| Physics Operator Comments |
| Nov 17 2009 09:00:58:057AM | | Ian Hutchinson | Load from 1090710015, which is the recommended low field startup for that day.
Call all predictors. Do so till no warning comes on load.
Set Ip to 0.6MA. Nl04 to 0.5e20.
Fiddle with async_pros dpcs_fizzle to use shot 1090731017.
|
| Nov 17 2009 09:50:04:090AM | 1091117001 | Ian Hutchinson | Plasma disrupts at 1.3s. Appears to be vertically unstable.
Lower clearin from .012 to .009. Increase zxu to 1cm from 0.
Long wait for data system.
|
| Nov 17 2009 09:50:17:137AM | 1091117002 | Ian Hutchinson | No power shot
|
| Nov 17 2009 10:09:23:637AM | 1091117003 | Ian Hutchinson | Load segment 2 from 1090911030 which is the early divert shot, but needs some
more adjustment, into segment 3.
Call predictors.
Set Ip to .6MA in seg 3.
Import seg 1 from 1090911030 to seg 4. Call predictors.
None of this is active yet. Go ahead with shot, since data system might be fixed.
|
| Nov 17 2009 10:21:39:777AM | 1091117003 | Ian Hutchinson | Plasma to rampdown.
Seg 3. Nl04 to .5e20. zcur kept at -.005 versus ramping to zero.
OH1V to 200V at seg switch.
Turn on Seg 3 instead of Seg 2.
|
| Nov 17 2009 10:50:13:073AM | 1091117004 | Ian Hutchinson | Plasma to rampdown! Unfortunately Bt was wrong and ramped up to 5.4T
Set TF current to 93500. Add rcur point at .15s at .665 (vs .662).
Set nl04 to .5 at .13s.
|
| Nov 17 2009 10:50:35:310AM | 1091117005 | Ian Hutchinson | Plasma to rampdown.
Enable Ar at 50ms puff. Ramp zcur to ~0 so as to keep kappa at >1.7
Tweak rcur out at .2s
|
| Nov 17 2009 11:09:25:370AM | 1091117006 | Ian Hutchinson | Plasma to rampdown. Multiple H-modes.
Rcur to .668 at .15s. Clearin to .013 from .014 at .13s
|
| Nov 17 2009 11:15:06:150AM | 1091117007 | Ian Hutchinson | Plasma to rampdown.
Add 0.5 derivative to clearin during .09 to .15s.
Nl04 to .65e20
Fill puff to 19ms from 17.
|
| Nov 17 2009 11:30:23:747AM | 1091117008 | Ian Hutchinson | Plasma to rampdown. Startup bounces improved.
OH1V to 100V at .13s try to prevent the overshoot on clearin.
nl04 to .7e20
|
| Nov 17 2009 11:43:06:900AM | 1091117009 | Ian Hutchinson | Plasma to rampdown. The OH1V is the right knob. Clearin overshot is moderated.
OH1V move last 200V to .1s from .12s
|
| Nov 17 2009 11:58:50:450AM | 1091117010 | Ian Hutchinson | Plasma disrupts at .65s. Big radiative event. Clearin overshoot mostly fixed.
OH1V to 50V at .13s. Clearin integral to 1. early.
|
| Nov 17 2009 12:08:36:260PM | 1091117011 | Ian Hutchinson | Plasma to rampdown.
Raise zxl at .3s on to move strikepoint on to plate earlier.
Set zcur to -.008 at .125s.
Set OH2u/l voltage to 70V at .04s (from 80V).
|
| Nov 17 2009 12:27:51:230PM | 1091117012 | Ian Hutchinson | Plasma to rampdown.
OH2Vs to 60V at 40ms.
EF3V to 2500V at 5ms (from 2400V).
|
| Nov 17 2009 12:42:58:150PM | 1091117013 | Ian Hutchinson | Plasma to rampdown.
EF1L voltage to 100V at .08s in segment 1. This asymmetrizes EF1s.
|
| Nov 17 2009 12:55:52:340PM | 1091117014 | Ian Hutchinson | Plasma to rampdown. The volt-seconds used in rampup is substantially reduced by
the RF injected (c.f. shot 13).
|
| Nov 17 2009 01:15:37:120PM | 1091117015 | Ian Hutchinson | Plasma to rampdown.
Decrease EF1u/l voltage in segment 1, and resymmetrize.
Speed up the segment 1 chopper ramp.
|
| Nov 17 2009 01:23:48:497PM | 1091117016 | Ian Hutchinson | Plasma to rampdown.
EF1V to 120V at 65ms.
|
| Nov 17 2009 01:37:47:497PM | 1091117017 | Ian Hutchinson | Plasma to rampdown.
raise nl04 to .8e20
EF2V to -150 at .08s. seg 1.
EF1V to 80V at .08s in seg 1.
|
| Nov 17 2009 01:48:21:230PM | 1091117018 | Ian Hutchinson | Plasma to rampdown.
EF2V to -150 at .06s.
EF1V to 70V at .065s.
|
| Nov 17 2009 02:18:32:620PM | 1091117019 | Ian Hutchinson | Plasma disrupts at 1.26s.
EF1V to 50V at .065s
|
| Nov 17 2009 02:13:23:480PM | 1091117020 | Bill Rowan | 020. Disruption at 0.7s. Looks like an injection.
Next shot. No PCS changes
|
| Nov 17 2009 02:19:05:467PM | 1091117021 | Bill Rowan | 021. Plsama through the ramp down.
several h-modes.
Next shot
Ian back
|
| Nov 17 2009 02:46:40:513PM | 1091117022 | Ian Hutchinson | Gas puff of 42V programmed from .2 to .4s.
EF1V to 0V at .065s
Plasma to rampdown.
Gas puff 100V from .2 to .4s.
OH1V to 50V at .115s
|
| Nov 17 2009 03:09:54:150PM | 1091117023 | Ian Hutchinson | Plasma disrupts at 0.68s.
EF2V to -100V at .08s in seg 3.
OH1V to 30V at .115s
|
| Nov 17 2009 03:22:47:560PM | 1091117024 | Ian Hutchinson | Plasma disrupts in rampdown.
EF1Vs to 0V at .042s.
Start OH1V ramp at .085s.
Ip to 0.45MA.
|
| Nov 17 2009 03:36:32:170PM | 1091117025 | Ian Hutchinson | Plasma disrupts at .98s. Failed to reduce the current because of making change
to segment 2 rather than 3.
Make real Ip change. Make real EF1V change. Looks like OH1V was properly entered.
|
| Nov 17 2009 03:50:31:933PM | 1091117026 | Ian Hutchinson | Plasma disrupts at 1.24s
Start zcur ramp at 60ms vs 70ms in seg 1.
Make seg3 OH1 voltage ramp earlier.
EF1V to -50V
|
| Nov 17 2009 04:02:51:717PM | 1091117027 | Ian Hutchinson | Plasma disrupts at .68s
Remove nl04 voltage puff and lower early nl04 point.
EF1V to -100V seg 1.
|
| Nov 17 2009 04:20:12:983PM | 1091117028 | Ian Hutchinson | Plasma to rampdown.
Ramp zcur faster in seg 1 and 3.
EF1V to -200V.
|
| Nov 17 2009 04:28:02:967PM | 1091117029 | Ian Hutchinson | Plasma to rampdown.
The bizarre startup is caused by having copied the EF2 voltage into the
EF1 trace!
Now EF2V are at -200V. EF1V to -150V.
|
| Nov 17 2009 04:42:03:387PM | 1091117030 | Ian Hutchinson | Plasma to .88s.
Turn nl04 gain down to 1 at .25s. Add a preprogrammed 10V puff instead.
OH1V to 350V at .072s (small increase).
|
| Nov 17 2009 04:53:56:857PM | 1091117031 | Ian Hutchinson | Plasma to rampdown.
Import segment 3 into segment 2. Turn off seg 3. Turn on seg 2.
Remove gas puff and put gain back into nl04 at .7e20.
Start segment 1 zcur ramp at .065s.
|
| System Availability |
| Nov 17 2009 09:00:53:573AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations applied | Aug 27 2009 09:09AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | | Nov 13 2009 06:37AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | yes | Operational | Nov 09 2009 09:12AM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | | Nov 09 2009 09:13AM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | All 32 channels working and calibrated. | Oct 06 2009 11:17AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controller repaired. | Aug 23 2009 10:36PM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Oct 27 2009 10:39AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | operational at 80 MHz | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | antenna and FFT operational | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | available at 80 MHz and [0,pi,0,pi] phasing | Sep 04 2009 10:01AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | Requires some advance notice for laser start-up | Oct 16 2009 12:46PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached. | Aug 27 2009 09:10AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Recalibrated 7/27/09. | Jul 28 2009 04:22PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Power back on morning of 11/09 before run | Nov 09 2009 09:10AM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. | Nov 12 2009 02:36PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,edlund,ennever,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Nov 13 2009 06:38AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Since 1091112000, 110 channel has been reinstalled. All channels are operational. | Nov 12 2009 09:19AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker back in operation before 11/09 run | Nov 09 2009 09:11AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers working. 15 spatial channels operational. Calibrated | Oct 13 2009 07:49PM (yma) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | yes | Operational, and calibrated. | Oct 11 2009 03:01PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Nov 17 2009 10:51:41:543AM |
good discharge, ran all thru rampdown
plasma shape good
level trajectories of li, gaps, q95, etc in flattop
divert at 120 ms
ICRF is warming up
|
| Nov 17 2009 11:14:15:467AM |
good discharge
ICRF gave 1.5 MW in flattop, H-mode(s) begin soon after end of rampup
density is low so lots of ELM free H-modes
q95 = 4, kappa = 1.7, li(H-mode) = 1.25
getting close to H-mode flattop baseline, will raise density next
radiation bursts are occuring
|
| Nov 17 2009 11:15:35:793AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations applied | Aug 27 2009 09:09AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | | Nov 13 2009 06:37AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | yes | Operational | Nov 09 2009 09:12AM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | | Nov 09 2009 09:13AM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | All 32 channels working and calibrated. | Oct 06 2009 11:17AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controller repaired. | Aug 23 2009 10:36PM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Oct 27 2009 10:39AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | operational at 80 MHz | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | antenna and FFT operational | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | available at 80 MHz and [0,pi,0,pi] phasing | Sep 04 2009 10:01AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | Requires some advance notice for laser start-up | Oct 16 2009 12:46PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached. | Aug 27 2009 09:10AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Recalibrated 7/27/09. | Jul 28 2009 04:22PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Power back on morning of 11/09 before run | Nov 09 2009 09:10AM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. | Nov 12 2009 02:36PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,edlund,ennever,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Nov 13 2009 06:38AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Since 1091112000, 110 channel has been reinstalled. All channels are operational. | Nov 12 2009 09:19AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker back in operation before 11/09 run | Nov 09 2009 09:11AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers working. 15 spatial channels operational. Calibrated | Oct 13 2009 07:49PM (yma) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | yes | Operational, and calibrated. | Oct 11 2009 03:01PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Nov 17 2009 11:28:02:497AM |
higher density improved flattop H-modes a bit
steadier H-mode features in li, kappa
ICRF is good, flat at 1.5 MW
radiated power up around 1.2 MW with lare variations
|
| Nov 17 2009 11:28:54:480AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations applied | Aug 27 2009 09:09AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | | Nov 13 2009 06:37AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | yes | Operational | Nov 09 2009 09:12AM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | | Nov 09 2009 09:13AM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | All 32 channels working and calibrated. | Oct 06 2009 11:17AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controller repaired. | Aug 23 2009 10:36PM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Oct 27 2009 10:39AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | operational at 80 MHz | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | antenna and FFT operational | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | available at 80 MHz and [0,pi,0,pi] phasing | Sep 04 2009 10:01AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | Requires some advance notice for laser start-up | Oct 16 2009 12:46PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached. | Aug 27 2009 09:10AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Recalibrated 7/27/09. | Jul 28 2009 04:22PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Power back on morning of 11/09 before run | Nov 09 2009 09:10AM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. | Nov 12 2009 02:36PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,edlund,ennever,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Nov 13 2009 06:38AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Since 1091112000, 110 channel has been reinstalled. All channels are operational. | Nov 12 2009 09:19AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker back in operation before 11/09 run | Nov 09 2009 09:11AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers working. 15 spatial channels operational. Calibrated | Oct 13 2009 07:49PM (yma) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | yes | Operational, and calibrated. | Oct 11 2009 03:01PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Nov 17 2009 11:42:05:603AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations applied | Aug 27 2009 09:09AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | | Nov 13 2009 06:37AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | yes | Operational | Nov 09 2009 09:12AM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | | Nov 09 2009 09:13AM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | All 32 channels working and calibrated. | Oct 06 2009 11:17AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controller repaired. | Aug 23 2009 10:36PM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Oct 27 2009 10:39AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | operational at 80 MHz | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | antenna and FFT operational | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | available at 80 MHz and [0,pi,0,pi] phasing | Sep 04 2009 10:01AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | Requires some advance notice for laser start-up | Oct 16 2009 12:46PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached. | Aug 27 2009 09:10AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Recalibrated 7/27/09. | Jul 28 2009 04:22PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Power back on morning of 11/09 before run | Nov 09 2009 09:10AM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. | Nov 12 2009 02:36PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,edlund,ennever,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Nov 13 2009 06:38AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Since 1091112000, 110 channel has been reinstalled. All channels are operational. | Nov 12 2009 09:19AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker back in operation before 11/09 run | Nov 09 2009 09:11AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers working. 15 spatial channels operational. Calibrated | Oct 13 2009 07:49PM (yma) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | yes | Operational, and calibrated. | Oct 11 2009 03:01PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Nov 17 2009 12:11:15:620PM |
good discharge
flat ICRF at 2 MW
EDA-ish H-modes
can't track radiated power
not sure if plasma outer strike pts are creating problems with injections or not
|
| Nov 17 2009 12:31:14:370PM |
OK, have ICRF up to 2.5 MW in flattop
getting EDA-ish H-modes
density set for H-mode in flattop
high radiation or something is affecting discharge
will begin ICRF in rampup next
|
| Nov 17 2009 12:55:31:073PM |
GREAT, got an H-mode forming at 200 ms
Good ICRF, 1 MW at 120 ms then 2.5 at 500 ms
really heated electrons early
li drops significantly at H-mode onset
back transition at 350 ms, since ICRF level at 1 MW
|