Alcator C-Mod Run 1090821 Information

Back to runs

Miniproposals
Miniproposal:559
Date Filed: 7/23/2009
Title:Species effects on the H-mode threshold in He4(H), D(H), and H(He3) plasmas
First Author:Joseph Snipes
Session Leader:Joseph Snipes (shots 1-35)

Operators
Session leader(s):Joseph Snipes
Physics operator(s):Ron Parker
Engineering operator(s):Sam Pierson,Ed Fitzgerald,Bill Byford

Engineering Operator Run Comment
Session Leader Plan for MP559 Comparison of H-mode threshold in He and D

Session Leader Plans
Entered: Aug 21 2009 03:35:23:450AM
Author: Joseph Snipes
Session Leader Plan for MP559 Comparison of H-mode threshold in He and D

Session Leader: Joseph Snipes (ITER)
Physop: Ron Parker

We will begin the run at 8:00 am following overnight ECDC in helium to remove the deuterium from the walls and hopefully begin the day with nearly pure helium plasmas. We will begin with 1090812013 as a 1 MA, 5.4 T shot with a lower single null equilibrium with a slightly non-standard shape since it has high strike points and an elongation of 1.56 to avoid an apparently protruding row of tungsten tiles in the divertor that led to disruptions last week.
1) The density from that shot will need to be lowered to nl04 = 4 x 10^19 m^-2. We will also start with a helium startup for the pre-puff to avoid deuterium contamination. Program a slow ICRF power ramp from 0.75 MW up to 3 MW to try to find the H-mode threshold. If the H-mode is obtained, we will change to a staircase RF waveform starting just below the previous threshold power and stepping up in 0.25 MW steps for at least 0.1 s each and maybe longer for a few steps. Keep an eye on the neutron rate as a monitor to see if the deuterium is really gone. If the neutron rate is dropping from shot to shot with otherwise similar conditions, that may mean we need to repeat a few shots until the neutron rate stops decreasing.
2) If the H-mode was obtained at nl04 = 4 x 10^19 m^-2, then decrement nl04 by 1 x 10^19 m^-2 steps and repeat to look for the low density limit.
3) If the H-mode was not obtained, we will increment nl04 by 1 x 10^19 m^-2 steps to see if we are below the low density limit for the threshold up to a maximum of nl04 = 9 x 10^19 m^-2, adjusting the power ramp depending on the threshold range. When H-modes are achieved, document the threshold with dedicated staircase power steps near the threshold. Map out the H-mode threshold in helium as a function of density.
4) Changeover to D plasmas by changing the pre-puff to D as well as the main gas puff. Set nl04 = 9 x 10^19 m^-2 and ramp the ICRF from 1.5 to 3 MW to get rid of the helium and replace it with D. Look for changes in the threshold and H-mode characteristics during the changeover to D. Monitor the D content with the neutron rate and Zeff. We may consider ECDC in D between shots if the changeover seems to be taking too many shots.
5) Repeat in D the same density points of the H-mode threshold that were found in helium and compare the threshold. Dedicated staircase power steps should be used to document the threshold as was done in helium. Map out the H-mode threshold as a function of density in D paying particular attention to the low density limit and compare with the helium results.

Depending on how slow the changeover goes and how easily the density dependence of the threshold is mapped out in both helium and deuterium, we may extend the run up to 18:00 (midnight here in France).

Physics Operators Plans
Entered: Aug 20 2009 01:35:25:020PM
Author: Ron Parker
Engineering Setup for Run 1090821
-----------------------------------

MP559: Comparison of H-mode threshold in He and D

Session leader: Snipes
Physop: Parker

Run begins at ** 08:00 ** and ends at ** 18:00 **

Power systems as on: 1090812013

Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:

Fill B-Top with 6 psi **He** Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
fill B-side upper with 40 psi **He** Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi **He** Hybrid enabled (PG3)
Leave NINJA fill as is, DISABLED

Enable gatevalves and shutters: ECE, VUV, Z-bolo

Torvac gatevalve toggle (yes/no): no

Boronization(yes/no): no
Overnight ECDC (yes/no): YES
ICRF(yes/no): yes -- all transmitters run on by 7:30 AM!
LH(yes/no): no
DNB(yes/no): no
Cryopump (yes/no): no

Vessel temperature: 60/60/60 overnight

------------------------------
ECDC Parameters
------------------------------
gas and pressure: **He** at 5e-5 Torr
sweep: 44/45/103 cm
scan: 20/120 s

---------
Shot Plan
---------

We'll start with a segment 1 of 1090804002 for startup in helium, and segment 2 from 1090812013, with the density lowered to 4e19. Note that the feedback P and D gains on nl_04 should be set at 2 for He. This shape should avoid strong interaction with the W tiles. See SL plan for detailed shotplan.

Session Leader Summaries
Entered: Aug 21 2009 06:15:39:753PM
Author: Joseph Snipes
MP559 Comparison of the H-mode threshold in He and D

The run went reasonably well despite a couple of air leaks after shot 27 and 33 and a data system hang on shot 33 that cost us a couple of hours. The H-mode thresholds in helium were consistently 2 to 2.5 times the latest deuterium threshold scalings produced by Yves Martin. The H-mode thresholds in deuterium, on the other hand, decreased relative to the scaling for lower density. At high density, the deuterium thresholds were up to 2 x the scaling, but at moderately low density, the thresholds were down to 1.2 - 1.3 times the scaling. In absolute terms, the threshold at nebar = 1.5 x 10^20 m^-3 was 1.9 MW = POH + 0.9*PRF - dW/dt in deuterium whereas in helium, the threshold was about 3.4 MW, which is a factor of 1.8 times higher in helium. More detailed analysis needs to be done to determine more precisely the differences between the helium and deuterium thresholds, but it is clear that the threshold is considerably higher in helium than it is in deuterium, by at least 40% or more. The results are therefore more consistent with the JET results than with the recent ASDEX Upgrade results and are not very good news for ITER. If these results extrapolate directly to ITER, it will be difficult for ITER to achieve H-mode before deuterium is introduced. However, given the differences between machines, a better physics understanding is required to extrapolate these results to ITER.

Physics Operator Summaries
Entered: Aug 21 2009 06:14:07:363PM
Author: Ron Parker
The run started slowly with several early disruptions and fizzles, mainly caused by too much gas from the fill pressure and post breakdown gas pulses. Finally, after tuning up, a full length discharge was produced in helium on shot 7, and from then on the machine ran well through shot 27, including the scheduled transition from helium to deuterium on shot 17. However, after shot 27 a leak developed which took the pressure up to the mid -5 range. After turning off the cooling, the leak sealed itself and plasma operation was resumed without consequence. However, the leak reappeared and became serious on shot 33. At the same time a data system hangup occurred. After the data system problem was fixed and the cooling turned off to reseal the leak, only one more shot could be run before the scheduled end of the run at 6:00 PM. (But it was worth it.)

One other problem that occurred early on was a problem with the J-port transmitter crowbar, which took the J antenna out of operation for the day. This limited the maximum power to ~ 3.4 MW, which was a bit unfortunate for the H-Mode threshold studies.

Overall, the run produced useful and interesting data on the threshold in He relative to D2, not as much as one would have wanted from the extended run, but nevertheless of good quality and value.

Scorecard: 34 plasma attempts, 5 fizzles, 3 disruptions and 26 full length plasmas

