Alcator C-Mod Run 1091217 Information

Back to runs

Miniproposals
Miniproposal:590
Date Filed:12/11/2009
Title:Reinforcing Characterization of Driven Alfvén Modes
First Author:Theodore Golfinopoulos
Session Leader:Theodore Golfinopoulos (shots 1-21)

Operators
Session leader(s):Theodore Golfinopoulos
Physics operator(s):Jim Irby
Engineering operator(s):Andy Pfeiffer,Gary Dekow

Engineering Operator Run Comment
automatically entered by signon - please replace with real comment

Session Leader Plans
Entered: Dec 16 2009 09:43:03:687PM
Author: Theodore Golfinopoulos
Run Plan for 1091217
Note: may start on 1091216

MP #590 - "Reinforcing Characterization of Driven Alfven Modes"

Goal:
*****
Reproduce specific Alfven resonance detected in 1080403010. Show rigorously:
1) whether resonance is reproducible and genuine
2) whether mode is n=0 (toroidal mode number=0)

If time remains, resurrect one of the original shots in C-Mod AMHD history - one for which a resonance is clearly identified - and try to reproduce results. Then, add ICRF and see if resonance persists.

Run Preparation:
****************
* Set CNPA aperture to 204, vias voltage 45 V - see CNPA Logbook comments.
* Setup GPC2 gratings for 5.4-6.3 T B_T range - B_T typically at 5.9 T
* Operate PCI if available
* Set AMHD drive frequency and tuning waveforms in BiRa (CAMAC)
* Prepare cryopump

Plasma Conditions:
******************
* Load equilibrium from 1080403010 (L-mode, upper single null)
* Later, if time allows, load 1021003025

Shot Sequence:
**************
Shots 1-7:
Ramp B_T to scan for resonant frequencies; try AMHD drive frequencies of 850 kHz, 825 kHz - both of these frequencies should resonances for 1080403010. Scan B_T from -5.4 T to -6.3 T from 0.5 s to 1.5 s (single rising ramp).

Shots 8-13
Density sweep by 20 % - ramp up and down in single triangle period to change TAE frequency. Density ranges are NL04 = 6.3-7.7E19, 5.8-7.2E19, and 6.8-8.3E19 m^{-2}. Ramp starts at 0.5 s, reaches peak at 1 s, and returns to initial value at 1.5 s.

Shots 14-19
B_T sweep by 10 % in a single triangle period, again to change TAE frequency. B_T ranges are 5.5-5.9, 5.7-6.1, and 5.9-6.3 T. Ramp starts at 0.5 s, reaches peak at 1 s, and returns to initial value at 1.5 s.

Shots 20-end
Reproduce shot 1021003025 - try to reproduce AE resonance seen originally (around 0.8-1.0 s). Then, turn on ICRF power at 2 MW and examine effect on resonance.

Physics Operators Plans
Entered: Dec 16 2009 01:24:07:060PM
Author: Jim Irby
-----------------
Engineering Setup
-----------------

Run begins at 09:00 and ends at 15:00 (PSFC Party)

Power systems as on: 1080403010 (L-mode, upper single null)

Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:

Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
fill NINJA with 10 psi D2 DISABLED

Enable gatevalves and shutters: ECE, VUV, HiREX Sr, Z-bolo

Torvac gatevalve toggle (yes/no):

Boronization(yes/no): no
Overnight ECDC (yes/no): yes
ICRF(yes/no): yes
LH(yes/no): no
Cryopump (yes/no): yes

Vessel temperature: 35/35/35

------------------------------
ECDC Parameters
------------------------------
gas and pressure: D2 at 2e-4 Torr
sweep: 44/45/103 cm
scan: 20/120 s

Session Leader Summaries
Entered: Dec 17 2009 04:34:01:390PM
Author: Theodore Golfinopoulos
Run Summary:
Goal:
*****
1. Achieve flat AMHD antenna current response at constant frequency.
2. Sweep Alfven eigenmode resonant frequency across constant driving frequency and reproduce clearly resonances from 1080403010.

Result:
*******

No grand-slams yet in terms of seeing a big bulge in the probe spectrograms and corresponding circles (or ellipses if non-constant damping rate) in complex plane of transfer function. Synchronous detection sometimes sees resonances, and these don't necessarily appear where the probe signal amplitude increases in the frequency range of interest. We will take a closer look to try to discover more resonances.

On the other hand, current on antenna fairly constant from Shot 9 onward. Before Shot 9, there was anomalous modulation in antenna current between 0.5 s and 0.9 s. Starting on Shot 008, antenna was excited at constant frequency from 0.2 s to 1.5 s instead of 0.5 s to 1.5 s - on the next shot, antenna current amplitude modulation largely went away.

(And because we have constant excitation frequency on the driving antenna, we can at least rule out that circles in the complex transfer function plane reflect resonances in the amplifier or the magnetics coils.)

Lots of trouble getting density to behave. ICRF drove a spike in density that took the pump considerable time to compensate. Starting on Shot 13,

(1) ICRF was started at 0.4 s to give control system more time to reverse the corresponding density spike, and

(2) we gave up on the density triangle waveform and just attempted to increase density monotonically in a single ramp.

This helped. Later, also started density level at 0.35E20 at 0.4 s at time that ICRF came on. This intentionally undershot the target value for density to try to compensate for the bump up in density that ICRF was causing (the goal was to have good control of density at least from 0.5 to 1.5 s).

In the later B-field sweeps (shots 18, 19, and 21), the calculated FTAE frequency did not track the clean triangle waveform of B_T, and density was highly variable despite a constant setting at 0.6E20 NL04.

In those last three shots, we did not try to compensate q, changing because of ramping B_T, with corresponding ramp in Ip, though we did do this earlier in the run when B was varied over a wider range (e.g. Shots 9 and 11).

Some nicer shots that we'll be studying more carefully in the
nearer future:
009
011
012
013
021

near future:
014
018
019

1-hour delay in the morning due to faulty fiber; end of day at 3:00 PM for PSFC Holiday Party. Some disruptions, one fizzle, and one no-power shot due to alternator issue.

Ranges of parameters over all shots
Bt: 5.4-6.3 T
Ip: 0.6-0.7MA
Nl04: 0.4-0.8+E20 (range between 0.5 and 1.5 s)
Picrf: 2 MW target always

Next Part of the Run:
*********************
...in January - trying to reproduce Joe Snipes results from 2002 and/or 2003.

Physics Operator Summaries
Entered: Dec 18 2009 07:58:18:590AM
Author: Jim Irby
We started out by loading 1080403010 (L-mode, upper single null) as requested by the SL. All magnetics predictors had to be recalculated. I loaded seg 1 of 1091208020 into seg 1 for startup, since it was very effective during the 1091208 run. The first shot was a fizzle however, having too much gas. Shot 02 ran into rampdown with 5 ms less prefill gas.

We had several disruptions today apparently caused by injections. We tried moving the upper strikepoint inside by 1 cm (RXU) to help with this problem, but as on the 1091208 run, there was no clear improvement.

We had great difficulty controlling the density today. With Steve Wolfe's help, we tried changes to the integral, proportional, and derivative gain without much success. The SL eventually decided to concentrate on toroidal field scans instead. A great deal of the problem was the density rise associated with the rf turn on.

We had one no power shot because of a spurious alternator inhibit signal. The cause turned out to be bad instrumentation issues with an RTD.

We also had a problem with the OH1 power supply control electronics which required about 1 hour of Bill and Gary's time to fix.

TF cooling delayed some shots today. I ran long TF pulses and had the double swing fizzle routine running full out. Could probably have cut back on these somewhat.

Startup was very good today, and the cryopump worked properly on every shot.


Score:

fizzles 01
no power 10

plasmas 02,03,04,05,06,07,08,09,11,12,
13,14,15,16,17,18,19,20,21



Session Leader Comments
Dec 17 2009 10:17:50:743AM1091217001Theodore GolfinopoulosShot Summary:
Goal:
*****
Establish L-mode plasma; tried to reproduce 1080403010.

Result:
*******

After delay due to error in OH cabinet (optical link not transmitting - resolved by Bill Cochran unplugging and plugging in offending fiber), and issue with cryo, we got

fizzle

Next Shot:
**********
Same - try again
Dec 17 2009 10:37:12:947AM1091217002Theodore GolfinopoulosShot Summary:
Goal:
*****
Establish L-mode plasma; tried to reproduce 1080403010.

Result:
*******

Bt: -5.85 T
Ip: -0.6 MA
Nl04: 0.55 E20
Picrf: 1 MW

Plasma

ICRF needs to come up to 2 MW

Funky spiking in magnetics coil singals from 0.5 s to 0.6 s, coincident with a bump in density.

Next Shot:
**********
Leave density setting at 6E19 instead of 7 - ftae calc in DPCS was saying that AE freq was low, anyway.

Ramp B_T from 5.4 - 6.3 - try to find Alfven resonances.

RF to 2 MW
Dec 17 2009 10:45:35:300AM1091217003Theodore GolfinopoulosShot Summary:
Goal:
*****
Establish L-mode plasma; tried to reproduce 1080403010.
Ramp B_T from 5.4-6.3 T to find AEs.

Result:
*******

Disruption prior to 0.5 s.

Next Shot:
**********
Try again.
Dec 17 2009 11:06:45:513AM1091217004Theodore GolfinopoulosShot Summary:
Goal:
*****
Establish L-mode plasma; tried to reproduce 1080403010.
Ramp B_T from 5.4-6.3 T to find AEs.

Result:
*******

Bt: 5.4-6.2T
Ip: 0.600 MA
Nl04: 0.6E20 - ish
Picrf: 2 MW with oscillation between 1 MW and 2 MW before 0.8 MW.

Plasma

Antenna current (I_GH_UPPER_Z) is not constant - starts out around 7+ A, then drops to around 4 A, then comes back up to 7 A, then falls, then rises to a steady level around 8 or 9 A. Frequency is steady at 850 kHz.

Don't know why antenna current is varying by so much.

Density perturbation around this time - 0.6-0.7E20 jumps.

RF is oscillating between 1 MW and 2 MW before 0.8 s, coincident with funny behavior in antenna current.

Chriping in magnetics coils from 0.5 s to 0.6 s is from RF.

Next Shot:
**********
Try same thing - let's hope for a flat antenna current or some understanding as to why it's moving.
Dec 17 2009 11:25:20:983AM1091217005Theodore GolfinopoulosShot Summary:
Goal:
*****
Establish L-mode plasma; tried to reproduce 1080403010.
Ramp B_T from 5.4-6.3 T to find AEs.

Result:
*******

Disruption around 0.6 s.

Funny - antenna current is dropping steadily until disruption - as soon as plasma disrupts, antenna returns to normal, near-steady-10-A current.

Lower antenna current monitor reports 2 A, but cell access confirms that lower antenna amplifier is off.

NOTE - didn't sign in as session leader until now.

Next Shot:
**********
Same thing
Dec 17 2009 11:40:29:063AM1091217006Theodore GolfinopoulosShot Summary:
Goal:
*****
Establish L-mode plasma; tried to reproduce 1080403010.
Ramp B_T from 5.4-6.3 T to find AEs.

Result:
*******

Bt: 5.4-6.3T
Ip: 0.6 MA
Nl04: 0.7-0.5E20 (target 0.6E20 flat)
Picrf: 2 MW

Plasma came out just fine.

Antenna current still modulating.

Density is moving around, though there doesn't seem to be a one-to-one correspondence between changes in nl04 and changes in I_GH_UPPER_Z.

Next Shot:
**********
Going to try bringing up plasma current from 600 kA to 700 kA to offset B_T ramp and maintain q.

Energizing antenna early at 0.2 s, since current modulation always seems to be early in the shot (before 0.9 s every time so far).
Dec 17 2009 11:54:24:407AM1091217007Theodore GolfinopoulosShot Summary:
Goal:
*****
Establish L-mode plasma; tried to reproduce 1080403010.
Ramp B_T from 5.4-6.3 T to find AEs.
Ramp Ip from 600 to 700 kA to keep q constant.

Result:
*******

Disruption 'round 0.58 s.

Error in setting frequency waveform - ended up ramping from 0.2 to 0.5 instead of turning on at 0.5 s. Fixed so that now, frequency is constant for as long as RFENABLE is on.

Next Shot:
**********
Same thing.
Dec 17 2009 12:14:32:450PM1091217008Theodore GolfinopoulosShot Summary:
Goal:
*****
Ramp B_T, find AEs
Ramp Ip to compensate for changing q.

Result:
*******

Bt: 0.54-0.625T
Ip: 0.6-0.7 MA
Nl04: 0.84E20@0.58s to 0.45@0.88s
Picrf: 2 MW mostly

Plasma

Antenna current still modulating after RF comes on.

Big density ramp down - this, combined with increasing |B_T|, should drive the AE frequency way up. We had wanted flat density.

Next Shot:
**********
Do density ramp - 0.63E20-0.77E20 and back.
Dec 17 2009 12:30:59:017PM1091217009Theodore GolfinopoulosShot Summary:
Goal:
*****
Ramp Density sweep, find AEs
Ramp Ip to compensate for changing q.

Result:
*******

Bt: 5.9T flat
Ip: 0.6-0.7 MA
Nl04: Bump to 0.54E20, down to 0.48, monotonic rise to 0.54
Picrf: 2 MW mostly

Plasma

Wanted density sweep from 0.63-0.77-0.63E20 at 0.5-1-1.5 s, but didn't get it. Density ended up pretty flat, and low.

Antenna current modulation is minimal - there's a blip from 8.5 A to 7 A at 0.5 s when RF comes on, then small rise to 7.5 A.

Interestingly, lots of movement in BP_BC_TOP trace amplitude even when antenna driving current is flat. Less modulation on amplitude of other probes, EXCEPT around t=0.6 - 0.7 s, when there seems to be a rise and fall in amplitude on the BP_**_TOP probes. And the DPCS FTAE calculation (fixed by Steve this morning - thanks!) shows FTAE approaching 850 kHz and then leaving this range during this time period. Might be interesting to look for resonances here.

The fact that density was lower than we had targeted may have helped us out - will try to move the density sweep to this range in the future.

Next Shot:
**********
Bring back shot 008, this time turn RF on at 0.6 s to see if funniness in density, antenna current follows RF.
Dec 17 2009 12:32:42:547PM1091217010Theodore GolfinopoulosShot Summary:
Goal:
*****
Bring back shot 008, this time turn RF on at 0.6 s to see if funniness in density, antenna current follows RF.

Result:
*******

No power shot - alternator fault.

Next Shot:
**********
Try again.
Dec 17 2009 12:55:02:797PM1091217011Theodore GolfinopoulosShot Summary:
Goal:
*****
Repeat 009, but turn on RF at 0.6 s instead of 0.5 to see if shifts in nl04 and antenna current blip timing are coincident with RF.

Result:
*******

Bt: 5.4-6.3T
Ip: 0.6-0.7MA
Nl04: E20
Picrf: 2 MW flat from 0.6 to 1.5 MW

Plasma

Density is flat at 0.6E20 from 0.5s to 0.6s, but jumps to 0.7s as soon as RF comes on, then control responds and pulls it back down to 0.6-ishE20. Antenna current also drops by about 2 A when RF comes up, then rises by 1 A to a steady value of 8 A (flat-ish).

Lots of modulation in magnetics probe envelopes with flat antenna current - hooray.

FTAE_CALC says TAE freq. is well below 850 kHz 'til a heroic burst in the last 50 ms or so. Otherwise, tracks with |B_T|. Meanwhile, guesses that modulation of magnetics probes is not TAE - could it be GAE, or something else?

Look for AE resonances in this shot.

Next Shot:
**********
Density sweep from 4.6-6.0E19 to bring AE resonance through 850 kHz based on shot 009. Keep Ip constant at 600 kA, Bt constant at 5.9 T.
Dec 17 2009 01:08:02:280PM1091217012Theodore GolfinopoulosShot Summary:
Goal:
*****
Density sweep from 4.6-6.0E19 to bring AE resonance through 850 kHz based on shot 009. Keep Ip at 600 kA, B_T at 5.9 T.

Result:
*******

Bt: 5.9T
Ip: 0.6MA
Nl04: from 0.46E20 at 0.5, bump when RF comes on, back down to waveform, then can't get density back down fast enough.
Picrf: 2 MW flat from 0.6 to 1.5 MW

Density response seems sluggish and has to compensate for when RF comes on.

Still modulation in probe pickups even with flat antenna current. FTAE_CALC is moving around - never gets to 850E3 Hz.

Look for resoance from 0.93-1.26? Here, FTAE_CALC shows drop from 825E3 to 760E3 and back.

Next Shot:
**********
1. Turn RF on at 0.4 s to give density control more time to respond. Make density equilibration happen outside 0.5-1.5 s range of interest.

2. Sweep density in single, monotonically-increasing ramp, 4.6E19 at t=0.5 s to 6.0E19 at t=1.5 s, since density control response seems sluggish, in any case. Hopefully, we'll catch the resonance.
Dec 17 2009 01:26:34:220PM1091217013Theodore GolfinopoulosShot Summary:
Goal:
*****
1. Turn RF on at 0.4 s to give density control more time to respond. Make density equilibration happen outside 0.5-1.5 s range of interest.

2. Sweep density in single, monotonically-increasing ramp, 4.6E19 at t=0.5 s to 6.0E19 at t=1.5 s, since density control response seems sluggish, in any case. Hopefully, we'll catch the resonance.

Density sweep from 4.6-6.0E19 to bring AE resonance through 850 kHz based on shot 009. Keep Ip at 600 kA, B_T at 5.9 T.

Result:
*******

Bt: 5.9T
Ip: 0.6MA
Nl04: Ramp from 0.475-0.6E20 with jumps centered at 0.47 s, 1.23 s, and 1.46 s
Picrf: 2 MW flat from 0.4 s

Density response much cleaner - seemed to help to turn on RF earlier. We'll leave it there. Some jumps in density later on.

BP_BC_TOP shows growing amplitude from 0.85 s to 1.1 s, and maybe also BP_EF_TOP, but other probes don't show this.

Lots of activity around 0.5 s in pickup probes, and FTAE_CALC seems to cross 850 kHz around here.

Next Shot:
**********
Same, but bring Ip up to 650 kA - move q profile a little. Try to catch behavior at 0.5 s.
Dec 17 2009 01:49:20:577PM1091217014Theodore GolfinopoulosShot Summary:
Goal:
*****
Same, but bring Ip up to 650 kA - move q profile a little. Try to catch behavior at 0.5 s.

Result:
*******

Bt: 5.9T
Ip: 0.65MA
Nl04: Ramp 0.48-0.68E20, ramp doesn't start until around 1 s
Picrf: 2 MW flat from 0.4 s

Early peaking in probes is probably not us, it looks like. Envelopes of probe traces show lots of movement, but spectrograms don't reveal strong resonances at our frequency of around 850 kHz, though some subtle indication of something around 1.3 s.

Next Shot:
**********
Go back to MP - 6.8-8.3E19 density. Ip back to 600 kA, B_T still at 5.9 T.
Dec 17 2009 02:07:12:170PM1091217015Theodore GolfinopoulosShot Summary:
Goal:
*****
Back to MP - density ramp from 6.8-8.3E19.


Result:
*******

Bt: 5.9T
Ip: 0.625MA
Nl04:
Picrf: 2 MW flat from 0.4 s

Plasma

Oscillation on RF from 0.81 to 1.16, then flattens at 1 MW. This drives chirping in magnetics fluctuations envelopes.

Density sweep didn't turn out as we wanted.

Next Shot:
**********
Density from 4.8 to 6.2 to reproduce conditions in 009, where Jason thinks he has found a resonance from 0.575 to 6 s.
Dec 18 2009 11:59:51:323AM1091217016Theodore GolfinopoulosShot Summary:
Goal:
*****
Density from 4.8 to 6.2E19 NL04 to reproduce conditions in 1091217009, where Jason thinks he has found a resonance from 0.575 to 6 s.

Result:
*******

Bt: -5.9 T
Ip: -0.6 MA (-0.64 MA at 0.5 s, reaches -0.61 MA at 0.87 s and flattens)
Nl04: 0.5 s: 0.67E20; 0.9 s: 0.516E20; 1.5 s: 0.6E20
Picrf: 2 MW

Wanted single monotonically-rising density, but got inverted triangle sweep (inverse of plan in MP!). RF kicked up density when it turned on, and control system only caught up with the target waveform halfway through the shot.

Interesting behavior in BP_BC_TOP - shows peaking in amplitude around 1.00 s, 1.07 s, and 1.134 s, among other times. At least the first two of these peaks seem to have a corresponding peak in the HISTORY plot from w_fluct on some other probes. But there is no clear resonance indicated by synchronous detection. FTAE_CALC crosses the same value of around 790 kHz during this time, but does not sweep cleanly through this value; as such it is possible that synchronous detection doesn't see a resonance because the pole is not swept sufficiently through the driving frequency. Check amplitude spread from synchronous detection at these times versus background noise to see if there is a difference. And check CNPA.

Next Shot:
**********
Density sweep from 4.2-6.0E19 - try to drive FTAE_CALC to 850 kHz.
Try to push up FTAE_CALC even further, closer to drive frequency.
Dec 17 2009 02:31:40:343PM1091217017Theodore GolfinopoulosShot Summary:
Goal:
*****
Density sweep from 4.2-6.0E19 - try to drive FTAE_CALC to 850 kHz.


Result:
*******

Disruption before 0.5 s

Next Shot:
**********
No more density sweeps. Start B-field sweep series and go as fast as we can 'till run finishes at 3:00 PM. Look for resonances between shots and try to cut power during a resonance.
May 19 2010 11:20:23:920AM1091217018Theodore GolfinopoulosShot Summary:
Goal:
*****
B_T sweep from 5.5-5.9

Result:
*******

Bt: 5.5-5.9 T and back
Ip: 0.6 MA
Nl04: ~0.5E20
Picrf: 2 MW

Jason thinks he may see a resonance in the unstable period just after 0.5 s, but not after that. BP_BC_BOT (a probe with a high-resonance-frequency) and several other probes seem to show clear features in 800-900 kHz band, but synchronous detection does not seem to indicate that these are resonances.

19 May 2010
Interesting: several unstable modes develop during rampdown - around 1.74-1.94 s between 40 and 80 kHz. Three narrow bands, the highest being the strongest and steadiest. Density is rampding down from nel=0.3-0.05E20 during this time, and core temperature ceases showing sawteething at onset of modes, but stabilizes while modes are present and strongest, before starting to fall again after modes disappear. The edge temperature follows the opposite program, falling during the start of the modes, before stabilizing toward the second half of the mode persistence. The plasma goes out around 1.95 s, shortly after the modes are no longer visible. See BP1T_GHK, BP2T_GHK. Unfortunately, other fluctuations instruments do not sample this late into the shot.

Next Shot:
**********
B_T sweep from 5.7-6.1.
Dec 17 2009 03:08:52:000PM1091217019Theodore GolfinopoulosShot Summary:
Goal:
*****
B_T sweep from 5.7-6.1

Result:
*******

Bt: 5.7-6.1 T and back
Ip: 0.6 MA
Nl04: ~0.5E20
Picrf: 2 MW

This puts the field value from 1080403010 in the center of the B_T sweep.

Density still under the target value and moves between 0.5E20 and 0.6E20, especially between 1 and 1.5 s.

Same deal - no clear resonances from synchronous detection, though there are some features in the probe signals in the 825-875 kHz band.

Next Shot:
**********
B_T sweep from 5.9-6.3. Keep density target at 0.6E20.
Dec 17 2009 03:09:18:640PM1091217020Theodore GolfinopoulosShot Summary:
Goal:
*****
B_T sweep from 5.9-6.3

Result:
*******

Disruption around 0.5 s.

Next Shot:
**********
Try again.
Dec 17 2009 03:56:01:357PM1091217021Theodore GolfinopoulosShot Summary:
Goal:
*****
B_T sweep from 5.9-6.3

Result:
*******

Bt: 5.9-6.3 T
Ip: 0.6 MA
Nl04: ~0.5E20
Picrf: 2 MW

Plasma

May be a promising resonance from around 0.52-0.56-ish - synchronous detection shows circle in complex plan of transfer function.

Same deal - don't really see any resonances from synchronous detection beyond 0.55 s, and there may be a corresponding fattening of the amplitude of the magnetics probe traces during this time.

But there are other regions where, based on position of DPCS:FTAE_CALC and probe traces in comparison with resonance seen from synchronous detection, should also see resonance, but we haven't seen this yet. Can try looking more closely on reflected side of B_T triangle.

Interesting that DPCS:FTAE_CALC is not a triangle as B_T is. Density is also not flat - it runs from 0.48-0.6.

Next Shot:
**********
...will be in January for this run because that was the last shot of the day before the PSFC holiday party.

Physics Operator Comments
Dec 17 2009 08:08:56:070AM1091217001Jim IrbyUsed following procedure to do magnetics re-calculations.

Loaded with no errors
Open tree done

New predictor algorithms have now been prepared and successfully tested off-line, and will be used during plasma operation today. When loading shots or importing segments from shots earlier than 1090925001 you will get the Configuration ID Warning message, telling you to "recalculate all magnetic predictors". As usual, this means you will need to

1) go into the Edit Wire screens for each of the magnetics predictors (BR_0,BZ_0,RCUR,ZCUR,RXL,ZXL,RXU,ZXU,SSEP,STRKPSI) that appear in any loaded or imported segment, noting any values in the OFFSET column

2) hit the CALL button for all rows that have an algorithm name other than CLEAR or CUSTOM

3) Replace any non-zero entries in the OFFSET column which get reset to zero by the CALL.

4) APPLY (or OK) the screen,

5) OK the Factor screen when it pops up, and also any P_INFO warnings that appear.

You do not need to, and generally should not, re-Call predictors for the coil currents, NL04, B21_PROJ, EF2_BY_EF4, or IP as part of this fix.

Dec 17 2009 08:57:49:867AM1091217001Jim Irbyimport seg 1 from 1091208020 into seg 1 --- startup with cryopump
loaded



Dec 17 2009 09:00:59:853AM1091217001Jim Irbyfizzle delay to 2.1 s
OH invert 2.3 s
OH delay 500 ms
TF delay 600
TF PLC current limit from 165 to 170 kA
fizzle $shot is 1090731017
Dec 17 2009 10:18:08:290AM1091217001Jim Irbydelay to fix problem in OH1 cabinet: ready by 10:02



changes --------------------------------

see previous entries

results --------------------------------

igt at 2.8e-8 Torr -- cryopump ok

fizzle -- fields ok, probably gas






Dec 17 2009 10:34:09:413AM1091217002Jim Irbychanges --------------------------------

prefill from 55 to 50 ms

results --------------------------------

plasma into rampdown --- big MARFE early --- nl04 at 5.5e19/m^2 -- 1 MW rf


Dec 17 2009 10:42:05:180AM1091217003Jim Irbychanges --------------------------------

added Bt ramp from 0.5 to 1.5 s from 5.4 to 6.3 T
loaded

results --------------------------------

igt at 1.2e-7 Torr

plasma for 0.35 s --- major injection

Dec 17 2009 10:59:03:163AM1091217004Jim Irbychanges --------------------------------

prefill from 50 to 48 ms

results --------------------------------

plasma into rampdown

only got to 6.1 T at 1.5 s --- should have asked for a little faster ramp-rate
got 2 MW of rf as requested

Dec 17 2009 11:09:34:797AM1091217005Jim Irbychanges --------------------------------

Tf current ramp max to 178 kA --- get to 175 by 1.5 s

results --------------------------------

disruption at 0.707 s --- lost pf breaker


Dec 17 2009 11:29:43:327AM1091217006Jim Irbychanges --------------------------------

no dpcs changes --- try again w/o dropping in chunks of things

results --------------------------------

plasma into rampdown ---
Dec 17 2009 11:47:29:907AM1091217007Jim Irbychanges --------------------------------

Try to get better density control:

nl_04 prop gain from 10 to 5
nl_04 deriv gain from 2 to 5 -- start at 0.078 s
pg3 gas puff zeroed late

Ip ramp from 0.5 to 1.5 from 600 to 700 kA

loaded


results --------------------------------

plasma for 0.6 s --- breaker pulled --- 8 MW on 2Pi




Dec 17 2009 11:58:35:720AM1091217008Jim Irbychanges --------------------------------

RXU from a ramp to a solid -0.03 from 0.3 s on
loaded

results --------------------------------

plasma into rampdown

density control no better or maybe worse

Dec 17 2009 12:12:08:983PM1091217009Jim Irbychanges --------------------------------

nl04 prop gain to 2
Bt ramp removed and set for 5.9 T flattop
nl04 to 6.3e19/m^2 at 0.5 s, 7.3 at 1.0 s, back down to 6.3 by 1.5 s
loaded


results --------------------------------

plasma into rampdown --- density flat not ramping


Dec 17 2009 02:09:54:577PM1091217010Jim Irbychanges --------------------------------

loaded shot 8 --- need to check rf effect
nl04 integral gain from 0 to 2 from 0.078 to 1.5 s
loaded


results --------------------------------

alternator inhibit --- no power shot

instrumentation issue resolved

Dec 17 2009 12:41:11:437PM1091217011Jim Irbychanges --------------------------------

try again

results --------------------------------

plasma into rampdown
Dec 17 2009 12:54:16:563PM1091217012Jim Irbychanges --------------------------------

Bt flat at 5.9 T (167 kA)
nl04 ramp from 0.46e20 to 0.6e20/m2 from 0.5 to 1.0 s, then back down to 0.46 at 1.5 s
Ip flat at 600 kA
loaded

results --------------------------------

plasma into rampdown --- density does not follow programming

Dec 17 2009 01:09:00:483PM1091217013Jim Irbychanges --------------------------------

nl04 ramp from 0.5 to 1.5 s from 4.6 to 7e19/m^2 (hope to get to 6.0 at 1.5 s)
loaded


results --------------------------------

plasma into rampdown

got a density ramp, but also marfe a 1.1 s
Dec 17 2009 01:26:45:687PM1091217014Jim Irbychanges --------------------------------

Ted liked 13. Try it again but with Ip at 650 kA from 600 kA
loaded


results --------------------------------

plasma into rampdown -- rf puts density over request until 1 s or so.

Dec 17 2009 01:45:11:373PM1091217015Jim Irbychanges --------------------------------

Ip back to 600 kA
nl_04 ramp from 6.8 to 8.3e19/m^2 from 0.4 to 1.5 s
loaded

results --------------------------------

plasma into rampdown
Dec 17 2009 01:59:36:450PM1091217016Jim Irbychanges --------------------------------

nl_04 integral gain turned off
nl_04 ramp from 4.8 to 6.2e19/m^2 from 0.4 to 1.5 s
loaded

results --------------------------------

plasma into rampdown --- still no density control
Dec 17 2009 02:18:46:920PM1091217017Jim Irbychanges --------------------------------

dropped pg3 early puff a little
nl04 from 0.35 to 5.6e19/m^2 from 0.4 to 1.5 s
loaded

TF cooling slowing us down --- -155C after 12:30 into recool

results --------------------------------

disruption at 0.459 s --- locked mode?


Dec 17 2009 02:39:14:187PM1091217018Jim Irbychanges --------------------------------

Bt ramp [5.5, 5.9, 5.5] T, [0.5, 1.0, 1.5] s
nl04 request to 6e19/m^2
loaded

results --------------------------------

plasma into rampdown --- TF ramp good
Dec 17 2009 02:46:38:653PM1091217019Jim Irbychanges --------------------------------

Bt ramp [5.7,6.1,5.7] T, [.5,1.,1.5] s
loaded

results --------------------------------

plasma into rampdown ---
Dec 17 2009 03:02:15:360PM1091217020Jim Irbychanges --------------------------------

Bt [5.9,6.3,5.9] T, [0.5,1.0,1.5] s
loaded

results --------------------------------

disruption at 0.5 s

Dec 17 2009 03:14:01:657PM1091217021Jim Irbychanges --------------------------------

TF PLC limit from 180 to 185 kA

results --------------------------------

plasma into rampdown

Engineering Operator Comments
ShotTimeTypeStatusComment
110:10:31:633AMPlasmaOk
210:23:22:743AMPlasmaOk
310:36:10:820AMPlasmaOk
410:48:56:393AMPlasmaOk
511:03:01:497AMPlasmaBadCom Fault OH2, OH1 self powered
611:23:41:623AMPlasmaOk
711:38:58:030AMPlasmaOk
811:51:44:030AMPlasmaOk
912:05:25:733PMPlasmaOk
1012:19:53:407PMPlasmaOk
1112:35:57:250PMPlasmaOk
1212:48:47:157PMPlasmaOk
1301:04:10:297PMPlasmaOk
1401:17:11:483PMPlasmaOk
1501:33:41:953PMPlasmaOk
1601:51:17:500PMPlasmaOk
1702:09:45:763PMPlasmaOk
1802:24:24:577PMPlasmaOk
1902:40:35:920PMPlasmaOk
2002:56:01:297PMPlasmaOk
2103:08:48:263PMPlasmaOk

System Availability
Dec 17 2009 10:10:00:947AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Nov 13 2009 06:37AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyes31 of 32 channels working (Ch29 no signal)Dec 09 2009 11:01AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational.Nov 12 2009 02:36PM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Nov 13 2009 06:38AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091112000, 110 channel has been reinstalled. All channels are operational.Nov 12 2009 09:19AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Dec 17 2009 11:02:37:277AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Nov 13 2009 06:37AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyes31 of 32 channels working (Ch29 no signal)Dec 09 2009 11:01AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational.Nov 12 2009 02:36PM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Nov 13 2009 06:38AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091112000, 110 channel has been reinstalled. All channels are operational.Nov 12 2009 09:19AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Dec 17 2009 11:23:17:967AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Nov 13 2009 06:37AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyes31 of 32 channels working (Ch29 no signal)Dec 09 2009 11:01AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational.Nov 12 2009 02:36PM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Nov 13 2009 06:38AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091112000, 110 channel has been reinstalled. All channels are operational.Nov 12 2009 09:19AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Dec 17 2009 11:38:35:703AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Nov 13 2009 06:37AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyes31 of 32 channels working (Ch29 no signal)Dec 09 2009 11:01AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational.Nov 12 2009 02:36PM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Nov 13 2009 06:38AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091112000, 110 channel has been reinstalled. All channels are operational.Nov 12 2009 09:19AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Dec 17 2009 11:51:13:983AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Nov 13 2009 06:37AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyes31 of 32 channels working (Ch29 no signal)Dec 09 2009 11:01AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational.Nov 12 2009 02:36PM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Nov 13 2009 06:38AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091112000, 110 channel has been reinstalled. All channels are operational.Nov 12 2009 09:19AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Dec 17 2009 12:05:01:843PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Nov 13 2009 06:37AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyes31 of 32 channels working (Ch29 no signal)Dec 09 2009 11:01AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational.Nov 12 2009 02:36PM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Nov 13 2009 06:38AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091112000, 110 channel has been reinstalled. All channels are operational.Nov 12 2009 09:19AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Dec 17 2009 12:19:33:047PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Nov 13 2009 06:37AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyes31 of 32 channels working (Ch29 no signal)Dec 09 2009 11:01AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational.Nov 12 2009 02:36PM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Nov 13 2009 06:38AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091112000, 110 channel has been reinstalled. All channels are operational.Nov 12 2009 09:19AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Dec 17 2009 12:35:35:123PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Nov 13 2009 06:37AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyes31 of 32 channels working (Ch29 no signal)Dec 09 2009 11:01AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational.Nov 12 2009 02:36PM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Nov 13 2009 06:38AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091112000, 110 channel has been reinstalled. All channels are operational.Nov 12 2009 09:19AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Dec 17 2009 12:48:25:767PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Nov 13 2009 06:37AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyes31 of 32 channels working (Ch29 no signal)Dec 09 2009 11:01AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational.Nov 12 2009 02:36PM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Nov 13 2009 06:38AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091112000, 110 channel has been reinstalled. All channels are operational.Nov 12 2009 09:19AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Dec 17 2009 01:03:42:970PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Nov 13 2009 06:37AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyes31 of 32 channels working (Ch29 no signal)Dec 09 2009 11:01AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational.Nov 12 2009 02:36PM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Nov 13 2009 06:38AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091112000, 110 channel has been reinstalled. All channels are operational.Nov 12 2009 09:19AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Dec 17 2009 01:16:49:093PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Nov 13 2009 06:37AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyes31 of 32 channels working (Ch29 no signal)Dec 09 2009 11:01AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational.Nov 12 2009 02:36PM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Nov 13 2009 06:38AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091112000, 110 channel has been reinstalled. All channels are operational.Nov 12 2009 09:19AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Dec 17 2009 01:50:54:920PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Nov 13 2009 06:37AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyes31 of 32 channels working (Ch29 no signal)Dec 09 2009 11:01AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational.Nov 12 2009 02:36PM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Nov 13 2009 06:38AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091112000, 110 channel has been reinstalled. All channels are operational.Nov 12 2009 09:19AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Dec 17 2009 02:09:21:453PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Nov 13 2009 06:37AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyes31 of 32 channels working (Ch29 no signal)Dec 09 2009 11:01AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational.Nov 12 2009 02:36PM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,edlund,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Nov 13 2009 06:38AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1091112000, 110 channel has been reinstalled. All channels are operational.Nov 12 2009 09:19AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke