Alcator C-Mod Run 1090812 Information

Back to runs

Miniproposals
Miniproposal:568
Date Filed: 8/10/2009
Title:Plasma Performance Evaluation with Boron coated Molybdenum Tiles
First Author:Steve Wukitch
Session Leader:Steve Wukitch (shots 1-29)

Operators
Session leader(s):Steve Wukitch
Physics operator(s):Jim Irby
Engineering operator(s):Sam Pierson,Bill Byford,Gary Dekow

Engineering Operator Run Comment
MP# --- EO Pierson, PO Irby, SL

Session Leader Plans
Entered: Aug 12 2009 08:41:56:060AM
Author: Steve Wukitch
Establish standard discharge at 5.4 T, IP =1 MA, nl04~1, right gap ~1.0 cm, elongation ~1.6, upper and lower triangularity 0.3 and 0.55 respectively (similar to 1090811028) where a steady EDA is obtained.

Run the ICRF power at 3 MW from 0.7 to 1.1 sec and increase to 4 MW from 1.1 to 1.5 sec.

If plasma performance is maintained in excess of 50 MJ (30 discharges) increase RF power 5 MW.

Monitor stored energy, H89, Prad, and Mo.

Physics Operators Plans
Entered: Aug 11 2009 09:24:13:950PM
Author: Jim Irby
-----------------
Engineering Setup
-----------------

Run begins at 09:00 and ends at 17:00

Power systems as on: 10908110028

Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:

Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
fill NINJA with 10 psi D2 DISABLED

Enable gatevalves and shutters: ECE, VUV, Z-bolo

Torvac gatevalve toggle (yes/no): no

Boronization(yes/no): no
Overnight ECDC (yes/no): yes
ICRF(yes/no): yes
LH(yes/no): no
DNB(yes/no): no
Cryopump (yes/no): no

Vessel temperature: 60/60/60 overnight

------------------------------
ECDC Parameters
------------------------------
gas and pressure: D2 at 2e-4 Torr
sweep: 44/45/103 cm
scan: 20/120 s

Session Leader Summaries
Entered: Aug 12 2009 05:03:51:150PM
Author: Steve Wukitch
Run summary

Scanned the strike point above the W tile row and found that
discharges with the strike point above W tile are better (less W and
fewer disruptions). The plasma performance was poor all day but
raising the density gave more constant EDAs at 1 MA. However, the
high density tended to exceed the antennas' neutral pressure limit.
The neutral pressure seemed sensitive to things other than density
like inner wall gap. Why was the RF operation so poor at high target
density and elevated strike point? For J antenna, there appeared to
be an increased probability of faulting as density increases.
Lowering the plasma current to 0.8 MA allowed for low quality EDA
H-modes and more consistent RF pulses.

Physics Operator Summaries
Entered: Aug 13 2009 10:17:32:600AM
Author: Jim Irby
The machine ran extremely well w/o any need of physop adjustments to
startup all day. We did have two fizzles, but the reason for them is
unclear and the next startup was fine.

Because of the tungsten injection problem, if we ran the strikepoint at
its standard location, we had to make numerous adjustments to the
plasma shape in an attempt to improve the rf coupling. All transmitters
were having trouble running at even the 1 MW level. We had an eda mode on shot 11, but did not do that well again until shot 26,
after reducing the plasma current to 800 kA.


Problems:

Issues with rf control --- path to server lost on shot 07. INIT actions
for rf failed.

We had OH2l crowbars on shot 10 and 12, with no clear explanation.

The rf is still affecting the EF1 supply.

We will need to move from the k-port to the c-port sparker as soon as
possible. The sparker at k-hor is often running at the 10 uA level
rather than the 150 uA level when it is regulating properly. This low
current level does not seem to affect the startups, at least for today.

