Alcator C-Mod Run 1090728 Information

Back to runs

Miniproposals
Miniproposal:355
Date Filed:11/12/2003
Title:ICRF Testing & Conditioning
First Author:Steve Wukitch
Session Leader:Steve Wukitch (shots 1-32)

Operators
Session leader(s):Steve Wukitch
Physics operator(s):Jim Irby,Ian Hutchinson,Jim Irby,Ian Hutchinson
Engineering operator(s):Sam Pierson,Bill Cochran,Sam Pierson,Bill Cochran,Ed Fitzgerald

Engineering Operator Run Comment
MP355 - ICRF testing and conditoning

Session Leader Plans
Entered: Jul 27 2009 04:58:10:900PM
Author: Steve Wukitch
1. Using standard discharge (1090724005 LSN), we will
resume J antenna operation. We will run J separate from D and E
antennas and begin with low power pulses. After evaluating the state
of J antenna from an operational standpoint, we will seek to increase
the power to 2 MW.

2. Discharge target is 1 MA, 5.4 T with moderate shaping and 1 cm outer
gap. If time permits we will change plasma current and density to
condition the antenna and other surfaces.

3. If needed we will switch to USN, like 1090724029, in deuterium with nl04~0.8

Physics Operators Plans

Session Leader Summaries
Entered: Jul 29 2009 10:40:07:477AM
Author: Steve Wukitch
After an initial issue with FMIT#3 PLC, J antenna was operated into
plasma up to 3 MW where the discharges were largely L-mode with brief
H-modes. After some high power pulses, a combination of PLC false
control issues and degradation of the voltage and power handling (019)
limited the performance of J antenna. In addition to the PLC, we are
concerned about the transmission line humidity. Despite this setback,
the antennas were stacked to 4 MW. PLC faults were causing the FMIT#3
to have false trips after 019 but by-passed for 025. From shot 021,
FMIT#3 and #4 were operating without fault sync because the PLC was
switching the gate from closed to open. We by-passed the PLC for 026
but struggles continued because the DIO2 channel that supplies the
gate was hung. After further analysis, we realized the PLC was also
flipping the phase controller for J antenna at random and causing the
system to fault. To add insult to injury, the H/H+D climbed from 6%
on 001 to 25% by 010 and did not appear to fall (RF pickup on
diagnostics remained high where on 001 it was low). The antennas were also still evolving significant density with each high power pulse.

Physics Operator Summaries
Entered: Jul 28 2009 05:05:04:210PM
Author: Ian Hutchinson
RF conditioning run went smoothly from the physop viewpoint once the
cabinet doors on the EF2 PLC were closed, avoiding the RF pickup
taking spurious control of EF2.



  Shot,Duration(s),Ipmax(MA),Result  Shot,Duration(s),Ipmax,Result
  |   01   1.978   0.822   Plasma  |   02   1.979   1.013   Plasma  |
  |   03   1.977   1.018   Plasma  |   04   1.979   1.014   Plasma  |
  |   05   1.977   1.018   Plasma  |   06   1.979   1.015   Plasma  |
  |   07   0.690   1.018   Plasma  |   08   0.000   0.050   Fizzle  |
  |   09   0.691   1.027   Plasma  |   10   1.980   1.014   Plasma  |
  |   11   0.000   0.021   Dud     |   12   1.980   1.017   Plasma  |
  |   13   1.981   1.016   Plasma  |   14   1.978   1.018   Plasma  |
  |   15   1.997   1.008   Plasma  |   16   1.997   1.007   Plasma  |
  |   17   1.994   1.007   Plasma  |   18   1.989   1.005   Plasma  |
  |   19   1.991   1.006   Plasma  |   20   1.990   1.007   Plasma  |
  |   21   1.988   1.008   Plasma  |   22   1.985   1.009   Plasma  |
  |   23   1.988   1.008   Plasma  |   24   1.990   1.009   Plasma  |
  |   25   1.990   1.009   Plasma  |   26   1.992   1.010   Plasma  |
  |   27   1.987   1.008   Plasma  |   28   1.976   1.005   Plasma  |
  |   29   1.992   1.007   Plasma  |   30   1.989   1.005   Plasma  |
  |   31   1.992   1.006   Plasma  |   32   1.990   1.007   Plasma  |
 
Date 1090728:  32 shots.  30 plasmas.   1 fizzle.   1 PS dud.   0 System Error.
        (Plasma = Ip gt 60.0 kA   Dud = H_alpha lt  0.40 V)
Total plasma duration: 56.98 s (exceeding  -82 kA)


Session Leader Comments
Jul 28 2009 10:39:01:300AM1090728001Steve Wukitchplasma - no J - Ip~0.8 MA

problem with PLC

D and E are faulting

H to D is ~5%

increase Ip to 1 MA
Jul 28 2009 10:38:01:957AM1090728002Steve Wukitchplasma - still no J

problem with PLC

set FMIT#3 to local mode and by-pass PLC remote control
Jul 28 2009 10:37:35:380AM1090728003Steve WukitchPlasma - J ran okay; E is still faulting

increase J power to 1.2 MW
Jul 28 2009 10:33:13:253AM1090728004Steve WukitchPlasma

J ran at ~1.5 MW

D and E at 1 MW

increase D, E, and J
Jul 28 2009 10:34:46:080AM1090728005Steve WukitchPlasma

brief H-modes with all antennas

J ran at ~2 MW

D and E struggled at 1.5 MW

increase J to 3 MW

Jul 28 2009 10:43:07:533AM1090728006Steve Wukitchplasma

all antennas struggle

repeat
Jul 28 2009 11:04:30:667AM1090728007Steve WukitchPlasma - early disruption during high power phase of J

do not see trace of reflected power or injection from J on any camera

back off on power and slow the power ramp from J
Jul 28 2009 11:07:56:223AM1090728008Steve Wukitchpost disruption fizzle
Jul 28 2009 11:40:19:880AM1090728009Steve Wukitchplasma - disruption

again during the J high power phase (lower than 007)

again interference from J antenna on EF2

upon inspection the EF2/TMX PLC cabinet is open and within 5 feet of FMIT#3

pushed doors closed and set table against the doors but the side still open
Jul 28 2009 11:52:31:007AM1090728010Steve WukitchPlasma - good shot

interference is gone

try overlapping D and E and raise J power to 3 MW
Jul 28 2009 12:04:42:147PM1090728011Steve Wukitchdud
Jul 28 2009 02:03:45:397PM1090728020Steve WukitchD/E run ok.
J many faults.
Next: move J earlier. and run by itself.
Jul 28 2009 02:18:10:693PM1090728021Steve WukitchD/E overlap ok.
J got better.
Next: Repeat.
Jul 28 2009 02:30:30:070PM1090728022Steve WukitchD/E ran OK. overlap at 2.4 MW.
J much better. a 200 ms sec with total power D+E+J ~ 4.4 MW.
Next: repeat, and hope J is getting better.
Jul 28 2009 02:44:38:007PM1090728023Steve WukitchD/E OK.
J got worse again. (It is in antenna conditioning process...)
next: Lower J power, and run it again.
Jul 28 2009 04:09:10:427PM1090728025Steve Wukitchplasma

J is degrading

injections at high power

repeat

Jul 28 2009 04:06:45:130PM1090728026Steve Wukitchplasma

J3 is running without J4

gate issues associated with PLC faults

by-pass J3 PLC control of J3 gate (still under computer control)
Jul 28 2009 04:05:17:240PM1090728027Steve Wukitchplasma

best looking J pulse since 019

still have injections

repeat
Jul 28 2009 04:03:48:600PM1090728028Steve Wukitchplasma

E and J are ugly

reset J4 back to previous (027)

check J gate boards - fault count is different from J3 to J4 allowing J3 to run independent

increase upper triangularity to move strike point away from cryopump slots

power cycled the gate boards and swapped from 3 to 4 and 4 to 3
Jul 28 2009 04:14:18:617PM1090728029Steve Wukitchplasma

RF has degraded

J4 allows more faults - gate board is suspect

separate RF pulses and attempt to regain power/voltage handling
Jul 28 2009 04:31:28:973PM1090728030Steve WukitchJ4 ran longer than J3.
Gate signals were still misbehaving.
Next: lower J power.
Jul 28 2009 04:53:33:630PM1090728031Steve WukitchD/E ran ok at 1.3 MW level.
No J4. J3 ran by itself.
J4 gate signal had a low voltage level. Possible a broken gate board.
Next shot: no J power. ran D/E only.

Jul 28 2009 05:04:21:723PM1090728032Steve WukitchD/E ran ok.
No J was programed.

Next: end of run.

Physics Operator Comments
Jul 28 2009 09:19:59:847AM1090728001Jim IrbyLoaded 1090721011 --- LSN with startup in D2 -- SL requested shot was a helium startup shot.

Loaded --- open tree done

plasma into rampdown

Looks like we have some confusion with gas signals/controls.
Jul 28 2009 09:47:18:753AM1090728001Ian HutchinsonPlasma to rampdown. H/D about 7%.

Puzzles about gas monitors reading incorrectly. Pause to investigate and to
work on J-port.

Ip to 1MA. Load.
Jul 28 2009 10:14:46:880AM1090728002Ian HutchinsonPlasma to rampdown.

Jul 28 2009 10:15:06:253AM1090728003Ian HutchinsonPlasma to rampdown.

Lower gain on ICEF4 in segment 2 ater .25s. It appears to be forcing up the EF2s.
Jul 28 2009 10:25:26:457AM1090728004Ian HutchinsonPlasma. EF2s somewhat improved.

Increase ICEF4 at .4s.
Increase early Clearin. Load
Jul 28 2009 11:05:04:727AM1090728005Ian HutchinsonPlasma to rampdown.

Clearin to .001.
EF1 crowbars to .12s.
Zcur in segment 2 at segment switch is set to -1.5cm. This is a big mistake
and causes a lurch on the position that nearly rails the EFC.
Change that to start at zero at 0.1s and ramp to -1.5cm at .135s.
Jul 28 2009 10:53:23:097AM1090728006Ian HutchinsonPlasma to rampdown.
Very nice early diversion at .13s.
We got rid of the lurch at segment switch but zcur still has a noticeable
excursion at crowbar.

No changes.
Jul 28 2009 11:05:31:800AM1090728007Ian HutchinsonDisrupts at .68s. Monstrous radiation event starting at .6s.

Delay segment 1 zcur ramp point to .09s.
Jul 28 2009 11:19:35:250AM1090728008Ian HutchinsonFizzle.

Reduce the fill puff from 22 to 20ms.
Slow the segment 2 zcur ramp to .15s. Load.
Jul 28 2009 11:42:56:990AM1090728009Ian HutchinsonDisrupts at .67s.

Find that there is RF pickup on the controls to EF2s for this shot and shot 7.
This interference appears to be the cause of the disruptions.
It starts on EF2U bus voltage at .668s.
It is reported that the doors were ajar on the EF2 TMX PLC cabinet (close to
the RF).
Have a shot with the doors closed. Then we'll go in and fix.
Jul 28 2009 11:48:11:367AM1090728010Ian HutchinsonPlasma to rampdown.
Jul 28 2009 01:59:47:380PM1090728010Ian HutchinsonPlasma.

Change EF2 V to 50 from 150 at .2s.
Jul 28 2009 12:19:15:117PM1090728012Jim Irbyno PCS changes

plasma into rampdown

h/(h+d) 30% at 1.3 s

neut/hards saturated early
Jul 28 2009 12:30:42:210PM1090728013Jim Irbyno DPCS changes --- hope neuts/hards go away on their own

plasma into rampdown -- plasma current rise good

neuts/hards much lower


Jul 28 2009 12:45:01:647PM1090728014Jim Irbynl04 from 6 to 7e19/m^2
loaded --- open tree done

plasma into rampdown

Jul 28 2009 12:54:37:427PM1090728015Jim Irbyload from 1090724029
import seg 1 to seg 1 from shot 1090728014
loaded --- open tree done

plasma into rampdown
Jul 28 2009 01:12:58:757PM1090728016Jim IrbyTF current to 150kA in seg 1 to match current request in seg 4
RCUR from 0.657 to 0.66 m
loaded --- open tree done

plasma into rampdown

right gap about 1.5 to 1.6 cm from 1.8 cm on previous shot

lots of rf power
Jul 28 2009 01:27:53:350PM1090728017Jim Irbyno DPCS changes

plasma into rampdown

neuts/hards continue to come down shot-to-shot


Jul 28 2009 01:48:11:350PM1090728018Jim IrbyTF rampdown start to 1.5 s from 2.0 s

plasma into rampdown --- icrf at 4 MW
Jul 28 2009 01:54:21:367PM1090728019Jim Irbyno DPCS changes

plasma into rampdown

--- cell entry for rf...
Jul 28 2009 02:15:00:677PM1090728020Ian HutchinsonPlasma. Taking over as physop again.

Try to fix the thrash at .2s.
Reduce the EF2 voltage to 50V.
Program RCUR to .655 at .1s.
Jul 28 2009 02:27:50:647PM1090728021Ian HutchinsonPlasma to rampdown.
I made changes to segment 2 but we are running on segment 4. Hence the same shot.

Move Rcur out, lower EF2 V-jumps tp 50V.
Lower IC-EF4 gain at .2s. Increase drawn ICEF4 current.
Jul 28 2009 02:40:27:083PM1090728022Ian HutchinsonPlasma to rampdown.

EF2byEF4 was set to -2500A set to -2000A.
Delay ICEF4 gain decrease to keep current ramping.
Move rcur out some more.
Jul 28 2009 03:04:16:320PM1090728023Ian HutchinsonPlasma to rampdown.
Finally got rid of most of the vertical stability problem.

Tweak the OH1 voltage programming at segment/crowbar switch.
Delay seg1 zcur point to .1s. Load.
Jul 28 2009 03:34:01:833PM1090728026Ian HutchinsonPlasma to rampdown.

Lower EF2V to 100V in seg 2 at .1s.
Start the clearin ramp earlier in seg4.
Jul 28 2009 03:59:59:350PM1090728027Ian HutchinsonPlasma

Tweaks at .2s to help stabilize.
Jul 28 2009 04:08:14:803PM1090728028Ian HutchinsonPlasma to rampdown.

Drop Ip gain to 1 at .1s.
RXu to -.028 from -.025 to avoid dangerous spots on upper divertor.
Jul 28 2009 04:30:19:460PM1090728029Ian HutchinsonPlasma.

Install PG1 argon puff.
Install point at gain of 1 (vs 2.5) at .1s in RXL.
Jul 28 2009 04:46:22:677PM1090728030Ian HutchinsonPlasma to rampdown.

Still haven't tracked down the cause of the rcur excursion.
clearin gain to 1 from 2 at .1s
Jul 28 2009 05:03:24:927PM1090728031Ian HutchinsonPlasma to rampdown.

OH2V to -20V at .12s from about zero, in seg 4.
Jul 28 2009 05:03:33:490PM1090728032Ian HutchinsonPlasma to rampdown.

Engineering Operator Comments
ShotTimeTypeStatusComment
109:04:53:970AMPlasmaOkPlasma plenum fired
209:44:05:380AMPlasmaOk
309:57:41:317AMPlasmaOk
410:10:07:580AMPlasmaOk
510:23:02:737AMPlasmaOk
610:38:40:767AMPlasmaOk
710:51:19:957AMPlasmaOk
811:04:40:530AMPlasmaOk
911:17:20:480AMPlasmaOk
1011:40:38:820AMPlasmaOk
1111:53:25:973AMPlasmaBadComm. Fault PF breaker opened
1212:07:59:147PMPlasmaOk
1312:21:09:820PMPlasmaOk
1412:34:02:927PMPlasmaOk
1512:48:39:413PMPlasmaOk
1601:01:19:630PMPlasmaOk
1701:15:24:367PMPlasmaOk
1801:30:39:820PMPlasmaOk
1901:46:10:850PMPlasmaOk
2001:59:30:630PMPlasmaOk
2102:13:01:427PMPlasmaOk
2202:25:34:070PMPlasmaOk
2302:38:32:867PMPlasmaOk
2402:52:01:163PMPlasmaOk
2503:05:07:850PMPlasmaOk
2603:22:32:723PMPlasmaOk
2703:36:49:117PMPlasmaOk
2803:50:04:223PMPlasmaOk
2904:05:58:020PMPlasmaOk
3004:20:17:867PMPlasmaOk
3104:43:08:570PMPlasmaOk
3204:56:48:520PMPlasmaOk

System Availability
Jul 28 2009 09:04:27:927AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
BolometersyesMost systems collecting data but not calibrated. WB2 and WB1 not attached.Jul 07 2009 01:00PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoCyopump hardware is not yet reinstalled in the cell.Jul 14 2009 09:21PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesThe lower freq. 16 channels are ready. Still need calibration and signal level adjustmentsJul 14 2009 12:15PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Problem with controller - signal noisy.Jul 14 2009 09:11PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational, but NOT CALIBRATED. Ch 1 seems low, others reasonable.Jun 26 2009 08:25AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesOperational, but NOT CALIBRATEDJun 26 2009 08:26AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable for conditioning and testingJul 21 2009 04:50PM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data but processed data not in tree. WB1-LY not attached.Jul 07 2009 01:01PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnoPumped down and awaiting good vacuum conditions to allow plasma testsJul 13 2009 10:08PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. NOT RECALIBRATEDJun 26 2009 11:25AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesOperational --- Uncalibrated and needs to be positioned at portJun 25 2009 05:08PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth HeNe and CO2 lasers have been shutdown. System is safe.May 30 2008 01:58PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesAs of 7/21/09, all channels are operational (50, 60, 75, 88, 88usb, 88lsb, 110, 140 and 110-140 swept frequency)Jul 21 2009 01:39PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. Several spatial channels operational, but ***uncalibrated***Jul 23 2009 03:31PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgenoExpected availability: week of Aug 3Jul 23 2009 03:32PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyescables attached, DAQ test run, ready for first plasmaJun 17 2009 03:42PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Jul 28 2009 10:09:49:220AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID/LEDGE/DIV foils still need calibrations appliedJul 28 2009 09:59AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoCyopump hardware is not yet reinstalled in the cell.Jul 14 2009 09:21PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesThe lower freq. 16 channels are ready. Still need calibration and signal level adjustmentsJul 14 2009 12:15PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Problem with controller - signal noisy.Jul 14 2009 09:11PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational, but NOT CALIBRATED. Ch 1 seems low, others reasonable.Jun 26 2009 08:25AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesOperational, but NOT CALIBRATEDJun 26 2009 08:26AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable for conditioning and testingJul 21 2009 04:50PM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data but processed data not in tree. WB1-LY not attached.Jul 07 2009 01:01PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesCollecting spectra but control system problem is not reporting voltages to treeJul 28 2009 10:00AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. NOT RECALIBRATEDJun 26 2009 11:25AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesOperational --- Uncalibrated and needs to be positioned at portJun 25 2009 05:08PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth HeNe and CO2 lasers have been shutdown. System is safe.May 30 2008 01:58PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesAs of 7/21/09, all channels are operational (50, 60, 75, 88, 88usb, 88lsb, 110, 140 and 110-140 swept frequency)Jul 21 2009 01:39PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. Several spatial channels operational, but ***uncalibrated***Jul 23 2009 03:31PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgenoExpected availability: week of Aug 3Jul 23 2009 03:32PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyescables attached, DAQ test run, ready for first plasmaJun 17 2009 03:42PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Jul 28 2009 04:42:49:913PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID/LEDGE/DIV foils still need calibrations appliedJul 28 2009 09:59AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoCyopump hardware is not yet reinstalled in the cell.Jul 14 2009 09:21PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesThe lower freq. 16 channels are ready. Still need calibration and signal level adjustmentsJul 14 2009 12:15PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Problem with controller - signal noisy.Jul 14 2009 09:11PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable for conditioning and testingJul 21 2009 04:50PM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data but processed data not in tree. WB1-LY not attached.Jul 07 2009 01:01PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesCollecting spectra but control system problem is not reporting voltages to treeJul 28 2009 10:00AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesOperational --- Uncalibrated and needs to be positioned at portJun 25 2009 05:08PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoBoth HeNe and CO2 lasers have been shutdown. System is safe.May 30 2008 01:58PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesAs of 7/21/09, all channels are operational (50, 60, 75, 88, 88usb, 88lsb, 110, 140 and 110-140 swept frequency)Jul 21 2009 01:39PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. Several spatial channels operational, but ***uncalibrated***Jul 23 2009 03:31PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgenoExpected availability: week of Aug 3Jul 23 2009 03:32PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyescables attached, DAQ test run, ready for first plasmaJun 17 2009 03:42PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke