| Dec 8 2009 08:36:47:463AM | 1091208001 | Arturo Dominguez | We'll skip the controlled locked mode shot since we expect the 1070614017 shot to be pretty difficult to reproduce. We'll hope to get the necessary Hirex Jr. data from the Ohmic part or from a steady EDA part.
We'll start, then, with the 1070614017 target shot
|
| Dec 8 2009 09:05:44:743AM | 1091208001 | Arturo Dominguez | Fizzle
Andy said: "No TMX"
that explains it
We'll try it again
|
| Dec 8 2009 09:29:02:637AM | 1091208002 | Arturo Dominguez | Plasma ran until 1.5s
RF didn't run as planned
Looks like the shape is similar to the target shape
One more time
|
| Dec 8 2009 09:44:04:900AM | 1091208003 | Arturo Dominguez | Fishizzle
The RF that appears is actually going into the dummy load so it's NOT the same as in shot 1.
Try again
|
| Dec 8 2009 10:00:34:167AM | 1091208004 | Arturo Dominguez | Plasma ran well but the J antenna didn't hold well...the plasma went into a small H-mode bump but stayed in L-mode.
J will run at lower power for next shot
|
| Dec 8 2009 10:18:31:417AM | 1091208005 | Arturo Dominguez | Plasma full length
It looks like J-port is coming along
We got a brief H-mode. We think SSEP might be overshooting so we'll try to keep it closer to DN for shot 6.
Small power increase from J-port
It looks like we might still get it in this configuration so we'll stay here instead of switching to the 1091022025 target for now.
|
| Dec 8 2009 10:30:44:120AM | 1091208006 | Arturo Dominguez | Josh, can you ping the FRCECE computer to check if it's working now?
|
| Dec 8 2009 11:32:46:090AM | 1091208006 | Arturo Dominguez | SSEP was changed so that it wouldn't go up as substantially in UN
Still some issues maintaining the H-mode
|
| Dec 8 2009 11:35:52:510AM | 1091208007 | Arturo Dominguez | SSEP sweep was delayed so as to leave time for H-mode to form
H-mode at 1.15 looks EDA-ish and has pretty high peaking.
Still not steady enough though.
|
| Dec 8 2009 11:54:05:883AM | 1091208008 | Arturo Dominguez | For this shot, we lower the LN SSEP in order to stay away from the DN during the H-formation.
H-Modes are looking very peaked.
|
| Dec 8 2009 11:56:23:557AM | 1091208009 | Arturo Dominguez | Interesting shot for H-modes. There are 3 brief H-modes of which the second has the desired ne profile that we want to start with. The third H-mode is even lower density...very peaked: ne(r/a=1) ~ 1E20 so it's what we want to target for the end of part A.
The Ip wasn't changed substantially.
|
| Dec 9 2009 08:28:33:293AM | 1091208009 | Arturo Dominguez | The H-modes looks EDAish. There is substantial peaking on the second one but a bit higher than it's wanted...next shot, lower Ip from 600kA to 500kA
|
| Dec 8 2009 12:35:20:233PM | 1091208010 | Arturo Dominguez | Shot 10 Disrupted at 0.5
|
| Dec 8 2009 01:59:32:153PM | 1091208011 | Arturo Dominguez | Brief H-Mode when RF turns on
|
| Dec 8 2009 12:47:03:950PM | 1091208014 | Arturo Dominguez | Great EDA low density H-Mode. Reflectometry window is in the right timing for the data. The ne(r/a~1) is close to 1E20 so we'd like to start raising the ne profile for next shot.
next shot: nl04=0.8
|
| Dec 8 2009 01:17:47:700PM | 1091208015 | Arturo Dominguez | Didn't go into H-Mode
|
| Dec 8 2009 01:31:20:420PM | 1091208016 | Arturo Dominguez | We raised the Ip by 50kA
There are two consecutive H-modes...the second one looks like it's in the right density range. The timing window is set earlier so we only get the first ~200ms of it.
we'll increase nl04 for next shot
|
| Dec 8 2009 01:35:03:030PM | 1091208017 | Arturo Dominguez | nl04 was raised to 0.75 but there was only one small H-Mode
|
| Dec 8 2009 01:58:01:390PM | 1091208018 | Arturo Dominguez | No H-Mode.
It's looking too difficult to modify shot 14 to scan density using this as the target. We'll switch from this to using 1091022025 as our target shot while lowering the Ip to about 600kA to lower the density to our target one.
I believe we lost the cryopump for shot 19
|
| Dec 8 2009 02:20:41:827PM | 1091208019 | Arturo Dominguez | Great shot....a bit higher density than I would've liked,, but it looks like this is a good target.
For 20, the top X point was moved to the left.
|
| Dec 8 2009 02:21:41:733PM | 1091208020 | Arturo Dominguez | Not as good as 19. A few brief EDA H-mode.
Will repeat 19 lowering Ip to 550kA
|
| Dec 8 2009 02:52:30:297PM | 1091208021 | Arturo Dominguez | We lowered the current by 50kA
Great EDA H-mode in the time window. ne profile is lower.
|
| Dec 8 2009 03:31:56:607PM | 1091208026 | Arturo Dominguez | For this shot we'll load 1091113011 to get a controlled locked mode in order to calibrate the Hirex sr. velocity.
|
| Dec 8 2009 03:43:52:670PM | 1091208027 | Arturo Dominguez | We'll start part B:
reload shot 1091022024 with Ip=750kA
|
| Dec 8 2009 03:59:52:827PM | 1091208027 | Arturo Dominguez | H-mode starts well and then there is a change at t~1s which increases nl04 out of the desired range...D(alpha) looks like it's showing L-H dithering but nl04 doesn't see it. Not an easy shot to explain
|
| Dec 8 2009 04:44:02:110PM | 1091208030 | Arturo Dominguez | We'll repeat the last shot because the variable frequency channel was still set at 111GHz-116GHz. This has been fixed for this shot.
Shot ran well. Good density profile at least up to t=1s.
|
| Dec 8 2009 05:04:57:840PM | 1091208031 | Arturo Dominguez | For shot 31 we'll decrease Ip by 50kA.
We got 2 H-modes of interest. We'll repeat it with a shifted reflectometry time window: 1-1.5
And with an RF notch at 0.9s
|
| Dec 8 2009 05:13:06:810PM | 1091208032 | Arturo Dominguez | repeat shot 31
reflectometry time window: 1-1.5
with an RF notch at 0.9s
It looks like we got 2 H-Modes in the reflectometry time window. the second looks like it's in the right density range.
End of run....THANKS EVERYONE
|
| Physics Operator Comments |
| Dec 8 2009 08:24:18:557AM | 1091208001 | Jim Irby | load from 1070614017
did recals on all magnetics predictors in all segments
loaded --- open tree done
imported seg 1 from 109120403 into seg 1
loaded
We successfully boronized last night.
We will be running with the cryopump for the first shot: trying 55 ms of gas
Fizzle still set up on wrong shot. Will change after we get going.
|
| Dec 8 2009 09:08:08:667AM | 1091208001 | Jim Irby | changes --------------------------------
enabled argon from 0.300 to 0.400 s for first shot
results --------------------------------
no TMX supplies --- breakers were not closed
but FMIT#2 ran !!
|
| Dec 8 2009 09:28:14:323AM | 1091208001 | Jim Irby | changes --------------------------------
run with all the fields
no fmit#2
results --------------------------------
plasma for 1.5 s
|
| Dec 9 2009 07:16:32:510AM | 1091208001 | Jim Irby | Note from Steve Wolfe following loss of F15 last September indicating how to do all the required magnetics recalculations:
Physics Operators-
On Thursday, Sep 24, 2009, the partial flux loop F15 became critically unreliable, failing on essentially every shot despite repeated "zapping" by Bob Granetz. There is some irony in the fact that it was probably intentional disruptions produced by Bob's gas jet that finally did the loop in, but it has been intermittently failing with increasing regularity for a couple of weeks.
Fortunately, the F15 loop signal can be replaced by combinations of other loops on the outer wall, so an in-principle exact software workaround for the loss of this signal is available. Unfortunately, the previously coded implementation of this workaround turned out to be buggy, so we lost six hours on Thursday instead of just one or two.
New predictor algorithms have now been prepared and successfully tested off-line, and will be used during plasma operation today. When loading shots or importing segments from shots earlier than 1090925001 you will get the Configuration ID Warning message, telling you to "recalculate all magnetic predictors". As usual, this means you will need to
1) go into the Edit Wire screens for each of the magnetics predictors (BR_0,BZ_0,RCUR,ZCUR,RXL,ZXL,RXU,ZXU,SSEP,STRKPSI) that appear in any loaded or imported segment, noting any values in the OFFSET column
2) hit the CALL button for all rows that have an algorithm name other than CLEAR or CUSTOM
3) Replace any non-zero entries in the OFFSET column which get reset to zero by the CALL.
4) APPLY (or OK) the screen,
5) OK the Factor screen when it pops up, and also any P_INFO warnings that appear.
You do not need to, and generally should not, re-Call predictors for the coil currents, NL04, B21_PROJ, EF2_BY_EF4, or IP as part of this fix.
You should do the preceding operations #1-5 for all segments if you have re-loaded an old shot, but if you do not want to take the time to do this for unused segments, then please hit the "Zero" button (bottom of the segment column, first button int the last row above the "DPCS Loadable Procedures" box, so that non-fixed predictors aren't left around for the next operator.
Since this fix involves removing a signal from the predictors, the automatic check_predictor routine will flag any wires in active segments which still contain the bad signal by popping up a warning widget during LOAD. If this happens, you need to acknowledge the pop-up, noting which wire(s) are affected, and when the load completes go back and fix the problem. You can test whether you've missed any wires by doing a BUILD_ALL (button just to the left of LOAD) before doing the LOAD.
--
Stephen M. Wolfe
M.I.T. Plasma Science and Fusion Center
|
| Dec 9 2009 06:49:16:073AM | 1091208002 | Jim Irby | changes --------------------------------
none
results --------------------------------
plasma for 1.5 s
|
| Dec 8 2009 09:44:41:260AM | 1091208003 | Jim Irby | changes --------------------------------
argon puff from 300 to 425 ms
loaded
reduced downward jog in ssep after 1.18 s --- leave it UN
results --------------------------------
fizzle
some rf into a dummy load --- not machine
|
| Dec 8 2009 10:02:22:590AM | 1091208004 | Jim Irby | changes --------------------------------
no dpcs changes --- gas and fields looked ok on shot 03
results --------------------------------
plasma into rampdown
|
| Dec 8 2009 10:15:16:760AM | 1091208005 | Jim Irby | changes --------------------------------
no dpcs changes --- drop j-port power a little (conditioning?)
results --------------------------------
plasma into rampdown --- short h-mode then upper null
current rise much better than on 04
|
| Dec 8 2009 10:29:02:603AM | 1091208006 | Jim Irby | changes --------------------------------
ssep reduced from +0.015 to +0.012 in seg 4
loaded
results --------------------------------
plasma into rampdown --- injection at 1.06 s kills rf for a while
|
| Dec 8 2009 10:43:14:043AM | 1091208007 | Jim Irby | changes --------------------------------
ssep sweep to upper null delayed from 700 to 800 ms --- Jerry suggests we give the h-mode a while to develop before going upper null.
loaded
results --------------------------------
plasma into rampdown -- a little better h-mode
|
| Dec 8 2009 11:08:42:543AM | 1091208008 | Jim Irby | changes --------------------------------
ssep from -0.003 to -0.005 m before 0.8 s
results --------------------------------
plasma into rampdown --- but still losing h-mode as we sweep up
injection early --- almost lost plasma
|
| Dec 8 2009 11:19:19:213AM | 1091208009 | Jim Irby | changes --------------------------------
Ip from 600 to 550 kA --- drop density?
loaded
results --------------------------------
plasma for 1.5 s --- good upper null h-mode
about 3 MW of rf
|
| Dec 8 2009 11:32:14:150AM | 1091208010 | Jim Irby | changes --------------------------------
no dpcs changes
results --------------------------------
plasma for 0.49 s --- injections
|
| Dec 8 2009 11:45:43:963AM | 1091208011 | Jim Irby | changes --------------------------------
just try again -- no dpcs changes
results --------------------------------
plasma into rampdown, but no late h-mode
|
| Dec 8 2009 12:13:27:670PM | 1091208012 | Jim Irby | changes --------------------------------
no dpcs changes
results --------------------------------
plasma into rampdown --- good late h-mode
|
| Dec 8 2009 12:27:08:653PM | 1091208013 | Jim Irby | changes --------------------------------
removed lower null in ssep and started sweep up to upper null at 0.425 s and ended at 0.550 s
clearin start from 0.85 to 0.50 s
loaded
results --------------------------------
plasma for 0.7 s --- EF2U behavior is strange --- plasma being lost before the ssep sweep
|
| Dec 8 2009 12:46:27:357PM | 1091208014 | Jim Irby | changes --------------------------------
dropped ssep gain from 6 to 2 early
loaded
results --------------------------------
plasma for 1.5 s --- good h-mode starting around 0.7 s
|
| Dec 8 2009 01:00:11:530PM | 1091208015 | Jim Irby | changes --------------------------------
mods to ef4 programming (by Steve) to improve EF2 response
nl04 request from 0.7 to 0.8e20/m^2
results --------------------------------
ef2u off the rail ---- good
plasma into rampdown --- no h-mode --- rf good
|
| Dec 8 2009 01:15:40:653PM | 1091208016 | Jim Irby | changes --------------------------------
nl04 request back down to 0.7e20/m^2
removed offset from Ip programming
Ip request to -630 kA
Ip gain changed made a little earlier
loaded
results --------------------------------
plasma into rampdown
|
| Dec 8 2009 01:26:28:750PM | 1091208017 | Jim Irby | changes --------------------------------
nl04 request to 0.75e20/m^2
loaded
results --------------------------------
plasma into rampdown -- but early h-mode mode --- radiation high
|
| Dec 8 2009 01:40:15:733PM | 1091208018 | Jim Irby | changes --------------------------------
ZCUR from -.01 to 0.00 cm
EF4 early positive point to 0.0
results --------------------------------
plasma into rampdown --- still plenty of radiation
|
| Dec 8 2009 02:09:13:623PM | 1091208019 | Jim Irby | changes --------------------------------
loaded shot 1091022025 into seg 2
down to 600 kA Ip request
loaded
results --------------------------------
plasma into rampdown --- nice h-mode
|
| Dec 8 2009 02:18:27:560PM | 1091208020 | Jim Irby | changes --------------------------------
RXU from +0.006 to -.02 m --- move strike off of slot
loaded
results --------------------------------
plasma into rampdown --- radiation is worse
|
| Dec 8 2009 02:34:13:950PM | 1091208021 | Jim Irby | changes --------------------------------
import seg 2 into seg 2 from 1091208019
Ip from 600 to 550 kA
loaded
results --------------------------------
plasma into rampdown --- nice long h-mode
|
| Dec 8 2009 02:47:26:950PM | 1091208022 | Jim Irby | changes --------------------------------
Ip from 550 to 500 kA
loaded
results --------------------------------
plasma into rampdown --- lost some e-port
|
| Dec 8 2009 03:06:56:780PM | 1091208023 | Jim Irby | changes --------------------------------
Ip from 500 to 450 kA
loaded
results --------------------------------
plasma into rampdown --- lost most of the rf though
|
| Dec 8 2009 03:10:51:450PM | 1091208024 | Jim Irby | changes --------------------------------
no dpcs changes --- rf tuned up for low Ip
results --------------------------------
plasma into rampdown --- d and e having some trouble still
|
| Dec 8 2009 03:27:02:060PM | 1091208025 | Jim Irby | changes --------------------------------
try to balance rf
no dpcs changes
results --------------------------------
plasma into rampdown --- long h-mode, but lost e-port
|
| Dec 8 2009 03:40:41:547PM | 1091208026 | Jim Irby | changes --------------------------------
import seg 3 from seg 3 of 1091113011 -- locked mode cal, 0.8 MA, 5e19/m^2
loaded
results --------------------------------
plasma for 1.67 s
|
| Dec 8 2009 04:01:50:403PM | 1091208027 | Jim Irby | changes --------------------------------
load from 1091022024
import seg 1 from 1091208026 into seg 1
Ip to 750 kA
loaded
results --------------------------------
plasma into rampdown
|
| Dec 8 2009 04:16:12:110PM | 1091208028 | Jim Irby | changes --------------------------------
add a little more rf power
no dpcs changes
results --------------------------------
plasma into rampdown --- 4 MW of rf
|
| Dec 8 2009 04:26:12:590PM | 1091208029 | Jim Irby | changes --------------------------------
Ip request from 750 to 700 kA
loaded
dropping rf power a bit
results --------------------------------
plasma into rampdown
|
| Dec 8 2009 04:43:30:200PM | 1091208030 | Jim Irby | changes --------------------------------
repeat --- lost reflectometry data; timing issue
results --------------------------------
plasma into rampdown
|
| Dec 8 2009 04:55:27:467PM | 1091208031 | Jim Irby | changes --------------------------------
Ip from 700 to 650 kA
results --------------------------------
plasma into rampdown
|
| Dec 8 2009 05:08:35:090PM | 1091208032 | Jim Irby | changes --------------------------------
repeat with reflect window delayed
put in an rf dropout
results --------------------------------
plasma into rampdown
that's all..
|
| System Availability |
| Dec 8 2009 09:00:49:853AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations applied | Aug 27 2009 09:09AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | | Nov 13 2009 06:37AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | yes | Operational | Nov 09 2009 09:12AM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | | Nov 09 2009 09:13AM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | All 32 channels working and calibrated. | Oct 06 2009 11:17AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controller repaired. | Aug 23 2009 10:36PM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Oct 27 2009 10:39AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | operational at 80 MHz | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | antenna and FFT operational | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | available at 80 MHz and [0,pi,0,pi] phasing | Sep 04 2009 10:01AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | Requires some advance notice for laser start-up | Oct 16 2009 12:46PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached. | Aug 27 2009 09:10AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Recalibrated 7/27/09. | Jul 28 2009 04:22PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Power back on morning of 11/09 before run | Nov 09 2009 09:10AM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. | Nov 12 2009 02:36PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,edlund,ennever,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Nov 13 2009 06:38AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Since 1091112000, 110 channel has been reinstalled. All channels are operational. | Nov 12 2009 09:19AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker back in operation before 11/09 run | Nov 09 2009 09:11AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers working. 15 spatial channels operational. Calibrated | Oct 13 2009 07:49PM (yma) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | yes | Operational, and calibrated. | Oct 11 2009 03:01PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Dec 8 2009 11:53:19:757AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations applied | Aug 27 2009 09:09AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | | Nov 13 2009 06:37AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | yes | Operational | Nov 09 2009 09:12AM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | | Nov 09 2009 09:13AM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | System down due to computer problems. | Dec 08 2009 11:42AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controller repaired. | Aug 23 2009 10:36PM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Oct 27 2009 10:39AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | operational at 80 MHz | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | antenna and FFT operational | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | available at 80 MHz and [0,pi,0,pi] phasing | Sep 04 2009 10:01AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | Requires some advance notice for laser start-up | Oct 16 2009 12:46PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached. | Aug 27 2009 09:10AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Recalibrated 7/27/09. | Jul 28 2009 04:22PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Power back on morning of 11/09 before run | Nov 09 2009 09:10AM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. | Nov 12 2009 02:36PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,edlund,ennever,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Nov 13 2009 06:38AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Since 1091112000, 110 channel has been reinstalled. All channels are operational. | Nov 12 2009 09:19AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker back in operation before 11/09 run | Nov 09 2009 09:11AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers working. 15 spatial channels operational. Calibrated | Oct 13 2009 07:49PM (yma) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | yes | Operational, and calibrated. | Oct 11 2009 03:01PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Dec 8 2009 12:15:44:513PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations applied | Aug 27 2009 09:09AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | | Nov 13 2009 06:37AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | yes | Operational | Nov 09 2009 09:12AM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | | Nov 09 2009 09:13AM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | System down due to computer problems. | Dec 08 2009 11:42AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controller repaired. | Aug 23 2009 10:36PM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Oct 27 2009 10:39AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | operational at 80 MHz | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | antenna and FFT operational | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | available at 80 MHz and [0,pi,0,pi] phasing | Sep 04 2009 10:01AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | Requires some advance notice for laser start-up | Oct 16 2009 12:46PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached. | Aug 27 2009 09:10AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Recalibrated 7/27/09. | Jul 28 2009 04:22PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Power back on morning of 11/09 before run | Nov 09 2009 09:10AM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. | Nov 12 2009 02:36PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,edlund,ennever,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Nov 13 2009 06:38AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Since 1091112000, 110 channel has been reinstalled. All channels are operational. | Nov 12 2009 09:19AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker back in operation before 11/09 run | Nov 09 2009 09:11AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers working. 15 spatial channels operational. Calibrated | Oct 13 2009 07:49PM (yma) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | yes | Operational, and calibrated. | Oct 11 2009 03:01PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Dec 8 2009 12:33:49:687PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations applied | Aug 27 2009 09:09AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | | Nov 13 2009 06:37AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | yes | Operational | Nov 09 2009 09:12AM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | | Nov 09 2009 09:13AM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | System down due to computer problems. | Dec 08 2009 11:42AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controller repaired. | Aug 23 2009 10:36PM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Oct 27 2009 10:39AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | operational at 80 MHz | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | antenna and FFT operational | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | available at 80 MHz and [0,pi,0,pi] phasing | Sep 04 2009 10:01AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | Requires some advance notice for laser start-up | Oct 16 2009 12:46PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached. | Aug 27 2009 09:10AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Recalibrated 7/27/09. | Jul 28 2009 04:22PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Power back on morning of 11/09 before run | Nov 09 2009 09:10AM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. | Nov 12 2009 02:36PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,edlund,ennever,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Nov 13 2009 06:38AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Since 1091112000, 110 channel has been reinstalled. All channels are operational. | Nov 12 2009 09:19AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker back in operation before 11/09 run | Nov 09 2009 09:11AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers working. 15 spatial channels operational. Calibrated | Oct 13 2009 07:49PM (yma) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | yes | Operational, and calibrated. | Oct 11 2009 03:01PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Dec 8 2009 12:47:49:280PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations applied | Aug 27 2009 09:09AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | | Nov 13 2009 06:37AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | yes | Operational | Nov 09 2009 09:12AM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | | Nov 09 2009 09:13AM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | System down due to computer problems. | Dec 08 2009 11:42AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controller repaired. | Aug 23 2009 10:36PM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Oct 27 2009 10:39AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | operational at 80 MHz | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | antenna and FFT operational | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | available at 80 MHz and [0,pi,0,pi] phasing | Sep 04 2009 10:01AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | Requires some advance notice for laser start-up | Oct 16 2009 12:46PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached. | Aug 27 2009 09:10AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Recalibrated 7/27/09. | Jul 28 2009 04:22PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Power back on morning of 11/09 before run | Nov 09 2009 09:10AM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. | Nov 12 2009 02:36PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,edlund,ennever,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Nov 13 2009 06:38AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Since 1091112000, 110 channel has been reinstalled. All channels are operational. | Nov 12 2009 09:19AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker back in operation before 11/09 run | Nov 09 2009 09:11AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers working. 15 spatial channels operational. Calibrated | Oct 13 2009 07:49PM (yma) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | yes | Operational, and calibrated. | Oct 11 2009 03:01PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Dec 8 2009 01:01:29:217PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations applied | Aug 27 2009 09:09AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | | Nov 13 2009 06:37AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | yes | Operational | Nov 09 2009 09:12AM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | | Nov 09 2009 09:13AM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | System down due to computer problems. | Dec 08 2009 11:42AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controller repaired. | Aug 23 2009 10:36PM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Oct 27 2009 10:39AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | operational at 80 MHz | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | antenna and FFT operational | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | available at 80 MHz and [0,pi,0,pi] phasing | Sep 04 2009 10:01AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | Requires some advance notice for laser start-up | Oct 16 2009 12:46PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached. | Aug 27 2009 09:10AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Recalibrated 7/27/09. | Jul 28 2009 04:22PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Power back on morning of 11/09 before run | Nov 09 2009 09:10AM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. | Nov 12 2009 02:36PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,edlund,ennever,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Nov 13 2009 06:38AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Since 1091112000, 110 channel has been reinstalled. All channels are operational. | Nov 12 2009 09:19AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker back in operation before 11/09 run | Nov 09 2009 09:11AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers working. 15 spatial channels operational. Calibrated | Oct 13 2009 07:49PM (yma) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | yes | Operational, and calibrated. | Oct 11 2009 03:01PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|