Alcator C-Mod Run 1091021 Information

Back to runs

Miniproposals
Miniproposal:527
Date Filed: 1/24/2008
Title:Optimization of H-mode pedestal and performance with magnetic balance control and active pumping
First Author:Jerry Hughes
Session Leader:Jerry Hughes (shots 1-36)

Operators
Session leader(s):Jerry Hughes
Physics operator(s):Robert Granetz
Engineering operator(s):Bill Parkin,Gary Dekow,Ed Fitzgerald

Engineering Operator Run Comment
automatically entered by signon - please replace with real comment

Session Leader Plans
Entered: Oct 20 2009 05:14:24:640AM
Author: Jerry Hughes

Boronization overnight
5.4T run in D2.
1psi Ar enabled, puff at 0.3s, 50ms in length

ICRF: up to 3MW from D+E; keep J in reserve in case needed
Essential diagnostics: Thomson, TCI, ECE, standard bolometry and Lyman
alpha, reflectometry, fast magnetics.
Highly desired diagnostics: passive edge CXRS, Hirex rotation,
divertor probes
Cryopump NOT requested.


A. Discharge development is needed to recover SSEP scan, while
avoiding the trouble row of tiles, and also to promote up-down
symmetry of the equilibrium.


1. Attempt to reproduce the equilibrium of shot 1080125013 (5.4T,
800kA, target nl04=7e19, SSEP jogging twice during flattop). ICRF
will tune D+E at low power (~1--2MW) during 1.3--1.5s.

2. Increase RXL as needed to raise strike point to the 4th tile. 3MW
from D+E from 0.6s to 1.5s. This is an attempt to reproduce density
and temperature pedestal modification observed in 2007-08.

2a.If necessary, adjust ZCUR program to achieve SSEP steps of -4mm,
~0mm, and +4mm.

3. Increase RXU so that triangularity is matched in the LSN/USN
cases. 3MW from D+E from 0.6s to 1.5s.

B. Keep discharge developed for A3. Keep ICRF program. Modify ZCUR to
obtain steady H-mode periods of >200ms (3 per shot), changing SSEP
on each shot to obtain a set of measurements at -6mm, -4mm, -2mm,
+2mm, +4mm, +6mm.

C. Raise Ip to 1MA, nl04 demand to 1e20. Keep ICRF program. Modify ZCUR to
obtain steady H-mode periods of >200ms (3 per shot), changing SSEP
on each shot to obtain a set of measurements at -6mm, -4mm, -2mm,
+2mm, +4mm, +6mm. Try tweaking nl04 if steady H-modes are not
accessible.

D. If steady H-modes were achieved in C, go to 1.2MA and increase nl04
demand to 1.2e20. Modify ZCUR to obtain steady H-mode periods of
>200ms (3 per shot), changing SSEP on each shot to obtain a set of
measurements at -6mm, -4mm, -2mm, +2mm, +4mm, +6mm. Try tweaking
nl04 if steady H-modes are not accessible.

E. If there's enough time, repeat the method in B, C, and D at
Ip=600kA, nl04=6e19.

F. When the clock strikes 4:00, do a series of ZCUR scans at each Ip
that's been successfully tried so far, with ICRF OFF. Insofar as
possible, use divertor probes and plenum pressures to "calibrate"
SSEP.

Physics Operators Plans
Entered: Oct 20 2009 07:35:01:700PM
Author: Robert Granetz

Engineering setup for Wednesday 2009/10/21

MP527 - H-mode SSEP scans

Session leaders: J. Hughes
Physics operator: R. Granetz

Overnight: usual ECDC in D2 and 60 C bake

Run will start at 09:00 and end at 17:00.

Power systems as on 1080125013, except set OH invert times to 2.3 s, and fizzle off time to 2.1 s. (5.4T, 0.8 MA, 3MW ICRF, ZCUR stepping up
twice during the H-mode to produce steps in SSEP.

A-coil configuration: +Dtop -Dbot -Jtop +Jbot; Enabled (standard
configuration)

Gas Setup:
   fill B-Top            with  6 psi D2  Hybrid enabled  (PG4)
   fill B-side lower     with  1 psi Ar  Hybrid DISABLED (PG1)
  leave B-side upper     as is           Hybrid DISABLED (PG2) 
   fill B-main (C-side)  with 40 psi D2  Hybrid enabled  (PG3)
  leave NINJA            as is           DISABLED

Enable the following gate valves and shutters, assuming no vacuum problems:
  ECE, VUV, Z-bolo
 
Torvac setup: keep gate valves open during PULSE

Specific diagnostics: standard set plus fast magnetics, reflectometry.
Highly desired: HIREX, divertor probes, passive edge CXRS

------------------------------------------------------------------------------
Boronization: yes, overnight
ICRF Setup: All three transmitters in run-on by 08:30
LH Setup: no
DNB: no
Cryopump: no
------------------------------------------------------------------------------

Run plan: SSEP jogs; Load from 1080125013; recall all magnetics predictors
          in seg 2 to bring them up-to-date.  Zero segs 3 & 4.  Import seg
          1 from Wednesday (1091014019).  (I did all this several days before
          today's run and saved it in /home/granetz/pcs_scratch as shot
          1091015000.)

          Additional info from session leader:

         "This shot needs to be tweaked however. The outer strike should be
          moved out of the tungsten trouble area. Simultaneously, I'd like
          to match the R-positions of the upper and lower x-point. This is
          because of an outstanding concern that, in these SSEP scans,
          triangularity changed when we transitioned from LSN to USN.

          For the first shot though, let's see if we can just repeat
          1080125013. I'll have RF tune on the latter part of the shot"

          See the session leader's run plan in the logbook for detailed
          information.


Session Leader Summaries
Entered: Oct 21 2009 05:30:21:800PM
Author: Jerry Hughes
This experiment was intended to improve the data set of pedestals and
confinement as a function of magnetic balance in near DN
configurations. Preliminary conclusion: At 1MA, with ICRF at the 2.5MW
power level, a confinement degradation is observed as the H-mode is
shifted from slightly LSN to DN, and then to USN. The density pumpout
at USN previously observed in 800kA discharge was not reproduced.

Because of the low success rate that resulted from inconsistent
startup, it was determined that we should ECDC overnight and resume
the experiment tomorrow.

Notes:

The overnight boronization left us with a lot of gas in the walls at
the beginning of the morning, which led to high neutral pressure and
hampered attempts to bring up ICRF. Initially we thought that this was
because the He ECDC was omitted following the boronization, but upon
further inspection it seems to have been done.

Whatever the reason I took advantage of the high density to 1.)
develop an optimal up-down symmetric shape for this experiment (part A
of run plan) and to 2.) "calibrate" EFIT's SSEP by performing Ohmic
SSEP scans and looking at the divertor pressures and probe data (part
F of run plan).

The middle part of the run consisted of trying to get the density
control back and recover ICRF. It was a struggle with disruptions,
injections, fizzles and duds from shot 11 onward, but by shot 20,
there were promising signs. We started to obtain EDA H-modes at 1MA
with SSEP ranging from -6mm to +3mm. By shot 32 I had become
disenchanted with the "jogs" in ZCUR and decided to try flat
programming, with some slow ramps mixed in. Combined with the improved
startup reliability engineered by Granetz from shot 31 on, the final
hour or so produced the most useful data.

Detailed shot list:


001: Fizzle
002: Fizzle
003: Approximately reproduced 1080125013 equilibrium. Ohmic, with SSEP
values of -5mm, 0mm and +4mm. 800kA.
004: Fizzle
005: Ohmic, with SSEP values of -5mm, 0mm and +4mm. 800kA.
006: Ohmic, SSEP of -6mm, -1mm, +4mm. 800kA.
007: Ohmic with SSEPs of -3mm, +2mm and +6mm. 800kA.
008: Ohmic, with SSEPs of -4mm, +1mm, and +6mm. 800kA.
009: Ohmic, with SSEPs of -4mm, +1mm, and +6mm. 1MA.
010: Ohmic, with SSEPs of -4mm, +1mm, and +5mm. 1.2MA. Disrupted.
011: 1.5MW ICRF L-mode, 1.2MA, SSEP of -4mm. Disrupted.
012: Fizzle
013: Fizzle
014: ELM-free H-modes at near DN.
015: 2 ELM free H-modes at SSEP of -4mm.
016: Very early injection and disruption before flattop.
017: Fizzle
018: Dud
019: Early disruption
020: 1.0MA H-mode, EDA-like , triggered with SSEP of -1mm. 1.5MW ICRF
021: 1.0MA H-mode, EDA, 2.5MW ICRF. Good data at SSEP of +1mm
022: Fizzle
023: Dud
024: 1.0MA H-mode, EDA, 2.5MW ICRF. Some data at SSEP of -6mm, -2mm.
025: Fizzle
026: 1.0MA EDA H-mode, 1.3MW of RF with Prad rising.
027: Dud
028: 1MA EDA H-modes, 2.5MW, interrupted by a planned "non-perturbative"
impurity injection.
029: Dud
030: Dud
031: 1MA EDA H-mode at SSEP of ~-4mm with 2.4MW RF from .7 to 1.5s.
032: 1MA steady EDA, H98=.73. SSEP ramps from -5mm to -1mm late in shot.
033: 1MA, short H-mode with 1.3MW RF, formed near DN (SSEP ~-1mm)
034: 1MA, Steady EDA with 2.4MW RF. SSEP ramps from -5mm to +3mm from
1.2 to 1.5s.
035: 1MA steady EDA with 2.4MW RF. SSEP ramps from -5mm to -9mm from
1.2 to 1.5s.
036: 1MA EDA steady from 0.95 to 1.03, 2.4MW RF

Ohmic shots to calibrate SSEP:
003: 800kA
005: 800kA
006: 800kA
007: 800kA
008: 800kA
009: 1MA
010: 1.2MA

Physics Operator Summaries
Entered: Oct 21 2009 05:04:50:100PM
Author: Robert Granetz

Run summary for Wednesday 2009/10/21

MP527 - H-mode SSEP scans

Session leaders: J. Hughes
Physics operator: R. Granetz

Power supplies and computers all ran well today, but I had a lot of fizzles
and duds.  The startup was not robust.  We boronized overnight before the
run, and there were some 1.2 and 1.0 MA disruptions, which might explain
some of the startup troubles, but certainly not all of them.  I made small
gas tweaks all day long, without notable improvement in startup
robustness.  After shot 30 I tweaked Bz0, and then got 5 good shots in a
row (right to the end of the run), so maybe that change was significant.

The run plan mostly involved changing SSEP during the discharges, which was
accomplished by jogging ZCUR.  This was quite successful.  We also
different a few different plasma currents, and a couple of different
densities.

This MP will continue tomorrow, and a good starting shot is the final one
from today, 1091021036.

Scorecard: 23 plasmas
            5 duds
            8 fizzles
            0 power supply tests
            0 no-power MDS shot cycles
           --------------
   Total:  36 shot cycles

Session Leader Comments
Oct 21 2009 10:23:56:393AMJerry HughesThere was a bit of a goof in the setup for this run. Post-boronization
ECDC was done in D2 rather than He, due to Bob having straight-up
copied the PO plan from last time. So, too much gas to start the day.

Never mind. They actually did the He ECDC for 2 hours.
Oct 21 2009 09:05:45:630AM1091021001Jerry HughesRF story as of now:
J-port is unavailable (went down on final shot yesterday).
D-port has so far not taken HV, but may be available given another ~15 minutes.
E-port is available, and can tune up into the end of the flattop, per the run
plan.

Attempt: Reproduce 1080125013.
Result: Fizzle.

Oct 21 2009 09:17:50:480AM1091021002Jerry HughesAccording to Yijun, both D+E are ready now.

Attempt: Reproduce 1080125013.

Result: Fizzle.
Oct 21 2009 09:46:47:897AM1091021003Jerry HughesAttempt: Reproduce 1080125013 equilibrium.

Result: Ohmic, with SSEP values of -5mm, 0mm and +4mm.
SSEP scan basically overlays the target shot. Pressure rise in upper
chamber and UDIV probe flux roughly consistent with the EFIT shift to DN and
USN.
Neutral pressure too high for D and E.

Oct 21 2009 09:47:47:473AM1091021004Jerry HughesAttempt: Rerun shot 3 with RXL shifted out to avoid W tile issue.

Result: Fizzle
Oct 21 2009 10:09:54:140AM1091021005Jerry HughesAttempt: Rerun shot 3 with RXL shifted out to avoid W tile issue.

Result: Outer strike is better.
D and E continue to be unhappy.
Oct 21 2009 10:20:55:253AM1091021006Jerry HughesAttempt: Modify shot 5 by increasing RXU.

Result: Ohmic, SSEP of -6mm, -1mm, +4mm.
Density still high. Earl is advocating a 1MA disruption. We'll get there soon,
I tell him.

Oct 21 2009 10:35:32:650AM1091021007Jerry HughesAttempt: Lower ZXU from shot 6.

Result: Ohmic with SSEPs of -3mm, +2mm and +6mm.
A much better up-down match. RXL and RXU nearly match. Need to raise ZXU a bit.
D and E showing signs of life.
Oct 21 2009 10:44:28:933AM1091021008Jerry HughesAttempt: Shot 7 with modified ZXU.

Result: The USN equilibrium reflects closely onto the LSN equilibrium, so
that kappa and deltas are reasonably matched in the 2 cases.
Ohmic, with SSEPs of -4mm, +1mm, and +6mm.
D and E are getting some energy in. Pressures are coming down.

Oct 21 2009 10:54:31:530AM1091021009Jerry HughesAttempt: raise Ip to 1MA, keeping nl04 request unchanged.

Result: 1MA Ohmic, SSEP values ranging from -4mm to +6mm.
Bursts of RF late.

Oct 21 2009 11:13:23:947AM1091021010Jerry HughesAttempt: Ip to 1.2MA

Result: Ohmic, mostly, with similar shaping to the previous two shots.
SSEP ranges from -4mm to +5mm.
Outer strike in LSN may be a little too low for comfort when RF is applied.
Got some power from D.
Should add that this disrupted early due to a power supply limit being reached.

Oct 21 2009 11:30:43:500AM1091021011Jerry HughesWe've more or less completed A and F of the run plan at this point.

Attempt: Repeat shot 10 with a faster ZCUR jog at 0.75s (100ms instead of 150ms.)
Also, allow RF to start at 0.6s.

Result:
1.5MW ICRF L-mode, 1.2MA, SSEP of -4mm.
Full current disruption, right as we try to sweep through DN, and kappa
is at its highest. We will back off the current to try to avoid this kind of
disruption.
E performs well until the instability kicks in at 0.87s.
2pi diode and foil traces do not look well at all.
Oct 21 2009 11:42:06:910AM1091021012Jerry HughesAttempt: Reduce to 1MA to avoid instability.

Result: Fizzle.
Oct 21 2009 11:51:31:680AM1091021013Jerry HughesAttempt: Retry 1MA

Result: Fizzle. Needs some gas pulse voodoo.
Oct 21 2009 12:18:25:503PM1091021014Jerry HughesAttempt: Retry 1MA

Results: Some ELM-free H-modes very close to DN. RF not steady yet.
There is what looks like bad pick-up on the bolos, particularly the 2pi foil.
Is that correlated with D-port? Judging from shot 11, it looks like its actually
correlated wit E-port.
Strike point may be encroaching on the W row of tiles.
Oct 21 2009 12:28:02:183PM1091021015Jerry HughesAttempt: Repeat shot 14 with the ZCUR jogs delayed. Now they are from 0.85 to
0.95 and from 1.15 to 1.25s.

Result: SSEP trace looks pretty good.
2 ELM free H-modes at SSEP of -4mm. RF still not steady.
I am concerned that the outer strike is precariously low. Having Bob
shift RXL and RXU out for next shot.


Oct 21 2009 12:34:44:560PM1091021016Jerry Hughes
Attempt: Retry 1MA with improved x-point/strike.

Result: Lets just forget this shot ever happened.
Oct 21 2009 12:53:22:677PM1091021017Jerry HughesAttempt: Retry 1MA shot with improved X-point/strikes, and nl04 demand at 1e20.
This should make it a proper attempt at part C of run plan. (Note that I have
skipped part B for now.)

Result: Fizzle.
Oct 21 2009 01:07:18:027PM1091021018Jerry Hughes
Attempt: Retry 1MA shot with improved X-point/strikes, and nl04 demand at 1e20.
The photograph of Flounder from "Animal House" is in place at the SL workstation.

Result: Flounder didn't help. Shot was a dud.


Oct 21 2009 01:27:35:253PM1091021019Jerry Hughes
Attempt: Retry 1MA shot with improved X-point/strikes, and nl04 demand at 1e20.

Result: Big injection kills shot at 0.35--0.37s.
Oct 21 2009 01:40:59:943PM1091021020Jerry Hughes
Attempt: Retry 1MA shot with improved X-point/strikes, and nl04 demand at 1e20.

Result: A full length plasma!
An H-mode, EDA-like , triggered with SSEP of -1mm. Only had E-port, however.
This shows promise, but we need full power.


Oct 21 2009 02:23:17:400PM1091021021Jerry HughesAttempt: Retry 20 with improved ICRF.

Result: Big improvement. Got almost 2.5MW ICRF with D and E, with a few faults.
EDA H-mode, with periods at SSEP of -4mm, +1mm, +5mm.
Pedestal degradation seems pretty clear as we shift toward USN. Te,ped drops.
If ne,ped is changing systematically with SSEP, it's subtle.
t=0.95--1.15s: ne,ped is 3--3.5e20. Te,ped is decreasing from 300eV to 250eV.
H98 drops from 0.7 to 0.6, having peaked at 0.8 at 0.8s.


Oct 21 2009 02:02:30:813PM1091021022Jerry Hughes
Attempt: Retry 21, with ZCUR shifted by -3mm. Also extend RF pulse out to 1.5s.

Result: Fizzle.
Oct 21 2009 02:15:30:817PM1091021023Jerry HughesAttempt: Retry 21, with ZCUR shifted by -3mm. Also extend RF pulse out to 1.5s.

Result: Fuddy dud.
Oct 21 2009 02:39:03:653PM1091021024Jerry HughesAttempt: Retry 21, with ZCUR shifted by -3mm. Also extend RF pulse out to 1.5s.

Result: EDA H-mode. More radiation than on 21. Little injections at 0.74s, 0.9s
seem to be to blame. We should try again and see if a cleaner plasma can be obtained.

Oct 21 2009 02:40:30:187PM1091021025Jerry HughesAttempt: Retry 24 and hope for lower Prad.

Result: Fizzle
Oct 21 2009 03:02:18:040PM1091021026Jerry Hughes
Attempt: Retry 24.

Result: H-mode, EDA. Prad evolving.
D-port gave out early. Even if it had stayed on, I think confinement would
have degraded with the SSEP jog upward.
For the next shot, I want to hold SSEP steady at its initial value.
Nate has permission to perform LBO at 1s.

Oct 21 2009 03:06:57:243PM1091021027Jerry Hughes
Attempt: 1MA, with flat SSEP at -5mm or so.

Result: Dud


Oct 21 2009 03:30:45:800PM1091021028Jerry HughesAttempt: 1MA, with flat SSEP at -5mm or so.

Result: Got the flat SSEP, good ICRF, EDA H-mode. Wrecked by LBO at 1s.
Now Nathan gets quelled for a while.
H-mode reforms at same density, but with higher Prad.
Oct 21 2009 03:34:32:300PM1091021029Jerry HughesAttempt: Retry 28 without the "non-perturbative" impurity injection.

Result: A dud. If I were Reinke I'd be swearing vociferously right now.


Oct 21 2009 03:46:22:930PM1091021030Jerry Hughes
Attempt: Retry 28 without the "non-perturbative" impurity injection.

Result: Dud
Oct 21 2009 04:08:29:860PM1091021031Jerry HughesAttempt: Again, retry the steady EDA at flat SSEP.

Result: A successful startup!
EDA H-mode at SSEP of ~-4mm with 2.4MW RF from .7 to 1.5s.
Ratcheting Prad at 0.86--0.9s kills the confinement. It doesn't take a lot of
excess Prad to knock down the Te pedestal at these levels of RF.




Oct 21 2009 04:29:40:133PM1091021032Jerry Hughes
Attempt: Repeat shot 31 with a ZCUR ramp up from 1.2 to 1.5s.

Result: 2 in a row!
Very steady EDA, H98=.73. SSEP ramps from -5mm to -1mm over 1.2--1.5s. No big
change in peddies or confinement until the burst of Prad at 1.43s.


Oct 21 2009 05:05:16:477PM1091021033Jerry HughesAttempt: Increased ramp rate on ZCUR to push through DN to USN by 1.5s

Result: Lost D-port early, so only had 1.3MW RF. No H-mode until 1.34s, as
the plasma approached DN. Veddy interesting. Is there a local minimum in Pth
as was seen on MAST, and to a lesser extent, AUG?
The resulting H-mode is rather tepid (H98~0.5).

Neutron alert as of this shot. ROTFL.
Oct 21 2009 04:47:34:203PM1091021034Jerry HughesAttempt: Retry 33 with full power.

Result: Another steady EDA. The SSEP ramp from 1.2 to 1.5s degrades the
confinement, though not the density pedestal. Te,ped droops, despite a concurrent
drop in Prad.


Oct 21 2009 05:00:25:880PM1091021035Jerry HughesAttempt: 1MA EDA with a SSEP ramp down.

Result: Good shot. Steady EDA at 2.4MW RF, no appreciable change in confinement
or pedestal during SSEP ramp (down to -9mm by 1.5s)
Oct 21 2009 05:08:42:947PM1091021036Jerry HughesAttempt: One more steady 1MA H-mode with reduced amplitude LBO at 1.2s.

Result: There is at least one injection there that is not planned.


Physics Operator Comments
Oct 21 2009 08:53:24:000AMRobert GranetzDPCS loaded from /home/granetz/pcs_scratch shot 1091015000 (same setup as for last Thursday's
aborted run)
Oct 21 2009 09:12:09:523AM1091021001Robert Granetz
Shot 01 -- Fizzle.  Very high pre-fill pressure even though the pre-fill pulse length is only 21 ms.

Next shot: reduce pre-fill pulse to 18 ms.

Oct 21 2009 09:22:40:170AM1091021002Robert Granetz
Shot 02 -- Fizzle.  Better than the preceding fizzle.  Pressure is still a bit high.  Steve Wolfe tells me
           that the F-side ratiomatic calibration is incorrect after it was repaired yesterday, so I'm flying
           a little blind on the pressure

Next shot: reduce pre-fill another 2 ms

Oct 21 2009 09:40:32:583AM1091021003Robert Granetz
Shot 03 -- Plasma, full length.  0.8 MA, 5.4 T, 0.9-1.0e20 m-2.  Spectroscopy traces have the wrong
           timebase (also on shot 01).  Equilibrium starts as SNL, then goes to DN, then to SNU, just
           as it's supposed to.  No RF power.

Next shot: move RXL out by 3 mm to ensure the strikepoint remains above the 3rd row of divertor tiles;
           also change C-coil "on" time to 0.2 s, instead of 0.3 s

Oct 21 2009 09:49:11:053AM1091021004Robert Granetz
Shot 04 -- Fizzle.  No spectroscopy data.  Pre-fill was higher than the previous shot.

Next shot: reduce pre-fill by 2 ms.  Also change DPCS_FIZZLE source_shot to 1090731017.

Oct 21 2009 10:07:13:733AM1091021005Robert Granetz
Shot 05 -- Plasma, full length.  0.8 MA, 5.4 T, 0.9e20 m-2.  SNL --> DN --> SNU.
           Divertor strikepoint looks good.  Still no RF power.

Next shot: move RXU out by 1.5 cm

Oct 21 2009 10:21:03:927AM1091021006Robert Granetz
Shot 06 -- Plasma, full length.  RXU looks good.

Next shot: move ZXU down by 1 cm

Oct 21 2009 10:33:39:180AM1091021007Robert Granetz
Shot 07 -- Plasma, full length.  ZXU moved alot.

Next shot: move ZXU upwards by 2 mm.

Oct 21 2009 10:41:55:620AM1091021008Robert Granetz
Shot 08 -- Plasma, full length.  0.8 MA.  D-port antenna is starting to come to life.

Next shot: increase Ip to 1.0 MA.

Oct 21 2009 10:53:35:500AM1091021009Robert Granetz
Shot 09 -- Plasma, full length.  1.0 MA, 5.4 T, 0.9-1.0e20 m-2.  About 1 MW from each of D and J.
           Shape is good, according to Jerry.

Next shot: increase Ip to 1.2 MA

Oct 21 2009 11:19:41:103AM1091021010Robert Granetz
Shot 10 -- Plasma, disrupted at t=1.45 s.  1.2 MA.  Density was climbing rapidly.

Next shot: tweak ZCUR programming; increase OH1 limit to -30 kA (from -27) and EF3 limit
           to 13 kA (from 12)

Oct 21 2009 11:26:37:390AM1091021011Robert Granetz
Shot 11 -- Plasma, disrupted at t=0.94 s.  1.2 MA.  Vertically unstable, even though N/Ncrit is not
           high.  1.5 MW from E.

Next shot: reduce Ip to 1.0 MA.

Oct 21 2009 11:35:41:750AM1091021012Robert Granetz
Shot 12 -- Fizzle.  Post-disruption recovery?  Pre-fill pressure was up.

Next shot: no DPCS changes

Oct 21 2009 11:51:00:757AM1091021013Robert Granetz
Shot 13 -- Fizzle, just barely.

Next shot: decrease pre-fill by 2 ms

Oct 21 2009 12:14:35:860PM1091021014Robert Granetz
Shot 14 -- Plasma, full length.  1.0 MA, 5.4 T.  1.4 MW from D, 1+ MW from E.  Looks like some short
           H-modes during the SNL and DN portions of the shot.

Next shot: tweaks to ZCUR programming (move the jogs 50 ms later)

Oct 21 2009 12:25:13:897PM1091021015Robert Granetz
Shot 15 -- Plasma, full length.  1.0 MA, 5.4 T, 0.8-0.9e20 m-2 (target).

Next shot: move RXL and RXU out by 3 mm to keep strikepoint off of W tiles, and to keep
           upper and lower shape parameters matched

Oct 21 2009 12:48:03:910PM1091021016Robert Granetz
Shot 16 -- Plasma.  Early disruption at t=0.50 s.  The plasma became very resistive due to an injection
           at t=0.14 s.  It was all downhill from there.  PF breaker pulled; lots of PF supplies crowbarred.

Next shot: increase nl_04 to 1.0e20 m-2

Oct 21 2009 12:55:55:240PM1091021017Robert Granetz
Shot 17 -- Fizzle, weak.

Next shot: reduce pre-fill 2 ms (to 10 ms)

Oct 21 2009 01:06:35:870PM1091021018Robert Granetz
Shot 18 -- Dud.  Pressure finally got too low.

Next shot: increase pre-fill by 3 ms (to 13 ms)

Oct 21 2009 01:24:02:953PM1091021019Robert Granetz
Shot 19 -- Plasma, disrupted early at t=0.38 s due to an injection.

Next shot: try again, no changes

Oct 21 2009 01:39:10:897PM1091021020Robert Granetz
Shot 20 -- Plasma, full length, but it almost died at t=0.13 s.  1.0 MA, 1.0e20 m-2, 1+ MW from E only.
           EDA H-mode.  Strikepoint is good.

Next shot: no DPCS changes; want more RF power

Oct 21 2009 01:57:29:700PM1091021021Robert Granetz
Shot 21 -- Plasma, full length.  1.0 MA, 1.0e20 m-2.  D and E each gave 1+ MW.  Nice EDA H-mode.

Next shot: modify ZCUR programming...move entire trace down by 3 mm

Oct 21 2009 02:02:28:843PM1091021022Robert Granetz
Shot 22 -- Fizzle.  Startup is not robust today.

Next shot: reduce pre-fill by 1 ms

Oct 21 2009 02:13:16:613PM1091021023Robert Granetz
Shot 23 -- Dud.

Next shot: okay, try raising the pre-fill this time.  Add 3 ms.

Oct 21 2009 02:33:05:667PM1091021024Robert Granetz
Shot 24 -- Plasma.  Disrupted at t=1.29 s.  Vertically unstable.  1.0 MA.  2+ MW (D+E)

Next shot: add 1 ms to pre-fill

Oct 21 2009 02:38:34:030PM1091021025Robert Granetz
Shot 25 -- Fizzle.

Next shot: reduce pre-fill by 2 ms

Oct 21 2009 03:03:46:303PM1091021026Robert Granetz
Shot 26 -- Plasma, full length.  1.0 MA.  1.3 MW from E-port.  Long EDA H-mode, followed by some short
           ones.

Next shot: get rid of ZCUR jogs so that plasma will stay SNL; also get rid of late
           CLEARIN FLUXIHH routine by loading CLEAR

Oct 21 2009 03:07:07:320PM1091021027Robert Granetz
Shot 27 -- Dud.  No EF3s

Next shot: repeat, no changes

Oct 21 2009 03:26:50:220PM1091021028Robert Granetz
Shot 28 -- Plasma, full length.  1.0 MA.  SNL for the entire flattop.  Prf=2.4 MW from D+E.
           Two long EDA H-modes.  Laser blowoff injection of CaF2 happened at t=1.0 s, which
           caused an increase in Prad, and a short transition back to L-mode, but no net
           density increase.

Next shot: repeat, but without LBO

Oct 21 2009 03:34:27:363PM1091021029Robert Granetz
Shot 29 -- Dud.  The previous shot had a nice startup, and I didn't change a thing.

Next shot: reduce pre-fill by 1 ms

Oct 21 2009 03:53:45:887PM1091021030Robert Granetz
Shot 30 -- Dud.  Everything looks just like shot 28, which was a good startup.  I'm baffled.

Next shot: add -15 A to IC_EF4U to reduce Bz0

Oct 21 2009 04:05:20:360PM1091021031Robert Granetz
Shot 31 -- Plasma, full length.  1.0 MA.  SNL for entire flattop.  One long EDA H-mode.
           Prf=2.4 MW (D+E).

Next shot: tweak ZCUR programming; I'll be satisfied with two plasmas in a row, at
           this point.

Oct 21 2009 04:18:09:317PM1091021032Robert Granetz
Shot 32 -- Plasma, full length.  Two in a row...my wish was granted.  One long, very steady
           EDA H-mode...REALLY steady.  The ZCUR ramp in the late flattop is there, but doesn't have
           much effect, apparently.  Prf=2.4 MW from D+E

Next shot: more ZCUR programming changes

Oct 21 2009 04:28:10:460PM1091021033Robert Granetz
Shot 33 -- Plasma, full length.  1.0 MA.  D-port didn't go.

Next shot: repeat to get power from both D & E

Oct 21 2009 04:47:11:360PM1091021034Robert Granetz
Shot 34 -- Plasma, full length.  1.0 MA.  Prf=2.4 MW from D+E.  One long EDA H-mode.  ZCUR ramped again,
           but it doesn't seem to be affecting things much.

Next shot: change ZCUR programming so that it moves downward by 10 mm after t=1.2 s.

Oct 21 2009 04:58:04:910PM1091021035Robert Granetz
Shot 35 -- Plasma, full length.  1.0 MA.  ZCUR ramped downwards by 10 mm after t=1.2 s.  Prf=2.4 MW (D+E).
           Long EDA H-mode.

Next shot: remove the ramp from ZCUR; fire the LBO with CaF2 at t=1.2 s; this will be the last shot today

Oct 21 2009 05:09:27:273PM1091021036Robert Granetz
Shot 36 -- Plasma, full length. 1.0 MA, 5.4 T, 1.0-1.1e20 m-2 (target).  I don't think the LBO worked.
           Prf=2.4 MW (D+E).

End of run

Engineering Operator Comments
ShotTimeTypeStatusComment
109:00:32:020AMPlasmaOk
209:14:08:650AMPlasmaOk
309:27:04:827AMPlasmaOk
409:42:00:567AMPlasmaOk
509:54:50:417AMPlasmaOk
610:08:26:467AMPlasmaOk
710:21:20:927AMPlasmaOk
810:34:06:023AMPlasmaOk
910:46:55:997AMPlasmaOk
1011:03:26:817AMPlasmaOk
1111:19:53:480AMPlasmaOk
1211:32:35:280AMPlasmaOk
1311:45:26:143AMPlasmaOk
1412:01:08:543PMPlasmaOk
1512:15:48:030PMPlasmaOk
1612:29:56:073PMPlasmaOkOH2U Crowbars after disruption
1712:51:16:037PMPlasmaOk
1801:03:48:853PMPlasmaOk
1901:16:33:077PMPlasmaOkOH1 Overvoltage Due To Disruption
2001:29:27:927PMPlasmaOk
2101:43:38:057PMPlasmaOk
2201:58:10:903PMPlasmaOk
2302:10:52:143PMPlasmaOk
2402:23:29:257PMPlasmaOk
2502:36:24:810PMPlasmaOk
2602:48:58:330PMPlasmaOk
2703:04:06:680PMPlasmaBadEf3 breaker opened in init, no faults observed reset breaker and went a
2803:16:38:107PMPlasmaOk
2903:29:15:313PMPlasmaOk
3003:41:54:693PMPlasmaOk
3103:54:49:730PMPlasmaOk
3204:07:21:610PMPlasmaOk
3304:20:59:240PMPlasmaOk
3404:34:50:183PMPlasmaOk
3504:48:44:780PMPlasmaOk
3605:03:03:787PMPlasmaOk

System Availability
Oct 21 2009 09:00:01:363AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoCyopump hardware is not yet reinstalled in the cell.Jul 14 2009 09:21PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll 32 channels working and calibrated.Oct 06 2009 11:17AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesOperational --- Uncalibrated and needs to be positioned at portJun 25 2009 05:08PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown. Will not be fixed until vent.Sep 24 2009 09:10AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1090824xxx, all channels are operational.Aug 25 2009 09:31AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke