Alcator C-Mod Run 1091218 Information

Back to runs

Miniproposals
Miniproposal:580
Date Filed: 9/4/2009
Title:Comparison of Type I ELM access and characteristics in He4 and D plasmas in C-Mod
First Author:Steve Wolfe
Session Leader:Steve Wolfe (shots 1-1)

Operators
Session leader(s):Steve Wolfe
Physics operator(s):Earl Marmar
Engineering operator(s):Sam Pierson

Engineering Operator Run Comment
MP#580 Comparison of Type I ELM access and characteristics in He4 and D

Session Leader Plans
Entered: Dec 15 2009 03:37:23:313PM
Author: Steve Wolfe
Session Leader Plan for Friday, Dec 18, 2009
MP#580 Comparison of Type I ELM access and characteristics in
He4 and D plasmas in C-Mod
SL: wolfe
PO: Marmar

The goal of this experiment is to produce type I ELMy H-mode discharges
in helium plasmas and, if successful, compare ELM behavior with similar
discharges in D2. We will be operating in the modified JFT2-M shape as
on 1090914016 (900kA, nl04=4e19), which exhibited strong ELM behavior in D.

This will be the first attempt at producing Helium ELMy H-modes in C-Mod.
I'll be happy if we just get an existence proof, but if possible we'll
document some scalings. Note that this experiment would probably benefit
from a more recent boronization (last was before 1091210), but there will
have been mostly ohmic runs since then, so it may be ok. Step 6 will help
evaluate the suitability of the wall conditions by comparison with 1090914016.

--------------
Preparation:
--------------
Overnight ECDC in He4, P=5e-5 Torr.
sweep: 44/45/103 cm
scan: 20/120 s

-----------------
Engineering Setup
-----------------

Run begins at 09:00 and ends at 17:00

Power systems as on: 1090914016

Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup: NOTE non-standard setup!

Fill B-Top with 6 psi He4 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi He4 Hybrid enabled (PG3)
fill H-bot with 2psi Ne, Hybrid DISABLED
fill NINJA with 10 psi He4 DISABLED

Enable gatevalves and shutters: ECE, VUV, B-spectrometer, HiREX Sr, Z-bolo

Torvac gatevalve toggle (yes/no):NO

Boronization(yes/no): no
Overnight ECDC (yes/no): Yes
ICRF(yes/no): Yes D,E, J
LH(yes/no): no
Cryopump (yes/no): no

Vessel temperature: 35/35/35

Session Leader Plan:
--------------------

1. Establish shot based on 1090914016 (900kA, nl04=4e19,"JFT2-M shape" in
helium. Bring up RF power, de-deuterize antenna and walls. [4-6 shots]

2. Look for ELMs. Vary power, density, shaping (esp. lower triangularity,
elongation), current, in order to provoke ELMs in helium. If Prad seems
to be a problem, try neon puffing from H-bottom. If unsuccessful
after sufficient effort, skip to step 6 to verify presence of ELMs in
D plasmas [1-15 shots]

3. If ELMs are obtained, determine power threshold, frequency vs power
scaling, using staircase RF waveform. Also bracket L-H threshold in
ELMy shape. Turn on argon for HIREX, evaluate effect on ELMs, if
acceptable leave on for Ti, rotation documentation. Allow NINJA He
puff for GPI camera.[4 shots]

4. If not already done during step 2, scan density (collisionality) [5 shots]

5. If not already done, and time permits, scan current (q95), e.g. down to
650kA up to 1.1MA [3 shots]

6. Beginning no later than 15:00, changeover to D plasma, monitoring change
(or appearance of) ELM behavior. Monitor changeover watching HeII signal,
neutrons. (4-10shots)

7. Document comparison of "best" ELM conditions from helium (if any) and
similar configuration in D. If no pure He example was produced in step 2,
then verify existence in D. [1-4 shots]

Physics Operators Plans
Entered: Dec 18 2009 12:23:48:557PM
Author: Earl Marmar
load from 1090914016
zero segments 3 and 4
recalculate all magnetics predictors in segment 2
import segment 1 from 1091217021 into segment 1
reduce prefill puff to 25 msec (He startup)

The alternator has a problem and will not operate today, so the run has been scrubbed.



Entered: Dec 18 2009 12:25:00:823PM
Author: Earl Marmar
see session leader plan



Session Leader Summaries
Entered: Dec 18 2009 10:16:49:543AM
Author: Steve Wolfe
Run 1091218 has been cancelled due to required repair
on the alternator drive system.

THIS CONCLUDES OPERATION FOR CALENDAR YEAR 2009

See you next year, folks.

Physics Operator Summaries

Session Leader Comments
Dec 18 2009 09:01:18:230AM1091218001Steve Wolfe
We are experiencing a delay in starting run 1091218 because 
of an alternator problem transferring to speed 3. 

Delay will probably be at least an hour. 

Dec 18 2009 09:29:36:760AM1091218001Steve Wolfe
Run 1091218 has been cancelled due to required repair
on the alternator drive system.

THIS CONCLUDES OPERATION FOR CALENDAR YEAR 2009

See you next year, folks.

Physics Operator Comments

Engineering Operator Comments
ShotTimeTypeStatusComment