA as is DISABLED

Enable the following gate valves and shutters, assuming no vacuum problems:
ECE, Z-bolo

Torvac setup: keep gate valves open during PULSE

Specific diagnostics: magnetics, ECE, TCI
------------------------------------------------------------------------------
ICRF Setup: D, E, J run on at 8:00
LH Setup: no
DNB: no
Cryopump: no
------------------------------------------------------------------------------
Run plan: See SL Plan

Session Leader Summaries
Entered: Jul 24 2009 01:08:41:827PM
Author: Steve Wukitch
We had a number of difficulties but made progress on correcting a few of them. PG3 was tested and found to be faulty but was corrected and installed on #010. An alternator vibration fault was indicated on shots#003-6. These were warnings from the housing (located above coupling of alternator to flywheel) vibration monitor and this warning level was raised. We had a few J conditioning pulses before a PLC issue caused FMIT#3 to go to run-off mid pulse. This eventually caused us to scrub the run.

Physics Operator Summaries
Entered: Jul 23 2009 04:40:42:887PM
Author: Ron Parker
A lot of problems today:

1. The main gas valve's pulse width modulator did not work at the beginning of the run. The problem was found to be one or more bad connections in a PCB. These were repaired by Bill Burke and normal feedback control of the plasma density became possible beginning with shot 12.

2. There was a failure of the UPS in the power room. It was reset and the problem did not recur.

3. PLC control of the alternator was lost. The problem was fixed and did not recur.

4. High levels of vibration occurred in the housing near the coupling in the alternator. This caused several aborted shots, since the vibrations increased to the alarm level when the alternator was excited. The problem was fixed by inserting a wedge between the alternator bearing supports and the coupling housing (see Power Systems).

5. A ground fault indication came up from the power room. Upon inspection, no fault current was detected and the ground fault indication did not recur.

6. The was a data system failure, which was quickly resolved and did not recur.

7. Finally, there was a failure of an RF PLC. This occurred around 3:00 and after trouble shooting it was determined that it was not fixable in the remaining run time -- thus the run was terminated at 4:15.

In spite of all of these problems, the machine ran well when it was possible to run plasma shots.

Scorecard: 16 shot count downs, 10 aborted due to above technical problems, 6 powered plasma attempts. All plasmas started up well, 5 went full length (including long ramp-downs), one disrupted at 1.23 s


Session Leader Comments
Jul 23 2009 09:50:42:050AM1090723001Steve Wukitchno power - PG3 test
Jul 23 2009 09:52:09:703AM1090723002Steve Wukitchno power - gas test
Jul 23 2009 10:24:19:237AM1090723003Steve Wukitchno power - alternator fault indication

vibration alarm - engineers are investigating
Jul 23 2009 10:25:18:767AM1090723004Steve Wukitchno power - lost PLC control
Jul 23 2009 10:35:19:953AM1090723005Steve Wukitchabort - no power - Alternator fault

engineers still analyzing
Jul 23 2009 11:23:10:580AM1090723006Steve Wukitchabort - no power - Alternator fault - PLC inhibit
Jul 23 2009 11:33:28:440AM1090723007Steve Wukitchplasma - J faulted out and had wrong phase

H-modes with D and E

need to improve the density abit
Jul 23 2009 11:46:14:407AM1090723008Steve Wukitchplasma - density is too low

J is still off

D and E improved.
Jul 23 2009 12:04:14:970PM1090723009Steve Wukitchplasma - density is still low

J phase and match are better - some power - increase pulse length

D and E are good

TF fast ground fault - check fuses

replace PG3 control board - need to do gas test on next shot


Jul 23 2009 12:18:21:237PM1090723010Steve Wukitchgas test - PG3 is working - set up for real shot
Jul 23 2009 12:37:53:140PM1090723011Steve Wukitchno power - data system fault
Jul 23 2009 12:53:50:837PM1090723012Steve Wukitchplasma - good shot

J improved - raise power for next shot

D and E are good

repeat with higher J antenna power (1 MW)
Jul 23 2009 01:41:25:513PM1090723014Steve Wukitchplasma -

J antenna is faulting ~ 1 MW

D and E are fine

Repeat - hopefully J improves
Jul 23 2009 02:08:16:667PM1090723015Steve Wukitchplasma - J did not improve - problem on FMIT#3 fault

J antenna is faulting ~ 1 MW

PLC issue on FMIT#3 so we will replace the module

cause a 20-30 minute delay
Jul 23 2009 02:45:30:903PM1090723016Steve Wukitchplasma - disruption

PLC problem with FMIT#3 will cause a delay (likely 30 minutes or more)

Physics Operator Comments
Jul 23 2009 09:01:16:393AM1090723001Ron ParkerRun will be delayed this morning due to problems with PG 3. The first shot was a no power shot to test the valve which had been "fixed" last night. However, PG 3 did not open so Willy and Steve are trouble shooting.


Jul 23 2009 09:12:32:393AM1090723002Ron ParkerShot 2 was a PG 3 test -- problem has not been fixed so we'll have to run without density feedback.


Jul 23 2009 09:23:04:640AM1090723002Ron ParkerNew problem, UPS in power room has failed. Entry into power room.
Jul 23 2009 09:56:15:610AM1090723003Ron ParkerAttempt for plasma on shot 3 was aborted due to flashing red indication from alternator. This was followed by a no power shot.
Jul 23 2009 10:16:32:330AM1090723004Ron ParkerSetting up for a shot, which may or may not go through.
Jul 23 2009 10:18:59:610AM1090723004Ron ParkerShot was aborted, followed by no power shot.
Jul 23 2009 10:26:08:190AM1090723004Ron ParkerNow we've lost PLC control of the alternator -- time to ask what else can go wrong today, but that would be tempting fate.
Jul 23 2009 10:31:55:877AM1090723004Ron ParkerTrying again for plasma on shot 5.
Jul 23 2009 10:35:15:127AM1090723005Ron ParkerNo shot again. No power shot coming up.
Jul 23 2009 10:48:24:860AM1090723006Ron Parkertrying again....
Jul 23 2009 11:00:59:470AM1090723006Ron ParkerShot didn't go -- no power shot

Problem is alternator vibration indication inhibits shot.
Jul 23 2009 11:17:01:080AM1090723006Ron ParkerTry again, for real!
Jul 23 2009 11:46:34:767AM1090723007Ron ParkerWunderbar! Ein schoen guter schuss!
Jul 23 2009 11:38:12:813AM1090723008Ron ParkerAnother good shot, we're on a roll

Power room access for ICRF.
Jul 23 2009 12:05:50:657PM1090723009Ron ParkerA fault came up from power room (TF fast ground fault), so there's a power room entry.

Meanwhile, Bill Burke believes that the pulse width modulation board for PG3 is fixed, so there is a cell entry to insert it.

We'll have to have a no-power shot to test it.
Jul 23 2009 12:09:41:923PM1090723009Ron ParkerNo current indicated in TF ground fault, so we'll proceed with shots after the test of the PG systems.
Jul 23 2009 12:16:54:330PM1090723010Ron ParkerSuccess with PG 3 (B-side main). We'll proceed with plasma shots.
Jul 23 2009 12:24:02:407PM1090723010Ron ParkerGas feedback = 8, derivative gain = 3 for entire shot
Jul 23 2009 12:26:33:877PM1090723011Ron ParkerShot aborted due to data system failure. This will become a no power shot

Jul 23 2009 12:53:57:227PM1090723012Ron ParkerShot 12 ran well. Density nL04 ran up to 0.8e20 but was programmed for 0.7e20.

Jul 23 2009 01:04:44:337PM1090723013Ron ParkerShot 13 aborted due to alternator problem. This will be followed by a no-power shot.
Jul 23 2009 01:18:27:200PM1090723013Ron ParkerThere is a delay while the vibration problem is being looked into.
Jul 23 2009 01:29:12:870PM1090723014Ron ParkerShot 14 ran well.
Jul 23 2009 02:09:57:230PM1090723015Ron ParkerShot 15 ran well.
Jul 23 2009 03:19:04:230PM1090723016Ron ParkerShot 16 started up well, but disrupted at 1.23 s.

Problems now with RF PLC, causing another delay.
Jul 23 2009 04:14:36:717PM1090723016Ron ParkerUnfortunately, the RF PLC problem cannot be fixed before the scheduled end of the run. Therefore the run will terminate.

Engineering Operator Comments
ShotTimeTypeStatusComment
108:53:00:453AMTestOk
209:10:05:440AMTestOk
309:52:05:987AMPlasmaBadAlt vibration
410:15:55:610AMPlasmaBadAlt plc
510:32:29:610AMPlasmaBadAlt vibration
610:48:15:703AMPlasmaBadAlt vibration
711:17:11:267AMPlasmaOk
811:30:47:750AMPlasmaOk
911:45:45:673AMPlasmaOk
1012:12:01:110PMTestOkGas Test
1112:24:31:080PMPlasmaBadcamac fault
1212:47:48:420PMPlasmaOk
1301:01:54:240PMPlasmaBadAlt Fault
1401:23:09:997PMPlasmaOk
1501:36:13:997PMPlasmaOk
1602:36:05:637PMPlasmaOk

System Availability
Jul 23 2009 08:52:39:080AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
BolometersyesMost systems collecting data but not calibrated. WB2 and WB1 not attached.Jul 07 2009 01:00PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoCyopump hardware is not yet reinstalled in the cell.Jul 14 2009 09:21PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesThe lower freq. 16 channels are ready. Still need calibration and signal level adjustmentsJul 14 2009 12:15PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Problem with controller - signal noisy.Jul 14 2009 09:11PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational, but NOT CALIBRATED. Ch 1 seems low, others reasonable.Jun 26 2009 08:25AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesOperational, but NOT CALIBRATEDJun 26 2009 08:26AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable for conditioning and testingJul 21 2009 04:50PM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data but processed data not in tree. WB1-LY not attached.Jul 07 2009 01:01PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoPumped down and awaiting good vacuum conditions to allow plasma testsJul 13 2009 10:08PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. NOT RECALIBRATEDJun 26 2009 11:25AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesOperational --- Uncalibrated and needs to be positioned at portJun 25 2009 05:08PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth HeNe and CO2 lasers have been shutdown. System is safe.May 30 2008 01:58PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesAs of 7/21/09, all channels are operational (50, 60, 75, 88, 88usb, 88lsb, 110, 140 and 110-140 swept frequency)Jul 21 2009 01:39PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - CoreyesMidplane channel is operational, but ***uncalibrated***Jul 14 2009 08:36AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgenoExpected availability: week of July 20Jun 24 2009 01:32PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyescables attached, DAQ test run, ready for first plasmaJun 17 2009 03:42PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke