| Session Leader Comments |
| Dec 9 2009 09:06:34:823AM | 1091209001 | Steve Wukitch | next: repeat with RF retuned
|
| Dec 9 2009 09:25:26:963AM | 1091209002 | Steve Wukitch | plasma
H-mode, need to work on getting rid of H-modes
next: raise Ip->1 MA
|
| Dec 9 2009 09:28:10:807AM | 1091209003 | Steve Wukitch | plasma
still got H-mode
next: raise current to 1.2 MA, break to install FRCECE computer
|
| Dec 9 2009 10:15:32:917AM | 1091209004 | Steve Wukitch | plasma
still H-modes
next: FRCECE computer still needs work
150 ms neon at 1 psi at 0.55 s
Ar enabled from J bottom for HIREX
|
| Dec 9 2009 11:49:29:527AM | 1091209005 | Steve Wukitch | plasma
still got H-modes
density decreased - still fueling with RF
FRCECE is back - great
next:lower density
|
| Dec 9 2009 11:44:02:400AM | 1091209006 | Steve Wukitch | plasma
still got H-modes
density decreased - still fueling with RF
next: increase Ip to 1.3 MA, lower density
|
| Dec 9 2009 11:38:00:200AM | 1091209007 | Steve Wukitch | plasma
still got H-modes
I-mode precedes H-modes and density increases
next: increase upper triangularity further and lower density
|
| Dec 9 2009 11:35:24:713AM | 1091209008 | Steve Wukitch | plasma
still got H-modes
next: increase upper triangularity further and lower density
|
| Dec 9 2009 11:20:44:743AM | 1091209009 | Steve Wukitch | plasma
disruption before RF
next: repeat minus disruption
|
| Dec 9 2009 12:11:44:200PM | 1091209010 | Steve Wukitch | plasma
disrupted little later
next: retry with adjustment
|
| Dec 9 2009 12:12:09:010PM | 1091209011 | Steve Wukitch | plasma
still disrupting
next: move RF back
|
| Dec 9 2009 12:31:02:497PM | 1091209012 | Steve Wukitch | plasma
still disrupting
next: lower Ip to 1.2 MA
|
| Dec 9 2009 12:51:16:200PM | 1091209013 | Steve Wukitch | plasma
No H-modes!
next: change antenna phase to -90 (270) and raise J power
|
| Dec 9 2009 12:51:58:010PM | 1091209014 | Steve Wukitch | plasma
power supply issue terminated plasma
|
| Dec 9 2009 01:20:12:293PM | 1091209015 | Steve Wukitch | plasma
J3 overloaded - too much anode current
next: retry with different match, add neon 100 ms
|
| Dec 9 2009 01:24:22:543PM | 1091209016 | Steve Wukitch | plasma
good shot, -90deg
next: change antenna phase to +90deg
|
| Dec 9 2009 02:01:26:870PM | 1091209017 | Steve Wukitch | plasma
good shot, -90deg
next: lower plasma current to 1 MA
|
| Dec 9 2009 02:00:17:307PM | 1091209018 | Steve Wukitch | plasma
good shot, -90deg
next: change phase to +90
|
| Dec 9 2009 02:31:24:150PM | 1091209019 | Steve Wukitch | plasma
+90 good shot, definitely different from -90
next: heating phase
|
| Dec 9 2009 02:30:43:527PM | 1091209020 | Steve Wukitch | fizzle - trying to breakdown in He to eliminate runaways
|
| Dec 9 2009 02:34:31:247PM | 1091209021 | Steve Wukitch | dud
|
| Dec 9 2009 03:00:49:487PM | 1091209022 | Steve Wukitch | fizzle
back to D startup
|
| Dec 9 2009 03:02:33:210PM | 1091209023 | Steve Wukitch | plasma
good shot, heating phase
next: 1.2 MA, +90
|
| Dec 9 2009 03:16:00:030PM | 1091209024 | Steve Wukitch | fizzle
|
| Dec 9 2009 03:42:03:610PM | 1091209025 | Steve Wukitch | plasma
good shot, +90, 1.2 MA
next: +90, 1 MA slower scan 5.8-6 T
|
| Dec 9 2009 03:46:18:530PM | 1091209026 | Steve Wukitch | plasma
good shot, st go longest, short, longer
next: change to -90
|
| Dec 9 2009 04:30:39:623PM | 1091209029 | Steve Wukitch | fizzle
|
| Dec 9 2009 04:47:20:483PM | 1091209030 | Steve Wukitch | plasma
good -90, 1 MA, slow BT scan
next: high field side deposition, scan BT 5-4.5 T
|
| Dec 9 2009 04:57:00:000PM | 1091209031 | Steve Wukitch | plasma
minority resonance did not cross q=1
next: sweep from 4.7 T to 4.2 T
|
| Dec 9 2009 05:01:40:360PM | 1091209031 | Steve Wukitch | plasma
early disruption
end of run
|
| Physics Operator Comments |
| Dec 9 2009 07:25:39:713AM | | Steve Wolfe |
Set up for MP#588 (sawtooth pacing)
SL: wukitch
Load from 1091124023 per SL_PLAN.
Seg1 and 2 active
Note that TF waveform for this shot is flat 145kA (5.2T),
despite SL email indicating it should have a ramp from
5.2 to 5.7T (158.4kA). Need to check with him when he comes in.
Otherwise, program is 1MA, 7e19 with an early blip up to 8e19, USN
high triangularity (RXU=-.04, ZXU=+.005. No pg3 feedforward, no Igain on nl04.
Seg 1 is 25msec PG4, short pg3,
RCUR offset=2000, waveform .60m@.02sec,.64m@.05sec
BR_0 offset=.0005
IC_EF4=-1300
No PCS changes to reference shot, pending addition of TF ramp
Load at 9-Dec-2009 07:25:30.00
Open tree /home/wolfe/pcs_scratch -1
Open tree done
|
| Dec 9 2009 08:27:19:590AM | | Steve Wolfe |
Re-reading the email from Wukie, I think he intended that the first
shot should have a TF ramp, although it doesn't say that in the run
plan. Therefore, go ahead and program that in.
Seg2: ramp TF from -145ka to -158.4kA between 0.8 and 1.5sec (5.2 to 5.7T);
while I'm at it, slow down the rampdown to end 2.7sec
Load at 9-Dec-2009 08:27:07.00
Open tree /home/wolfe/pcs_scratch -1
|
| Dec 9 2009 08:45:31:950AM | | Steve Wolfe |
Latest word from Wukie is he wants the current changed from 1MA to 800kA.
Does want the TF ramp. Will be calling in from home, because a street
blockage is preventing him from getting in.
Ip changed from 1MA to 800kA; title of seg2 changed accordingly
Load at 9-Dec-2009 08:43:03.00
Open tree /home/wolfe/pcs_scratch -1
Open tree done
|
| Dec 9 2009 09:05:21:980AM | 1091209001 | Steve Wolfe |
Shot#1: Trying for 0.8MA, 7e19, USN, TF ramp from 5.2 to 5.7T,
based on 1091124023 (change Ip, TF).
PG4 at 25msec, may get runaways.
Result: plasma full length, 2 h-modes (unwanted).
No runaways. TF ramp gets to 5.64T, probably good enough.
RF looks ratty: D faults, J faulting continuously, E ok (1 fault).
Next: ???
|
| Dec 9 2009 09:18:34:417AM | 1091209002 | Steve Wolfe |
Shot#2: Repeat after RF retuning on D,J
Result: plasma full length, multiple H-modes, no runaways
lots of neuts.
D is better, J still ragged, E has a few more faults.
I don't think Steve wants these H-modes, but not sure how he
would prefer to avoid. Raising current seems obvious, but he
specifically asked for the change to 800kA.
Next: repeat with 4MW total, and go back to 1MA (per Wukie)
|
| Dec 9 2009 09:28:37:290AM | 1091209003 | Steve Wolfe |
Shot#3:repeat with 4MW total, and go back to 1MA (per Wukie on the phone)
After this shot there will be an access for Josh to re-install
the FRCECE computer.
Result: plasma full length some runaways, time to start pushing pg4 up.
Still have H-modes. Will go up to 1.2MA for next shot.
Next: raise Ip to 1.2MA, pg4 to 30msec
|
| Dec 9 2009 09:48:09:277AM | 1091209003 | Steve Wolfe |
Shot#4: raise Ip to 1.2MA, pg4 from 25 to 30msec
Waiting for FRCECE re-install.
|
| Dec 9 2009 10:06:20:417AM | 1091209004 | Steve Wolfe |
Shot#4: raise Ip to 1.2MA, pg4 from 25 to 30msec
Waiting for FRCECE re-install.
Computer re-installed, but is now hanging midway through reboot.
Proceeding...
Result: plasma full length , no runaways, three h-modes, middle one over 200kJ
Next: Add some neon and argon.
|
| Dec 9 2009 10:21:50:430AM | 1091209005 | Steve Wolfe |
Shot#5: PG1 (150msec from .55 to .70) Neon;
PG5 (Argon) from .3 to .375sec
No other changes, may want to lower nl04 next.
Result: plasma full length, H-modes
Next: reduce nl04 flattop to 6e19
|
| Dec 9 2009 10:36:46:823AM | 1091209006 | Steve Wolfe |
Shot#6: lower nl04 from 7 to 6e19
Increase TF ramp from 5.4 to 5.8T, program 150kA to 163kA (should be 161,
but it doesn't quite keep up with ramp)
Not sure what to do about oh2l coax warning, f.d. settings look ok.
Result: plasma full length, with H-modes
Next: Drop density again to 5e19, increase Ip to 1.3MA
|
| Dec 9 2009 10:50:57:057AM | 1091209007 | Steve Wolfe |
Shot#7: lower nl04 from 6 to 5e19, max from 8 to 7e19,
recalculate custom predictor just in case
Ip from 1.2MA to 1.3MA
Result: plasma full length, still two H-modes, minimum
of q95 is right at 3.0, but it doesn't seem to mind.
We're up to 225kJ and 1.5e14neuts (don't want it!)
Target density is coming down,but RF is fueling; gas almost
off in seg2, can't get it much lower.
Next: Try higher triangularity
|
| Dec 9 2009 11:02:40:213AM | 1091209008 | Steve Wolfe |
Shot#8: RXU from -.04 to -.05
plasma full length, still getting H-modes.
Triangularity up to .76. H-mode actually seems earlier.
Next; Drop nl04 to 4e19, which should turn off the gas entirely.
Most likely the best way to stay out of H-mode is to put the TF
further off-axis, but that's not consistent with the experiment.
|
| Dec 9 2009 11:22:25:137AM | 1091209009 | Steve Wolfe |
Shot#9:nl04 from 5 to 4e19
RXU from -.05 to -.06
leave pg4 at 30msec
Result: early disruption .7sec (in flattop)
q95 gets to 2.9, may have been the problem.
BP14_DE may have had a problem, reporting an offset of 1.7e-2;
it's in DPCS. looks ok during the shot, disruption may have zapped it.
Next: back to 5e19 and RXU from -.06 to 0.04; Wukitch will drop D&E power
|
| Dec 9 2009 12:04:16:807PM | 1091209010 | Steve Wolfe |
Shot#10:nl04 from 4 to 5e19
RXU from -.06 to -.04
pg4 from 30 to 27msec
TF ramp from 5.6 to 6.0T (155.6 to 168to allow for lag)
decrease pg5 from 75 to 50msec
Delay for IGT, fixing ceiling leak in control room,
while waiting for disruption junk to pump away
IGT is dead, no more filaments.
We will temporarily move the interlocks for diag valves
to one of the turbo gauges, TMP2, otherwise they will not open.
Reading on TMP2 is about a factor of two lower, presently 5.6e-7
After 40min...
Result: another disruption, same timing, .72sec, just after rf turns on,
Next: Put density back up to 6e19, max value back to 8e19
|
| Dec 9 2009 12:14:49:870PM | 1091209011 | Steve Wolfe |
Shot#11:nl04 from 4 to 6e19 (really change it this time)
pg4 from 27 to 25msec
Result: Same disruption, just after the rf turns on.
I don't want to keep running 1.3MA disruptions!
There is a flake of something coning in on the zmeter at .025sec,
doesn't show up on dalpha or CIII. No runaways.
Next: delay rf turn-on. Raise nl04 from 6 to 7e19.
|
| Dec 9 2009 12:30:16:793PM | 1091209012 | Steve Wolfe |
Shot#12:nl04 from 6 to 7e19, delay rf
pg4 still at 25msec
Result: Still disrupts at 0.69sec, before the RF.
Doesn't look like a locked mode, q95 is above 3.1
Next: reduce current to 1.2MA, turn off neon puff
|
| Dec 9 2009 12:39:35:213PM | 1091209013 | Steve Wolfe |
Shot#13:reduce current to 1.2MA, turn off neon and argon puffs
Result: plasma full length,with runaways, no H-modes
Next: raise pg4, leave plasma alone?
|
| Dec 9 2009 12:54:39:620PM | 1091209014 | Steve Wolfe |
Shot#14:raise pg4 from 25 to 28msec
RF will change antenna phase and increase J power
Result: runaway saturated early disruption at 0.4sec
OH1 crowbar after disruption.
Very low density from t=.01, <2e18 at .02sec despite higher puff.
Next: pg4 to 30msec
|
| Dec 9 2009 01:08:14:400PM | 1091209015 | Steve Wolfe |
Shot#15:raise pg4 28 to 30msec, rcur offset from 2000 to 2500
RF will change antenna phase and increase J power
Result: plasma full length, still some runaways, no h-mode
J faulted off after 150msec
Next: raise pg4 to 33msec, maybe put back some neon?
|
| Dec 9 2009 01:21:03:073PM | 1091209016 | Steve Wolfe |
Shot#16:raise pg4 from 30 to 33msec
neon puff to 100msec (.55 to .65sec)
plasma full length, runaways worse.
RF ran to 1.4sec,
Next: PG4 to 37msec, Rcur offset to 3000
|
| Dec 9 2009 01:35:29:057PM | 1091209017 | Steve Wolfe |
Shot#17:raise pg4 from 33 to 38msec, rcur offset from 2500 to 3000
RF will change phase
Result: plasma full length, runaways are worse again!
Some injections early as well. Noticed on previous shot that outer gap
gets very small between .3 and .55sec, should adjust
Next: raise pg4 again, adjust outer gap between .3 and .55sec
|
| Dec 9 2009 02:09:00:543PM | 1091209019 | Steve Wolfe |
Shot#19:move clearin step from .35 to .3sec
pg4 from 42 to 45msec
plasma full length, still killer runaways, breakdown density is lower!
left gap doesn't come in much earlier. Radiated power still bad
Next: replace btop with helium4, reduce pg4 to 30msec
|
| Dec 9 2009 02:22:14:840PM | 1091209020 | Steve Wolfe |
Shot#20:replace btop with helium4, reduce pg4 to from 45 to 35msec
RF will change to heating phasing.
Web-based logbook is failing with mssql resource errors (mine and Wukie's)
Hope the entries are really going in.
Result: fizzle, looks like pressure too high.
Next: pg4 from 35 to 28msec. I hope these entries are going in ok,
the IDL logbook seems to be hosed too.
|
| Dec 9 2009 03:10:49:553PM | 1091209021 | Steve Wolfe |
Shot#21: pg4 from 35 to 28msec (helium)
Result: dud!
Next; pg4 up to 32msec, if this doesn't work, go back to D2
|
| Dec 9 2009 03:11:10:993PM | 1091209022 | Steve Wolfe |
Shot#22: pg4 from 28 to 32msec (helium)
rcur offset from 3000 to 2500
if this doesn't work, go back to D2
Result: another fizzle, looks like it's moving in more than #19.
Maybe it needs more gas, rather than less, or maybe it's the fields,
but can't waste any more time. We were getting something before, so...
next: put the D2 back
|
| Dec 9 2009 03:03:04:950PM | 1091209023 | Steve Wolfe |
Shot#23: pg4 from 32 to 40msec (D2)
leave rcur offset at 2500
raise pg3 puff in seg1
I expect this one to have runaways again, but we need to at least get some
plasmas.
result: plasma full length, runaways are bad but it survives and thrives
next: back to 1.2MA
|
| Dec 9 2009 03:20:39:360PM | 1091209024 | Steve Wolfe |
Shot#24: Ip from 1 to 1.2MA
no seg1 change, let it runaway!
Tom says the reason the logbook doesn't know what shot it is has to do
with the cycle having lost contact with the database.
Gary will need to restart the cycle.
Result: runaway burst plasma dies at 38msec.
looks like something came in at 25msec. Not sure if I need to raise gas or not
Restarting the cycle did not cure the logbook current shot problem,
will continue incrementing the shot# manually for entries.
Next: pg4 to 42msec
|
| Dec 9 2009 03:32:21:280PM | 1091209025 | Steve Wolfe |
Shot#25: pg4 from 40 to 45msec
Ip still at 1.2MA
Result: plasma full length,lots of runaways but better than 23.
Next: leave it alone
|
| Dec 9 2009 03:44:35:953PM | 1091209026 | Steve Wolfe |
Shot#26: change tf ramp to start at 5.8 (161.1kA)and go to 6T
and reduce Ip back to 1MA (so much for leaving it alone)
Result: plasma full length, runaways getting better! Score one for benign neglect
SL has a result that he likes.
Next: RF will switch the phase.
|
| Dec 9 2009 03:56:34:907PM | 1091209027 | Steve Wolfe |
Shot#27: No DPCS changes. RF will switch the phase.
Result: plasma full length, with bad runaways again. Benign neglect
only works so far.
RF wasn't clean, SL wants a repeat
Next: Play with clearin program to eliminate thrash around .29sec,
think about raising pg4 even more.
|
| Dec 9 2009 04:13:00:280PM | 1091209028 | Steve Wolfe |
Shot#28: Begin clearin change to diverted at .15 instead of .25, still
ending at 0.3sec.
PG4 from 45 to 50msec. As far as SL is concerned, we're doing a repeat.
Result: plasma with runaways disrupts at 0.57sec, before rf.
Next: zero the neon, but I don't think that's the problem.
|
| Dec 9 2009 04:21:58:000PM | 1091209029 | Steve Wolfe |
Shot#29: pg4 from 50 to 45msec, zero pg1 (neon)
Result: fizzle. Didn't drop fill enough?
Next: pg4 down to 40msec
|
| Dec 9 2009 04:34:15:500PM | 1091209030 | Steve Wolfe |
Shot#30: pg4 from 45 to 40msec
I expect this to have runaways, but the last fizzle was unexpected,
since the disruption was at relatively low current and energy and I had
already dropped fill by 10%. Pressure should still be ~0.1mTorr, so I don't
think it will be a dud, although the helium window looked narrower than
before. The Bz_0 may actually be a bit high.
Result: plasma full length, small runaways.
Next: TF sweep at low field (high field side resonance)
|
| Dec 9 2009 04:50:10:453PM | 1091209031 | Steve Wolfe |
Shot#31: TF sweep at from 5.0T to 4.5T (138.9 to 125.0kA)
Leave pg4 at 40msec, ic_ef4u from -1300 to -1310A
Result: plasma with runaways, disrupts in rampdown at 1.7sec
no H-mode, one rf fault. Breakdown was no earlier.
Next: put ef4 back to -1300, maybe adjust tf ramp?
|
| Dec 9 2009 05:08:15:720PM | 1091209032 | Steve Wolfe |
Shot#32: put ef4 back from -1310 to -1300
Sweep from -130.5 to -116 (4.7 to 4.2T)
Result: Short runaway disruption 0.3sec
Looks like an injection, no obvious cause; happens at the density dip,
but I don't think it's a locked mode. I suspect the runaways are melting
the outer limiter and we're getting moly balls.
Anyhow, too late to do anything about it now.
END OF RUN
|
| System Availability |
| Dec 9 2009 08:57:22:963AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations applied | Aug 27 2009 09:09AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | | Nov 13 2009 06:37AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | yes | Operational | Nov 09 2009 09:12AM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | | Nov 09 2009 09:13AM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | System down due to computer problems. | Dec 08 2009 11:42AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controller repaired. | Aug 23 2009 10:36PM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Oct 27 2009 10:39AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | operational at 80 MHz | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | antenna and FFT operational | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | available at 80 MHz and [0,pi,0,pi] phasing | Sep 04 2009 10:01AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | Requires some advance notice for laser start-up | Oct 16 2009 12:46PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached. | Aug 27 2009 09:10AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Recalibrated 7/27/09. | Jul 28 2009 04:22PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Power back on morning of 11/09 before run | Nov 09 2009 09:10AM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. | Nov 12 2009 02:36PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,edlund,ennever,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Nov 13 2009 06:38AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Since 1091112000, 110 channel has been reinstalled. All channels are operational. | Nov 12 2009 09:19AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker back in operation before 11/09 run | Nov 09 2009 09:11AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers working. 15 spatial channels operational. Calibrated | Oct 13 2009 07:49PM (yma) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | yes | Operational, and calibrated. | Oct 11 2009 03:01PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Dec 9 2009 11:11:53:887AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations applied | Aug 27 2009 09:09AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | | Nov 13 2009 06:37AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | yes | Operational | Nov 09 2009 09:12AM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | | Nov 09 2009 09:13AM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | 31 of 32 channels working (Ch29 no signal) | Dec 09 2009 11:01AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controller repaired. | Aug 23 2009 10:36PM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Oct 27 2009 10:39AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | operational at 80 MHz | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | antenna and FFT operational | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | available at 80 MHz and [0,pi,0,pi] phasing | Sep 04 2009 10:01AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | Requires some advance notice for laser start-up | Oct 16 2009 12:46PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached. | Aug 27 2009 09:10AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Recalibrated 7/27/09. | Jul 28 2009 04:22PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Power back on morning of 11/09 before run | Nov 09 2009 09:10AM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. | Nov 12 2009 02:36PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,edlund,ennever,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Nov 13 2009 06:38AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Since 1091112000, 110 channel has been reinstalled. All channels are operational. | Nov 12 2009 09:19AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker back in operation before 11/09 run | Nov 09 2009 09:11AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers working. 15 spatial channels operational. Calibrated | Oct 13 2009 07:49PM (yma) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | yes | Operational, and calibrated. | Oct 11 2009 03:01PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Dec 9 2009 03:39:33:000PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations applied | Aug 27 2009 09:09AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | | Nov 13 2009 06:37AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | yes | Operational | Nov 09 2009 09:12AM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | | Nov 09 2009 09:13AM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | 31 of 32 channels working (Ch29 no signal) | Dec 09 2009 11:01AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controller repaired. | Aug 23 2009 10:36PM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Oct 27 2009 10:39AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | operational at 80 MHz | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | antenna and FFT operational | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | available at 80 MHz and [0,pi,0,pi] phasing | Sep 04 2009 10:01AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | Requires some advance notice for laser start-up | Oct 16 2009 12:46PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached. | Aug 27 2009 09:10AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Recalibrated 7/27/09. | Jul 28 2009 04:22PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Power back on morning of 11/09 before run | Nov 09 2009 09:10AM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. | Nov 12 2009 02:36PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,edlund,ennever,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Nov 13 2009 06:38AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Since 1091112000, 110 channel has been reinstalled. All channels are operational. | Nov 12 2009 09:19AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker back in operation before 11/09 run | Nov 09 2009 09:11AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers working. 15 spatial channels operational. Calibrated | Oct 13 2009 07:49PM (yma) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | yes | Operational, and calibrated. | Oct 11 2009 03:01PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Dec 9 2009 03:52:24:390PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations applied | Aug 27 2009 09:09AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | | Nov 13 2009 06:37AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | yes | Operational | Nov 09 2009 09:12AM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | | Nov 09 2009 09:13AM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | 31 of 32 channels working (Ch29 no signal) | Dec 09 2009 11:01AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controller repaired. | Aug 23 2009 10:36PM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Oct 27 2009 10:39AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | operational at 80 MHz | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | antenna and FFT operational | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | available at 80 MHz and [0,pi,0,pi] phasing | Sep 04 2009 10:01AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | Requires some advance notice for laser start-up | Oct 16 2009 12:46PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached. | Aug 27 2009 09:10AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Recalibrated 7/27/09. | Jul 28 2009 04:22PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Power back on morning of 11/09 before run | Nov 09 2009 09:10AM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. | Nov 12 2009 02:36PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,edlund,ennever,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Nov 13 2009 06:38AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Since 1091112000, 110 channel has been reinstalled. All channels are operational. | Nov 12 2009 09:19AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker back in operation before 11/09 run | Nov 09 2009 09:11AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers working. 15 spatial channels operational. Calibrated | Oct 13 2009 07:49PM (yma) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | yes | Operational, and calibrated. | Oct 11 2009 03:01PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|