Alcator C-Mod Run 1091110 Information

Back to runs

Miniproposals
Miniproposal:581
Date Filed: 9/28/2009
Title:High Density Target Plasma Antenna Operation
First Author:Steve Wukitch
Session Leader:Steve Wukitch (shots 1-34)

Operators
Session leader(s):Steve Wukitch
Physics operator(s):Ian Hutchinson,Robert Granetz,Ian Hutchinson
Engineering operator(s):Andy Pfeiffer,Bill Cochran,Gary Dekow

Engineering Operator Run Comment
automatically entered by signon - please replace with real comment

Session Leader Plans
Entered: Nov 9 2009 05:02:54:510PM
Author: Steve Wukitch
1. Start with 1091023011 DN discharge, NINJA puff as on 1091023007 (20
psi and two pulses), and moderate RF power (stay out of H-mode)

2. With DN and cryopump enabled.
a. NINJA puff start at 0.6 s for 0.1 s
b. NINJA puff start at 0.6 s for 0.2 s
c. NINJA puff start at 0.6 s for 0.4 s

3. Repeat #2 with target density to nl04~0.5 at 0.6 s.

Switch to optimizing He3 concentration for minority and mode conversion - USN discharge 109110929

4. scan He3 gas puff

5. scan minority resonance position

6. scan antenna phase

Switch to He if time permits

7. Fuel from main gas system and obtain highest neutral pressure
possible.

a. Take several discharges to switch over. (5 shots)
b. Reduce plasma current if unable to reach neutral pressure limit
using gas fueling alone.

Physics Operators Plans

Session Leader Summaries
Entered: Nov 13 2009 04:49:00:413PM
Author: Steve Wukitch
To raise the target density, we scanned NINJA plenum pressure from
20-30 psi with two NINJA puffs. Once the cryopump was cold, we needed
to operate at high plenum pressure (30 psi) to increase the density
sufficiently. We started J antenna on 007 with He3 at 150 msec puff
at 0.2 sec. We have a lower neutral pressure limit with NINJA puff,
~1 mtorr, than from B-side. However the density we can heat was
higher with NINJA puff, nebar ~2.5 x 10 ^20 m^-3.

The second half the day was dedicated to scanning He3 fraction to
optimize minority heating. The most effective concentration was ~0.1
a.u. and the resonance on the low field side. In L-mode, the best
discharges were 033 and 034.

Physics Operator Summaries
Entered: Nov 10 2009 05:06:48:060PM
Author: Ian Hutchinson
Pretty reliable day:

Scorecard

  Shot,Duration(s),Ipmax(MA),Result  Shot,Duration(s),Ipmax,Result
  |   01   1.892   0.809   Plasma  |   02   1.969   0.817   Plasma  |
  |   03   0.000   0.002   Dud     |   04   1.985   0.813   Plasma  |
  |   05   1.957   0.816   Plasma  |   06   1.952   0.811   Plasma  |
  |   07   1.934   0.807   Plasma  |   08   1.928   0.807   Plasma  |
  |   09   1.936   0.806   Plasma  |   10   1.943   1.004   Plasma  |
  |   11   1.937   1.001   Plasma  |   12   1.756   0.809   Plasma  |
  |   13   1.758   0.819   Plasma  |   14   1.714   0.812   Plasma  |
  |   15   1.784   0.809   Plasma  |   16   0.707   0.810   Plasma  |
  |   17   1.975   0.821   Plasma  |   18   1.964   0.819   Plasma  |
  |   19   1.968   0.823   Plasma  |   20   0.000   0.002   Dud     |
  |   21   1.236   0.820   Plasma  |   22   0.000   0.048   Fizzle  |
  |   23   0.963   0.818   Plasma  |   24   1.957   0.823   Plasma  |
  |   25   1.964   0.820   Plasma  |   26   1.959   0.819   Plasma  |
  |   27   1.954   0.815   Plasma  |   28   1.966   0.818   Plasma  |
  |   29   1.957   0.818   Plasma  |   30   1.967   0.821   Plasma  |
  |   31   1.962   0.821   Plasma  |   32   1.964   0.818   Plasma  |
  |   33   1.965   0.822   Plasma  |   34   1.964   0.825   Plasma  |
 
Date 1091110:  34 shots.  31 plasmas.   1 fizzles.   2 duds.   0 System Error.
        (Plasma = Ip gt 60.0 kA   Dud = H_alpha lt  0.40 V)
Total plasma duration: 56.84 s (exceeding  -81 kA)

Session Leader Comments
Nov 10 2009 09:10:51:850AM1091110001Steve Wukitchplasma

neutral pressure (ratiomatic) ~0.8 mtorr

NINJA: first puff @0.15 s and second puff ~0.8 s

next: enable cryopump, first puff @0.6 and second at 0.8s 20 psi
Nov 10 2009 09:34:55:640AM1091110002Steve Wukitchplasma

density was ~15% lower and neutral pressure was ~0.45 mtor with cryopump active

next: raise NINJA plenum pressure to 25 psi from 30 psi.

Nov 10 2009 09:40:56:140AM1091110003Steve Wukitchno plasma

we attempted a shot while a computer reboot (to fix RF_monitor) was underway
Nov 10 2009 10:06:01:150AM1091110004Steve Wukitchplasma

density increased only to 1.05 with NINJA pressure to 25 psi

next: increase plenum pressure to 30 psi.
Nov 10 2009 10:19:42:313AM1091110005Steve Wukitchplasma

density to nl04~1.2

next: raise target density to nl04~1 at 0.6 s
Nov 10 2009 10:26:25:003AM1091110006Steve Wukitchplasma

nl04~1.23 with neutral pressure ~0.9 mtorr

next: enable He3 (150 msec puff) and J antenna
Nov 10 2009 11:24:11:493AM1091110007Steve Wukitchplasma

higher density yet with neutral pressure ~1 mtorr

no J

next: try again

Nov 10 2009 11:23:33:213AM1091110008Steve Wukitchplasma

still no J - tube arc on FMIT#4

next: try again

Nov 10 2009 11:23:14:353AM1091110009Steve Wukitchplasma

still no J

next: raise Ip to 1 MA
Nov 10 2009 11:22:59:447AM1091110010Steve Wukitchplasma

J still struggled and nl04 reaches 1.35

next: retune J, cell access for HIREX
Nov 10 2009 11:38:49:110AM1091110011Steve Wukitchplasma

J ran intermittantly

next: find J neutral pressure limit by ramping density under feedback control
No NINJA
No cryopump
Nov 10 2009 11:51:20:630AM1091110012Steve Wukitchplasma

good density ramp

bloody J antenna ran to higher neutral pressure

next: repeat with J to higher power and better match
Nov 10 2009 12:16:55:250PM1091110013Steve Wukitchplasma

yuk H-modes! Again can't get them when you want them and can't avoid them when you want to

next: USN with density ramp- where is the neutral pressure limit.
Nov 10 2009 12:27:50:190PM1091110014Steve Wukitchplasma

USN - wild density trace - did not reach neutral pressure limit

next: enable NINJA without cryopump - 20 psi plenum pressure
Nov 10 2009 12:46:25:323PM1091110015Steve Wukitchplasma

USN - MARFE - Neutral pressure limit ~1 mtorr

next: move to He3 concentration scan
Nov 10 2009 01:09:29:097PM1091110016Steve Wukitchplasma - flash heating treatment

next: retry
Nov 10 2009 01:36:42:653PM1091110017Steve Wukitchplasma

good modulation - good heating @125 ms He3 puff - 0.15 a.u.

He monitor indicates the He was pumping out due to cold cryopump

next: repeat with cryopump off
Nov 10 2009 01:40:38:250PM1091110018Steve Wukitchplasma

less heating, more injections - would pump-puff with cryo be better?

higher He3 0.2 a.u.

next: lower puff to 75 ms

Nov 10 2009 01:43:16:330PM1091110019Steve Wukitchplasma

He3 to 0.17 a.u.

bit better heating

next: 50 ms puff
Nov 10 2009 01:55:42:573PM1091110020Steve Wukitchno power
Nov 10 2009 02:10:14:277PM1091110021Steve Wukitchplasma - flash heating ~1.22 s

50 ms gas puff but very little registers on the He monitor

He monitor is ~0.13 a.u.

neutron rate is typical a bit higher but Te central is lower than 75 ms puff.

next: repeat minus disruption


Nov 10 2009 02:31:47:330PM1091110022Steve Wukitchfizzle
Nov 10 2009 02:38:50:990PM1091110023Steve Wukitchplasma - flash heating for hydrogenic species removal ~0.96 s

He is even lower - heating is poorer

He monitor ~0.065 a.u.

next: raise He puff to 100 ms
Nov 10 2009 02:52:58:683PM1091110024Steve Wukitchplasma

good heating until He level erodes below ~0.1 a.u.

next: He puff to 150 ms

Nov 10 2009 03:02:41:967PM1091110025Steve Wukitchplasma

injections early confuse things but electron heating is more prompt

neutrons are down

He monitor up to 0.24 a.u.

next: He3 puff to 200 ms
Nov 10 2009 03:30:17:790PM1091110027Steve Wukitchplasma

good RF modulation

next: He3 puff to 100 ms; +90deg phase
Nov 10 2009 03:51:01:127PM1091110028Steve Wukitchplasma

He fraction is still high

J antenna phase +90

next: repeat - hopefully He will decrease
Nov 10 2009 04:14:54:560PM1091110030Steve Wukitchplasma

He3 is close to optimal more minority heating
phase is closer to +45

next: He3 puff 100 ms, phase to 180deg
Nov 10 2009 04:29:28:987PM1091110031Steve Wukitchplasma

good heating, good He3 fraction

next: raise Bt to 5.6 T
Nov 10 2009 04:45:38:540PM1091110032Steve Wukitchplasma

good match of He3 resonance and q=1 surface
He3 is too high

next: lower target density, raise E power, no He3 puff
Nov 10 2009 04:57:20:450PM1091110033Steve Wukitchplasma

higher neutron rate than expected

He3 level is good ~0.1 a.u.

next: 5.7 T and 75 ms He3 puff
Nov 10 2009 05:04:53:560PM1091110034Steve Wukitchplasma

good He fraction - higher neutron rate

need to compare sawtooth evolution with previous

End of Run

Physics Operator Comments
Nov 10 2009 09:03:55:893AMIan HutchinsonLoad from 1091023011
Nov 10 2009 09:15:45:070AM1091110001Ian HutchinsonPlasma to rampdown.

Fill puff to 45ms at -.3s
PG1 to 40ms at +.3s. This is B-side lower at 1.1psi Ar.
Nov 10 2009 09:24:45:480AM1091110002Ian HutchinsonPlasma to rampdown.
Nov 10 2009 09:50:07:677AM1091110003Ian HutchinsonNo power
Nov 10 2009 10:08:44:357AM1091110004Ian HutchinsonPlasma to rampdown.
Nov 10 2009 10:09:10:170AM1091110005Ian HutchinsonPlasma to rampdown.

Raisel nl04 to 1e20.
Nov 10 2009 10:32:30:147AM1091110006Ian HutchinsonPlasma to rampdown.

Enable B-side upper with 15psi of He3 [At ENORMOUS expense]
PG2 puff 150ms starting at .2s
Nov 10 2009 10:45:50:353AM1091110007Ian HutchinsonPlasma to rampdown.
Nov 10 2009 12:04:39:260PM1091110008Ian HutchinsonPlasma to rampdown.
Nov 10 2009 10:58:32:373AM1091110009Robert Granetz
Granetz covering as physics operator for Ian for about an hour.  I loaded shot 9 (repeat of shot 8). 

Nov 10 2009 11:09:51:380AM1091110009Robert Granetz
Shot 09 -- Plasma, full length.  0.8 MA, 5.4 T, 1.3e20 m-2.  USN, but almost DN.  Prf=1.0 MW, from E only.
           Startup wasn't so good.

Next shot: increase Ip to 1.0 MA; increase pre-fill pulse by 2 ms

Nov 10 2009 11:26:29:277AM1091110010Robert Granetz
Shot 10 -- Plasma, full length.  1.0 MA, 5.4 T, 1.3e20 m-2, varying between USN and DN.
           Prf_E=1.0 MW.  Startup was somewhat better.

Next shot: no DPCS changes

Nov 10 2009 11:40:58:720AM1091110011Robert Granetz
Shot 11 -- Plasma, full length.  1.0 MA.  E ran well; J spitted a lot.

Next shot: no NINJA; no cryopump; decrease Ip to 0.8 MA, program nl_04 to ramp as per
           session leader's verbal specification; decrease pre-fill to 24 ms (because
           cryopump will be off)

Nov 10 2009 11:48:41:143AM1091110012Robert Granetz
Shot 12 -- Plasma, nearly full length.  0.8 MA, nl_04 ramps from 0.9 to 1.3e20 m-2.
           Varying between DN and USN.  E and J both ran reasonably well.  Prf=2.0 MW.
           Startup was not so good.

Next shot: increase pre-fill pulse by 2 ms

Nov 10 2009 12:09:52:013PM1091110013Robert Granetz
Shot 13 -- Plasma, nearly full length.  0.8 MA.  Density programming was masked by multiple short
           H-modes.  J faulted a lot; E had some faulting too.

Ian is back and will take over as physics operator after this shot. 

Nov 10 2009 12:34:55:850PM1091110014Ian HutchinsonBefore this shot:
Load segment 2 from 1091109029. Upper null
program nl04 to .8 at .8 1.5 at 1.3.
Load

Plasma to rampdown. Disrupts at .5MA. Some injections.

Program nl04 to .9 flat.
Nov 10 2009 12:51:28:497PM1091110015Ian HutchinsonPlasma to rampdown.

nl04 to 0.8
Nov 10 2009 01:14:45:973PM1091110016Ian HutchinsonPlasma disrupts at .7s. VDE caused by OH2U crowbar at .6s.
Nov 10 2009 01:32:23:510PM1091110017Ian HutchinsonPlasma to rampdown. Cryo was unexpectedly on. Still initiation worked.
Nov 10 2009 01:43:01:000PM1091110018Ian HutchinsonPlasma to rampdown.

He3 puff to 75ms.
Nov 10 2009 02:06:10:257PM1091110019Ian HutchinsonPlasma to rampdown.

He3 puff to 50ms.
Nov 10 2009 02:20:58:967PM1091110021Ian HutchinsonPlasma disrupts at 1.2s.Big injection.

Raise gas fill to 34ms.
Nov 10 2009 02:32:05:457PM1091110022Ian HutchinsonFizzle. Too much gas.
Nov 10 2009 02:46:09:587PM1091110023Ian HutchinsonPlasma disrupts at .96s.

He3 puff to 100ms.
Nov 10 2009 03:02:33:530PM1091110024Ian HutchinsonPlasma to rampdown.

He3 puff to 150ms.
Nov 10 2009 03:12:36:660PM1091110025Ian HutchinsonPlasma to rampdown.

He3 puff to 200ms.
Nov 10 2009 03:27:38:260PM1091110026Ian HutchinsonPlasma to rampdown.

He3 puff to 300ms.
Nov 10 2009 03:38:34:543PM1091110027Ian HutchinsonPlasma to rampdown.