Session Leader Comments
Aug 21 2009 07:59:04:130AM1090821001Joseph SnipesShot 1: Breaker pulled. Early disruption at 0.41 s. Density needs to be flattened out at nl04 = 4 x 10^19 m^-2.
Aug 21 2009 08:28:35:100AM1090821002Joseph SnipesShot 2: Very similar to shot 1. Need higher density.
Aug 21 2009 08:38:07:527AM1090821003Joseph SnipesShot 3: Fizzle.
Aug 21 2009 08:57:02:753AM1090821004Joseph SnipesShot 4: Slightly better, but disrupted just after 1 s. Got nearly 2 MW of ICRF by that time and no sign of an H-mode. Let's increase nl04 to 5 x 10^19 m^-2 and try again.
Aug 21 2009 09:03:27:067AM1090821005Joseph SnipesShot 5: Fizzle.
Aug 21 2009 09:28:13:170AM1090821006Joseph SnipesShot 6: Fizzle.
Aug 21 2009 09:49:14:880AM1090821007Joseph SnipesShot 7: Good shot. Got > 2.5 times the deuterium threshold scaling values with no H-mode up to 2 MW of ICRF. So, we may be below the low density limit or else the threshold in He is significantly higher than in D. Raise nl04 to 6 x 10^19 m^-2 for shot 8.
Aug 21 2009 10:04:30:463AM1090821008Joseph SnipesShot 8: Good shot. Got slightly higher density and > 2 times the deuterium threshold scaling values with no H-mode up to 2 MW of ICRF. The RF is tripping out at the higher power. Raise nl04 to 7 x 10^19 m^-2.
Aug 21 2009 10:29:36:070AM1090821009Joseph SnipesShot 9: Good shot. Got slightly higher density and two brief H-modes. The threshold is about 2 times the D threshold scaling. The first H-mode starts at 2.6 MW. Do a staircase ICRF pulse around the threshold for shot 10.
Aug 21 2009 10:48:21:827AM1090821010Joseph SnipesShot 10: Good shot. Got two brief H-modes. The threshold is about 2.5 to 2.7 times the D threshold scaling. The first H-mode starts at 2.8 MW.
Aug 21 2009 10:51:27:233AM1090821011Joseph SnipesShot 11: Good shot. Got a brief H-mode. The threshold is about 2.5 times the D threshold scaling. The first H-mode starts at 2.6 MW.
Aug 21 2009 10:57:11:157AM1090821012Joseph SnipesShot 12: Good shot. Density set to nl04 = 9 x 10^19 m^-2. H-mode near the end of the RF pulse at just over 3 MW of RF. It is about 2.4 x D threshold scaling.
Aug 21 2009 11:10:37:867AM1090821013Joseph SnipesShot 13: Try a staircase RF waveform at 3.0, 3.2, and 3.4 MW to narrow down the threshold value. Got a brief H-mode at the end of the RF pulse around 3.3 MW.
This corresponds to 2.3 to 2.4 times the D threshold scaling.
Aug 21 2009 11:31:54:233AM1090821014Joseph SnipesShot 14: Increase nl04 to 1 x 10^20 m^-2. RF ramp from 2.5 MW to 3.4 MW. RF trips out at the highest power levels, but there was no H-mode up to about 3.4 MW.
Aug 21 2009 11:48:56:083AM1090821015Joseph SnipesShot 15: RF programed at 3.4 MW straight across. Higher power is not available. Got an H-mode with about 3.2 MW of RF. This is about 2.3 to 2.4 x the D threshold.
Aug 21 2009 12:02:52:963PM1090821016Joseph SnipesShot 16: Raised nl04 to 1.1 x 10^20 m^-2. Keep RF pulse programmed at 3.4 MW.
No H-mode with 3.2 MW of RF corresponding to 2.2 to 2.3 x D threshold scaling assuming 90% of the RF power is coupled.
Aug 21 2009 12:29:59:083PM1090821017Joseph SnipesShot 17: Changeover to deuterium plasmas keeping nl04 = 1.1 x 10^20 m^-2. Ramp the ICRF from 1 MW to 3 MW. Got 3 H-modes with the first at Prf = 2.2 MW. So, the threshold is already lower with only some D. This corresponds to about 2 times the D threshold scaling.
Aug 21 2009 12:40:33:887PM1090821018Joseph SnipesShot 18: Repeat with higher gain on the density feedback to get the density up to nl04 = 1.1 x 10^20 m^-2. Density rises too much early leading to a MARFE. Then, the density settles down to the requested value. D-port RF antenna tripped out leaving < 1 MW of power. No H-modes.
Aug 21 2009 12:52:13:890PM1090821019Joseph SnipesShot 19: Fizzle.
Aug 21 2009 01:09:35:380PM1090821020Joseph SnipesShot 20: Density is fine, but the D port antenna tripped again leaving only just over 1 MW of RF and no H-modes.

Aug 21 2009 01:26:20:043PM1090821021Joseph SnipesShot 21: Similar to shot 20. The D port antenna tripped again leaving only just over 1 MW of RF and no H-modes.

Aug 21 2009 01:35:57:170PM1090821022Joseph SnipesShot 22: Similar to shots 20 and 21. The D port antenna tripped again leaving only just over 1 MW of RF and no H-modes. Reduce nl04 to 1 x 10^20 m^-2.

Aug 21 2009 01:46:39:643PM1090821023Joseph SnipesShot 23: Fizzle.
Aug 21 2009 02:09:52:497PM1090821024Joseph SnipesShot 24: Good shot with RF ramp from 1 to 3 MW. nl04 = 1 x 10^20 m^-2. No H-modes. Threshold is apparently high in this condition, more than 2 times the D threshold scaling.
Aug 21 2009 02:29:37:410PM1090821025Joseph SnipesShot 25: RF trips out some of the time, but the power varies from 2.5 to 1.6 MW with 3 H-modes with thresholds 1.5 to 2 x the D threshold scaling.
Aug 21 2009 02:43:10:540PM1090821026Joseph SnipesShot 26: Good shot. 3 H-modes with RF ramp. First H-mode at 2.7 MW of RF at about 2 x the D threshold scaling. So, the He threshold is about 40% higher than the D threshold in agreement with the JET results and disagreement with the AUG results.

Aug 21 2009 03:00:25:737PM1090821027Joseph SnipesShot 27: RF steps programmed for 2.6, 2.8, and 3.0 MW to narrow down the threshold. H-mode at the first step with 2.5 MW at 1.8 - 2 x D scaling. Need to repeat starting with lower power.

Aug 21 2009 04:07:03:293PM1090821028Joseph SnipesShot 28: RF steps programmed for 2.2, 2.4, and 2.6 MW to narrow down the threshold. H-mode at the first step with 2.3 MW at 1.7 - 1.8 x D scaling. Need to repeat starting with lower power.

Aug 21 2009 04:25:57:173PM1090821029Joseph SnipesShot 29: RF steps programmed for 1.8, 2.0, and 2.2 MW to narrow down the threshold. No H-mode. Move on to lower density for shot 30.

Aug 21 2009 04:41:16:650PM1090821030Joseph SnipesShot 30: nl04 set to 9 x 10^19 m^-2. RF ramp from 1 - 3 MW. 3 H-modes with the first one at 1.6 MW of RF. This corresponds to 1.5 - 1.6 x D threshold scaling.
Aug 21 2009 04:51:54:823PM1090821031Joseph SnipesShot 31: nl04 set to 8 x 10^19 m^-2. RF ramp from 1 - 3 MW. 4 H-modes with the first one at 1.4 MW of RF. This corresponds to 1.4 - 1.5 x D threshold scaling.
Aug 21 2009 05:18:13:763PM1090821032Joseph SnipesShot 32: nl04 set to 7 x 10^19 m^-2. RF ramp from 0.5 - 2.5 MW. 4 H-modes, 1st one at 0.9 MW about 1.2 - 1.3 x D threshold scaling.
Aug 21 2009 05:28:35:770PM1090821033Joseph SnipesShot 33: nl04 set to 7 x 10^19 m^-2. RF steps from 0.7, 0.9, 1.1 MW. An air leak has opened up again due to cooling like it did before shot 28, but it was not as bad this time. 3 H-modes with the first one just before 0.8 s. However, the RF power data may be lost.
Aug 21 2009 06:09:41:283PM1090821034Joseph SnipesShot 34: nl04 set to 6 x 10^19 m^-2. RF ramp from 0.5 to 2.5 MW. No power shot due to a data system hang.

Aug 21 2009 06:14:47:880PM1090821035Joseph SnipesShot 35: nl04 set to 6 x 10^19 m^-2. RF ramp from 0.5 to 2.5 MW. Many H-modes. The threshold is between 1.2 and 1.4 x the D scaling.

Physics Operator Comments
Aug 21 2009 08:03:03:533AM1090821001Ron ParkerFirst shot occurred just before 8:00. The shot disrupted at 0.4 s.


Aug 21 2009 08:30:50:197AM1090821002Ron ParkerShot 2: More or less the same problem as in shot 1, an early disruption.

The density during rampup seems too low -- falling to nl_04 ~ 0.16e20 --, so we'll revert to the shot 33 startup from last night, including an early PG 3 pulse.
Aug 21 2009 08:49:17:560AM1090821003Ron ParkerShot 3 fizzled.
Aug 21 2009 09:00:06:160AM1090821004Ron ParkerShot 4 started up better, disrupting after 1 s. RF ramped from 1 to 1.8 MW with no sign of H-mode.

Next: Raise density to 5e19.
Aug 21 2009 09:03:18:613AM1090821005Ron ParkerFizzle.
Aug 21 2009 09:16:57:790AM1090821005Ron ParkerDelay while RF checks things in power room
Aug 21 2009 09:31:06:577AM1090821006Ron ParkerShot fizzled. Drop the prepuff from 25 to 23 ms.
Aug 21 2009 09:57:21:930AM1090821007Ron ParkerFinally success! A full length shot, RF ramps up close to 3 MW, density during RF increased to 5e19 from 4e19.

Next:increase density (nl_04) by 1e19.
Aug 21 2009 10:06:49:420AM1090821008Ron ParkerShot 8 ran full length. It appears that there is a problem with J's crowbar which cannot be fixed without long delay. We are stuck with maximum of 3 MW from D and E.

Next: Raise nl_04 to 7e19.


Aug 21 2009 10:21:40:207AM1090821009Ron ParkerAgain, a full length shot. SW reports two tiny H-modes.

Next: Step RF power pulse in 150 - 200 ms each, 2.4, 2.6, and 2.8 MW.
Aug 21 2009 10:33:40:460AM1090821010Ron ParkerShot 10 again ran full length. RF stepped and H-mode transitions transiently occurred at RF power of 2.7 MW

Next: Raise density another 1e19 with ramped RF
Aug 21 2009 10:45:53:793AM1090821011Ron ParkerShot 11 ran full length, RF ramped and an H-mode appeared at about 2.6 MW.

Next: Raise density by another 1e19 on nl_04. RF ramp start at 1.5 MW instead at 1.0 MW
Aug 21 2009 10:56:02:017AM1090821012Ron ParkerShots continue to roll, another one at full length.

Next: Staircase 2.8, 3.0, 3.2 MW -- same density as in shot 12
Aug 21 2009 11:10:45:880AM1090821013Ron ParkerGood shot, with H-mode transition at 3.3 MW, confirming ramp threshold.But RF trips and so H-mode is not sustained.

Next: Increase density again by 1e19 on nl_04
Aug 21 2009 11:30:13:577AM1090821014Ron ParkerShot 14 ran well, no H-mode although some RF trips make the conclusion a bit ambiguous.

Next: Repeat with 3.4 MW RF pulse
Aug 21 2009 11:47:29:957AM1090821015Ron ParkerShot 15 ran full length. Surprisingly, an H-mode developed at ~ 3.2 MW.

Next: Increase n to 1.1e20 (another 1e19)
Aug 21 2009 12:04:26:293PM1090821016Ron ParkerShot 16 ran full length, no H-mode.

Next: Change to D2, ramp 1 to 3, same density. P-gain on density feedback increased from 2 to 8.
Aug 21 2009 12:44:23:747PM1090821017Ron ParkerShot 17 ran full length. Gain change on nl_04 wasn't loaded so density didn't reach 1.1e20.

Next: reload with Pgain on nl_04 = 8.
Aug 21 2009 12:48:26:683PM1090821018Ron ParkerShot ran full length, disupting on current rampdown.

Prefill and PG 3 puff killed runaways, but resulted in MARFE.

Next: reduce density rise demand
Aug 21 2009 12:51:57:077PM1090821019Ron ParkerShot 19 fizzled. Drop prefill by 3 ms, to 22 ms pulse.
Aug 21 2009 01:10:09:240PM1090821020Ron ParkerShot 20 ran full length, RF had trips
Aug 21 2009 01:20:19:103PM1090821021Ron ParkerShot 21 ran full length. RF continues to trip
Aug 21 2009 01:34:31:047PM1090821022Ron ParkerShot 22 was OK, but RF still not up to requested power due to high neutral density.

Next: reduce nl_04 to 1e20
Aug 21 2009 01:51:52:647PM1090821023Ron ParkerShot 23 fizzled. Reduce fill by 2 ms, also move pg3 pulse out by 10 ms.
Aug 21 2009 02:07:42:730PM1090821024Ron ParkerShot ran full length, but no H-mode up to 3 MW!

Next: Repeat with power up to 3.4 MW
Aug 21 2009 02:44:57:807PM1090821025Ron ParkerShot 25 ran full length.
Aug 21 2009 02:43:01:477PM1090821026Ron ParkerShot 26 ran full length and RF power ramp produced an H-mode at ~2.8 MW.

Next: Same pulse, but with steps in RF power.
Aug 21 2009 02:54:50:607PM1090821027Ron ParkerShot 27 ran full length. H-mode developed in first RF step at ~ 2.5 MW.

Repeat with lower steps
Aug 21 2009 03:59:56:150PM1090821027Ron ParkerOoops, the base pressure is rising into the mid -5 range. Cell access to investigate. After turning off cooling, the leak appears to have sealed. Base pressure is now in the mid - 7 range and cooling is back on


Aug 21 2009 04:06:42:620PM1090821028Ron ParkerIn spite of the leak problem, the shot ran full length and the H-mode transition occurred at 2.4 MW.

Next:Repeat with different RF steps -- 1.8, 2.0, 2.2
Aug 21 2009 04:20:01:220PM1090821029Ron ParkerShot 29 ran well, full length. No H mode, bracketing the threshold.

Next: reduce nl_04 to 0.9e20
Aug 21 2009 04:40:43:447PM1090821030Ron ParkerShot 30 ran full length, H-mode appeared.

Next: Lower nl_04 to 8e19.
Aug 21 2009 05:13:04:500PM1090821031Ron ParkerShot 31 ran full length
Aug 21 2009 05:17:31:327PM1090821032Ron ParkerShot 32 ran full length, ramp threshold ~ 0.9 MW.

Leak is opening again, so we are slowing the cooling down.
Aug 21 2009 05:33:35:363PM1090821033Ron ParkerShot 33 ran full length, but vessel still leaking

Data system problem
Aug 21 2009 06:09:42:377PM1090821034Ron ParkerShot 34 will be a no power shot
Aug 21 2009 06:14:55:240PM1090821035Ron ParkerShot 35 ran full length.

Engineering Operator Comments
ShotTimeTypeStatusComment
107:54:22:570AMPlasmaBadPF breaker opened
208:20:31:520AMPlasmaBadPF Breaker opened
308:35:46:167AMPlasmaOk
408:48:29:233AMPlasmaOk
509:01:14:300AMPlasmaOk
609:26:16:480AMPlasmaOk
709:38:48:317AMPlasmaOk
809:55:20:430AMPlasmaOk
910:11:54:593AMPlasmaOk
1010:24:47:097AMPlasmaOk
1110:37:53:243AMPlasmaOk
1210:50:29:360AMPlasmaOk
1311:04:05:990AMPlasmaOk
1411:24:26:950AMPlasmaOk
1511:40:39:377AMPlasmaOk
1611:54:59:477AMPlasmaOk
1712:19:06:910PMPlasmaOk
1812:34:05:447PMPlasmaOk
1912:48:30:247PMPlasmaOk
2001:01:00:360PMPlasmaOk
2101:15:25:693PMPlasmaOk
2201:29:56:967PMPlasmaOk
2301:44:33:520PMPlasmaOk
2402:01:03:447PMPlasmaOk
2502:15:26:593PMPlasmaOk
2602:33:00:380PMPlasmaOk
2702:47:35:150PMPlasmaOk
2804:00:15:803PMPlasmaOk
2904:13:57:263PMPlasmaOk
3004:30:11:223PMPlasmaOk
3104:44:35:773PMPlasmaOk
3204:57:23:360PMPlasmaOk
3305:17:35:983PMPlasmaOk
3506:09:21:707PMPlasmaOk

System Availability
Aug 21 2009 07:54:02:090AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID/LEDGE/DIV foils still need calibrations appliedJul 28 2009 09:59AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoCyopump hardware is not yet reinstalled in the cell.Jul 14 2009 09:21PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesThe lower freq. 16 channels are ready. Still need calibration and signal level adjustmentsJul 14 2009 12:15PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Problem with controller - signal noisy.Jul 14 2009 09:11PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable for conditioning and testingJul 21 2009 04:50PM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data but processed data not in tree. WB1-LY not attached.Jul 07 2009 01:01PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesCollecting spectra but control system problem is not reporting voltages to treeJul 28 2009 10:00AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesOperational --- Uncalibrated and needs to be positioned at portJun 25 2009 05:08PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesSystem is operable. Channels 7 and 9 (of 32) are dead.Aug 05 2009 02:48PM (edlund)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesStarting on 1090819011 only channels 50, 60, 75, 88lsb and 88usb are available. 110, 140 and the variable frequency channel are out of service.Aug 20 2009 03:54PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Initial (NOT final) Te calibration applied. ***No ne calibration yet*** Aug 05 2009 08:44AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, Te calibration is thought to be good. Density is ***uncalibrated***Aug 11 2009 02:31PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyescables attached, DAQ test run, ready for first plasmaJun 17 2009 03:42PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Aug 21 2009 05:10:34:220PM
alignment looks ok. YAG one cannot be adjusted due to the broken mirror adjustment. Now Yag 1 alignment is perfect on top machine (bot plate) and that's the most important thing.
Aug 21 2009 05:17:18:343PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID/LEDGE/DIV foils still need calibrations appliedJul 28 2009 09:59AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoCyopump hardware is not yet reinstalled in the cell.Jul 14 2009 09:21PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesThe lower freq. 16 channels are ready. Still need calibration and signal level adjustmentsJul 14 2009 12:15PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Problem with controller - signal noisy.Jul 14 2009 09:11PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable for conditioning and testingJul 21 2009 04:50PM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data but processed data not in tree. WB1-LY not attached.Jul 07 2009 01:01PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesCollecting spectra but control system problem is not reporting voltages to treeJul 28 2009 10:00AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesOperational --- Uncalibrated and needs to be positioned at portJun 25 2009 05:08PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesSystem is operable. Channels 7 and 9 (of 32) are dead.Aug 05 2009 02:48PM (edlund)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesStarting on 1090819011 only channels 50, 60, 75, 88lsb and 88usb are available. 110, 140 and the variable frequency channel are out of service.Aug 20 2009 03:54PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Initial (NOT final) Te calibration applied. ***No ne calibration yet*** Aug 05 2009 08:44AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, Te calibration is thought to be good. Density is ***uncalibrated***Aug 11 2009 02:31PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyescables attached, DAQ test run, ready for first plasmaJun 17 2009 03:42PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Aug 23 2009 04:40:09:900PM
A laser head interlock for YAG2 between shot 34 and shot 35. Shot 34 is a no power shot and met a control problem. Both YAGs fired in shot 33, and only YAG 1 fired in shot 35. The laser head could be overheated due to longer flashing.

Sat, 08/22/09
I checked in the lab that the deionized filter for YAG2 was newly replaced on 07/06/09. The water level is reasonable. The water should be pure (there is no LED indicating water purity for YAG2) according to experience. I'll keep an eye on the laser head interlock during Monday run.

The top motor alignment has received weak signals since this week. (first plasma Wed afternoon). I tried minor adjustment during Thur and Fri (within 10 steps since last Aug 14). No significant change yet, while the signal level looked normal, so I gave up the trial.

I checked the fiber plate today and saw the 3 top alignment fibers stuck out from the holder surface for about half an inch. No doubt these fibers were not on focal plane so that's why the signals were low. I's very likely happened when we took out the fiber plate after Aug 14 run (before Jerry left). I toggle the fibers back and now they are back on the focal plane.

Due to only YAG2 operation and bad alignment on Thursday, the cross calibration results was not quite successful. Calculated fudge factors for core channels (not all) are about 1.05~1.10. This verified that the precious calculation is quite close, and the bad alignment gave us information that in extreme case the density should still within 10% error. Shot 1090820029 is a cut-off shot with good bot plate alignment (no idea on top, signals were low).

Next wed afternoon Martin will repeat the high density fueling experiment. Now Mirror 1 is fixed by 3 washers so that the HeNe's on TV are well on target. Minor adjustment available for Mirror 2 in x,y direction and Mirror 1 in y direction. Bot motor in perfect alignment Friday. So if everything remains well and YAG2 not affected by Friday laser head interlock, we could get quite good cutoffs.