We had a couple of no power shots because of INIT errors and IGOR (07,
27)

Score:

no power 07
oh2l crowbar 10,12
init failure 27

fizzle 23,29
plasma 01,02,03,04,05,06,08,09,11,13,14,15,16,17,18,19,20,21,22
24,25,26,28

Session Leader Comments
Aug 12 2009 09:30:26:203AM1090812001Steve Wukitchplasma

H-mode performance is underwhelming

H/H+D~5%

impurity accumulation is still significant

raise strike point 0.5 cm
Aug 12 2009 09:43:28:803AM1090812002Steve Wukitchplasma - disruption @1.2 sec

decent RF - impurities still accumulating

raise strike point ~0.5 cm


Aug 12 2009 09:54:04:383AM1090812003Steve Wukitchplasma - no disruption

H-modes but still radiating

strike point approaching the divertor nose

raise strike point another 0.5 cm - how high is too high
Aug 12 2009 11:13:57:623AM1090812005Steve Wukitchplasma

L-mode no E antenna gate

return to strike point location of shot 003 and increase upper triangularity

Aug 12 2009 11:28:26:440AM1090812006Steve Wukitchplasma

upper triangularity is largely unchanged

RF pulse was ratty

again try to increase triangularity
Aug 12 2009 11:36:44:943AM1090812007Steve Wukitchno power
Aug 12 2009 11:57:24:403AM1090812008Steve Wukitchplasma

still ratty RF

upper triangularity was higher but plasma confinement was not remarkably changed

f-side neutral pressure is rising

increase triangularity further




Aug 12 2009 12:10:21:003PM1090812009Steve Wukitchplasma

no H-mode

D failed to start

upper triangularity is ~0.3

increase RF power and density
Aug 12 2009 12:17:50:533PM1090812010Steve Wukitchno power

power supply issue
Aug 12 2009 12:56:56:630PM1090812011Steve Wukitchplasma - target density is 1.1 as requested until ICRF is on

ratty ICRF

H-mode is constant

raise elongation (raise plasma center)
Aug 12 2009 12:58:56:787PM1090812012Steve Wukitchno power

power supply issue (OH2L)
Aug 12 2009 01:30:12:460PM1090812013Steve Wukitchplasma

J and E fault out - likely neutral pressure limit

lower target density to 1.05


Aug 12 2009 01:36:57:993PM1090812014Steve Wukitchplasma

still run into neutral pressure limit

raise initial RF power

Aug 12 2009 01:48:12:560PM1090812015Steve Wukitchplasma

lousy RF both E and J struggle

chase tune on J4, cross fingers on E
ramp power more slowly (50 msec)
Aug 12 2009 01:55:42:750PM1090812016Steve Wukitchearly disruption
Aug 12 2009 02:14:15:460PM1090812017Steve Wukitchplasma

D and E were better

J is still poor

chase match; increase elongation
Aug 12 2009 02:23:15:430PM1090812018Steve Wukitchearly disruption
Aug 12 2009 02:50:36:370PM1090812019Steve Wukitchplasma

multiple H-modes

elongation has increased to 1.6

right gap is ~2 cm

neutral pressure decreased?

raise density
Aug 12 2009 02:54:44:493PM1090812020Steve Wukitchplasma

neutral pressure doubled!?!!

chase match
Aug 12 2009 03:16:54:770PM1090812021Steve Wukitchplasma

RF is ugly

can we find conditions were the RF is more happy?

large outer gap, high target density
Aug 12 2009 03:23:29:553PM1090812022Steve Wukitchplasma

matches were not good for D and J

chase tune and repeat
Aug 12 2009 03:36:02:603PM1090812023Steve Wukitchfizzle
Aug 12 2009 04:02:18:470PM1090812024Steve Wukitchplasma

H-mode

RF power at 1 MW is better

lower target density to 0.8
Aug 12 2009 04:07:23:410PM1090812025Steve Wukitchplasma

D and J were better - E was lousy

lower plasma current to 0.8 MA
Aug 12 2009 04:31:06:780PM1090812026Steve Wukitchplasma

EDA H-mode

increase plasma current to 0.9 MA
Aug 12 2009 04:36:58:377PM1090812027Steve Wukitchno power
Aug 12 2009 04:48:27:443PM1090812028Steve Wukitchplasma - early disruption

brief RF

try again
Aug 12 2009 05:00:57:023PM1090812029Steve Wukitchfizzle

Physics Operator Comments
Aug 12 2009 09:14:33:213AM1090812001Jim Irbypg4 at 23 ms (as on 1090811028)
pg3 large pulse for hards: 22 to 45 ms at near 100% (as on 1090811028)
running seg 2: SNL, 1 MA, TF at 152800 A
import seg 2 from 1090811025 into seg 2
Open tree done

plasma into rampdown --- about 2 MW of rf ---

neuts/hards signal made it to interface room



Aug 12 2009 09:49:05:100AM1090812002Jim Irbyenabled argon for this shot: 0.3 to 0.35 s on pg1

ZXL from +0.015 to +0.020 m
OTD

plasma for 1.2 s --- 118 kJ --- h/(h+d) at 5 to 7% level

Z_XL -0.375 m (was -0.379 m)

move up some more for next shot
Aug 12 2009 09:51:51:587AM1090812003Jim IrbyZXL from +0.020 to +0.025 m
OTD

plasma into rampdown
Aug 12 2009 10:14:18:567AM1090812004Jim IrbyZXL from 0.025 to 0.030 m
OTD

plasma for 1.56 s --- 126 kJ --- Z_XL -0.371 m


neuts/hards ok early


Aug 12 2009 10:37:06:043AM1090812005Jim IrbyCell entry to adjust DNB gas levels

ZXL from 0.030 to 0.035 m
OTD

plasma into rampdown --- no D or E but about 2 MW from J --- ohmic h-mode following j-turnoff



Aug 12 2009 11:27:33:250AM1090812006Jim Irbylong delay as we debug a transmitter problem

import seg 2 from 1090812003 into seg 2 --- ZXL back to +0.025 m

RXU adjusted to -0.02 from 0.47 s to 1.3 s ---> deltaU from 0.2 to 0.3
OTD

plasma into rampdown --- barely changed upper triangularity



Aug 12 2009 11:36:40:177AM1090812007Jim IrbyZXU dropped by 2 cm (approx 5 to 3)
OTD

init failure on rf transmitters --- "path to server lost"

no power shot




Aug 12 2009 11:52:15:963AM1090812008Jim Irbyplasma into rampdown
Aug 12 2009 12:09:24:017PM1090812009Jim IrbyRXU from -0.02 to -0.03 m from 0.47 s to 1.15 s, then rampdown
OTD

plasma into rampdown --- no h-modes with 2.3 MW? No D-Port

h/(h+d) 6 to 8%


Aug 12 2009 12:20:13:387PM1090812010Jim Irbynl04 request from 1.0e20 to 1.1e20 /m^2
OTD

no plasma --- oh2l crowbar

into power room to check


Aug 12 2009 12:51:37:707PM1090812011Jim Irbystill trying to get higher target density

plasma into rampdown --- nice long h-mode ---
Aug 12 2009 01:00:35:477PM1090812012Jim IrbyZCUR from -0.015 to -0.005 m
ZXU from +0.03 to +0.02 m
OTD

oh2l crowbar again
Aug 12 2009 01:21:49:890PM1090812013Jim Irbytry again

plasma into rampdown
Aug 12 2009 01:34:00:913PM1090812014Jim Irbynl04 request from 1.1 to 1.05 e20 /m^2
loaded

plasma into rampdown ---- rf thinks neutral pressure too high --- very late h-mode


Aug 12 2009 01:47:18:043PM1090812015Jim Irbyno DPCS changes --- more rf power

plasma into rampdown --- a couple of h-modes --- neuts peak briefly at 4e13/s


Aug 12 2009 02:02:46:253PM1090812016Jim Irbyno DPCS changes

plasma for 0.4832 s --- big injection

Aug 12 2009 02:11:54:960PM1090812017Jim Irbyrepeat --- I forgot to load changes to the clearin

plasma into rampdown


Aug 12 2009 02:26:12:963PM1090812018Jim Irbyloaded clearin change

plasma for 0.41 s --- big crossover injection


Aug 12 2009 02:42:19:100PM1090812019Jim Irbyreduce rate of change of clearin before crossover

plasma into rampdown --- left gap at 1.5 cm --- k at 1.6 --- 160 kJ

neutral pressure lower
Aug 12 2009 02:58:02:760PM1090812020Jim Irbynl04 request back to 1.1e20/m2 from 1.05e20/m^2
loaded

plasma into rampdown --- neutral pressure up
Aug 12 2009 03:15:25:220PM1090812021Jim Irbyno DPCS changes

plasma into rampdown
Aug 12 2009 03:33:11:947PM1090812022Jim Irbynl04 request from 1.1 to 1.0e20/m^2
loaded

plasma into rampdown ---
Aug 12 2009 03:42:00:700PM1090812023Jim Irbyno DPCS changes

fizzle --- fields fine --- pressure ok --- sparker current only 10 uA at t=0


Aug 12 2009 03:54:38:703PM1090812024Jim Irbyno DPCS changes --- see if sparker performs better

plasma into rampdown --- sparker current still only 10uA/voltage limited

Aug 12 2009 04:06:36:677PM1090812025Jim Irbynl04 request from 1.0 to 0.8e20/^2
loaded

sparker start from -1.87 to -1.5 s

plasma into rampdown --- sparker ok
Aug 12 2009 04:24:55:543PM1090812026Jim IrbyIp request from 1000 kA to 800 kA
loaded

plasma into rampdown --- looks much better --- eda


Aug 12 2009 04:44:42:223PM1090812027Jim Irbysparker start from -1.5 to -1.2 s

Ip request from 800 kA to 900 kA
loaded

no power shot --- stuck in init


Aug 12 2009 04:51:37:520PM1090812028Jim Irbytry again

plasma for 0.738 s


Engineering Operator Comments
ShotTimeTypeStatusComment
109:02:21:287AMPlasmaOk
209:32:41:080AMPlasmaOk
309:45:46:460AMPlasmaOk
410:07:19:160AMPlasmaOk
510:22:51:193AMPlasmaOk
611:18:44:687AMPlasmaOk
711:33:21:300AMPlasmaBadNo Power do to Critical failure from RF
811:45:07:993AMPlasmaOk
911:57:40:810AMPlasmaOk
1012:12:26:567PMPlasmaBadOH2L Commutation Failure
1112:39:57:670PMPlasmaOk
1212:55:56:647PMPlasmaBadOH2L Comm Failure
1301:12:59:840PMPlasmaOk
1401:26:16:963PMPlasmaOk
1501:39:09:853PMPlasmaOk
1601:52:21:793PMPlasmaOk
1702:05:40:753PMPlasmaOk
1802:18:19:117PMPlasmaOk
1902:32:41:420PMPlasmaOk
2002:47:57:397PMPlasmaOk
2103:01:21:060PMPlasmaOk
2203:16:53:817PMPlasmaOk
2303:31:13:680PMPlasmaOk
2403:45:21:260PMPlasmaOk
2504:00:41:377PMPlasmaOk
2604:16:53:663PMPlasmaOk
2804:44:36:050PMPlasmaOk
2904:58:59:320PMPlasmaOk

System Availability
Aug 12 2009 09:01:52:880AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID/LEDGE/DIV foils still need calibrations appliedJul 28 2009 09:59AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoCyopump hardware is not yet reinstalled in the cell.Jul 14 2009 09:21PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesThe lower freq. 16 channels are ready. Still need calibration and signal level adjustmentsJul 14 2009 12:15PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Problem with controller - signal noisy.Jul 14 2009 09:11PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable for conditioning and testingJul 21 2009 04:50PM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data but processed data not in tree. WB1-LY not attached.Jul 07 2009 01:01PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesCollecting spectra but control system problem is not reporting voltages to treeJul 28 2009 10:00AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesOperational --- Uncalibrated and needs to be positioned at portJun 25 2009 05:08PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesSystem is operable. Channels 7 and 9 (of 32) are dead.Aug 05 2009 02:48PM (edlund)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesAs of 7/21/09, all channels are operational (50, 60, 75, 88, 88usb, 88lsb, 110, 140 and 110-140 swept frequency)Aug 04 2009 11:20AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Initial (NOT final) Te calibration applied. ***No ne calibration yet*** Aug 05 2009 08:44AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, Te calibration is thought to be good. Density is ***uncalibrated***Aug 11 2009 02:31PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyescables attached, DAQ test run, ready for first plasmaJun 17 2009 03:42PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke