Alcator C-Mod Run 1100209 Information

Back to runs

Miniproposals
Miniproposal:593
Date Filed: 1/10/2010
Title:Vertical Equilibrium Shifts for Triggering ELMs
First Author:Jerry Hughes
Session Leader:Jerry Hughes (shots 1-31)

Operators
Session leader(s):Jerry Hughes
Physics operator(s):Ron Parker
Engineering operator(s):Andy Pfeiffer,Bill Parkin,Gary Dekow

Engineering Operator Run Comment
MP 593: Vertical equilibrium shifts for triggering ELMs Session leader:

Session Leader Plans
Entered: Feb 9 2010 06:01:11:870AM
Author: Jerry Hughes
Run plan for 1100209
MP 593: Vertical equilibrium shifts for triggering ELMs
SL: Jerry Hughes
PO: Ron Parker

Prep:

-- Overnight boronization followed by He, then D2, ECDC
-- Working Gas Species: Deuterium
-- ICRF at 80 MHz at 4--5 MW level.
-- Special gas puffing:
1psi Ar puff enabled, puff at 0.3s, 50ms in length
10psi D2 NINJA puff enabled for GPI, CXRS --- please consult SL before
triggering NINJA puff.
-- A-Coils: Standard configuration
-- LBO may piggyback near end of flattop --- please request SL permission
before actually firing.
-- Cryopump should be available for beginning of run

Required Diagnostics and their set up:
1.) Edge TS, no position changes.
2.) ECE. Optimize for pedestal top
3.) 0-D Fast D-alpha for ELM timing
4.) Fast magnetics. Digitize for full length of shot.
5.) Fast EFIT set up from 0.8 to 1.1s

Desired diagnostics:
1.) Passive and GP-assisted CXRS.
2.) PCI. Unmasked configuration, digitizing from 0.4 to 1.6s.
3.) Reflectometer. Set 0.5s digitization window to begin at 0.8s.
4.) Fast D-alpha GPI.
5.) Bolometry.
6.) Lyman alpha.
7.) HIREX Sr.


Run plan:

1. Reproduce 1100202017, keeping Ip, nl04 demand the same. Also leave ZCUR as
programmed, with a 40ms modulation period and 1ms rampup/rampdown from 0.9 to
1.4s. RF program should ramp from 1.5MW to 3.5MW from 0.6 to 0.8s, and stay
flat at 3.5MW until 1.5s. The difference now is that we will use the cryopump.

It will take a few shots to recover from boronization and to bring up the RF.
Once a full length H-mode is achieved, repeat with the ZCUR modulation removed.

If added pumping prevents us from achieving the same conditions achieved on
1100202017, then try a shot with the cryopump warm.

GOAL OF PART 1: Recover from boronization and establish a high power EDA
H-mode. Compare the jogged vs. unjogged case.
APPROX. # OF SHOTS: 5--7

2. Raise RF flattop to max. available power. Begin shot-by-shot density scan,
with ZCUR modulation. This should both reduce EDA access and give us hotter
pedestals. Try L-mode target nl04 of 8e19, 7e19 and 6e19. Look for ELMs.

GOAL OF PART 2: Try to promote ELM triggering by lowering collisionality.
APPROX. # OF SHOTS: 3--4

3. Test modulation scheme at higher Ip. Keep similar RF power trace.

a. Try 1.0MA with target nl04=1e20. Based on SMW's latest simulations, we should
reduce modulation amplitude demand to 0.004m in order to prevent overshoot.

b. If the 1.0MA case is stable, raise Ip to 1.1MA. Lower modulation amplitude
demand to 0.0025m.

c. If neither (a) nor (b) is stably modulated, lower Ip to 0.9MA. Set modulation
amplitude demand to 0.004m with target nl04=9e19.

GOAL OF PART 3: Try to use the scheme in higher confinement H-modes with more
ELM-free qualities. Document any changes in the plasma introduced by jogs.
APPROX. # OF SHOTS: 4--6

4. In the highest current case that was stable (if that was 0.9MA or more), try a
density scan down in increments of 2e19 until 6e19 is reached. Keep similar RF
power trace.

GOAL OF PART 4: Combining goals of 2 and 3.
APPROX. # OF SHOTS: 0--3

5. a. If ELMs have been triggered at any point, repeat the successful discharge
and see whether some degree of ELM pacing is possible by varying the drive
frequency shot-to-shot over the range of 20--100Hz.

b. If ELMs have not been triggered in 1--4, then find a suitably stationary
H-mode with modulation and raise the baseline ZCUR so that the upswing of the
modulation takes the discharge just through double null. Look for changes in
the H-mode, including ELMs.

GOAL OF PART 5:
APPROX. # OF SHOTS: 4--6

6. If we exhaust steps 1--5 with no ELMs, and there's time, try to make an I-mode
and see if we can trigger ELMs there. Keep similar RF power trace.

a. Load shot 1091203015 (1.2MA, 5.6T). Insert ZCUR modulation from 0.9 to 1.4s.
Parameters: ModMax= -.004m, ModMin=0.0m , trampup/down=.002 s

b. Load shot 1100204014 (1.35MA). Insert ZCUR modulation from 0.9 to 1.4s.
Parameters: ModMax= -.004m, ModMin=0.0m , trampup/down=.002 s

GOAL OF PART 6: Shake and bake.
APPROX. # OF SHOTS: whatever's left

Physics Operators Plans
Entered: Feb 8 2010 05:38:00:910PM
Author: Ron Parker

-----------------
Engineering Setup for Tuesday, 1100209
-----------------

MP 593: Vertical equilibrium shifts for triggering ELMs

Session leader: Hughes
Physics operator: Parker


Run begins at 09:00 and ends at 17:00

Power systems as on: 1100202017

Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:

Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
fill NINJA with 10 psi D2 ENABLED for GPI

Enable gatevalves and shutters: ECE, VUV, HiREX Sr, Z-bolo

Torvac gatevalve toggle (yes/no): no

Boronization(yes/no): yes, overnight
Overnight ECDC (yes/no): He 2 hours then D2 1 hour following boronization, see below
ICRF(yes/no): yes, Prf = 4 -5 MW level
LH(yes/no): no
Cryopump (yes/no): yes, ready for the start of the run

Vessel temperature: 35/35/35

------------------------------
ECDC Parameters (if requested)
------------------------------

Post boronization ECDC
----------------------------
1st Gas Setup:
Gas: He
sweep: 44/45/103 cm
scan: 20/120 s
Pressure: 5.0e-5 Torr
Duration: 2 Hour

2nd Gas Setup
Gas: D2
sweep: 44/45/103 cm
scan: 20/120 s
Pressure: 2e-4 Torr
Duration: 1 hours
-----------------------------

Session Leader Summaries
Entered: Feb 9 2010 05:23:32:617PM
Author: Jerry Hughes
Here is a short initial summary:

Despite some data system delays and a number of pesky fizzles, we got a lot
of interesting stuff today.

Significant accomplishments included:

1.) Reestablishment of modulation scheme @25Hz in 800kA EDA H-modes. (Shot 012)
2.) Established modulation scheme @25Hz in 800kA ELM-free H-modes. (016)
3.) Established modulation scheme @25Hz in 1MA ELM-free H-modes. (023)
4.) Established modulation scheme @25Hz in 1MA EDA H-modes. (017,019,022)
5.) Established modulation scheme @70Hz, 100Hz and ~200Hz in 1MA EDA H-modes.
(024,025,028,030)
6.) Demonstrated some degree of triggering and/or synchronization of small
ELMs, and compared directly with a case with no modulation.
(017,019,022,024,025,028,029,030)

As an initial scoping study went, this was very successful. Small ELMs were
triggered in a number of cases, although they seemed to have very little
instantaneous effect on the edge pedestal and confinement. Future work should
concentrate on trying to find operational space and perhaps more aggressive
jog parameters where larger ELMs can be triggered.

Physics Operator Summaries
Entered: Feb 9 2010 04:47:56:027PM
Author: Ron Parker
Shot 27 fizzled
Entered: Feb 9 2010 05:11:18:130PM
Author: Ron Parker
This run followed an overnight boronization, after which followed 3 hours of discharge cleaning, 2 hrs in helium and 1 hour in deuterium.

The run proceeded with a few short delays in the morning due to hangups in the engineering action monitor and data systems.Fortunately the delays were fairly short and the problems were quickly resolved thanks to Josh.

The main problem today was the lack of a consistent startup, resulting in many fizzles or early disruptions. Nevertheless the good shots that were obtained with vertical position modulation were interesting and seemed to clearly demonstrate the use of the modulation technique to pace or cause ELM's, to the extent that they could be identified on the H alpha emission.

Scorecard: 29 attempts at plasma, 2 no power shots

16 full length shots
9 fizzles
3 disruptions >= 1 s

Session Leader Comments
Feb 9 2010 09:08:40:473AM1100209001Jerry HughesNo power shot.
Feb 9 2010 09:42:04:833AM1100209002Jerry HughesInjection at 0.92s. Disrupts at about 1s. No obvious H-mode. You can see the
modulation on the H-alpha. Got through 2 modulation cycles and it disrupts on
the 3rd. Magnetics data is lost.

Feb 9 2010 09:53:20:900AM1100209003Jerry HughesFizzle.

Cell access for 3 grad students (see how they run . . .)
PO is a grumpy gus about it.

Feb 9 2010 10:08:25:233AM1100209004Jerry HughesTurning off modulation for this shot.
Progress! 800kA. Long EDA H-mode. Density trace looks pretty good.
No RFNET data, but Wukitch says the transmitters look like they gave 1MW,
ramping to 3MW. One fault from J.
We are missing some additional data: Bolos, GPC, edge TS.
Peak Wp is close to 120kJ. 1100202017 had 125--130kJ.
Feb 9 2010 11:05:32:253AM1100209005Jerry HughesData came in. RF ramp is looking fairly good. Prad is low.
Long EDA H-mode.
WE are heating up the outer divertor tiles (4th and 3rd row, no sign of tungsten
yet.)
No TS data, due to a YAG problem.

Feb 9 2010 11:06:19:147AM1100209006Jerry HughesMore power early. Up to 4MW at 0.8s. Nice pedestal, but a big W injection
at 0.87s. Another H-mode at 1s .
For next shot, back off power demands.

Feb 9 2010 11:15:50:427AM1100209007Jerry HughesBetter. Long EDA H-mode. Peak Wp of 145kJ. beta_n=1.34. H98=1. Small-ELM-like
hash in the high confinement phase.
Small injection at 1s blows it away.
Great RF trace. Flat at 3MW. E faults starting after 1.1s, but no big deal.

Next shot: Time to modulate. Put the modulation back in from 0.9 to 1.4s
Feb 9 2010 11:20:39:500AM1100209008Jerry HughesFizzle.
Feb 9 2010 11:35:11:657AM1100209009Jerry HughesFizruption.

Time to crank out the Fiz Rev Letter.
Feb 9 2010 12:05:52:900PM1100209010Jerry HughesEDA H-modes with modulation.

First H-mode is humming along quite nicely before the modulation begins at 0.9s.
Looks okay on the upswing, but on the downswing we start to raise the radiation.
Prad grows until there is an injection at about 1s.

2nd H-mode is better. Prad does not continuously increase, although there
is still an injection.

Speculation is that the strike is simply too low on the divertor. We still see
big dTs (>100C) on both the 3rd and 4th row of tiles. Matt has given me
the safe word.

NExt shot will try to raise strike by mean rise in Z position.
PO is raising ZCUR program by 3mm, and decreasing modulation demand to 5mm only.

Feb 9 2010 12:07:46:963PM1100209011Jerry HughesFizzzzzz
Feb 9 2010 01:03:52:517PM1100209012Jerry HughesLong EDA H-mode with higher ZCUR than before, reduced modulation demand.
Upswings are ~7mm, and downswings are ~10mm.
Prad decreases during H-mode, as observed last week. The decrease continues
after the modulation ceases, though.
By the end of the shot, confinement has improved considerably. Hash on D-alpha, ICRF comes back.
Frequency of QCM is dhifted with the dz modulation on PCI and magnetics.

Feb 9 2010 12:44:13:103PM1100209013Jerry HughesFizruption
Feb 9 2010 12:55:08:060PM1100209014Jerry HughesFizzle.
Feb 9 2010 01:13:49:770PM1100209015Jerry HughesWe're back. We got the lower density. RF is less happy now, and they need to
retune.
Multiple H-modes, ELM-free. There is a hint of QCM at 0.97--1.0s.

Next shot: retry.
Feb 9 2010 01:37:46:203PM1100209016Jerry HughesELM-free H-modes. The 2nd one stays at a high level of confinement for 80ms,
before the Prad takes off. Maybe the modulation reduced the rate-of-rise? It's
not easy to judge.
There are hints of a weak QCM in the latter H-modes

Next: Move on the 3a. Higher Ip.
Feb 9 2010 01:49:14:533PM1100209017Jerry HughesRF tune needs work.
2 H-modes, pretty cold. It's hard to make anything out of the hash on H-alpha,
but there does seem to be a tendency for it spike whenever there's a
downward stroke on the vertical modulation. Are we pacing Type III ELMs?


Feb 9 2010 02:03:58:900PM1100209018Jerry HughesFizzle.
Feb 9 2010 02:23:22:910PM1100209019Jerry HughesLong steady EDA H-mode, ~2.5MW of RF. Fairly dense. Teped,max~400eV.
Seems to be a lot of variation in the reported pedestal parameters from TS, even
though the confinement seems to be monotonically decreasing throughout the
H-mode. Perhaps aliasing with the modulation?

There still tend to be blips at regular intervals in the H-alpha. They seem
to be correlated with both the upswings and the downswings this time. There
are plenty of blips that are uncorrelated with the programmed jogs as well.


Feb 9 2010 02:24:02:140PM1100209020Jerry HughesThis is a magical shot with no actual plasma, but a lot data traces which
are identical to those on shot 19.


Feb 9 2010 02:39:45:773PM1100209021Jerry HughesRough shot. Bad ramp-up.Moly brick. No ICRF. Modulation goes unstable.
Feb 9 2010 03:00:39:953PM1100209022Jerry HughesRadiative, pretty early. RF is clean, but the core radiation leads us to be
underpowered. There are blips in D-alpha between 0.9 and 1.1 are correlated with
the rises and the falls.

There's probably not much I can do about the high core radiation here, so let's
proceed to lower the density at this Ip. (I don't want to go to 1.1MA.)


Feb 9 2010 03:19:22:507PM1100209023Jerry HughesSeveral ELM-free H-modes. Looks like there are some paced blips. If they are ELMs
they don't seem to be relaxing the pedestal at all.

Next: Go back to 22 and increase rate of modulation. Period will be 14ms.
Feb 9 2010 03:35:10:140PM1100209024Jerry Hughes1.0MA, target nl04=1e20
Long, nominally EDA H-mode. It looks like we trigger again on the rises and
falls. But, now we are at ~70Hz.
Amanda reports some interesting crash-like behavior on several edge ECE channels
---maybe a density effect.


Feb 9 2010 03:53:06:287PM1100209025Jerry HughesTrying a 10ms period on the modulation.
Result is pretty cool. Spikes on the D-alpha are very fast now, peaking in
activity between 1.1 and 1.4s. Radiation is fairly under control.

Next: Be aggressive and try for 200Hz modulation.
Feb 9 2010 03:59:32:053PM1100209026Jerry HughesFishizzle.
Feb 9 2010 04:22:28:563PM1100209027Jerry HughesFizzle.
Feb 9 2010 04:32:00:490PM1100209028Jerry HughesA most excellent shot. Very distinct spikes on the D-alpha (and RF) coinciding
with the modulation period. Radiation is nearly flat, decreasing toward the end
of the shot. The ELMs are not exactly regular.

Feb 9 2010 04:44:50:103PM1100209029Jerry HughesTurned off modulation. ELMs go away, but the global behavior of the shot
is otherwise the same!
So the ELMs are triggerable, but they do nothing. Welcome to C-Mod.
Feb 9 2010 04:59:47:890PM1100209030Jerry HughesReload the 200Hz modulation and attempt to bring the RF power up.
The step up in RF wasn't entirely successful. Yijun will try to improve
for next shot.
Otherwise pretty similar to 28.

Feb 9 2010 05:05:09:720PM1100209031Jerry HughesThis was the finest fizzle so far today.

Physics Operator Comments
Feb 9 2010 08:53:22:140AM1100209001Ron ParkerAll systems are functioning and run should start promptly at 9:00
Feb 9 2010 09:08:28:490AM1100209001Ron ParkerShot 1 coming up, keep in mind the machine was boronized, the gas valve control status is unknown, and the cryo is on. It may take several shots to recover a discharge.

Action monitor misfunctioned (engineering), no power shot.
Feb 9 2010 09:11:36:883AM1100209001Ron ParkerJosh is looking into the action monitor problem.
Feb 9 2010 09:18:11:150AM1100209001Ron ParkerTry again
Feb 9 2010 09:26:21:340AM1100209002Ron ParkerShot started up, but disrupted at ~ 1 s.

Data system hungup. Josh is looking into it.

Meanwhile, Willy confirms that the chopper board is installed in the gas control circuit.
Feb 9 2010 09:39:10:067AM1100209002Ron ParkerDiagnostic gate valves are not closing at overpressure trip.


Maybe related to a mod put in by Joe -- Andy is trying to find him.
Feb 9 2010 09:43:05:880AM1100209002Ron ParkerAction monitor hung up again. Josh is on it.

Shot 1 magnetics data are lost.
Feb 9 2010 09:43:58:973AM1100209002Ron ParkerTrying again.
Feb 9 2010 09:50:03:650AM1100209003Ron ParkerWell after all that, the shot fizzled. Perhaps a little too much gas, but maybe not. We'll shoot it again and see. Meanwhile, the first cell access of the day.
Feb 9 2010 09:57:22:713AM1100209003Ron ParkerJust to make things simpler during the tuneup phase, we have removed the Zcur modulation for the next shot.
Feb 9 2010 10:09:46:467AM1100209004Ron ParkerSo finally a decent shot.

Looks like we'll have to add a bit more prefill, breakdown gas pressure ~ 0.05 mTorr. Increase PG pulse from 50 to 55 ms.

RF data system problems
Feb 9 2010 10:11:14:220AM1100209004Ron ParkerTrying to recover RF data
Feb 9 2010 10:19:41:673AM1100209004Ron ParkerHolding for Josh
Feb 9 2010 10:51:17:453AM1100209005Ron ParkerShot 5 ran full length. No Zcur modulation.

Next: Bring RF up earlier to 4 MW power
Feb 9 2010 11:02:07:033AM1100209006Ron ParkerShot 6 ran full length, RF still tuning up.
Feb 9 2010 11:13:20:773AM1100209007Ron ParkerShot 7 ran full length.

Next: Zcur modulation on, loaded segment 2 from 1100209002
Feb 9 2010 11:27:49:967AM1100209008Ron ParkerShot 8 fizzled. Looks like a poor startup

Try again
Feb 9 2010 11:44:32:097AM1100209009Ron ParkerShot 9 disrupted very early, ~ 100 kA.

RGA died at 11:03
Feb 9 2010 12:05:50:450PM1100209010Ron ParkerShot 10 ran with modulation.

Next Raise Zcur 3 mm, and reduced modulation from 7mm to 5mm
Feb 9 2010 12:10:21:200PM1100209011Ron ParkerShot fizzled/disrupted. Try again, hoping new Zcur position and modulation will put the strike point in a better location.
Feb 9 2010 12:33:38:380PM1100209012Ron ParkerShot 12 ran full length with Zcur modulation.
Feb 9 2010 12:39:45:977PM1100209013Ron ParkerDisruption/fizzle.

At Steve's suggestion, raise EF4 to -1300 from -1315
Feb 9 2010 01:02:29:313PM1100209014Ron ParkerShot fizzled.

Reset EF4 to -1315, add 5 ms more gas -- pulse = 60 ms

Josh wants a hold
Feb 9 2010 01:45:34:753PM1100209015Ron ParkerShot 15 disrupted at ~ 1.2 s
Feb 9 2010 01:46:28:830PM1100209016Ron ParkerShot 16 ran full length, in and out of H-modes
Feb 9 2010 01:49:42:800PM1100209017Ron ParkerShot 17 went full length.

Current was raised to 1 MA, density to 1e20 m-2 and Zcur modulation was changed.

RF was ragged.
Feb 9 2010 01:52:35:880PM1100209018Ron ParkerFizzle
Feb 9 2010 02:19:50:220PM1100209019Ron ParkerShot 19 ran full length.

Errors showing up on Init prior to shot 20. No power shot coming up.

Feb 9 2010 02:30:12:050PM1100209020Ron ParkerShot 20 was a no power shot.
Feb 9 2010 02:45:41:510PM1100209021Ron ParkerShot 21 disrupted at ~ 1 s
Feb 9 2010 02:54:47:030PM1100209022Ron ParkerShot 22 ran full length
Feb 9 2010 03:16:57:210PM1100209023Ron ParkerShot 23 ran full length. Density target @ 0.8e20 m-2.

Next 70 Hz modulation
Feb 9 2010 03:35:02:263PM1100209024Ron ParkerShot 24 ran full length
Feb 9 2010 03:38:43:890PM1100209025Ron ParkerShot 25 ran full length, a fairly nice shot
Feb 9 2010 04:01:17:210PM1100209026Ron ParkerFizzle
Feb 9 2010 04:48:16:823PM1100209028Ron ParkerShot 28 ran full length
Feb 9 2010 04:45:43:667PM1100209029Ron ParkerShot 29 ran full length -- no Zcur modulation.
Feb 9 2010 04:50:14:073PM1100209030Ron ParkerShot 30 ran full length, with modulation and higher (than shot 28) RF power.
Feb 9 2010 05:05:59:517PM1100209031Ron ParkerFizzle

Engineering Operator Comments
ShotTimeTypeStatusComment
209:18:39:510AMPlasmaOk
309:44:25:740AMPlasmaOk
409:58:16:120AMPlasmaOk
510:38:23:947AMPlasmaOk
610:51:30:470AMPlasmaOk
711:05:27:350AMPlasmaOk
811:18:27:623AMPlasmaOk
911:31:24:747AMPlasmaOk
1011:45:18:580AMPlasmaOk
1112:05:03:370PMPlasmaOk
1212:18:21:767PMPlasmaOk
1312:33:36:223PMPlasmaOk
1412:49:53:077PMPlasmaOk
1501:04:53:877PMPlasmaOk
1601:18:41:837PMPlasmaOk
1701:34:38:297PMPlasmaOk
1801:49:30:130PMPlasmaOk
1902:02:52:713PMPlasmaOk
2002:16:56:030PMPlasmaBadNo power shot. Critical failure during init
2102:31:56:393PMPlasmaOk
2202:45:11:480PMPlasmaOk
2302:59:32:593PMPlasmaOk
2403:17:10:600PMPlasmaOk
2503:35:12:310PMPlasmaOk
2603:51:56:317PMPlasmaOk
2704:04:58:697PMPlasmaOk
2804:19:30:203PMPlasmaOk
2904:34:35:693PMPlasmaOk
3004:47:39:433PMPlasmaOk
3105:00:46:453PMPlasmaOk

System Availability
Feb 9 2010 08:09:38:187AM
GPC and GPC2 morning test shots OK.
Feb 9 2010 09:18:14:090AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Nov 13 2009 06:37AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll channels working and calibrated.Feb 02 2010 09:56AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational.Nov 12 2009 02:36PM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Nov 13 2009 06:38AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1100120000 the system is operational except for channel 110 which is not installedJan 20 2010 09:17AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Feb 9 2010 09:44:01:397AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Nov 13 2009 06:37AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll channels working and calibrated.Feb 02 2010 09:56AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational.Nov 12 2009 02:36PM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Nov 13 2009 06:38AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1100120000 the system is operational except for channel 110 which is not installedJan 20 2010 09:17AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke