Alcator C-Mod Run 1091215 Information

Back to runs

Miniproposals
Miniproposal:571
Date Filed: 8/21/2009
Title:Further Investigation of Turbulence and Transport in Low Density Ohmic Plasmas to Resolve the Myster
First Author:Liang Lin
Session Leader:Miklos Porkolab (shots 1-36)

Operators
Session leader(s):Miklos Porkolab
Physics operator(s):Ian Hutchinson
Engineering operator(s):Andy Pfeiffer,Bill Cochran,Bill Byford

Engineering Operator Run Comment
automatically entered by signon - please replace with real comment

Session Leader Plans
Entered: Dec 14 2009 05:36:22:553PM
Author: Miklos Porkolab
Day 1 of Liang Lin's plan for ohmic runs.
Shot plan laid out in E mail, but Ian will tune in the shots as appropriate. Perhaps starting with higher density and lower it toward 2x10^19.
We should avoid runaways to the extent possible.
B=5.2T to start with and Ip=600 kA.

Physics Operators Plans

Session Leader Summaries
Entered: Dec 15 2009 05:30:07:140PM
Author: Miklos Porkolab
Everything went very well today.
The summary of good shots and parameters had been placed by Liang Lin in the PCI summary. Please refer to it for further information regrading tody's run.
Tomorrow we will run two sets of plasmas, one at 3.9 T at 0.6 MA,
and another set at 2.6 T and 0.4MA at various densities that will be specified tomorrow and what is needed to complete the data set. HIREX SR collected data, as well as the GPI was running. The laser blow-off dropped out earlier in the morning due to a closed gate-valve.

Physics Operator Summaries
Entered: Dec 15 2009 05:06:31:733PM
Author: Ian Hutchinson
PO summary 15 Dec 09
--------------------
MP571 Low density ohmic plasmas.

We used 3T initiation throughout; for both 5.2 and 2.6 T fields, with
appropriate field ramps after breakdown, and early diversion. We had
a rather high OH coax resistance after two low current disruptions the
first two shots. A rather slow trend over the whole day brought the
resistance back to about 2.5 micro ohms.

The initiation was very reliable, with one dud that appeared to be
caused by a 20A jump in EF4L, and a post disruption fizzle.

The entire first day of the shot list was covered, although it proved
impossible to avoid locked modes and disruptions for the lowest
densities (.2 and .3) at 1MA. Having the cryopump made density control
quite easy at the low densities desired. It was, as expected
impossible to avoid runaways. Their levels were variable.

In addition, the 5.2T part of day 2 was also covered (higher densities)
at the request of the SL.

Thus all that is left to do for tomorrow is 1-14 of the Dec 16 shot
list. Those are the 3.9 and the 2.6T field plasmas.

Scorecard
---------


  Shot,Duration(s),Ipmax(MA),Result  Shot,Duration(s),Ipmax,Result
  |   01   0.000   0.002   Dud     |   02   0.100   0.360   Plasma  |
  |   03   0.172   0.527   Plasma  |   04   1.983   0.520   Plasma  |
  |   05   1.996   0.442   Plasma  |   06   1.992   0.634   Plasma  |
  |   07   1.993   0.634   Plasma  |   08   1.991   0.633   Plasma  |
  |   09   0.535   0.633   Plasma  |   10   1.991   0.629   Plasma  |
  |   11   1.992   0.630   Plasma  |   12   2.050   0.627   Plasma  |
  |   13   2.040   0.430   Plasma  |   14   2.060   0.431   Plasma  |
  |   15   2.050   0.432   Plasma  |   16   2.010   0.433   Plasma  |
  |   17   2.010   0.432   Plasma  |   18   2.090   0.435   Plasma  |
  |   19   2.120   0.435   Plasma  |   20   2.110   0.435   Plasma  |
  |   21   0.000   0.035   Dud     |   22   2.110   0.437   Plasma  |
  |   23   2.110   0.434   Plasma  |   24   0.810   1.125   Plasma  |
  |   25   0.647   1.089   Plasma  |   26   0.505   1.077   Plasma  |
  |   27   0.000   0.039   Fizzle  |   28   1.978   1.021   Plasma  |
  |   29   1.975   1.018   Plasma  |   30   1.977   1.017   Plasma  |
  |   31   0.814   1.095   Plasma  |   32   1.993   0.629   Plasma  |
  |   33   1.990   0.627   Plasma  |   34   1.971   0.430   Plasma  |
  |   35   1.975   0.432   Plasma  |   36   0.100   0.273   Plasma  |
 
Date 1091215:  36 shots.  33 plasmas.   1 fizzles.   2 duds.   0 System Error.
Total plasma duration: 54.24 s (exceeding -100 kA)


Session Leader Comments
Dec 15 2009 10:29:44:207AM1091215001Miklos PorkolabDay 1 of ohmic run for Liang Lin.
Collect more data for linear ohmic regime transport at low densities.
PCI is set to medium to low k regime (k < 15 cm-1).Timing is set to 0.8-1.4 sec.
BT = 5.2 T, Ip= 400 kA.
Proposed shots will include additional special diagnostics as follows:
at 1.30 sec, on selected shots, Nathan Howard will inject CaF2 with the laser blow-off to collect information on particle transport at low densities.
Following this, perhaps 50 ms later, there will be GPI injections (Istvan Cziegler, Jim Terry) to collect data on edge turbulence at low densities (like to see if it has different features than the PCI).
The proposed shot sequence is as follows:
1. Start with a shot like 1090918012 at Bt = 5.2 T, Ip = 0.4 MA, target density of nl04 = 0.2. Runaways are expected. Check TS to see if spatial coverage is optimized. Repeat until good data is obtained.Increase density if necessary.
2. Increase current , Bt= 5.2 T, Ip = 0.6 MA. Keep density at nl04 = 0.2.
3. Repeat to improve on the runaway situation.
4. Move on to Bt= 2.6 T, Ip = 0.4 MA. Keep density at nl04 = 0.2.
Runaways are expected. Two or three shots might be necessary to get to target Bt and Ip.
5. Move to Bt = 5.2 T, Ip = 0.4 MA, nl04 = 0.25. Runaways should be mitigated.
6.Repeat shot as necessary for good data.
7. Move to Bt = 2.6 T, Ip = 0.4 MA, nl04 = 0.25. Repeat shot as necessary for good data.
8. Move to Bt = 5.2 T, Ip = 0.4 MA, nl04 = 0.30. Expect no runaways. Repeat as necessary.
9. Move to Bt = 5.2T, Ip = 0.6 MA, nl04 = 0.30. Repeat as necessary.
10. Move to Bt = 2.6T, Ip = 0.4 MA, nl04 = 0.30. Expect no runaways. Rrepeat.

Lower Priority sequence of shots:
11. Bt= 5.2 T, Ip = 1.0 MA, nl04 = 0.20. Expect locked modes but shot useful at earlier times.
12. Bt= 5.2 T, Ip = 1.0 MA, nl04 = 0.30.
13. Bt= 5.2 T, Ip = 1.0 MA, nl04 = 0.40.
14. Bt= 5.2 T, Ip = 1.0 MA, nl04 = 0.50.
15. Bt= 5.2 T, Ip = 1.0 MA, nl04 = 0.60.
End of today's plan. Will continue on the 16th , starting at 3.9 T.
Prepare for overnight ECDC.
Dec 15 2009 10:43:00:127AM1091215008Miklos PorkolabDensity rising slowly from nl04 = 0.25 at 0.8 sec to 0.30 at 1.6 sec.
Bt = 5.37 T, Ip= 0.63 MA.
Dec 15 2009 11:14:17:830AM1091215010Miklos PorkolabBt = 5.39T, Ip= 0.63 MA, nl04 = 0.2. Still runaways. Will try to raise the density to give Amanda a thermal plasma for a calibration shot for ECE.
Dec 15 2009 11:30:53:410AM1091215011Miklos PorkolabBt = 5.2 T, Ip = 0.62 MA, nl04 = 0.3. Still substantial runaways.
Will need to raise the density further to calibrate ECE.
Dec 15 2009 11:42:24:597AM1091215012Miklos PorkolabExcellent shot. Thermal mostly. Good enough for ECE calibration.
Bt= 5.2 T, Ip= 0.62 MA, nl04 = 0.30.
Next shot target plasma will be at 2.6 T, Ip = 0.4 MA, nl04 = 0.3.
Dec 15 2009 12:11:05:393PM1091215013Miklos PorkolabBt= 2.7 T, Ip = 0.4 MA, nl04 = 0.21E20.
Good shot.
Dec 15 2009 12:14:24:363PM1091215014Miklos PorkolabGood shot. Some hard Xrays.
Bt= 2.7 T, Ip= 0.4 MA, nl04 = 0.20.
Lost CaF2 injector some time ago due to closed gatevalve (at which shot ?)

Dec 15 2009 12:24:54:753PM1091215015Miklos PorkolabBt= 2.7 T, nl04 = 0.25, Ip = 0.4 MA. Fewer hard X rays this time.

Dec 15 2009 12:33:19:330PM1091215016Miklos PorkolabBt= 2.7 T, nl04 = 0.30, Ip = 0.4 MA. More Argon injected.
Dec 15 2009 12:53:03:097PM1091215017Miklos PorkolabDid Bt = 2.7 T, Ip = 0.4 MA, nl04 = 0.28.
With this shot we are done with the 2.7 T shot sequence
(including Liang's reference shot 17, 18).
We shall now return to Bt = 5.2 T, Liang's reference shot 7.
Dec 15 2009 01:02:14:783PM1091215018Miklos PorkolabBt= 5.2 T, Ip = 0.4 MA, nl04 = 0.2E20. Runaways mild to small.
Will repeat shot.

Dec 15 2009 01:16:03:067PM1091215019Miklos PorkolabBt = 5.2 T, Ip = 0.4 MA, nl04 = 0.25. Lot more Hard Xrays than before.

Dec 15 2009 01:28:06:887PM1091215020Miklos PorkolabThis was basically a repeat shot from 19.
Will increase the density on the next shot.
Dec 15 2009 02:00:09:640PM1091215022Miklos PorkolabGood shot after the dud on the previous shot.
Bt = 5.2 T, nl04 = 0.31E20, Ip = 0.4 MA.
Apparently there was no Thomson so shot needs to be repeated.
Dec 15 2009 02:17:34:327PM1091215023Miklos PorkolabGood shot.
Bt= 5.2 T, Ip = 0.42 MA, nl04 = 0.3E20.
Thomson OK this time.
Dec 15 2009 02:24:58:563PM1091215024Miklos PorkolabTried 5.2 T, Ip = 1.0 MA. Got disruption at 0.8 sec (locked mode ?).
Density too high, nl04 = 0.5E20 .
Dec 15 2009 02:39:03:487PM1091215025Miklos PorkolabRepeat previous shot. Locked mode disrupts again at about 0.65 sec.
Density lower this time, nl04 = 0.25E20. Bt = 5.2 T.
Dec 15 2009 02:52:38:407PM1091215026Miklos PorkolabGot locked mode again but now at 0.5 sec.
Will try to go to higher density next shot.

Dec 15 2009 03:09:47:593PM1091215027Miklos PorkolabStill at 5.2 T, 1 MA. Fizzle ?
Dec 15 2009 03:22:17:500PM1091215028Miklos PorkolabGood shot, enormous amounts of runaway,but did not disrupt. Good for shot 21 of Liang's series, Bt= 5.2T, Ip = 1.0 MA, nl04 = 0.4E20.
Moving up in density on the next two shots, trying to match Liang's 22,23.
Dec 15 2009 03:33:15:330PM1091215029Miklos PorkolabEven better shot, still runaways but now reduced significantly at the higher density. Bt = 5.2 T, Ip= 1.0 MA, nl04 = 0.5E20.
Dec 15 2009 03:42:56:767PM1091215030Miklos PorkolabVery nice thermal shot. Good for ECE calibration.
Bt = 5.2 T, Ip = 1.0 MA, nl04 = 0.6E20.
Dec 15 2009 04:03:17:157PM1091215031Miklos PorkolabOk, got injection at 0.8 sec and disrupted.
Bt = 5.2T, Ip = 1.0 MA, nl04 = 0.35 at t= 0.6-0.7 sec.
Next going to lower currents, from the runplan of tomorrow,
namely, Bt=5.2 T, Ip = 0.4, 0.6 MA, nl04 = 0.4, 0.5, 0.6.
Dec 15 2009 04:22:38:390PM1091215032Miklos PorkolabBagan low current, high density campaign from tomorrow's runplan.
Bt = 5.2 T, Ip = 0.6 MA, nl04 = 0.4E20.
Runaways present but ramping down with time. Best conditions at 1.0-1.5 sec
for potential confinement studies.

Dec 15 2009 04:26:48:563PM1091215033Miklos PorkolabGood shot. Bt = 5.2 T, Ip = 0.6 MA, nl04 = 0.5 - 0.6E20 for t= 0.8-1.4 sec.
Had PCI on from 0.8 - 1.4 sec. This covers densities 0.5,0.6 at this current.
Pretty thermal plasma, without any x rays from 0.8 to1.4 sec.
We will next drop current to 0.4 MA
Dec 15 2009 04:40:07:250PM1091215034Miklos PorkolabBt = 5.2 T, Ip = 0.4 MA, nl04 = 0.55E20. Good shot.
X-rays negligible from 1.0 - 1.4 sec.
Use this for transport analysis. PCI covers time range 0.8-1.4 sec.
Will lower density on next shot, same current and Bt.
Dec 15 2009 04:55:39:157PM1091215035Miklos PorkolabGood shot.
Bt = 5.2 T, Ip = 0.4 MA, nl04 = 0.40E20 at 1.0 sec, and pretty steady at 0.5-1.0 sec, with a slight minimum at 0.37 at 1.25 sec into the pulse.
No hard xrays. PCI covers 0.8-1.4 sec.

Physics Operator Comments
Dec 15 2009 09:04:03:987AMIan HutchinsonLoad from 1091117022. Low field controlled startup. This was using segments 1 3.
Load seg 2 from 1090918012. Needs magnetics predictors called.
Call predictors. Load. Warning about wire 11 zeroed in seg 15.
Use seg 2, not 3. Start at 0.08s.
Get engineering settings changed appropriately.
Segment 2.
Adjust early current to .4MA.
Argon puff is 50ms. No other puff. Nl04 is set very low.
Itf is 144.5kA. Put in ramp up in seg 1 to patch.
Reduce number of points of PG3 in segment 1.
Fill puff to 40ms at -.3s for cryopump.
Move out 80ms rcur point to .66m Seg 2.
Begin clearin ramp earlier. Adjust rxl.
Dec 15 2009 09:07:49:987AM1091215001Ian HutchinsonNo power test.
Dec 15 2009 09:37:08:940AM1091215002Ian HutchinsonDisrupts at .1s. Appears to be vertical position problem.

Found issue with zcur controller not on till .9s. Made it zero.
Also used load gains to get from segment 3 on wires 2 and 3.
Load.
Dec 15 2009 09:47:40:550AM1091215003Ian HutchinsonDisrupts at .15s

Improve vertical control by
load wave for RXL. Move up early zxl.
Delay the clearin rampup to .2 from .175s.
Dec 15 2009 10:01:41:393AM1091215004Ian HutchinsonPlasma to rampdown. Very low density and amazing runaways. Still a bit unstable.

Move rcur out to mirror the other startup at .15-.2s. to stabilize further.
Load gains from seg 3 to seg 2 in wire 16 Ip.
Dec 15 2009 10:19:04:753AM1091215005Ian HutchinsonPlasma to rampdown. The density glitch at 1.3s is due to OH1 crossover.

Bring on the OH1 crossover test pro in PCS. switch times .4,1.4.
Ip to 0.6MA.
Delay clearin ramp end to .22s
Dec 15 2009 10:24:20:160AM1091215006Ian HutchinsonPlasma to rampdown.

Lower OH1V to 200 from 250 in early segment 2.
Increase Ar puff to 90ms.
Dec 15 2009 10:37:21:470AM1091215007Ian HutchinsonPlasma to rampdown. Stability problem is fixed.

Raise Nl04 to .25
Dec 15 2009 10:51:52:130AM1091215008Ian HutchinsonPlasma to rampdown.

Delay TF rampdown.
nl04 final point decreased.
Load wire 15 ICEF4 from segment 3.
Dec 15 2009 11:05:10:860AM1091215009Ian HutchinsonPlasma disrupts at .52s. Vertical postion problem apparently as EF2s come out
of zero limits.

Import seg 3 to seg 3 from 1091117030. This is to check the EF2 programs.
Don't use that. Just set EF2 Voltages to zero at .07s.
Add a little EF2byEF4 gain at .15s.
Dec 15 2009 11:18:56:080AM1091215010Ian HutchinsonPlasma to rampdown.

Nl04 to .3
Lower OH1V to 150V at .1s
EF2Vs to -50V at .07s
EF3V to 2800 at 5ms.
Dec 15 2009 11:42:30:440AM1091215011Ian HutchinsonPlasma to rampdown.

EF2V to -100V.
Lengthen shot to 1.8s.
Dec 15 2009 11:54:24:800AM1091215012Ian HutchinsonPlasma to rampdown.

Ip to .4MA.
Itf to 72250A
NL04 to .2
Rcur shifted out in rampdown.
Dec 15 2009 12:03:21:033PM1091215013Ian HutchinsonPlasma to rampdown.

OH1V to 130V at .1s
Adjust EF2 by ef4 at end.
Extend many feedbacks at the end of the shot. Got some granularity warning.
Dec 15 2009 12:19:47:423PM1091215014Ian HutchinsonPlasma to rampdown.

NL04 to .25
Many controllers points put to 2.2s.
Increase Rcur value at 2s
Tweak voltages in rampdown to move slower.
Still have a granularity warning.
Dec 15 2009 12:32:32:957PM1091215015Ian HutchinsonPlasma to rampdown.

Increase Ar.
Increase NL04 to .3
Drop ef2byef4 gain at 1.8s.
Dec 15 2009 12:47:39:410PM1091215016Ian HutchinsonPlasma to rampdown.

NL04 to .27
Tweak some ends. Can't find granularity error.
Dec 15 2009 01:04:21:270PM1091215017Ian HutchinsonPlasma to rampdown.

Bt to 5.2T. NL04 to .2
Move integrator gates to 2.2s
Dec 15 2009 01:15:58:453PM1091215018Ian HutchinsonPlasma to rampdown. EF3 is going to zero before EF4.

Reduce ICEF4 at end.
NL04 to .25
Dec 15 2009 01:26:13:100PM1091215019Ian HutchinsonPlasma to rampdown.

NL04 to .3
ICEF4 raised a tad to try to keep EF2s off.
Loaded too late. It did not take.
Dec 15 2009 01:41:33:563PM1091215020Ian HutchinsonPlasma to rampdown.

Load prior changes.
Dec 15 2009 01:53:29:280PM1091215021Ian HutchinsonDud. No obvious reason. EF4L current rose by 20A from prior shots. (Not EF4U).

No changes.
Dec 15 2009 01:59:20:077PM1091215022Ian HutchinsonPlasma to rampdown. Apparently no TS.

Repeat.
Dec 15 2009 02:19:42:703PM1091215023Ian HutchinsonPlasma to rampdown.

Load seg 4 from shot 11 seg 2. Standard duration shot.
Set Ip to 1MA. NL04 to .2
Change references for 9-12 to 10 in preparation for B21proj adjustments.
But don't yet change that.
Switch to segment 4. Load.
Dec 15 2009 02:32:01:030PM1091215024Ian HutchinsonDisrupts at .8s

Turn off crossover.
Import seg 4 to seg 2.
Draw B21proj at 1.e-4 0-.5s.
Switch to segment 2.
Dec 15 2009 02:48:46:123PM1091215025Ian HutchinsonPlasma to .64s. Definite locked mode starting at .35s

Ar puff to 60ms.
B21proj start to 0.1s
Increase to 1.5Gauss.
Dec 15 2009 03:01:37:063PM1091215026Ian HutchinsonPlasma disrupts at .5s. Locks a bit earlier.

NL04 to .4. RXL moved out to try to avoid the slot divertor early.
Dec 15 2009 03:12:03:940PM1091215027Ian HutchinsonFizzle.

Repeat.
Dec 15 2009 03:29:40:737PM1091215028Ian HutchinsonPlasma to rampdown. Apparently not locked.

NL04 to .5
Dec 15 2009 03:40:44:280PM1091215029Ian HutchinsonPlasma to rampdown.

NL04 to .6
Dec 15 2009 03:53:39:767PM1091215030Ian HutchinsonPlasma to rampdown.

Program NL04 to peak at .45 and ramp down to .2
Dec 15 2009 04:09:27:220PM1091215031Ian HutchinsonPlasma disrupts at .8s. Injection at .7 (no locked mode).

Ip to .6MA. NL04 to .4
Dec 15 2009 04:22:53:687PM1091215032Ian HutchinsonPlasma to rampdown.

Turn on OHcrossover.
Set NL04 to .5
Dec 15 2009 04:33:23:877PM1091215033Ian HutchinsonPlasma to rampdown.

Ip to .4MA
Dec 15 2009 04:50:59:267PM1091215034Ian HutchinsonPlasma to rampdown.

NL04 to 0.4
Dec 15 2009 05:03:26:750PM1091215035Ian HutchinsonPlasma to rampdown

NL04 to .6
Dec 15 2009 05:05:49:203PM1091215036Ian HutchinsonDisrupts at .1s. Ratty startup.

Engineering Operator Comments
ShotTimeTypeStatusComment
109:01:35:127AMTestOk
209:13:15:737AMPlasmaOk
309:26:34:847AMPlasmaOk
409:41:35:567AMPlasmaOk
509:54:45:627AMPlasmaOk
610:08:44:597AMPlasmaOk
710:22:16:690AMPlasmaOk
810:35:30:427AMPlasmaOk
910:49:28:020AMPlasmaOk
1011:03:12:300AMPlasmaOk
1111:16:57:720AMPlasmaOk
1211:33:49:863AMPlasmaOk
1311:48:18:770AMPlasmaOk
1412:01:17:380PMPlasmaOk
1512:14:29:910PMPlasmaOk
1612:29:26:127PMPlasmaOk
1712:42:37:567PMPlasmaOk
1812:56:31:720PMPlasmaOk
1901:10:04:020PMPlasmaOk
2001:23:16:250PMPlasmaOk
2101:36:48:860PMPlasmaOk
2201:51:29:843PMPlasmaOk
2302:04:27:453PMPlasmaOk
2402:17:31:470PMPlasmaOk
2502:31:48:750PMPlasmaOk
2602:46:17:720PMPlasmaOk
2702:59:39:267PMPlasmaOk
2803:12:40:327PMPlasmaOk
2903:25:30:593PMPlasmaOk
3003:38:28:593PMPlasmaOk
3103:51:23:170PMPlasmaOk
3204:07:20:250PMPlasmaOk
3304:20:47:373PMPlasmaOk
3404:33:43:030PMPlasmaOk
3504:46:53:343PMPlasmaOk
3604:59:39:983PMPlasmaOk

System Availability
Dec 15 2009 09:01:08:173AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Nov 13 2009 06:37AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyes31 of 32 channels working (Ch29 no signal)Dec 09 2009 11:01AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational.Nov 12 2009 02:36PM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Nov 13 2009 06:38AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091112000, 110 channel has been reinstalled. All channels are operational.Nov 12 2009 09:19AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke