Alcator C-Mod Run 1100205 Information

Back to runs

Miniproposals
Miniproposal:534
Date Filed: 2/21/2008
Title:Foil/AXUV Bolometer Calibration in Helium
First Author:Matt Reinke
Session Leader:Matt Reinke (shots 1-17)

Operators
Session leader(s):Matt Reinke
Physics operator(s):Robert Granetz
Engineering operator(s):Sam Pierson,Bill Cochran

Engineering Operator Run Comment
MP 534 Foil/AXUV Bolometer Calibration in Helium, EO Pierson, PO Granetz

Session Leader Plans
Entered: Feb 4 2010 03:08:44:360PM
Author: Matt Reinke
MP 534 Foil/AXUV Bolometer Calibration in Helium

This run will use He plasmas, seeded with a Ar and (separately) N2 to assist "calibration" of the Foil and AXUV diode bolometers.

ECDC in He the night before
B-SIDE-LOWER at 2.0 psi Ar

1) Working gas changeover and RF conditioning.
Load 1080411024 (USN, Ip= 1MA, nl04=1.0) with cryopump
Run ICRF at 3 MW using only D+E from 0.4-1.4 and ramp from 3.0-1.0 from 1.4-1.6
IMPINJ at 1.55, injecting tungsten

2) Add a dash of radiation
Once ICRF stable add Ar gas puff from 0.3-1.2, adjust pressure if necessary
Add IMPINJ pulse at 1.35 when confident it won't kill the plasma
Repeat until LYMID/H-alpha/Neuts shows low D-level

2-1) HIREXSR crystal size calibration
Once repeatable Ar-seeded plasmas are demonstrated, cell access to install crystal cover.
Repeat at least two Ar seeded plasmas

3) Large outer gap scan
Load 1071221002 which has an outer gap scan from 2-15 cm
Turn off ICRF
Reduce Ar puff to 0.3-0.5 seconds

3-1) Once repeatable shots are demonstrated, cell access to REMOVE crystal cover
Repeat Ar seeded gap scan

4) Change B_SIDE_LOWER to 8.0 psi N2 and repeat (2)

5) Repeat (3) with N2


Physics Operators Plans
Entered: Feb 4 2010 05:01:29:797PM
Author: Robert Granetz

Engineering setup for Friday 2010/02/05

MP534 - (1/2 day) Foil/AXUV bolometer calibration in He

Session leaders: M. Reinke
Physics operator: R. Granetz

Overnight: ECDC in HELIUM and 60 C bake

Run will start at 09:00 and end BY 13:00.

Power systems as on 1080411024 (USN, 1 MA, 5.4 T)

A-coil configuration: +Dtop -Dbot -Jtop +Jbot; Enabled (standard
configuration)

Gas Setup:
   fill B-Top            with  6 psi D2  Hybrid enabled  (PG4)
   fill B-side lower     with  2 psi Ar  Hybrid DISABLED (PG1)
  leave B-side upper     as is           Hybrid DISABLED (PG2)   
   fill B-main (C-side)  with 40 psi He  Hybrid enabled  (PG3)
  leave NINJA            as is           DISABLED

Enable the following gate valves and shutters, assuming no vacuum problems:
  ECE, VUV, Z-bolo
 
Torvac setup: keep gate valves open during PULSE

Specific diagnostics: impurity injector (tungsten), HIREX w/crystal cover

------------------------------------------------------------------------------
Impurity injector: yes, with tungsten
Boronization: no
ICRF Setup: 3 MW using on D+E
LH Setup: no
DNB: no
Cryopump: yes, ready for the start of the run
------------------------------------------------------------------------------

Run plan: start from 1080411024, but with cryopump.  Prf=3 MW from D+E,
          with timing as per session leader's run plan.  Tungsten impurity
          injection at t=1.55 s.

          Later we will do an outer gap scan by loading 1071221002 (no RF).

          Finally, we will switch to puffing N2 instead of Ar.


Session Leader Summaries
Entered: Feb 5 2010 01:43:35:037PM
Author: Matt Reinke
Got most of the SL_PLAN finished despite some duds and early disruptions. Got several good plasmas for intensity calibration of AXUV and foil bolometers using Ar seeding and spatial calibration using Ar seeded plasma with a large outer gap scan.
Piggybacking on to this I was able to get matched RF and gap scan plasmas with and with out the crystal mask for the He-like HIREXSR crystal.
The W injections worked out very well and I was able to isolate the spectral lines from W on XEUS and get impurity confinement times using McPherson.
The N2 seeded plasmas went OK, but didn't create the strong edge radiation layer I was hoping, even w/o ICRF. Still they're very useful for the N V emission comparison using the Ly-alpha cameras and CXRS and seeing the He-like spectra on XEUS.

Physics Operator Summaries
Entered: Feb 23 2010 03:34:26:690PM
Author: Robert Granetz

Run summary for Friday 2010/02/05

MP534 - Foil/AXUV bolometer calibration in helium (half-day)

Session leaders: M. Reinke
Physics operator: R. Granetz

We got off to a slow start because of several mistakes made in the setup of
the gas plenum system, and to a minor problem with the alternator.  But by
shot 3 we were getting helium plasmas with lots of impurity gas puffing
(argon, then nitrogen).  We also did a few shots that scanned the outer
edge inward, and these worked reasonably well too.

At about 11:00 the run was paused for a few minutes to allow Congressman Ed
Markey and his party to tour the C-Mod cell and see the tokamak.

Scorecard: 14 plasmas
            2 dud (due to EF1U problem)
            1 fizzle
            0 power supply tests
            0 no-power MDS shot cycle
           --------------
   Total:  17 shot cycles

Session Leader Comments
Feb 5 2010 09:11:36:997AM1100205001Matt ReinkeDud
Feb 5 2010 09:47:13:713AM1100205002Matt ReinkeShot ran but seems like D2 was the working gas, not He. RF ran well.

NEXT: Move on to seeding with Ar. Enable 2.0 psi puff from 0.4-1.2. Add W injection at 1.55 seconds.
Feb 5 2010 10:05:14:737AM1100205003Matt ReinkeGood shot, plenty of Ar, W injection large but not a killer. Bolometer signals look great, too. Still some neuts.H-a/Ly.

NEXT: Repeat to degas
Feb 5 2010 10:19:31:647AM1100205004Matt ReinkeLost density control, getting nl04~1.5 and huge MARFE. Flash heating to degas the walls, I guess.

NEXT: Repeat w/ density control, please. Lower target to nl0=0.8 to try and avoid MARFE.
Feb 5 2010 10:32:53:760AM1100205005Matt ReinkeFull length shot. Still density control problems.

NEXT: Bob's tweaking gas, but otherwise repeat.
Feb 5 2010 11:03:50:960AM1100205007Matt ReinkeExcellent steady density shot.

NEXT: Repeat w/ HIREXSR He-like crystal masked
Feb 5 2010 11:24:37:953AM1100205008Matt ReinkeWonderfully reproduced shot! HIREXSR w-line down about 1/2 as expected and the measured ion temperature reduced on w/z but not on Ly-a. Good test of finite crystal effects!!!!

NEXT: Repeat after the Gentleman from Massachusetts gets out of the cell.
Feb 5 2010 11:34:03:097AM1100205009Matt ReinkeEarly disruption. Would like to have another repeat w/ crystal cover but want to move on.

NEXT: Load outer gap scan plasma. ICRF off, IMPINJ off, Ar puff from 0.3-0.4.
Feb 5 2010 12:05:07:280PM1100205010Matt ReinkeGood outer gap scan on this shot with plenty of Ar.

NEXT: Repeat shot with an additional 0.7-0.8 Ar puff.
Feb 5 2010 12:05:23:843PM1100205011Matt ReinkeDud, power supply failure.

NEXT: Repeat 010 w/o crystal cover and remove the 0.7-0.8 Ar puff that was supposed to be in 011.
Feb 5 2010 12:16:16:740PM1100205012Matt ReinkeEarly injection killed shot.

NEXT: Try again to get a repeat of 010
Feb 5 2010 12:29:00:743PM1100205013Matt ReinkeGood repeat of 010 w/o the crystal cover.

NEXT: Repeat 008 w/ N2 puffing. Turn off cryopump, and put 6 psi N2 in B-SIDE-LOWER.
Feb 5 2010 12:47:06:330PM1100205014Matt ReinkeGood shot. See N2 in the plasma and residual Ar. Plasma handles the N2 just fine.

NEXT: Increase N2 pressure to 10 psi. Decrease ICRF power to 2 MW.
Feb 5 2010 12:58:31:223PM1100205015Matt ReinkeGood shot.

NEXT: Repeat w/o RF.
Feb 5 2010 01:09:56:680PM1100205016Matt ReinkeUgh, early disruption.

NEXT: Last shot, try one more time.
Feb 5 2010 01:23:31:560PM1100205017Matt ReinkeShot disrupted early, looks like an injection, but still got the data I wanted from it.

Physics Operator Comments
Feb 4 2010 10:00:06:840PMRobert Granetz
Load seg 1 from seg 1 of most recent shot (1100204030).  Keep pre-fill
pulse at 50+ ms; Cryopump on.

Load seg 2 from SEG 4 of 1080411024 (USN, 1 MA, 5.4 T).  Update all Bp- and
flux-dependent wires.  Load nl_04 with nl_04 from most recent shot (valve
driver board still not replaced, copy PG3 voltage programming from most
recent shot), and program nl_04=1.0e20 m-2.  Program PG1 from t=0.3 to 1.2
s, but disable for beginning of run.

Load seg 3 from SEG 4 of 1071221002 (ramped RCUR & Ip).  Update all Bp- and
flux-dependent wires.  Load nl_04 with nl_04 from most recent shot (valve
driver board still not replaced, copy PG3 voltage programming from most
recent shot), and program nl_04=0.7e20 m-2 (same as 1071221002).  Program
PG1 from t=0.3 to 0.5 s.

Save (the night before) as 1100205000 in /home/granetz/pcs_scratch

Feb 5 2010 09:12:01:933AM1100205001Robert Granetz
Shot 01 -- Dud, almost no pre-fill gas.  The B-top plenum was mistakenly filled to 2 psi only.  There's also
           a minor problem with a gas valve in the alternator house.

Next shot: try again

Feb 5 2010 09:31:17:300AM1100205001Robert Granetz
After shot 1 the alternator had to spin down.  This is causing a delay in starting shot 2.

Feb 5 2010 09:51:45:400AM1100205002Robert Granetz
Shot 02 -- Plasma, full length.  But the fueling plenum was filled with D2, even though my run setup
           clearly specified helium.  1.0 MA, 5.46 T, 0.9e20 m-2, USN.  Prf=2.9 MW (D+E)

Next shot: repeat, but with helium.  Also enable the Ar puff (B-side-lower); also tweak Btor; also
           reduce the P and D feedback on nl_04 to account for helium recycling

Feb 5 2010 10:07:33:283AM1100205003Robert Granetz
Shot 03 -- Plasma, nearly full length; disrupted at t=1.69 s during the rampdown.  W injection
           at t=1.55 s.  Lots of argon radiated power.  Prf=2.9 MW.

Next shot: tweak up nl_04 P gain, turn on nl_04 I gain; move W injection to t=1.3 s.

Feb 5 2010 10:21:32:477AM1100205004Robert Granetz
Shot 04 -- Plasma, disrupted at t=0.74 s.  Large density overshoot (nl_04=1.6e20 m-2), although the
           fueling valve was not open much.  Perhaps it was the argon puff?  RF pulse?  marfe?

Next shot: turn off integral gain on nl_04, decrease nl_04 to 0.8e20 m-2; reduce pre-fill
           pulse by 3 ms (disruption recovery)

Feb 5 2010 10:35:26:043AM1100205005Robert Granetz
Shot 05 -- Plasma, full length.  Density control is not good enough.

Next shot: adjust PG3 programming, which is going to take a few shots because we don't have the
           usual chopper feedback circuit, so the valve control is very non-linear;
           Add 2 ms back to pre-fill

Feb 5 2010 10:47:05:500AM1100205006Robert Granetz
Shot 06 -- Plasma, but very short.  Lots of hard x-rays.  Startup looks okay.  Not sure what the
           problem was.

Next shot: no DPCS changes

Feb 5 2010 10:57:42:490AM1100205007Robert Granetz
Shot 07 -- Plasma, nearly full length.  Density looked pretty good.  Startup needs some work.
           1.0 MA, 5.4 T, 0.9e20 m-2, USN, Prf=2.9 MW.

Next shot: reduce pre-fill by 3 ms

Feb 5 2010 11:11:26:260AM1100205008Robert Granetz
Shot 08 -- Plasma, full length.  Very similar to previous shot; good density control.
           1.0 MA, 5.4 T, 0.9e20 m-2, USN, Prf=2.9 MW.  Tungsten injection at t=1.3 s.
           Lots of argon puffing.  Still have early hard x-rays, and the startup still
           has a slight pause in the early current rampup.

Next shot: reduce pre-fill 1 ms

Feb 5 2010 11:26:09:157AM1100205008Robert Granetz
We paused the run to let Congressman Ed Markey and his party tour the C-Mod cell.

Feb 5 2010 11:39:06:147AM1100205009Robert Granetz
Shot 09 -- Plasma, disrupted at t=0.43 s.  I think this was due to an impurity injection.  Huge early hard x-ray
           signal.

Next shot: switch to 2nd part of MP, the outer gap scan plasma.  Turn on segment 3, which I have preloaded with
           the desired shot.  But reduce the argon puff to 100 ms (was 200 ms), and copy over all the relevant
           traces for nl_04 (PG3 programming, P, I, D gains) and set nl_04 to 0.7e20 m-2

Feb 5 2010 11:49:56:260AM1100205010Robert Granetz
Shot 10 -- Plasma, disrupted at t=1.42 s.  This was a limiter discharge which scanned the outer edge inward,
           and it worked reasonably well.  The current is also ramped down to keep q95 nearly constant.
           Ohmic.  DNB fired into plasma, but I_beam was only 0.5 amps.

Next shot: add a 2nd argon puff at t=0.7 s for 100 ms.

Feb 5 2010 11:59:42:687AM1100205011Robert Granetz
Shot 11 -- Dud.  EF1U switch opened way too early.

Next shot: try again; remove 2nd argon puff

Feb 5 2010 12:17:15:830PM1100205012Robert Granetz
Shot 12 -- Plasma, but it got killed at 22 ms by a big injection.  Plasma current got up to 120 kA, so
           it was not a fizzle.

Next shot: try again, no changes

Feb 5 2010 12:29:48:510PM1100205013Robert Granetz
Shot 13 -- Plasma, nearly full length.  Outer gap scan, just like shot 10.  Ohmic.

Next shot: reload shot 8 (radiative shot), except switch argon to nitrogen, and turn off cryopump (so
           decrease the pre-fill to 25 ms).  Turn RF back on.

Feb 5 2010 12:44:15:623PM1100205014Robert Granetz
Shot 14 -- Plasma, full length.  1.0 MA, 5.4 T, 0.9e20 m-2, USN, Prf=2.9 MW.  Tungsten injection
           at t=1.3 s.  Ugly startup.

Next shot: reduce pre-fill by 3 ms; increase N2 pressure to 10 psi

Feb 5 2010 12:55:34:753PM1100205015Robert Granetz
Shot 15 -- Plasma, full length.  Decent shot, but terrible startup. 

Next shot: repeat, but turn off the ICRF; increase pre-fill by 6 ms

Feb 5 2010 01:07:51:790PM1100205016Robert Granetz
Shot 16 -- Fizzle.  Bad startup.

Next shot: add 4 ms to pre-fill

Feb 5 2010 01:21:13:200PM1100205017Robert Granetz
Shot 17 -- Plasma, disrupted at t=0.74 s due to an injection.  Startup was much better, but still huge
           hard x-ray signal

End of (half-day) run.

Engineering Operator Comments
ShotTimeTypeStatusComment
109:06:30:460AMPlasmaOkNo plasma, gas plenum pressure low.
209:36:38:960AMPlasmaOkB-side main filled with gas.
309:57:44:217AMPlasmaOk
410:10:50:300AMPlasmaOk
510:23:52:383AMPlasmaOk
610:37:36:420AMPlasmaOk
710:50:33:847AMPlasmaOk
811:04:54:837AMPlasmaOk
911:26:34:343AMPlasmaOk
1011:41:39:520AMPlasmaOk
1111:55:43:887AMPlasmaBadEF1 commutation switch did not close
1212:10:24:237PMPlasmaOk
1312:23:25:210PMPlasmaOk
1412:36:39:903PMPlasmaOk
1512:50:15:843PMPlasmaOk
1601:03:39:523PMPlasmaOk
1701:17:01:747PMPlasmaOk

System Availability
Feb 5 2010 09:05:55:163AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Nov 13 2009 06:37AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll channels working and calibrated.Feb 02 2010 09:56AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational.Nov 12 2009 02:36PM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Nov 13 2009 06:38AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1100120000 the system is operational except for channel 110 which is not installedJan 20 2010 09:17AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Feb 5 2010 09:58:20:890AM