Alcator C-Mod Run 1100202 Information

Back to runs

Miniproposals
Miniproposal:593
Date Filed: 1/10/2010
Title:Vertical Equilibrium Shifts for Triggering ELMs
First Author:Jerry Hughes
Session Leader:Jerry Hughes (shots 1-23)

Operators
Session leader(s):Jerry Hughes
Physics operator(s):Jim Irby
Engineering operator(s):Sam Pierson,Andy Pfeiffer,Bill Byford

Engineering Operator Run Comment
MP 593: Vertical equilibrium shifts for triggering ELMs SL: Hughes, PO:

Session Leader Plans
Entered: Feb 1 2010 02:45:55:213PM
Author: Jerry Hughes
Run plan for 1100202
MP 593: Vertical equilibrium shifts for triggering ELMs
SL: Jerry Hughes
PO: Jim Irby

Prep:

-- Overnight boronization followed by He ECDC
-- Working Gas Species: Deuterium
-- ICRF at 80 MHz up to 4 MW available.
-- Special gas puffing:
1psi Ar puff enabled, puff at 0.3s, 50ms in length
10psi D2 NINJA puff enabled for GPI, CXRS --- please consult SL before
triggering NINJA puff.
-- A-Coils: Standard configuration
-- LBO set up for Rowan et al. to piggyback --- please request SL permission
before actually firing.

Required Diagnostics and their set up:
1.) Edge TS, no position changes.
2.) ECE. Optimize for pedestal top
3.) 0-D Fast D-alpha for ELM timing
4.) Fast magnetics. Digitize for full length of shot.

Desired diagnostics:
1.) Passive and GP-assisted CXRS.
2.) PCI. Unmasked configuration, digitizing for full length of discharge.
3.) Reflectometer. Set 0.5s digitization window to begin at 0.6s.
4.) Fast D-alpha GPI.
5.) Bolometry.
6.) Lyman alpha.
7.) HIREX Sr.


Run plan:

1. Start from shot 1091022012, an 800kA, 5.4T discharge which had fixed
X-points and ZCUR control. Set nl04 to 1e20. Program a steady ZCUR such
that the resulting plasma is LSN with an SSEP value of approximately -7mm.
This probably means lowering the ZCUR program by about 3mm. Apply flat ICRF
pulses from 0.6s to 1.5s, bringing power up to 4MW (or max available).
GOAL OF PART 1: Recover from boronization and establish a high power EDA
H-mode
APPROX. # OF SHOTS: 3--5

2. Begin applying modulation to ZCUR during the H-mode. The modulation window
should range from 0.9s to 1.4s.

Initial modulation parameters:
Modulation max: 0.007m, Modulation min: 0.0m
Modulation rampup: 0.010s, Modulation rampdown: 0.010s
Modulation period: 0.040s (f=25.0Hz)
If this is unsuccessful, the modulation demands may need to be reduced
somewhat. If successful, then attempt to reduce the modulation rampup and
rampdown times to 0.005s, then 0.002s.

After a minimum ramp time is established, increase drive frequency by
decreasing mod period to 0.020s, 0.013s and 0.010s (50, 77 and 100Hz),
insofar as is consistent with the minimum constraints on rampup/rampdown
time.

GOAL OF PART 2: Test the feasibility of modulating in a stationary H-mode.
Once the modulation is working, look for changes in the H-mode character.
APPROX. # OF SHOTS: 8--12

3. Raise Ip to 1.1MA while keeping nl04 at 1e20. Run a shot with flat ZCUR
first, as in part 1. Then add modulation at the highest successful drive
frequency in step 2. If the plasma control is unstable, back off of the
modulation demands. If the H-modes are too radiative and transient,
raise target density slightly. If they are too EDA-like, lower the target
density.
GOAL OF PART 3: Extend technique to an ELM-free H-mode.
APPROX. # OF SHOTS: 4--8

4. If ELMs have been triggered at any point, repeat the successful discharge
and see whether some degree of ELM pacing is possible by varying the drive
frequency shot-to-shot over the range of 20--100Hz.
If ELMs have not been triggered, then repeat the modulation in lower
current H-modes, under the assumption that higher beta_poloidal will promote
ELM instability. Try 0.6MA, then 0.4MA.
GOAL OF PART 4: Self-evident
APPROX. # OF SHOTS: 4--6, or whatever is left



Physics Operators Plans
Entered: Feb 2 2010 08:35:31:727AM
Author: Jim Irby
-----------------
Engineering Setup
-----------------

Run begins at 09:00 and ends at 17:00

Power systems as on: 1091022012

Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:

Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid ENABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
fill NINJA with 10 psi D2 DISABLED

Enable gatevalves and shutters: ECE, VUV, HiREX Sr, Z-bolo

Torvac gatevalve toggle (yes/no): no

Boronization(yes/no): yes
Overnight ECDC (yes/no): following boronization
ICRF(yes/no): yes
LH(yes/no): no
Cryopump (yes/no): no

Vessel temperature: 35/35/35


--------------------------------------
Boronization Parameters: See SL Plan
--------------------------------------
f

Session Leader Summaries
Entered: Feb 2 2010 05:36:54:470PM
Author: Jerry Hughes
Run summary for 1100202
MP 593: Vertical equilibrium shifts for triggering ELMs
SL: Jerry Hughes
PO: Jim Irby

There were long delays early in the run day to 1) address faulty gas
feedback control and 2) replace the EF3 breaker. Because of this, the
time devoted to boronization recovery extended into the afternoon
portion of the run. By 14:45 we had only 10 full-length
plasmas and were just starting to get signs of steady EDA H-mode.

With a little over 2 hours to go, we began applying ZCUR
modulation on shot 14. This was highly successful in 800kA EDA
H-modes, and we were able to maintain steady H-modes with controlled
Prad and good confinement on shots 15 and 17. On these two shots, it
looked like a rising radiated power was arrested and kept under
control by the mosulation.

Outer gaps did not oscillate significantly, and ICRF handled the modulation
well. The QCM was dianosed with PCI and magnetics, as well as fast
D-alpha. During the modulation phase, there was a hint that the lab
frame frequency of the QCM was being shifted as we modulated, but this
bears further looking at.

In the last hour or so, we moved on to 1.1MA H-modes to test this
technique in an ELM-free case. This was less successful. The plasma
went vertically unstable in every case, even when we reduced the
programmed slew rate substantially.

Because of the delays today, we made only marginal progress on the
MP. The technique could use some more exploration. We might want to
try it at 1MA and low target density. Also, in the future the cryopump
could be useful in helping to outgas the walls after boronization, and
keeping the density down.

Summary of modulation sequence.

Programmed parameters:
SHOT AMP.(mm) PERIOD(ms) RAMPUP/DOWN(ms) Ip(MA) STABLE?
014 7 40 10 0.82 Y
015 7 40 5 0.82 Y
016 7 40 2 0.82 Y
017 7 40 1 0.82 Y
018 0 0 0 0.82 Y
019 7 40 1 1.10 N
020 7 40 2 1.10 N
022 7 40 5 1.10 N
023 5 40 5 1.10 N

Physics Operator Summaries
Entered: Feb 2 2010 05:37:51:643PM
Author: Jim Irby
Machine ran extremely well today. We had only one fizzle (shot 21)
probably because I didn't keep the fill pressure low following the
disruption on shot 20. The first half of the run was spent on
boronization recovery and conditioning the antennas.

A new modulation technique was applied to ZCUR today that worked
extremely well. Only when we tried to push the plasma current to 1100
kA did we run into trouble and have a few disruptions. ZCUR modulation
amplitudes of 0.007 m, at 25 Hz, with 0.001 s rise and fall were
successfully applied.

Problems:

We noticed by shot 2 that the main gas puff was not happening and we
were running off the walls. Willy found that the chopper supply for the
piezo drive was not working. We pulled out the board and ran
successfully on the analog drive for the rest of the run

During the test of the gas system (04) we found that the EF3 breaker was
no longer working properly. It was replaced before shot 05.

We had a data system slow down that Josh and Tom had to spend some time
fixing.

We lost D-Port antenna when a leak developed in an FPA cooling line
elbow. The water took out some electronics. Not clear if we will have
D-Port back by tomorrow.


Session Leader Comments
Feb 2 2010 09:14:52:867AM1100202001Jerry HughesShot 1:

Let's get started. 800kA target. Try a little RF.

Full length discharge. Lots of RF faults. No H-modes yet.
Equilibrium looks reasonably good.
TS working with one laser
Fluctuation diagnostics seem to be mostly working.


Feb 2 2010 09:32:48:000AM1100202002Jerry HughesShot 2.

800kA. Got an H-mode with 2MW ICRF. Injection at 0.7s.
Not sure the main gas valve is working. Density is well below the target
in the L-mode phase.

Feb 2 2010 10:33:42:790AM1100202003Jerry HughesShot 3

Gas test shot. Results were less than favorable.


Feb 2 2010 01:23:34:810PM1100202004Jerry Hughes
Another gas test
Feb 2 2010 01:23:49:577PM1100202005Jerry Hughes
No plasma
Feb 2 2010 01:24:21:470PM1100202006Jerry Hughes
Plasma, no significant H-modes yet.
Feb 2 2010 01:25:05:640PM1100202007Jerry Hughes
EDA H-mode. RF still ratty.

Feb 2 2010 01:31:05:910PM1100202008Jerry Hughes
EDA H-mode, fairly low power by the end. E and J fault out. D is better
High neutral pressure. Not quite recovered from boronization yet.

Feb 2 2010 01:44:50:367PM1100202009Jerry HughesShot 9:

Neutral pressure still rather high. For the next shot, lower nl04 program to
8e19.


Feb 2 2010 02:14:14:143PM1100202010Jerry Hughes
Shot 10

Multiple H-modes. Radiation, injections are a problem.
QCM is in evidence on PCI. Perhaps it is too weak, or the impurity sources are
too great.

Lower RF demand for next shot.


Feb 2 2010 02:15:49:143PM1100202011Jerry HughesShot 11

3MW RF to begin with, and we see better performance. We are getting close to a
steady H-mode target for this experiment.


Feb 2 2010 02:21:54:227PM1100202012Jerry Hughes
Shot 12

Injection at 0.7s, but H-mode recovers by 0.9s. D and E not happy after that,
perhaps because of high pressure.


Feb 2 2010 02:45:02:297PM1100202013Jerry HughesShot 13

Pretty tough injection at 0.68s. Getting an EDA H-mode from 0.86s on, with
some faults on RF.

We have a little over 2 hours left, so we'd better start trying to modulate
ZCUR, even though we don't have a very steady target.

Feb 2 2010 03:09:13:760PM1100202014Jerry HughesShot 14

Try a ZCUR modulation from 0.9 to 1.4s at 25Hz.
Plasma went through. Programmed oscillation worked. You can actually see the
oscillation on the slow H-alpha signal and the pressure in the cryo plenum.
ZMAGX varies by ~1cm starting at 0.9s. Numerous other things vary too, including
X-points and left gap.
Density seems to exhibit a favorable reduction after 1s.
No ELMs. Wolfe is disappointed.
Feb 2 2010 03:36:32:423PM1100202015Jerry HughesShot 15

ZCUR at 25Hz from 0.9 to 1.4s
PO increases rampup/rampdown rates on modulation. (10ms-->5ms)
Works. The plasma response is noticeably faster.

I also asked Yijun to ease in the RF with a ramp from 1MW to 3.5MW

Best shot so far. RF does well until 1.12s. Radiation is well controlled.
Beefy pedestal.


Feb 2 2010 03:35:31:770PM1100202016Jerry Hughes
Shot 16

ZCUR at 25Hz from 0.9 to 1.4s
PO increases rampup/rampdown rates on modulation. (5ms-->2ms)
Works! The plasma response is a little faster. ZCUR slews in ~3ms.

Next. Let's see if 1ms ramp time works.


Feb 2 2010 03:46:44:243PM1100202017Jerry Hughes
Shot 17

ZCUR at 25Hz from 0.9 to 1.4s
PO increases rampup/rampdown rates on modulation. (2ms-->1ms)
It survived! The plasma response on the ramp down seems to be faster than
the ramp-up.

Tped, H98, and neutron rate are very respectable. Good shot.

Next: let's remove the modulation and get the baseline shot that we couldn't get
earlier due to early injections.


Feb 2 2010 04:15:50:910PM1100202018Jerry Hughes
Shot 18

No vertical jog programmed on this shot.

Lost D-port on this shot, and for the rest of the day.

"There is water where water is not supposed to be." --YL

So, we don't get our baseline, unfortunately. We will continue with reduced
power. I will move on to low q points.

Next shot: Raise Ip to 1.1MA. Put modulation back in.
Feb 2 2010 04:30:27:773PM1100202019Jerry HughesShot 19

Attempting 1.1MA with modulation:
ZCUR at 25Hz from 0.9 to 1.4s, rampup/rampdown=1ms

H-mode, looks pretty QCM-free.

Disrupts at 1.02s. Seems to be vertically unstable by the third period of the
modulation.

J-port wasn't very happy with this H-mode apparently.


Feb 2 2010 04:38:59:450PM1100202020Jerry HughesShot 20

ZCUR at 25Hz from 0.9 to 1.4s
PO decreases rampup/rampdown rates on modulation. (1ms-->2ms)
vertical instability again.


Feb 2 2010 04:59:29:080PM1100202021Jerry HughesShot 21

Fizzle
Feb 2 2010 05:06:45:990PM1100202022Jerry Hughes
Shot 22

ZCUR at 25Hz from 0.9 to 1.4s
PO decreased rampup/rampdown rates on modulation. (2ms-->5ms)
vertical instability at 0.945s, right after an L-H transition.

One more attempt with less amplitude in the modulation.


Feb 2 2010 05:16:09:370PM1100202023Jerry HughesWell, we tried.

Unstable again, at same time. In ELM-free H-mode.

End of run.

Physics Operator Comments
Feb 2 2010 09:05:15:257AM1100202001Jim Irbyloaded from 1091022012
open tree done

nl_04 request to 1e20/m^2
zcur from -0.013 to -0.020 m flat
loaded

Argon puff from 0.300 to 0.350 s --- enabled

Boronization last night

Prefill from -0.516 to 0.500 s --- same as on 1091022012

************************************

plasma into rampdown
Feb 2 2010 09:34:06:940AM1100202002Jim Irbychanges --------------------------------

prefill to 18 ms from 16 ms

results --------------------------------

plasma into rampdown

last shot Steve noticed the we had no main gas piezo signal. Not sure if it ran or not --- Willy and Tommy to cell
Feb 2 2010 10:15:54:030AM1100202003Jim Irbyno power shot --- gas system test --- plenty of gas
Feb 2 2010 11:12:37:370AM1100202004Jim Irbygas puff test:

main gas board analog only --- no chopper

no gas from main valve but it did have the proper signal
Feb 2 2010 12:46:57:330PM1100202005Jim Irby11:50

Delay as we try to find a problem with one of the 13.8 kV breakers

12:00

EF3 breaker needs to be replaced

12:35

Ready to test --- try for plasma

12:40

plasma: 143 kA

spikes on all neuts_hards signals
hit something?
Feb 2 2010 12:59:43:740PM1100202006Jim Irbychanges --------------------------------

prefill from 18 to 22 ms
loaded

results --------------------------------

plasma into rampdown --- a few bounces
very little rf --- no h-modes

Feb 2 2010 01:17:31:967PM1100202007Jim Irbychanges --------------------------------

no DPCS changes

results --------------------------------

plasma into rampdown

h-mode --- rf looks a little better
Feb 2 2010 01:26:29:233PM1100202008Jim Irbychanges --------------------------------

no DPCS changes

results --------------------------------

plasma into rampdown --- nice h-mode -- 3 MW faulting

No argon puff since shot 2
Feb 2 2010 01:39:33:710PM1100202009Jim Irbychanges --------------------------------

no DPCS changes

results --------------------------------

plasma into rampdown -- h-modes

all neuts_hards detectors saturated for a while early

OH/EF1 over limits in double swing because of oscillations in current
Feb 2 2010 01:50:10:213PM1100202010Jim Irbychanges --------------------------------

prefill to 25 ms from 22 ms
nl04 request from 1.0 to 0.8e20/m^2 --- reduce edge pressure for icrf

results --------------------------------

plasma into rampdown


Feb 2 2010 02:08:04:580PM1100202011Jim Irbychanges --------------------------------

a few people go to cell -- check argon issue

no DPCS changes

results --------------------------------

nothing found wrong with argon --- but still dead

plasma --- rf looks better (at lower request)




Feb 2 2010 02:24:49:540PM1100202012Jim Irbychanges --------------------------------

no DPCS changes --- trying to get more rf

results --------------------------------

plasma


Feb 2 2010 02:42:24:890PM1100202013Jim Irbychanges --------------------------------

moving argon puff to bside-upper --- PG2 programmed for 0.3 to 0.35 s pulse
loaded

results --------------------------------

plasma

Feb 2 2010 02:57:47:690PM1100202014Jim Irbychanges --------------------------------

put in ZCUR modulation per SL plan step 2
loaded


results --------------------------------

plasma --- modulation looks good
Feb 2 2010 03:15:10:747PM1100202015Jim Irbychanges --------------------------------

faster rise/fall on modulation --- 0.01 to 0.005 s

results --------------------------------

plasma --- modulation looks good


Feb 2 2010 03:30:15:360PM1100202016Jim Irbychanges --------------------------------

modulation ramp up/ramp down from .005 to .002 s
loaded

results --------------------------------

plasma
Feb 2 2010 03:39:02:690PM1100202017Jim Irbychanges --------------------------------

modulation ramp up/ramp down 0.001 s
loaded

results --------------------------------

plasma
Feb 2 2010 04:01:37:933PM1100202018Jim Irbychanges --------------------------------

modulation amplitude set to 0.0
loaded

results --------------------------------

plasma --- no D-Port
Feb 2 2010 04:19:30:363PM1100202019Jim Irbychanges --------------------------------

power room entry to check out d-port transmitter
** leak in FPA cooling line elbow **
** D-Port done for a while **

Ip from 800 to 1100 kA
ZCUR modulation is back (r/f .001 s, .007 mm, .040 s)
loaded


results --------------------------------

plasma for 1.01 s

Feb 2 2010 04:40:19:183PM1100202020Jim Irbychanges --------------------------------

rise/fall of modulation from .001 to .002 s
loaded

prefill reduced from 25 to 22 ms
loaded


results --------------------------------

plasma for 0.957 s

lots of signal on all neuts/hards detectors
Feb 2 2010 04:45:02:280PM1100202021Jim Irbychanges --------------------------------

prefill from 22 to 24 ms
loaded

rise/fall from 0.002 to 0.005 s
loaded

results --------------------------------

fizzle --- should have reduced prefill and not worried about hards

Feb 2 2010 05:03:51:287PM1100202022Jim Irbychanges --------------------------------

prefill to 23 ms from 24 ms
loaded


results --------------------------------

plasma for 0.957 s

lots of hards early
Feb 2 2010 05:14:00:400PM1100202023Jim Irbychanges --------------------------------

ZCUR modulation amplitude reduced to 5 ms
loaded

results --------------------------------

plasma for 0.963 s --- still too much modulation or Ip

That's all...

Engineering Operator Comments
ShotTimeTypeStatusComment
109:00:05:860AMPlasmaOk
209:20:41:260AMPlasmaOk
310:03:40:230AMTestOkNo power shot, gas test
411:05:21:210AMTestOkShot #3 gas test only, no power.
512:38:14:890PMPlasmaOk
612:52:07:860PMPlasmaOk
701:05:30:087PMPlasmaOk
801:18:38:480PMPlasmaOk
901:31:39:987PMPlasmaOk
1001:45:44:523PMPlasmaOk
1102:02:15:403PMPlasmaOk
1202:15:19:160PMPlasmaOk
1302:28:06:057PMPlasmaOk
1402:49:29:390PMPlasmaOk
1503:08:19:853PMPlasmaOk
1603:21:21:840PMPlasmaOk
1703:34:22:957PMPlasmaOk
1803:48:17:617PMPlasmaOk
1904:14:15:503PMPlasmaOk
2004:27:26:320PMPlasmaOk
2104:40:22:683PMPlasmaOk
2204:53:27:970PMPlasmaOk
2305:09:44:210PMPlasmaOk

System Availability
Feb 2 2010 08:59:38:410AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Nov 13 2009 06:37AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyes31 of 32 channels working (Ch29 no signal)Dec 09 2009 11:01AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational.Nov 12 2009 02:36PM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Nov 13 2009 06:38AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1100120000 the system is operational except for channel 110 which is not installedJan 20 2010 09:17AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Feb 2 2010 10:03:14:450AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Nov 13 2009 06:37AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll channels working and calibrated.Feb 02 2010 09:56AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational.Nov 12 2009 02:36PM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Nov 13 2009 06:38AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1100120000 the system is operational except for channel 110 which is not installedJan 20 2010 09:17AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Feb 2 2010 11:04:55:680AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Nov 13 2009 06:37AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll channels working and calibrated.Feb 02 2010 09:56AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational.Nov 12 2009 02:36PM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Nov 13 2009 06:38AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1100120000 the system is operational except for channel 110 which is not installedJan 20 2010 09:17AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Feb 2 2010 11:55:34:777AM
Replaced neon lamp source 0707031 which had burned out with 0903019, which I replaced the bulb in today.