He puff to 100ms.
Nov 10 2009 03:53:59:207PM1091110028Ian HutchinsonPlasma to rampdown.
Nov 10 2009 04:08:47:557PM1091110029Ian HutchinsonPlasma to rampdown

He3 puff to zero.
Nov 10 2009 04:21:13:077PM1091110030Ian HutchinsonPlasma to rampdown.

He3 to 100ms.
Nov 10 2009 04:38:21:583PM1091110031Ian HutchinsonPlasma to rampdown

Bt to 5.6T. IBT=155kA.
Nov 10 2009 04:56:01:777PM1091110032Ian HutchinsonPlasma to rampdown.

nl04 to 0.6e20.
Zero He3 puff.
Nov 10 2009 05:05:44:233PM1091110033Ian HutchinsonPlasma to rampdown.

IBT to 157.5kA
He3 to 75ms.

Engineering Operator Comments
ShotTimeTypeStatusComment
109:01:37:347AMPlasmaOk
209:15:10:287AMPlasmaOk
309:27:51:120AMPlasmaOkNo Power shot pcdaqeng1 hung up
409:48:09:240AMPlasmaOk
510:03:22:743AMPlasmaOk
610:16:54:547AMPlasmaOk
710:29:42:567AMPlasmaOk
810:43:23:713AMPlasmaOk
910:58:50:220AMPlasmaOk
1011:16:28:600AMPlasmaOk
1111:29:41:027AMPlasmaOk
1211:43:30:300AMPlasmaOk
1312:03:16:180PMPlasmaOk
1412:16:40:077PMPlasmaOk
1512:32:57:770PMPlasmaOk
1612:46:12:290PMPlasmaBadOH2L Type 1 Flt
1701:10:58:410PMPlasmaOk
1801:24:51:430PMPlasmaOk
1901:38:01:187PMPlasmaOk
2001:51:33:240PMPlasmaBadPF breaker during init
2102:03:05:473PMPlasmaOk
2202:18:22:420PMPlasmaOk
2302:31:11:050PMPlasmaOk
2402:43:58:130PMPlasmaOk
2502:57:14:480PMPlasmaOk
2603:10:00:313PMPlasmaOk
2703:22:46:223PMPlasmaOk
2803:35:27:043PMPlasmaOk
2903:48:59:627PMPlasmaOk
3004:03:23:570PMPlasmaOk
3104:17:53:230PMPlasmaOk
3204:31:26:377PMPlasmaOk
3304:44:14:507PMPlasmaOk
3404:59:45:217PMPlasmaOk

System Availability
Nov 10 2009 09:01:03:377AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle in the cell with valve closed. PV4 closed for backfill.Oct 27 2009 10:36AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll 32 channels working and calibrated.Oct 06 2009 11:17AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown. Will not be fixed until vent.Sep 24 2009 09:10AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoPowered down and TaggedOct 27 2009 10:44AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091022003, 110 channel is out of order. All others are operational..Oct 23 2009 09:16AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Nov 10 2009 09:50:36:613AM
Only YAG1 fired 75 pulses this shot.
Nov 10 2009 10:02:51:930AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle in the cell with valve closed. PV4 closed for backfill.Oct 27 2009 10:36AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll 32 channels working and calibrated.Oct 06 2009 11:17AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown. Will not be fixed until vent.Sep 24 2009 09:10AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoPowered down and TaggedOct 27 2009 10:44AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091022003, 110 channel is out of order. All others are operational..Oct 23 2009 09:16AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Nov 10 2009 10:07:17:840AM
Only YAG2 was fired 75 pulses this shot.
Next shot, fire both YAGs in normal basis.
Nov 10 2009 10:08:26:010AM
The beams look std, while PLC control from computer died.
Nov 10 2009 10:16:25:107AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle in the cell with valve closed. PV4 closed for backfill.Oct 27 2009 10:36AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll 32 channels working and calibrated.Oct 06 2009 11:17AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown. Will not be fixed until vent.Sep 24 2009 09:10AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoPowered down and TaggedOct 27 2009 10:44AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091022003, 110 channel is out of order. All others are operational..Oct 23 2009 09:16AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Nov 10 2009 10:29:18:817AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle in the cell with valve closed. PV4 closed for backfill.Oct 27 2009 10:36AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll 32 channels working and calibrated.Oct 06 2009 11:17AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown. Will not be fixed until vent.Sep 24 2009 09:10AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoPowered down and TaggedOct 27 2009 10:44AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091022003, 110 channel is out of order. All others are operational..Oct 23 2009 09:16AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Nov 10 2009 10:42:56:743AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle in the cell with valve closed. PV4 closed for backfill.Oct 27 2009 10:36AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll 32 channels working and calibrated.Oct 06 2009 11:17AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown. Will not be fixed until vent.Sep 24 2009 09:10AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoPowered down and TaggedOct 27 2009 10:44AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091022003, 110 channel is out of order. All others are operational..Oct 23 2009 09:16AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Nov 10 2009 10:58:21:843AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle in the cell with valve closed. PV4 closed for backfill.Oct 27 2009 10:36AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll 32 channels working and calibrated.Oct 06 2009 11:17AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown. Will not be fixed until vent.Sep 24 2009 09:10AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoPowered down and TaggedOct 27 2009 10:44AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091022003, 110 channel is out of order. All others are operational..Oct 23 2009 09:16AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Nov 10 2009 11:15:45:787AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle in the cell with valve closed. PV4 closed for backfill.Oct 27 2009 10:36AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll 32 channels working and calibrated.Oct 06 2009 11:17AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown. Will not be fixed until vent.Sep 24 2009 09:10AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoPowered down and TaggedOct 27 2009 10:44AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091022003, 110 channel is out of order. All others are operational..Oct 23 2009 09:16AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Nov 10 2009 11:29:14:650AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle in the cell with valve closed. PV4 closed for backfill.Oct 27 2009 10:36AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll 32 channels working and calibrated.Oct 06 2009 11:17AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown. Will not be fixed until vent.Sep 24 2009 09:10AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoPowered down and TaggedOct 27 2009 10:44AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091022003, 110 channel is out of order. All others are operational..Oct 23 2009 09:16AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Nov 10 2009 11:43:05:750AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle in the cell with valve closed. PV4 closed for backfill.Oct 27 2009 10:36AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll 32 channels working and calibrated.Oct 06 2009 11:17AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown. Will not be fixed until vent.Sep 24 2009 09:10AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoPowered down and TaggedOct 27 2009 10:44AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091022003, 110 channel is out of order. All others are operational..Oct 23 2009 09:16AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Nov 10 2009 12:02:50:510PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle in the cell with valve closed. PV4 closed for backfill.Oct 27 2009 10:36AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll 32 channels working and calibrated.Oct 06 2009 11:17AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown. Will not be fixed until vent.Sep 24 2009 09:10AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoPowered down and TaggedOct 27 2009 10:44AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091022003, 110 channel is out of order. All others are operational..Oct 23 2009 09:16AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Nov 10 2009 12:16:08:263PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle in the cell with valve closed. PV4 closed for backfill.Oct 27 2009 10:36AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll 32 channels working and calibrated.Oct 06 2009 11:17AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown. Will not be fixed until vent.Sep 24 2009 09:10AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoPowered down and TaggedOct 27 2009 10:44AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091022003, 110 channel is out of order. All others are operational..Oct 23 2009 09:16AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Nov 10 2009 12:32:30:740PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle in the cell with valve closed. PV4 closed for backfill.Oct 27 2009 10:36AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll 32 channels working and calibrated.Oct 06 2009 11:17AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown. Will not be fixed until vent.Sep 24 2009 09:10AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoPowered down and TaggedOct 27 2009 10:44AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091022003, 110 channel is out of order. All others are operational..Oct 23 2009 09:16AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Nov 10 2009 12:45:42:620PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle in the cell with valve closed. PV4 closed for backfill.Oct 27 2009 10:36AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll 32 channels working and calibrated.Oct 06 2009 11:17AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown. Will not be fixed until vent.Sep 24 2009 09:10AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoPowered down and TaggedOct 27 2009 10:44AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091022003, 110 channel is out of order. All others are operational..Oct 23 2009 09:16AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Nov 10 2009 01:09:14:440PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle in the cell with valve closed. PV4 closed for backfill.Oct 27 2009 10:36AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll 32 channels working and calibrated.Oct 06 2009 11:17AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown. Will not be fixed until vent.Sep 24 2009 09:10AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoPowered down and TaggedOct 27 2009 10:44AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091022003, 110 channel is out of order. All others are operational..Oct 23 2009 09:16AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Nov 10 2009 01:24:27:120PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle in the cell with valve closed. PV4 closed for backfill.Oct 27 2009 10:36AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll 32 channels working and calibrated.Oct 06 2009 11:17AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown. Will not be fixed until vent.Sep 24 2009 09:10AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoPowered down and TaggedOct 27 2009 10:44AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091022003, 110 channel is out of order. All others are operational..Oct 23 2009 09:16AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Nov 10 2009 01:37:36:873PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle in the cell with valve closed. PV4 closed for backfill.Oct 27 2009 10:36AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll 32 channels working and calibrated.Oct 06 2009 11:17AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown. Will not be fixed until vent.Sep 24 2009 09:10AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoPowered down and TaggedOct 27 2009 10:44AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091022003, 110 channel is out of order. All others are operational..Oct 23 2009 09:16AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Nov 10 2009 01:51:04:253PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle in the cell with valve closed. PV4 closed for backfill.Oct 27 2009 10:36AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll 32 channels working and calibrated.Oct 06 2009 11:17AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown. Will not be fixed until vent.Sep 24 2009 09:10AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoPowered down and TaggedOct 27 2009 10:44AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091022003, 110 channel is out of order. All others are operational..Oct 23 2009 09:16AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Nov 10 2009 02:02:34:973PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle in the cell with valve closed. PV4 closed for backfill.Oct 27 2009 10:36AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll 32 channels working and calibrated.Oct 06 2009 11:17AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown. Will not be fixed until vent.Sep 24 2009 09:10AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoPowered down and TaggedOct 27 2009 10:44AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091022003, 110 channel is out of order. All others are operational..Oct 23 2009 09:16AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Nov 10 2009 02:17:52:607PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle in the cell with valve closed. PV4 closed for backfill.Oct 27 2009 10:36AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll 32 channels working and calibrated.Oct 06 2009 11:17AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown. Will not be fixed until vent.Sep 24 2009 09:10AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoPowered down and TaggedOct 27 2009 10:44AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091022003, 110 channel is out of order. All others are operational..Oct 23 2009 09:16AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Nov 10 2009 02:30:41:877PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle in the cell with valve closed. PV4 closed for backfill.Oct 27 2009 10:36AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll 32 channels working and calibrated.Oct 06 2009 11:17AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown. Will not be fixed until vent.Sep 24 2009 09:10AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoPowered down and TaggedOct 27 2009 10:44AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091022003, 110 channel is out of order. All others are operational..Oct 23 2009 09:16AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Nov 10 2009 02:43:32:367PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle in the cell with valve closed. PV4 closed for backfill.Oct 27 2009 10:36AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll 32 channels working and calibrated.Oct 06 2009 11:17AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown. Will not be fixed until vent.Sep 24 2009 09:10AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoPowered down and TaggedOct 27 2009 10:44AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091022003, 110 channel is out of order. All others are operational..Oct 23 2009 09:16AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Nov 10 2009 02:56:48:060PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle in the cell with valve closed. PV4 closed for backfill.Oct 27 2009 10:36AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll 32 channels working and calibrated.Oct 06 2009 11:17AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown. Will not be fixed until vent.Sep 24 2009 09:10AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoPowered down and TaggedOct 27 2009 10:44AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091022003, 110 channel is out of order. All others are operational..Oct 23 2009 09:16AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Nov 10 2009 03:09:26:987PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle in the cell with valve closed. PV4 closed for backfill.Oct 27 2009 10:36AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll 32 channels working and calibrated.Oct 06 2009 11:17AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown. Will not be fixed until vent.Sep 24 2009 09:10AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoPowered down and TaggedOct 27 2009 10:44AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091022003, 110 channel is out of order. All others are operational..Oct 23 2009 09:16AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Nov 10 2009 03:22:16:223PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle in the cell with valve closed. PV4 closed for backfill.Oct 27 2009 10:36AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll 32 channels working and calibrated.Oct 06 2009 11:17AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown. Will not be fixed until vent.Sep 24 2009 09:10AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoPowered down and TaggedOct 27 2009 10:44AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091022003, 110 channel is out of order. All others are operational..Oct 23 2009 09:16AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Nov 10 2009 03:35:01:650PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle in the cell with valve closed. PV4 closed for backfill.Oct 27 2009 10:36AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll 32 channels working and calibrated.Oct 06 2009 11:17AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown. Will not be fixed until vent.Sep 24 2009 09:10AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoPowered down and TaggedOct 27 2009 10:44AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091022003, 110 channel is out of order. All others are operational..Oct 23 2009 09:16AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Nov 10 2009 03:48:31:470PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle in the cell with valve closed. PV4 closed for backfill.Oct 27 2009 10:36AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll 32 channels working and calibrated.Oct 06 2009 11:17AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown. Will not be fixed until vent.Sep 24 2009 09:10AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoPowered down and TaggedOct 27 2009 10:44AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091022003, 110 channel is out of order. All others are operational..Oct 23 2009 09:16AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Nov 10 2009 04:02:55:727PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle in the cell with valve closed. PV4 closed for backfill.Oct 27 2009 10:36AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll 32 channels working and calibrated.Oct 06 2009 11:17AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown. Will not be fixed until vent.Sep 24 2009 09:10AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoPowered down and TaggedOct 27 2009 10:44AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091022003, 110 channel is out of order. All others are operational..Oct 23 2009 09:16AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Nov 10 2009 04:17:27:153PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle in the cell with valve closed. PV4 closed for backfill.Oct 27 2009 10:36AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll 32 channels working and calibrated.Oct 06 2009 11:17AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown. Will not be fixed until vent.Sep 24 2009 09:10AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoPowered down and TaggedOct 27 2009 10:44AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091022003, 110 channel is out of order. All others are operational..Oct 23 2009 09:16AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Nov 10 2009 04:30:55:720PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle in the cell with valve closed. PV4 closed for backfill.Oct 27 2009 10:36AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll 32 channels working and calibrated.Oct 06 2009 11:17AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown. Will not be fixed until vent.Sep 24 2009 09:10AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoPowered down and TaggedOct 27 2009 10:44AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091022003, 110 channel is out of order. All others are operational..Oct 23 2009 09:16AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Nov 10 2009 04:43:45:443PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle in the cell with valve closed. PV4 closed for backfill.Oct 27 2009 10:36AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll 32 channels working and calibrated.Oct 06 2009 11:17AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown. Will not be fixed until vent.Sep 24 2009 09:10AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoPowered down and TaggedOct 27 2009 10:44AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091022003, 110 channel is out of order. All others are operational..Oct 23 2009 09:16AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Nov 10 2009 04:59:14:073PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle in the cell with valve closed. PV4 closed for backfill.Oct 27 2009 10:36AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll 32 channels working and calibrated.Oct 06 2009 11:17AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown. Will not be fixed until vent.Sep 24 2009 09:10AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoPowered down and TaggedOct 27 2009 10:44AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091022003, 110 channel is out of order. All others are operational..Oct 23 2009 09:16AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke