| Physics Operator Comments |
| Oct 23 2009 08:19:30:130AM | | Steve Wolfe |
Beginning setup for MP#581 run.
Will be running 800kA, LSN, DN, IW discharges, mostly L-mode
Startup taken from last shot from yesterday:
RCUR offset=2000
BR_0 offset=0.0005
IC_EF4U=-1315
pg4 = 17msec, small pg3 puff (40,20,12,0)
Leave all this alone
Import seg2 from 1091022011 (ZCUR=-.017,
ZXL=-.00113,-.00038,ZXU=-.008,RXL=+.0085,RXU=.0055)
Right gap looks ok, about 1.5cm as requested, not too steady
RCUR seems to be running an error level around 1500Am,
not clear why; P=6,D=6,I=0, nothing railed. RCUR waveform has some funny
time history, moves out after 1.3sec. Possibly hold-over from SSEP jogs
on other shots in the sequence?
SSEP=-5mm
outer strike looks high, closer to the nose than tile4
Changes:
ZXL to -.002
SSEP=0 (wire11,12 unused for now)
NL04 8e19 from .4 to .8sec, ramp to 1.4e20 at 1.5sec
NL04 D gain to 6, extend pg3 feedforward 20V to 1.4sec
EF2_BY_EF4 D=1 from .15sec, see if this helps EF2/EF4 oscillation
Move Ip BOF from .35sec to .25sec
Load at 23-Oct-2009 08:19:19.00
Open tree /home/wolfe/pcs_scratch -1
Open tree done
|
| Oct 23 2009 09:02:29:003AM | 1091023001 | Steve Wolfe |
Shot#1: Program 800kA, LSN, nl04 ramp after 0.8sed
IGT is on the low 7 scale, I'm tempted to raise pg4 to 20ms for first
shot, but leave it and see how it goes.
Result: plasma full length, no runaways. dithery H-mode
Two-step rf max 2MW (too much). Right gap is close to 2cm at .6sec,
probably ok.
Next: reduce rf, else repeat
|
| Oct 23 2009 09:12:32:743AM | 1091023002 | Steve Wolfe |
Shot#2: Increase EF2_by_EF4 D from 1 to 2, to reduce ef4/ef2 oscillation more
Otherwise, just repeat; no startup change
Result: plasma full length, hardly any rf <800kW total.
nl04 lags program a little then catches up at 1.35sec, as rf trips out.
Curiouser and curiouser...
EF2/EF4 waveforms much calmer than normal; maybe that actually works
Next: no rf, repeat as ohmic to see what gas, density do this time.
|
| Oct 23 2009 09:31:27:750AM | 1091023003 | Steve Wolfe |
Shot#3: no rf, repeat as ohmic to see what gas, density do this time.
I ought to raise pg4, but leave everything alone for one shot
Result: plasma full length, no rf, no runaways, density ramp
still non-linear, no sharp break-in-slope, tops out at 1.4 where I
turn down the feedforward (maybe). Ratiomatic tops out at 1.9mTorr.
Note: EFIT SSEP is pretty flat -5mm, DPCS SSEP error -4000 to -2000Am thru flattop
Next: Go on to step 2, turn down feedback, turn on NINJA
|
| Oct 23 2009 09:39:14:880AM | 1091023004 | Steve Wolfe |
Shot#4: Go on to step 2, turn down feedback target to 0.8e20 from
0.6sec on, PG3 feedforward to 0 after 0.6sec, turn on NINJA
Startup looked ok, leave pg4 alone.
RF back on
Result: plasma full length, small injection at .35sec,
density flat at 8e19, NINJA may not have fired? JT is sorry.
RF flat at 750kW. ratiomatic~0.5mTorr flat to EOF
Startup still looks ok, nl04@.02 around 8e18, no hards, leave pg4 alone.
Next: repeat, with NINJA
|
| Oct 23 2009 09:50:34:070AM | 1091023005 | Steve Wolfe |
Shot#5: repeat, with NINJA
Result: plasma full length, no runaways, not much density from NINJA, just a
short hump on nl04 between .6 and .8sec, ratiomatic shows increase to 0.7mTorr
Next: on to 2b, increase length of NINJA pulse (not my department)
No DPCS changes
|
| Oct 23 2009 10:05:47:000AM | 1091023006 | Steve Wolfe |
Shot#6: repeat, with more NINJA
Enable B-side lower (1psi argon) 50msec@.03sec
Result: plasma full length, no runways, more ninja,
NL04 to 1.15e20, flat to EOF, ratiomatic to 1.4mTorr
Rf stays on
Next: continue increasing NINJA using 2nd pulse.
|
| Oct 23 2009 10:28:51:567AM | 1091023007 | Steve Wolfe |
Shot#7: continue increasing NINJA using 2nd pulse.
No DPCS changes
RAC fault DFOL alarm before shot: Utility, maybe some rf functions also
affected, also cell exhaust fan (reset to 75%).
While they're working on that, allow a cell access for
Nathan(LBO) and Roman(DNB).
Result: plasma full length, no runaways, more gas, marfe in rampdown
nl04 to 1.3e20, similar to #2,3. ratiomatic to 2mTorr, RF stayed on.
Next: increase NINJA again (raise plenum pressure),
trying to get rf to fault (ratiomatic pressure is apparently not good measure
of "neutral pressure limit")
|
| Oct 23 2009 10:46:12:680AM | 1091023008 | Steve Wolfe |
Shot#8: continue increasing NINJA (higher plenum pressure)
No DPCS changes
Result: plasma to 1.74sec, marfe before EOF,
nl04 to 1.7e20, rf faults at around 1.2sec, ratiomatic at 3.5mTorr,
but rising fast
Tripped filament on IGT, needed to reset manually in cell.
Next: change rf power to see what happens to limit (not in plan)
|
| Oct 23 2009 10:55:20:467AM | 1091023009 | Steve Wolfe |
Shot#9: change rf power to see what happens to limit (not in plan)
LBO has permission to pulse at 1.4sec
IGT down to 3.3e-6 at 10min, go to INIT, should be ok
Result: plasma to 1.75sec, small injection at .95sec
nl04 to 1.7e20, rf faulting from start, never really got on.
I think I can see shit-shooter at 1.4sec
Need to reset IGT in cell again. Need to tell Joe/Yuri to fix this on TORVAC
screen -- it apparently won't let them reset filament#2.
Next: Change rf waveform?
|
| Oct 23 2009 11:04:13:953AM | 1091023010 | Steve Wolfe |
Shot#10: No DPCS changes.
RF waveform changes to stay on before it trips off
IGT=3.6e-6 at 10min, go for it
Result: plasma to 1.75sec, slight hesitation in startup,
rf comes on, starts faulting at .82sec, 1.3MW total
Next: Try for DN
|
| Oct 23 2009 11:24:01:760AM | 1091023011 | Steve Wolfe |
Shot#11: Try for DN: ZCUR from -.017 to -.007, leave SSEP gain off
NINJA pressure back down to 20psi, rf power back down (moving to step#3)
No startup changes, I'm pushing my luck but there is a small delay while
they chase down the IGT remote control issue, pump down NINJA.
IGT down to 2.3e-6 at 15min, ready to roll
Result: plasma to 1.8sec, nl04 to 1.35e20, SSEP around +2mm, need to
drop it a little. SEP error seems to be around +1000Am
rf stayed on.
Next: ZCUR from -.007 to -.009
|
| Oct 23 2009 11:39:30:077AM | 1091023012 | Steve Wolfe |
Shot#12: ZCUR from -.007 to -.01, SSEP 11 gain to 2 from 0.6:1.6sec
No startup changes
Result: plasma to 1.7sec, SSEP pretty close to zero with some flinches
small injection 1.36sec, nl04 to 1.4e20, rf stays on, ratiomatic to 2.1mTorr
DPCS ssep error is <1000Am, not clear how effective the gain is relative
to preprogrammed Zcur.
Next: leave shape alone, Wukie will raise power
|
| Oct 23 2009 11:59:05:757AM | 1091023013 | Steve Wolfe |
Shot#13: leave shape alone, Wukie will raise power
No DPCS changes
Cell access for IGT, Joe couldn't fix torvac, must be PLC hardware?
Result: disrupted at .6sec, injection at .58, looks like something
happens to ef2L starting at .56sec, inverts, then single phases.
Looks like the C-supply has a problem from .47sec on. D-supply voltage
doesn't appear on the ef2 scope at all, possible camac issue, it's missing
on previous as well. The problem seems to start at .47sec on C, then
progresses.
Engineers to power room.
Next: ?
|
| Oct 23 2009 12:49:28:057PM | 1091023013 | Steve Wolfe |
EF2L supply has a burned out contactor, cannot be repaired before 17:00
END OF RUN
Next: No plasmas till after APS meeting
|
| System Availability |
| Oct 23 2009 08:53:21:580AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations applied | Aug 27 2009 09:09AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Cyopump hardware is not yet reinstalled in the cell. | Jul 14 2009 09:21PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | All 32 channels working and calibrated. | Oct 06 2009 11:17AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controller repaired. | Aug 23 2009 10:36PM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | operational at 80 MHz | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | antenna and FFT operational | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | available at 80 MHz and [0,pi,0,pi] phasing | Sep 04 2009 10:01AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | Requires some advance notice for laser start-up | Oct 16 2009 12:46PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached. | Aug 27 2009 09:10AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Recalibrated 7/27/09. | Jul 28 2009 04:22PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Operational --- Uncalibrated and needs to be positioned at port | Jun 25 2009 05:08PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Down. Will not be fixed until vent. | Sep 24 2009 09:10AM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,edlund,ennever,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Since 1090824xxx, all channels are operational. | Aug 25 2009 09:31AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers working. 15 spatial channels operational. Calibrated | Oct 13 2009 07:49PM (yma) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | yes | Operational, and calibrated. | Oct 11 2009 03:01PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Oct 23 2009 09:18:48:807AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations applied | Aug 27 2009 09:09AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Cyopump hardware is not yet reinstalled in the cell. | Jul 14 2009 09:21PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | All 32 channels working and calibrated. | Oct 06 2009 11:17AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controller repaired. | Aug 23 2009 10:36PM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | operational at 80 MHz | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | antenna and FFT operational | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | available at 80 MHz and [0,pi,0,pi] phasing | Sep 04 2009 10:01AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | Requires some advance notice for laser start-up | Oct 16 2009 12:46PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached. | Aug 27 2009 09:10AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Recalibrated 7/27/09. | Jul 28 2009 04:22PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Operational --- Uncalibrated and needs to be positioned at port | Jun 25 2009 05:08PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Down. Will not be fixed until vent. | Sep 24 2009 09:10AM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,edlund,ennever,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Since 1091022003, 110 channel is out of order. All others are operational.. | Oct 23 2009 09:16AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers working. 15 spatial channels operational. Calibrated | Oct 13 2009 07:49PM (yma) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | yes | Operational, and calibrated. | Oct 11 2009 03:01PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Oct 23 2009 10:21:38:827AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations applied | Aug 27 2009 09:09AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Cyopump hardware is not yet reinstalled in the cell. | Jul 14 2009 09:21PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | All 32 channels working and calibrated. | Oct 06 2009 11:17AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controller repaired. | Aug 23 2009 10:36PM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | operational at 80 MHz | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | antenna and FFT operational | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | available at 80 MHz and [0,pi,0,pi] phasing | Sep 04 2009 10:01AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | Requires some advance notice for laser start-up | Oct 16 2009 12:46PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached. | Aug 27 2009 09:10AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Recalibrated 7/27/09. | Jul 28 2009 04:22PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Operational --- Uncalibrated and needs to be positioned at port | Jun 25 2009 05:08PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Down. Will not be fixed until vent. | Sep 24 2009 09:10AM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,edlund,ennever,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Since 1091022003, 110 channel is out of order. All others are operational.. | Oct 23 2009 09:16AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers working. 15 spatial channels operational. Calibrated | Oct 13 2009 07:49PM (yma) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | yes | Operational, and calibrated. | Oct 11 2009 03:01PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Oct 23 2009 10:34:25:130AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations applied | Aug 27 2009 09:09AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Cyopump hardware is not yet reinstalled in the cell. | Jul 14 2009 09:21PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | All 32 channels working and calibrated. | Oct 06 2009 11:17AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controller repaired. | Aug 23 2009 10:36PM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | operational at 80 MHz | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | antenna and FFT operational | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | available at 80 MHz and [0,pi,0,pi] phasing | Sep 04 2009 10:01AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | Requires some advance notice for laser start-up | Oct 16 2009 12:46PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached. | Aug 27 2009 09:10AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Recalibrated 7/27/09. | Jul 28 2009 04:22PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Operational --- Uncalibrated and needs to be positioned at port | Jun 25 2009 05:08PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Down. Will not be fixed until vent. | Sep 24 2009 09:10AM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,edlund,ennever,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Since 1091022003, 110 channel is out of order. All others are operational.. | Oct 23 2009 09:16AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers working. 15 spatial channels operational. Calibrated | Oct 13 2009 07:49PM (yma) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | yes | Operational, and calibrated. | Oct 11 2009 03:01PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Oct 23 2009 10:47:13:103AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations applied | Aug 27 2009 09:09AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Cyopump hardware is not yet reinstalled in the cell. | Jul 14 2009 09:21PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | All 32 channels working and calibrated. | Oct 06 2009 11:17AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controller repaired. | Aug 23 2009 10:36PM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | operational at 80 MHz | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | antenna and FFT operational | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | available at 80 MHz and [0,pi,0,pi] phasing | Sep 04 2009 10:01AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | Requires some advance notice for laser start-up | Oct 16 2009 12:46PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached. | Aug 27 2009 09:10AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Recalibrated 7/27/09. | Jul 28 2009 04:22PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Operational --- Uncalibrated and needs to be positioned at port | Jun 25 2009 05:08PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Down. Will not be fixed until vent. | Sep 24 2009 09:10AM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,edlund,ennever,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Since 1091022003, 110 channel is out of order. All others are operational.. | Oct 23 2009 09:16AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers working. 15 spatial channels operational. Calibrated | Oct 13 2009 07:49PM (yma) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | yes | Operational, and calibrated. | Oct 11 2009 03:01PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Oct 23 2009 10:59:56:717AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations applied | Aug 27 2009 09:09AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Cyopump hardware is not yet reinstalled in the cell. | Jul 14 2009 09:21PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | All 32 channels working and calibrated. | Oct 06 2009 11:17AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controller repaired. | Aug 23 2009 10:36PM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | operational at 80 MHz | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | antenna and FFT operational | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | available at 80 MHz and [0,pi,0,pi] phasing | Sep 04 2009 10:01AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | Requires some advance notice for laser start-up | Oct 16 2009 12:46PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached. | Aug 27 2009 09:10AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Recalibrated 7/27/09. | Jul 28 2009 04:22PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Operational --- Uncalibrated and needs to be positioned at port | Jun 25 2009 05:08PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Down. Will not be fixed until vent. | Sep 24 2009 09:10AM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,edlund,ennever,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Since 1091022003, 110 channel is out of order. All others are operational.. | Oct 23 2009 09:16AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers working. 15 spatial channels operational. Calibrated | Oct 13 2009 07:49PM (yma) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | yes | Operational, and calibrated. | Oct 11 2009 03:01PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Oct 23 2009 11:17:29:223AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations applied | Aug 27 2009 09:09AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Cyopump hardware is not yet reinstalled in the cell. | Jul 14 2009 09:21PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | All 32 channels working and calibrated. | Oct 06 2009 11:17AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controller repaired. | Aug 23 2009 10:36PM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | operational at 80 MHz | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | antenna and FFT operational | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | available at 80 MHz and [0,pi,0,pi] phasing | Sep 04 2009 10:01AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | Requires some advance notice for laser start-up | Oct 16 2009 12:46PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached. | Aug 27 2009 09:10AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Recalibrated 7/27/09. | Jul 28 2009 04:22PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Operational --- Uncalibrated and needs to be positioned at port | Jun 25 2009 05:08PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Down. Will not be fixed until vent. | Sep 24 2009 09:10AM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,edlund,ennever,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Since 1091022003, 110 channel is out of order. All others are operational.. | Oct 23 2009 09:16AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers working. 15 spatial channels operational. Calibrated | Oct 13 2009 07:49PM (yma) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | yes | Operational, and calibrated. | Oct 11 2009 03:01PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Oct 23 2009 11:30:55:713AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations applied | Aug 27 2009 09:09AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Cyopump hardware is not yet reinstalled in the cell. | Jul 14 2009 09:21PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | All 32 channels working and calibrated. | Oct 06 2009 11:17AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controller repaired. | Aug 23 2009 10:36PM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | operational at 80 MHz | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | antenna and FFT operational | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | available at 80 MHz and [0,pi,0,pi] phasing | Sep 04 2009 10:01AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | Requires some advance notice for laser start-up | Oct 16 2009 12:46PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached. | Aug 27 2009 09:10AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Recalibrated 7/27/09. | Jul 28 2009 04:22PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Operational --- Uncalibrated and needs to be positioned at port | Jun 25 2009 05:08PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Down. Will not be fixed until vent. | Sep 24 2009 09:10AM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,edlund,ennever,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Since 1091022003, 110 channel is out of order. All others are operational.. | Oct 23 2009 09:16AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers working. 15 spatial channels operational. Calibrated | Oct 13 2009 07:49PM (yma) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | yes | Operational, and calibrated. | Oct 11 2009 03:01PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Oct 23 2009 11:49:50:393AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations applied | Aug 27 2009 09:09AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed from the Cell, Piezo box on Igloo Removed. System in safe mode for In-Vessel Access | May 30 2008 02:25PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Cyopump hardware is not yet reinstalled in the cell. | Jul 14 2009 09:21PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | safely disabled; ready to be dismantled | May 28 2008 10:22AM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | power locked & tagged out; gate valve disabled | May 28 2008 10:03AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | no | 6/10/09 Magnetron relocated to west wall in cell at H-port. All controls and hardware have been installed but need to be tested prior to full operation. Magnetron Unplugged and Red tagged, PEI breaker red tagged, Safe for In-Vessel Activity | Jun 10 2009 02:35PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | All 32 channels working and calibrated. | Oct 06 2009 11:17AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controller repaired. | Aug 23 2009 10:36PM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Disconnect switch is open, reg tagged and locked. Shunt Trip Breaker is opened. Safe for in-vessel work. | Jun 04 2008 12:24PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | operational at 80 MHz | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | antenna and FFT operational | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | available at 80 MHz and [0,pi,0,pi] phasing | Sep 04 2009 10:01AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | Requires some advance notice for laser start-up | Oct 16 2009 12:46PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached. | Aug 27 2009 09:10AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Recalibrated 7/27/09. | Jul 28 2009 04:22PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Operational --- Uncalibrated and needs to be positioned at port | Jun 25 2009 05:08PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Down. Will not be fixed until vent. | Sep 24 2009 09:10AM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,edlund,ennever,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | Operational ---- ECDC running as required | Jun 19 2009 08:06AM (irby) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Since 1091022003, 110 channel is out of order. All others are operational.. | Oct 23 2009 09:16AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker now at K-Hor. Set for 100 uA of current. Will up to 200 uA before first plasma | Jun 18 2009 01:01PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers working. 15 spatial channels operational. Calibrated | Oct 13 2009 07:49PM (yma) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | yes | Operational, and calibrated. | Oct 11 2009 03:01PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|