Alcator C-Mod Run 1091023 Information

Back to runs

Miniproposals
Miniproposal:581
Date Filed: 9/28/2009
Title:High Density Target Plasma Antenna Operation
First Author:Steve Wukitch
Session Leader:Steve Wukitch (shots 1-13)

Operators
Session leader(s):Steve Wukitch
Physics operator(s):Steve Wolfe
Engineering operator(s):Bill Parkin,Sam Pierson

Engineering Operator Run Comment
automatically entered by signon - please replace with real comment

Session Leader Plans
Entered: Oct 22 2009 04:26:16:070PM
Author: Steve Wukitch
Start with 1091021005 for as basis for discharges. It is a 0.8 MA
discharge with the strike point moved to avoid the W tile and an upper
strike that maximizes the cryopump effectiveness. Would like to keep the right gap
is 1.5 cm, kapa~1.6, lower triangularity ~0.5, and upper triangularity
0.35-0.4 when in LSN configuration.



1. Start with 1 MA discharge, target density nl04~1 at 0.8 s and ramp plasma density to
1.4 at 1.5 s. If neutral pressure limit is not reached with standard low field side gas
fueling raise target density to 1.1 at 0.8 s and ramp to 1.6 at 1.5 s.

2. Using same shape, lower target density to nl04~0.8 at 0.6 s, D&E at 1 MW,
and vary NINJA programming with plenum pressure 20 psi: (3 shots)
a. NINJA puff start at 0.6 s for 0.1 s
b. NINJA puff start at 0.6 s for 0.2 s
c. NINJA puff start at 0.6 s for 0.4 s

3. Repeat step 2 with DN discharge based on 1091021005 (zcur ~ -7-9 mm)

4. Repeat step 2 with DN and cryopump enabled.

5. Repeat step 2 with IWL discharge

choose either DN or DN with cryo

6. Repeat #2 with target density to nl04~0.5 at 0.6 s.

If successful raise/lower plenum pressure and repeat 2 with best condition.

Switch to He if unsuccessful with lowering the neutral pressure
7. Fuel from main gas system and obtain highest neutral pressure possible.
a. Take several discharges to switch over. (5 shots)
b. Reduce plasma current if unable to reach neutral pressure limit using gas
fueling alone.

Physics Operators Plans
Entered: Oct 22 2009 03:18:16:490PM
Author: Steve Wolfe
Physop plan and Engineering Setup for Friday, Oct 23, 2009
MP#581 High density target plasma antenna operation
SL Wukitch
PO wolfe

-----------------
Engineering Setup
-----------------
Overnight bake at 60C, ECDC in D2
gas and pressure: D2 at 2e-4 Torr
sweep: 44/45/103 cm
scan: 20/120 s

Run begins at 09:00 and ends at 17:00
We will want the cryopump starting at about 10:30AM

Power systems as on: 1091021008

Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:

Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
fill NINJA with 20 psi D2 DISABLED

Enable gatevalves and shutters: ECE, VUV, Z-bolo, HIREX_SR

Torvac gatevalve toggle (yes/no): no

Boronization(yes/no): no
Overnight ECDC (yes/no): yes
ICRF(yes/no): yes
LH(yes/no): no
DNB(yes/no): no
Cryopump (yes/no): yes

Vessel temperature: 35/35/35

--------------------------------------------------
Physics operator plan:

1. Start with an 800kA LSN discharge, small to moderate SSEP.
Cryopump OFF for first part of run (until step 4). Maybe
pick an example like 1091022011 or just extend the initial zcur from
1091021005or 008. Probably move BOF earlier. Adjust outer gap to ~15mm, density
program to 1.0e20 at 0.8sec, then ramping up to 1.4e20 at 1.5sec, all using
B-main (PG3) fueling; turn on D gain in nl04. Trying to calibrate neutral pressure "limit" of each antenna with target density using PG3 fueling. If neutral limit is not
encountered, then raise target density to 1.1e20@0.8sec,1.6e20@1.5sec.
Check limits on D and E separately.
While I'm doing this, run SSEP predictor (zero gain) on wire 11 with zero
target, just in case I want to use this at step 3.

2. Compare fueling with inner-wall NINJA puff. Reduce NL04 target to
0.8e20@0.6sec, flat from there, and try puffing NINJA with plenum=20psi
a) t=0.6sec,dt=0.1sec
b) t=0.6sec,dt=0.2sec
c) t=0.6sec,dt=0.4sec

3. Change to DN discharge. Most likely use the equilibrium from
step 1 and change Zcur. If I start with 1091021005 the magic value should
be around -.007. Monitor SSEP observer signal (with zero target) and
consider turning it on, depending on how well it stays DN with just ZCUR
and xpoint control. repeat step 2 with NINJA puffs.

4. Turn on cryopump (increase pg4 in seg1 to 50msec), and repeat NINJA
sequence, as in 3 (and 2).

5. Go to inner wall limited discharge. Turn off SSEP feedback, if it
was used, and change CLEARIN and RCUR to make a limited shape with
outer gap still ~1.5cm. Not sure if SL wants cryo for this one or not,
pumping might be less efficient, but might be worth a try just to see.

6. Back to DN, either with or without cryo, depending on what worked,
repeat #2 with reduced early target density nl04=5e19@0.6sec
If successful (?) repeat with higher and/or lower plenum pressure

7. If unsuccessful in lowering neutral pressure (2-6), put Helium in
pg3 and go back to fueling from there. Run plan says to obtain highest
neutral pressure possible, but I think he means with plasma, so I
shouldn't just turn the valve on full and leave it. If we get this far,
change the nl04 gains (start with P=D=2, I think) and aim for 2e20@1.5sec,
go from there. I'm assuming that SL intends this to be done in DN shape.

Session Leader Summaries
Entered: Oct 23 2009 01:02:25:330PM
Author: Steve Wukitch
Run Summary

Despite a shortened run, we accomplished the first two parts of the
run plan. As expected, inner wall puff alone did not significantly
reduce the neutral pressure for given density. This is consistent
with the picture that the observed pressure is a result of plasma
transport. The inner wall fueling did allow easier access to higher
density discharges but to lower the neutral pressure a sink is likely
needed. The EF2L contractor failed the discharge before we were going
to try the cryopump. At 0.75 MW, neutral pressure limit appeared to
be much higher - target density reached 1.75 x 10^20 on NL04 than at
higher power. At the neutral pressure limit, the match suddenly
changes - likely the cause of the first fault.


Physics Operator Summaries
Entered: Oct 23 2009 01:14:20:160PM
Author: Steve Wolfe
Physics Operator Summary for Friday, Oct 23
MP#581 High density RF
SL: Wukitch
PO: wolfe
EO: Parkin, Pierson

Things were really going well until lucky shot#13, when the 
EF2L supply faulted and burned up its 3-phase contactor. This is 
the same supply that had a similar failure last month. Repair 
estimate is over 4 hours, and since the cause is still undetermined
the run was terminated. 

We got into the 3rd step of the run plan, and actually 
learned some things about the rf/neutral/density issue. See SL_SUMMARY
for details of that. 

On the physop side, the machine ran well. The startup was left unchanged
from yesterday, and performed perfectly, no runaways, no fizzles despite 
some high pressures at the end of shots and ramp-down disruptions.

I instituted derivative gain (D=2) along with the standard proportional
gain (P=2) on the EF2_by_EF4 wire, and this seemed to help suppress
some of the swings on these currents during the flattop. This should be
tried on shots with more violent changes in parameters to see if the loop
stability is actually improved. 

The initial lower single null discharges ran well with modest negative
bias (SSEP~-5mm), which wasn't too surprising. For the DN discharges
zcur=-0.01 seemed to give good double null. I activated SSEP control 
with moderate gain P=2 from 0.6sec to EOF, and the SSEP error stayed 
near zero, but it wasn't clear how much this really mattered since the
ZCUR was probably sufficient by itself. The ZXU gain was not reduced from
P=6, so the SSEP control was definitely sub-dominant. 

For the shots using pg3 for density feedback the gains P=8,D=6 gave
very nice flat density for flat programming, and did a good job on 
the density ramps as well. The PG3 also had feedforward before
0.6sec on all shots and constant at 20V to EOF for the ramps. 

An interesting effect was noted that when the RF faulted at the 
"neutral pressure limit" on shot#2 the efficiency of the  
gas fueling seemed to increase. With NINJA (we didn't try DN with PG3)
the DN cases got to higher density for the same puff than the LSN. 
This is consistent with earlier observations that the density increased
when the plasma went to DN and/or USN. 

We didn't quite get to the cryopump part of the run, so that remains to
be done when we come back up in November. 

Scorecard:
      No power tests        0
      Duds                  0
      Fizzles               0
      Plasmas              13
      ============         ==
      Shots                13 

Session Leader Comments
Oct 23 2009 09:05:03:770AM1091023001Steve Wukitchplasma - equilibrium looks good
H-mode - can't get H-mode when you want it and can't avoid it when you don't

gas turns off when RF comes on.

lower power to 0.75 MW

ramp density to from 0.8 to 1.5
Oct 23 2009 09:13:49:900AM1091023002Steve Wukitchplasma

observe neutral pressure limit for D and E antenna (J is out of service)

density increases once RF turns off

next: ohmic density ramp


Oct 23 2009 09:28:09:187AM1091023003Steve Wukitchplasma

good reference

next start NINJA inner wall puff with LSN shape

puff to hit at 0.6 s (ninja triggered ~0.12 s prior) for 0.1 sec 20 psi

RF at 0.75 MW total
Oct 23 2009 09:36:35:000AM1091023004Steve Wukitchplasma

steady density - steady neutral pressure

no NINJA

next try again with NINJA
Oct 23 2009 10:06:25:063AM1091023005Steve Wukitchplasma

got NINJA - density increases to nl04~1 with increasing the neutral pressure

RF causes density pumpout

next: increase NINJA pulse to 0.4 s from 0.1 s
Oct 23 2009 10:07:48:797AM1091023006Steve Wukitchplasma

got NINJA - density increases to nl04~1.1; missed the neutral pressure limit

next: add second NINJA pulse triggered at 0.85 s
Oct 23 2009 10:34:21:600AM1091023007Steve Wukitchplasma

density increases to nl04~1.3; missed the neutral pressure limit

exceeded previous neutral pressure limit according to ratiomatic

next: increase NINJA pressure from 20 psi to 30 psi repeat
Oct 23 2009 11:22:21:633AM1091023008Steve Wukitchplasma

density increases to nl04~1.8; found neutral pressure limit

neutral pressure limit ~3.6 mtorr
density 1.75 on nl04

next: increase RF power to 2 MW
Oct 23 2009 11:00:15:123AM1091023009Steve Wukitchplasma

density increases to nl04~1.75

RF performed poorly

next: ramp RF power to 2 MW
Oct 23 2009 11:36:22:013AM1091023010Steve Wukitchplasma

neutral pressure limit is lower for higher power

next: DN, return NINJA to 20 psi, and two pulses as on 007
Oct 23 2009 11:34:57:810AM1091023011Steve Wukitchplasma - more USN

density increase is similar 007

no neutral limit

next: tweak for better DN
Oct 23 2009 11:38:56:903AM1091023012Steve Wukitchplasma - better DN

neutral pressure is lower for given density

next: Raise RF power
Oct 23 2009 12:49:28:980PM1091023013Steve WukitchEF2 three phase contactor failed - EOR

That's all folks

Physics Operator Comments
Oct 23 2009 08:19:30:130AMSteve Wolfe
Beginning setup for MP#581 run. 
Will be running 800kA, LSN, DN, IW discharges, mostly L-mode
Startup taken from last shot from yesterday:
 RCUR offset=2000
 BR_0 offset=0.0005
 IC_EF4U=-1315
 pg4 = 17msec, small pg3 puff (40,20,12,0)
 Leave all this alone
Import seg2 from 1091022011 (ZCUR=-.017,
  ZXL=-.00113,-.00038,ZXU=-.008,RXL=+.0085,RXU=.0055)
 Right gap looks ok, about 1.5cm as requested, not too steady
 RCUR seems to be running an error level around 1500Am,
 not clear why; P=6,D=6,I=0, nothing railed. RCUR waveform has some funny 
 time history, moves out after 1.3sec. Possibly hold-over from SSEP jogs
 on other shots in the sequence? 
 SSEP=-5mm
 outer strike looks high, closer to the nose than tile4
 Changes:
  ZXL to -.002
  SSEP=0 (wire11,12 unused for now)
  NL04 8e19 from .4 to .8sec, ramp to 1.4e20 at 1.5sec
  NL04 D gain to 6, extend pg3 feedforward 20V to 1.4sec
  EF2_BY_EF4 D=1 from .15sec, see if this helps EF2/EF4 oscillation
  Move Ip BOF from .35sec to .25sec
Load at 23-Oct-2009 08:19:19.00
Open tree /home/wolfe/pcs_scratch      -1
Open tree done


Oct 23 2009 09:02:29:003AM1091023001Steve Wolfe
Shot#1: Program 800kA, LSN, nl04 ramp after 0.8sed
IGT is on the low 7 scale, I'm tempted to raise pg4 to 20ms for first
shot, but leave it and see how it goes.

Result: plasma full length, no runaways. dithery H-mode 
Two-step rf max 2MW (too much). Right gap is close to 2cm at .6sec,
probably ok. 

Next: reduce rf, else repeat


Oct 23 2009 09:12:32:743AM1091023002Steve Wolfe
Shot#2: Increase EF2_by_EF4 D from 1 to 2, to reduce ef4/ef2 oscillation more
Otherwise, just repeat; no startup change

Result: plasma full length, hardly any rf <800kW total. 
nl04 lags program a little then catches up at 1.35sec, as rf trips out.
Curiouser and curiouser...
EF2/EF4 waveforms much calmer than normal; maybe that actually works

Next: no rf, repeat as ohmic to see what gas, density do this time.

Oct 23 2009 09:31:27:750AM1091023003Steve Wolfe
Shot#3:  no rf, repeat as ohmic to see what gas, density do this time.
I ought to raise pg4, but leave everything alone for one shot

Result: plasma full length, no rf, no runaways, density ramp 
still non-linear, no sharp break-in-slope, tops out at 1.4 where I
turn down the feedforward (maybe). Ratiomatic tops out at 1.9mTorr.
Note: EFIT SSEP is pretty flat -5mm, DPCS SSEP error -4000 to -2000Am thru flattop


Next: Go on to step 2, turn down feedback, turn on NINJA

Oct 23 2009 09:39:14:880AM1091023004Steve Wolfe
Shot#4:  Go on to step 2, turn down feedback target to 0.8e20 from
0.6sec on, PG3 feedforward to 0 after 0.6sec, turn on NINJA
Startup looked ok, leave pg4 alone. 
RF back on

Result: plasma full length, small injection at .35sec,
density flat at 8e19, NINJA may not have fired? JT is sorry. 
RF flat at 750kW. ratiomatic~0.5mTorr flat to EOF
Startup still looks ok, nl04@.02 around 8e18, no hards, leave pg4 alone. 

Next: repeat, with NINJA

Oct 23 2009 09:50:34:070AM1091023005Steve Wolfe
Shot#5: repeat, with NINJA

Result: plasma full length, no runaways, not much density from NINJA, just a 
short hump on nl04 between .6 and .8sec, ratiomatic shows increase to 0.7mTorr

Next: on to 2b, increase length of NINJA pulse (not my department)
No DPCS changes

Oct 23 2009 10:05:47:000AM1091023006Steve Wolfe
Shot#6: repeat, with more NINJA
Enable B-side lower (1psi argon) 50msec@.03sec

Result: plasma full length, no runways, more ninja, 
NL04 to 1.15e20, flat to EOF, ratiomatic to 1.4mTorr 
Rf stays on

Next: continue increasing NINJA using 2nd pulse. 

Oct 23 2009 10:28:51:567AM1091023007Steve Wolfe
Shot#7:  continue increasing NINJA using 2nd pulse. 
No DPCS changes
RAC fault DFOL alarm before shot: Utility, maybe some rf functions also
affected, also cell exhaust fan (reset to 75%). 
While they're working on that, allow a cell access for 
Nathan(LBO) and Roman(DNB). 

Result: plasma full length, no runaways, more gas, marfe in rampdown
nl04 to 1.3e20, similar to #2,3. ratiomatic to 2mTorr, RF stayed on. 

Next: increase NINJA again (raise plenum pressure), 
trying to get rf to fault (ratiomatic pressure is apparently not good measure
of "neutral pressure limit")

Oct 23 2009 10:46:12:680AM1091023008Steve Wolfe
Shot#8:  continue increasing NINJA (higher plenum pressure) 
No DPCS changes

Result: plasma to 1.74sec, marfe before EOF, 
nl04 to 1.7e20, rf faults at around 1.2sec, ratiomatic at 3.5mTorr,
but rising fast 
Tripped filament on IGT, needed to reset manually in cell.

Next: change rf power to see what happens to limit (not in plan)

Oct 23 2009 10:55:20:467AM1091023009Steve Wolfe
Shot#9: change rf power to see what happens to limit (not in plan)
LBO has permission to pulse at 1.4sec
IGT down to 3.3e-6 at 10min, go to INIT, should be ok

Result: plasma to 1.75sec, small injection at .95sec
nl04 to 1.7e20, rf faulting from start, never really got on.
I think I can see shit-shooter at 1.4sec
Need to reset IGT in cell again. Need to tell Joe/Yuri to fix this on TORVAC
screen -- it apparently won't let them reset filament#2.

Next: Change rf waveform?

Oct 23 2009 11:04:13:953AM1091023010Steve Wolfe
Shot#10: No DPCS changes. 
RF waveform changes to stay on before it trips off
IGT=3.6e-6 at 10min, go for it

Result: plasma to 1.75sec, slight hesitation in startup,
rf comes on, starts faulting at .82sec, 1.3MW total

Next: Try for DN
 

Oct 23 2009 11:24:01:760AM1091023011Steve Wolfe
Shot#11:  Try for DN: ZCUR from -.017 to -.007, leave SSEP gain off
NINJA pressure back down to 20psi, rf power back down (moving to step#3)
No startup changes, I'm pushing my luck but there is a small delay while
they chase down the IGT remote control issue, pump down NINJA.
IGT down to 2.3e-6 at 15min, ready to roll

Result: plasma to 1.8sec, nl04 to 1.35e20, SSEP around +2mm, need to 
drop it a little. SEP error seems to be around +1000Am
 rf stayed on.

Next: ZCUR from -.007 to -.009
 

Oct 23 2009 11:39:30:077AM1091023012Steve Wolfe
Shot#12:   ZCUR from -.007 to -.01, SSEP 11 gain to 2 from 0.6:1.6sec
No startup changes

Result: plasma to 1.7sec, SSEP pretty close to zero with some flinches
small injection 1.36sec, nl04 to 1.4e20, rf stays on, ratiomatic to 2.1mTorr
DPCS ssep error is <1000Am, not clear how effective the gain is relative
to preprogrammed Zcur. 

Next: leave shape alone, Wukie will raise power

Oct 23 2009 11:59:05:757AM1091023013Steve Wolfe
Shot#13: leave shape alone, Wukie will raise power
No DPCS changes
Cell access for IGT, Joe couldn't fix torvac, must be PLC hardware?

Result: disrupted at .6sec, injection at .58, looks like something 
happens to ef2L starting at .56sec, inverts, then single phases.
Looks like the C-supply has a problem from .47sec on. D-supply voltage
doesn't appear on the ef2 scope at all, possible camac issue, it's missing 
on previous as well. The problem seems to start at .47sec on C, then
progresses. 
Engineers to power room.

Next: ?

Oct 23 2009 12:49:28:057PM1091023013Steve Wolfe
EF2L supply has a burned out contactor, cannot be repaired before 17:00

END OF RUN

Next: No plasmas till after APS meeting 

Engineering Operator Comments
ShotTimeTypeStatusComment
108:53:48:877AMPlasmaOk
209:06:28:710AMPlasmaOk
309:19:12:073AMPlasmaOk
409:32:20:627AMPlasmaOk
509:45:15:270AMPlasmaOk
609:58:33:350AMPlasmaOk
710:21:56:250AMPlasmaOk
810:34:45:457AMPlasmaOk
910:47:35:383AMPlasmaOk
1011:00:15:733AMPlasmaOk
1111:17:49:973AMPlasmaOk
1211:31:19:997AMPlasmaOk
1311:50:12:410AMPlasmaBadEF2L fault

System Availability
Oct 23 2009 08:53:21:580AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoCyopump hardware is not yet reinstalled in the cell.Jul 14 2009 09:21PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll 32 channels working and calibrated.Oct 06 2009 11:17AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesOperational --- Uncalibrated and needs to be positioned at portJun 25 2009 05:08PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown. Will not be fixed until vent.Sep 24 2009 09:10AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1090824xxx, all channels are operational.Aug 25 2009 09:31AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Oct 23 2009 09:18:48:807AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoCyopump hardware is not yet reinstalled in the cell.Jul 14 2009 09:21PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll 32 channels working and calibrated.Oct 06 2009 11:17AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesOperational --- Uncalibrated and needs to be positioned at portJun 25 2009 05:08PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown. Will not be fixed until vent.Sep 24 2009 09:10AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091022003, 110 channel is out of order. All others are operational..Oct 23 2009 09:16AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Oct 23 2009 10:21:38:827AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoCyopump hardware is not yet reinstalled in the cell.Jul 14 2009 09:21PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll 32 channels working and calibrated.Oct 06 2009 11:17AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesOperational --- Uncalibrated and needs to be positioned at portJun 25 2009 05:08PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown. Will not be fixed until vent.Sep 24 2009 09:10AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091022003, 110 channel is out of order. All others are operational..Oct 23 2009 09:16AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Oct 23 2009 10:34:25:130AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoCyopump hardware is not yet reinstalled in the cell.Jul 14 2009 09:21PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll 32 channels working and calibrated.Oct 06 2009 11:17AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesOperational --- Uncalibrated and needs to be positioned at portJun 25 2009 05:08PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown. Will not be fixed until vent.Sep 24 2009 09:10AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091022003, 110 channel is out of order. All others are operational..Oct 23 2009 09:16AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Oct 23 2009 10:47:13:103AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoCyopump hardware is not yet reinstalled in the cell.Jul 14 2009 09:21PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll 32 channels working and calibrated.Oct 06 2009 11:17AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesOperational --- Uncalibrated and needs to be positioned at portJun 25 2009 05:08PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown. Will not be fixed until vent.Sep 24 2009 09:10AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091022003, 110 channel is out of order. All others are operational..Oct 23 2009 09:16AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Oct 23 2009 10:59:56:717AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoCyopump hardware is not yet reinstalled in the cell.Jul 14 2009 09:21PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll 32 channels working and calibrated.Oct 06 2009 11:17AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesOperational --- Uncalibrated and needs to be positioned at portJun 25 2009 05:08PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown. Will not be fixed until vent.Sep 24 2009 09:10AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091022003, 110 channel is out of order. All others are operational..Oct 23 2009 09:16AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Oct 23 2009 11:17:29:223AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoCyopump hardware is not yet reinstalled in the cell.Jul 14 2009 09:21PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll 32 channels working and calibrated.Oct 06 2009 11:17AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesOperational --- Uncalibrated and needs to be positioned at portJun 25 2009 05:08PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown. Will not be fixed until vent.Sep 24 2009 09:10AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091022003, 110 channel is out of order. All others are operational..Oct 23 2009 09:16AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Oct 23 2009 11:30:55:713AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoCyopump hardware is not yet reinstalled in the cell.Jul 14 2009 09:21PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll 32 channels working and calibrated.Oct 06 2009 11:17AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesOperational --- Uncalibrated and needs to be positioned at portJun 25 2009 05:08PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown. Will not be fixed until vent.Sep 24 2009 09:10AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091022003, 110 channel is out of order. All others are operational..Oct 23 2009 09:16AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Oct 23 2009 11:49:50:393AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel AccessMay 30 2008 02:25PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoCyopump hardware is not yet reinstalled in the cell.Jul 14 2009 09:21PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnosafely disabled; ready to be dismantledMay 28 2008 10:22AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnopower locked & tagged out; gate valve disabledMay 28 2008 10:03AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel ActivityJun 10 2009 02:35PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll 32 channels working and calibrated.Oct 06 2009 11:17AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoDisconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work.Jun 04 2008 12:24PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesOperational --- Uncalibrated and needs to be positioned at portJun 25 2009 05:08PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown. Will not be fixed until vent.Sep 24 2009 09:10AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyesOperational ---- ECDC running as required Jun 19 2009 08:06AM (irby)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091022003, 110 channel is out of order. All others are operational..Oct 23 2009 09:16AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasmaJun 18 2009 01:01PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke