Alcator C-Mod Run 1090903 Information

Back to runs

Miniproposals
Miniproposal:576
Date Filed: 8/28/2009
Title:Improve ITER-like Discharge Startup
First Author:Chuck Kessel
Session Leader:Chuck Kessel (shots 1-33)

Operators
Session leader(s):Chuck Kessel
Physics operator(s):Ian Hutchinson
Engineering operator(s):Andy Pfeiffer,Bill Parkin,Bill Byford

Engineering Operator Run Comment
MP576 SL Chuck Kessel PO Ian Hutchinson

Session Leader Plans
Entered: Sep 2 2009 07:46:48:323PM
Author: Chuck Kessel
Goal: establish improved startup for ITER-like discharges by developing reliable diverting time and making the diverting time as early as possible.

Recover discharge 1080221010 with AT startup programming, remove LH and ICRF heating. In corporate shaping improvements (target kappa = 1.8, before or at end of ramp) established with AT rampup in 1090710 run day. (5 shots)

1) establish fastest rampup possible with power supplies (targeting 1.35 MA in 500-700 ms (5 shots)

2) begin to push divert time to earlier times
a. with earlier crowbar if possible (5 shots)
b. modification of PF coil pre-program to pull X-point into VV sooner (EF1L and/or EF2L) (10 shots)

3) introduce 1-2 MW ICRF power at or about the divert time and confirm the established scenario is preserved (3 shots)

Physics Operators Plans
Entered: Sep 2 2009 05:16:49:643PM
Author: Ian Hutchinson
MP576
This run is primarily for developing controlled ramp-ups with early diversion.
That means early crowbar. The shots from this campaign most suitable for the
segment 1 are from the low-field startup that was developed also with early
crowbar. We will therefore start from 1090710015, but adjust EF1 and EF4 for the field.

Engineering setup should be as for 1090710015.

The measured values for this shot are:
TF current -87443
EF1L -5994
EF4 -1310

Compared with a startup from 2 Sep:
TF -151000
EF1L -5840
EF4 -1273.

Thus the deltas to be applied to 1090710015 for 150000A TF are nominally.
EF1 +154A EF4 +37A. These will be applied symmetrically.

More generally dEF1/dTF = 2.46 A/kA dEF4/dTF = 0.59 A/kA. For general
field changes.

Then we will adjust the preprogramming and currents and positions to get
even earlier diversion with a current ramp rate consistent with the controlled
ITER like startup required.

Session Leader Summaries
Entered: Sep 3 2009 06:15:24:260PM
Author: Chuck Kessel
MP576 Improvement of ITER-Like Startup

003 produced good smooth ramp to 1.3 MA, with a very early left gap > 0, while divert is > 120 ms, but based on non-ITER shot (JFT-2M?)

005 Ip ramp then disrupt, divert time similar to AT scenarios at about 170-180 ms, kappa is high early

006 Ip to 1.2 MA by 700 ms, divert at 200 ms, return to more typical plasma programming, improving density, disrupt at 770 ms

007 reduce Ip to 1.0 MA by 500 ms to get discharge setup, produced full discharge thru rampdown, very good Ip(t), divert at 200 ms, kappa up to 1.65

008 like 007 but make shape closer to ITER specs, higher kappa to 1.7, upper triangularity higher, divert time at 200 ms, disrupt at 1.42 s

010 full discharge thru rampdown, divert time at 160 ms, H-mode at end of flattop

011 good reproduction of 010, full discharge thru rampdown

012 go to 1.2 MA at 700 ms, full discharge thru rampdown, positioning x-pt in vessel early at 100 ms, though plasma not connecting until 120-160 ms. lots of H-modes in flattop, li drops with H-modes, smooth kappa rise in ramp

013 1.2 MA by 700 ms, very early divert at 100 ms, short kiss of inner wall at 150 ms, li little lower in this early phase, H-modes in flattop with disrupt at beginning of rampdown

015 1.2 MA at 670 ms, otherwise similar to 013

017 raise Ip to 1.3 MA, good rampup, divert at 100 ms, plasma is vertically waffling after this and then lock to lower x-pt at 140 ms, disrupt after 900 ms

018 similar to 017, ran out to 1.5 s, beginning of rampdown

022 Ip to 1.3 MA at 670 ms, similar divert timing to 018, disrupt at 1.05 s

024, 025 Ip to 1.3 MA at 670 ms, pushing early divert at 100 ms with larger bore plasmas very early, helping somewhat with bouncing, disrupts in early rampdown, H-modes in end of flattop extending into rampdown

027, 028 MUCH better early time plasma shape leading to diverted plasma with larger bore, divert time 120-140 ms, 028 full discharge thru rampdown

029 1.3 MA at 670 ms, ICRF 1 MW on at 200 ms, divert 100-120 ms, good plasma shapes early, disrupt after 1.2 s

030 same as 029, ICRF 1 MW (actually 1.2 MW) at 150 ms, making Te higher as it should

033 Ip 1.3 MA at 670 ms, ICRF 1 MW on at 150 ms, looks like H-mode start there from density rise, magnetics getting messed up, but divert time appears to be 80-100 ms, disrupt at 1.35 s

Overall, VERY productive day. Early diverting was obtained for ITER-like discharges going up to 1.3 MA, with divert time ranging from 80-120 ms, even better than standard AT scenarios. This startup will be incorporated into AT scenarios. Tremendous effort by Hutchinson to work on this early phase and on Ip rampup. Smooth Ip rampup to 1.3 MA with crowbars at 40 ms. ICRF injected early just after divert time, discharge scenario was preserved, with last discharge showing early H-mode onset at 150-200 ms. Ohmic H-modes were obtained in the flattop, will some spilling into the rampdown. We had a lot of "things" entering the plasma and causing very high radiated power with disruption, the cause is not clear. Thanks to Wolfe for plasma control twiddles and disruption investigations.





Physics Operator Summaries
Entered: Sep 3 2009 05:26:30:990PM
Author: Ian Hutchinson
Controlled early diversion current ramps were obtained as per the MP576.

The difficulty with this configuration and objective is that the
segment switch is at a time (.08s) in the middle of where the action
is. So really you need both segments adjusted to get what you want.
There is a significant effect at segment switch from the rcur offset
change from 1000 (or on early shots 2000) to zero. Moreover the
plasma is not fully under feedback by the times we care about, so
there is a good deal of voltage preprogramming to undertake.

The run went tolerably well from the viewpoint of the discharge
development. Diversions at 0.1s and earlier were obtained, and
controlled. We were able to get to 1.3MA (q=3.1) by .65s and could
probably get there earlier with more development time. Indeed, we even
used ICRF in the startup as per the MP and got hot plasmas. OH1
crossovers were noticable but probably not dominant.

It appeared that locked modes were occuring at the elevated
current. We doubled the A-Coil current and they went away.

Ohmic H-modes were easily obtained at >1MA. They made rampdowns more
difficult. Elongations ~1.75 were routinely obtained during flat top.

Numerous magnetics errors were reported, some of which were clearly
serious for control. Some log entries by Wolfe describe shots to be
wary of. This may mean that with working magnetics one gets different
results from reloading shots from this day!

Numerous disruptions were obtained, these were caused mostly by
injections and some by control problems.

Future development of this scenario will require starting from both
segment 1 and segment 2 of shots 32 or 33, and then drawing changes. I
recommend against trying to patch segment 2s from other run days on to
this seg 1.


Scorecard
---------

  Shot,Duration(s),Ipmax(MA),Result  Shot,Duration(s),Ipmax,Result
  |   01   0.103   0.395   Plasma  |   02   0.129   0.484   Plasma  |
  |   03   0.710   1.297   Plasma  |   04   0.000   0.028   Fizzle  |
  |   05   0.704   1.199   Plasma  |   06   0.769   1.293   Plasma  |
  |   07   1.998   1.000   Plasma  |   08   1.447   1.004   Plasma  |
  |   09   0.249   0.046   Fizzle  |   10   1.983   1.000   Plasma  |
  |   11   1.974   1.000   Plasma  |   12   1.974   1.200   Plasma  |
  |   13   1.515   1.199   Plasma  |   14   0.277   0.053   Fizzle  |
  |   15   1.959   1.191   Plasma  |   16   0.286   0.433   Plasma  |
  |   17   0.934   1.354   Plasma  |   18   1.502   1.291   Plasma  |
  |   19   0.279   0.284   Plasma  |   20   0.000   0.002   Dud     |
  |   21   0.455   0.987   Plasma  |   22   1.066   1.363   Plasma  |
  |   23   0.238   0.045   Dud     |   24   1.635   1.290   Plasma  |
  |   25   1.630   1.290   Plasma  |   26   0.261   0.057   Fizzle  |
  |   27   1.533   1.292   Plasma  |   28   1.982   1.289   Plasma  |
  |   29   1.184   1.302   Plasma  |   30   1.099   1.302   Plasma  |
  |   31   0.250   0.046   Fizzle  |   32   0.744   1.394   Plasma  |
  |   33   1.373   1.299   Plasma 
Date 1090903:  33 shots.  26 plasmas.   5 fizzles.   2 duds.   0 System Error.
        (Plasma = Ip gt 60.0 kA   Dud = H_alpha lt  0.40 V)
Total plasma duration: 32.24 s (exceeding  -39 kA)


Session Leader Comments
Sep 3 2009 09:49:11:363AM1090903003Chuck KesselWOW
Ip ramp good
kappa is low, so q95 too low
divert time very early, about 70 ms, then bounces at 400 ms
HOwEVER, there is mixing of discharge programming from various places that needs to be sorted out
Sep 3 2009 11:15:30:927AM1090903007Chuck Kesselfull diacharge thru rampdown
Ip to 1 MA, avoid disruptions
rampup Ip(t) is very good, progressively decreasing dIp/dt
AT divert clearly getting established, trying to avoid the bounce later

Sep 3 2009 11:24:13:430AM1090903008Chuck KesselIp = 1 MA
higher triangularity
stayed in L-mode, li got high in flattop
disruption at 1.45 s


Sep 3 2009 11:55:50:270AM1090903010Chuck KesselIp = 1 MA
full discharge
left gap > 0 at 150 ms, divert time appears the same
kappa up to 1.7, targeting 1.8
H-mode in end of flattop
triangularity not as high as last year, but may be OK



Sep 3 2009 11:59:28:163AM1090903011Chuck Kesselgood reproduction of 010
smoother outer gap



Sep 3 2009 12:09:42:760PM1090903012Chuck KesselIp = 1.2 MA, full discharge,
left gap > 0 and divert about 180-200 ms
smoother kappa ramp to 1.7
H-modes in flattop, good for lower li as we raise Ip

Sep 3 2009 12:26:30:063PM1090903013Chuck KesselIp = 1.2 MA, disrupt at start of rampdown
left gap > 0 and divert about 100 ms, super!
it bounces off inboard at 150 ms
H-modes in flattop
L-mode at beginning of rampdown, kappa = 1.7, li higher

Sep 3 2009 01:03:48:000PM1090903015Chuck KesselIp = 1.2 MA
full discharge
very early divert at 100 ms again, some bouncing
competition between plasma growth to full bore and attaching to x-pt
2 H-modes in flattop

Sep 3 2009 01:53:00:503PM1090903018Chuck KesselIp = 1.3 MA at 670 ms, Ip ramp nice
disrupt at rampdown
vertical instability? other stuff too


Physics Operator Comments
Sep 3 2009 08:59:10:047AMIan HutchinsonMany physop adjustments carefully documented were lost when firefox crashed.
Broadly I started from 1090710015 and changed a load of things.

Sep 3 2009 09:24:00:040AM1090903001Ian HutchinsonDisrupts at .1 sec because of loss of zcur control, starting about .08s.

Back off clearin demand at .1s.
No that's not the reason. The reason is that the zcur controller on chopper
did not turn on till 0.09s. 10ms after the seg switch.

Fix chopper controller. Clearin to -.01s.
Adjust gain switches on fast zcur to accommodate early seg switch.
Sep 3 2009 09:34:44:500AM1090903002Ian HutchinsonDisrupts at 0.12s. Loss of z-control.

EFC floors at .1s and stays that way till the disruption.
Slow zcur controller derivative and proportional are wrong before .1s.
Set them to the same as afterwards.

Set clearin to -.015 at .1s
Sep 3 2009 09:55:05:897AM1090903003Ian HutchinsonPlasma. Disrupts at 0.7sec at 1.3MA.

Rcur gain programming is incorrect in segment 2.
Its proportional gain is zero prior to 0.9s.
Set to 6.

All of this is irrelevant. Somehow segment 2 is incorrect and a strange
mixture of yesterdays seg 2 and what I want. Stop this.

Load seg 2 from 1090710015.
Adjust Ip
Set fast zcur controller to 0s.
Load.
Set TF in seg 2 to seg 1 values.
Load.
Sep 3 2009 10:05:43:777AM1090903004Ian HutchinsonFizzle.

Gas puff to 20ms from 25ms.
Sep 3 2009 10:32:04:740AM1090903005Ian HutchinsonDisrupts at 0.7s.Apparent vertical instability. Locked mode perhaps at .65s.


Lower clearin to .01 from .012.
Ramp density to .7e20
Sep 3 2009 10:50:03:900AM1090903006Ian HutchinsonPlasma disrupts at .76s.This disruption not caused by zcur control loss.
Strange apparent instability on gas puff. F13 was in error.

Clearin ramp start earlier in seg 2.
Limit Ip to 1MA till we figure out the other problems.
Zap F13.
Add derivative gain of 3 to nl04.
Sep 3 2009 11:05:25:753AM1090903007Ian HutchinsonPlasma to rampdown.

RXU and ZXU changed to give more ITER-like shape.
zcur ramps to 0.
Ramp clearin faster.
Load
Sep 3 2009 11:20:49:193AM1090903008Ian HutchinsonDisrupts at 1.45s.VDE.

Fix TF rampdown
Fix nl04
Start Ip ramp at 1.4s
Lower clearin to .008 at 1s.
EF1V to -50V at .1s.
Load.
Sep 3 2009 11:32:41:607AM1090903009Ian HutchinsonFizzle.
Sep 3 2009 11:48:12:847AM1090903010Ian HutchinsonPlasma to rampdown.

VEF1 to 50V at .08s from 100V.
Clearin to +0,01 at .075s.
Sep 3 2009 11:56:29:100AM1090903011Ian HutchinsonPlasma to rampdown.

Ip flattop to 1.2MA
VEF1 to 0V at .08s.
zxl proportional to 4 at .1s (from 2.5)
nl04 to .8e20 at 1s.
Sep 3 2009 12:17:58:107PM1090903012Ian HutchinsonPlasma to rampdown.

Get rid of the ICEF1 proportional point at about .05s. Not helpful.
Ip to 1MA at 0.46s.
Sep 3 2009 12:28:26:737PM1090903013Ian HutchinsonPlasma disrupts at 1.5s.

Add clearin point at +.015 at .1s
Lower clearin 1mm to .007 after 1.s
Sep 3 2009 12:45:11:570PM1090903014Ian HutchinsonFizzle.

ICEF4 to 2500A from 1000A. This should move EF3 away from saturation.
ICEF4 to -1310 from -1300A in startup.
Ip programming earlier 1.2MA at .65s
nl04 to .9e20 in flat top.
VEF1 to zero at about .06s.
Sep 3 2009 12:57:32:123PM1090903015Ian HutchinsonPlasma to rampdown. Some early zcur issues.

EV1V to -10V at .05s.
Sep 3 2009 01:13:54:190PM1090903016Ian HutchinsonEarly disruption because of vertical loss of control.

Set Ip to 1.3MA. at 0.65s. 1MA at .42s.
Move the .1s clearin point back to .01.
Adjust zcur programming to go down slower. Lower slow zcur proportional to 1.
Sep 3 2009 01:25:57:963PM1090903017Ian HutchinsonPlasma 1.3MA. Disrupts at .93s. Locked mode at .86s.

Increase EF3lower coeff of b21proj from -1.20880e-08 to -2.40e-08.
Should give more A-coil current.
Slow zcur proportional to .8 from 1 in early seg 1.
Sep 3 2009 01:39:56:373PM1090903018Ian HutchinsonDisrupts at 1.5s. Locked mode seems gone.

raise nl04 to 1e20
Install extra fast zcur gain points at .06s in seg 2 with higher D and P, though still
not all the way up to the full level used for the main shot.
Sep 3 2009 01:57:59:210PM1090903019Ian HutchinsonDisrupts at .08s. Something bad happens at .04s. Not my fault I think.

Make clearin gain 5 at seg switch and only up to 10 later. Try to avoid
the big OH2 thrash.
Sep 3 2009 01:58:26:723PM1090903020Ian HutchinsonGot 2ms granularity error. This is a no power shot.
Sep 3 2009 02:23:30:470PM1090903021Ian HutchinsonDisrupts at .44 owing to big injection at .433s

Rcur to .65 from .64 at .04s
Tweak clearin gain. Tweak zxl early.
Sep 3 2009 02:36:26:510PM1090903022Ian HutchinsonDisrupts at 1.06s.

Make OH2V 0 not 10 at .07s.
Sep 3 2009 02:55:45:307PM1090903022Ian HutchinsonShot 23. No EF3 or plasma.

Increase seg 1 rcur gain at .05s.
Rcur to .658 at .05s.
Small clearin tweak.
Sep 3 2009 03:06:30:437PM1090903024Ian HutchinsonDisrupts at 1.63s.

Clearin to .012 at .1s
Rcur to .66 at .05s.
Sep 3 2009 03:19:10:630PM1090903025Ian HutchinsonDisrupts at 1.617.

Rcur to .663 at .05s.
Clearin to .013
Start Ip rampdown at 1.4s.
Sep 3 2009 03:36:04:150PM1090903026Ian HutchinsonFizzle.


OH2Vs to +30V from -10V at .05s.
Rcur offset to 1000 from 2000.
Sep 3 2009 03:47:00:110PM1090903027Ian HutchinsonDisrupts at 1MA, slightly earlier. Might be z-control problem.

Tweaks at the rampdown.
Clearin up 1mm round .1s
Sep 3 2009 04:00:33:300PM1090903028Ian HutchinsonPlasma to rampdown.

EF1V to -50 from -10V at .05s.
Clearin to .014 at .1s
Sep 3 2009 04:14:37:853PM1090903029Ian HutchinsonDisrupts at 1.16s.Looks like an injection.

Clearin to .014 at .09s.
EF1Vs to -80V at .05s.
Rcur to .662 at .08s.
Sep 3 2009 04:26:37:263PM1090903030Ian HutchinsonDisrupts at 1.1s.


Raise fill puff to 27ms.
EF1V to -100 at .05-.1s
clearin to .015 at .09s.
Rcur to .667 at .05s.
Sep 3 2009 04:39:41:347PM1090903031Ian HutchinsonFizzle.

Fill puff to 24ms.
ZXL gain to 5 from 4 at .1s
Sep 3 2009 04:53:28:273PM1090903032Ian HutchinsonDisrupts at .73s.

Move out rxl at .4s to zero try to prevent slot divertor effect.
EF1Vs to -50V in seg 2 early.
Sep 3 2009 05:26:08:350PM1090903033Ian HutchinsonDisrupts at 1.35s.

Magnetics errors on this shot.

Engineering Operator Comments
ShotTimeTypeStatusComment
109:02:13:940AMPlasmaOk
209:22:10:180AMPlasmaOk
309:35:03:140AMPlasmaOk
409:55:09:130AMPlasmaOk
510:15:12:700AMPlasmaOk
610:29:43:957AMPlasmaOk
710:48:33:997AMPlasmaOk
811:03:27:847AMPlasmaOk
911:17:44:240AMPlasmaOk
1011:30:50:650AMPlasmaOk
1111:44:10:237AMPlasmaOk
1211:57:30:693AMPlasmaOk
1312:13:27:823PMPlasmaOk
1412:27:11:300PMPlasmaOk
1512:43:12:930PMPlasmaOk
1612:57:01:170PMPlasmaOk
1701:09:58:910PMPlasmaOk
1801:23:20:197PMPlasmaOk
1901:39:58:357PMPlasmaOk
2001:52:46:753PMPlasmaBadNo power shot
2102:06:20:010PMPlasmaOk
2202:20:07:000PMPlasmaOk
2302:33:57:997PMPlasmaBadEF 3 fault in check
2402:51:31:180PMPlasmaOk
2503:06:05:157PMPlasmaOk
2603:19:05:333PMPlasmaOk
2703:31:55:197PMPlasmaOk
2803:45:06:950PMPlasmaOk
2903:58:25:330PMPlasmaOk
3004:11:19:993PMPlasmaOk
3104:24:26:623PMPlasmaOk
3204:37:28:033PMPlasmaOk
3304:51:24:210PMPlasmaOk

System Availability
Sep 3 2009 09:01:45:767AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoCyopump hardware is not yet reinstalled in the cell.Jul 14 2009 09:21PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesThe lower freq. 16 channels are ready. Still need calibration and signal level adjustmentsJul 14 2009 12:15PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable for conditioning and testingJul 21 2009 04:50PM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesOperational --- Uncalibrated and needs to be positioned at portJun 25 2009 05:08PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoSystem under repair.Aug 31 2009 05:43PM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1090824xxx, all channels are operational.Aug 25 2009 09:31AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Initial (NOT final) Te calibration applied. ***No ne calibration yet*** Aug 05 2009 08:44AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, Te calibration is thought to be good. Density is ***uncalibrated***Aug 11 2009 02:31PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke