Alcator C-Mod Run 1100211 Information

Back to runs

Miniproposals
Miniproposal:597
Date Filed: 2/5/2010
Title:ICRF Mode Conversion Flow Drive at 8 Tesla
First Author:Yijun Lin
Session Leader:Yijun Lin (shots 1-17)

Operators
Session leader(s):Yijun Lin
Physics operator(s):
Engineering operator(s):Andy Pfeiffer,Bill Parkin,Ed Fitzgerald

Engineering Operator Run Comment
automatically entered by signon - please replace with real comment

Session Leader Plans
Entered: Feb 11 2010 08:33:50:663AM
Author: Yijun Lin
This run will continue on MP 597: mcfd at ~ 8T.

We will try out the following 'knobs' until clear flow drive is observed.
RF steps up to 4.8 MW. 3 steps.

Start with shot 1100210017, but hope to get RF power.
Bt = 7.8, nl = 0.5, Ip = 1.2 MA, USN plasma.

1. Bt
2. He3 puff length (possibly 2 puffs).
3. Ip
4. Density.

After flow drive has been found, we will run constant RF power and see how much rotation I can get.

If time permits, I will run LSN plasmas to get H-mode.

Physics Operators Plans
Entered: Feb 10 2010 06:28:38:933PM
Author: Jim Irby
-----------------
Engineering Setup
-----------------

Run begins at 09:00 and ends at 17:00

Power systems as on: 1100210017

Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:

Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
fill NINJA with 10 psi D2 DISABLED

Enable gatevalves and shutters: ECE, VUV, HiREX Sr, Z-bolo

Torvac gatevalve toggle (yes/no): no

Boronization(yes/no): no
Overnight ECDC (yes/no): no
ICRF(yes/no): yes
LH(yes/no): no
Cryopump (yes/no): yes

Vessel temperature: 35/35/35

------------------------------
ECDC Parameters (if requested)
------------------------------
gas and pressure: D2 at 2e-4 Torr
sweep: 44/45/103 cm
scan: 20/120 s

Session Leader Summaries
Entered: Feb 12 2010 04:32:04:273PM
Author: Yijun Lin
SL_summary for 1100211 (and also 1100210):

For the two run days, total 17 plasmas with RF power:
1100210: 6, 7, 8, 9, 12, 13, 14,
1100211: 3,4,5,6,8,12,13,14,15,16

In these two runs, we have had RF heated plasmas at Bt = 7.8, 7.9 and 8.0 T, Ip = 1.0 and 1.2 MA, nl = 0.7e20 m^-2 and 0.5e20 m^-2. Antennas at +90, dipole, and -90 phases, also He3 level from 0 puff to 250 ms puff. We ran max power up to 4.8 MW with all antennas. Maximum toroidal rotation observed was about 80 km/s.

At the same current, the core rotation increases vs. the change of stored energy (dW). However, I can also claim that the rotation follows the input RF power. Since all plasma are in L-mode, it is not possible to clearly separate dW and Prf.

Rotation at +90 degree (1.2 MA) is about a factor of 2 of that at -90 degree phase at the same RF power (or the same dW). The rotation of dipole phase is lower than +90, but larger than -90. The difference vs. antenna phases suggests that the observed rotation is not solely intrinsic (at least in the sense of dW/Ip Rice scaling).

Almost all these plasmas had rather high temperature (up to 9 keV at the peak of sawtooth). -90 degree phase tend to have a much larger and longer sawtooth oscillations.

Further analysis is required to sort things out.



Physics Operator Summaries
Entered: Feb 11 2010 05:18:25:573PM
Author: Jim Irby
There were many distruptions today. Several shots ended before 200 ms
and were lost either because of injections, or by instabilities in the
control system. Steve Wolfe suggested several changes that seemed to
help. We observed wild variations in the EFC currents until these
changes were main. We also made many changes to the rampdown parmeters
including density, RCUR, CLEARIN, amd ZXU, to account for the 1.3 s
rampdown time. We finally had a couple of shots near the end of the run
that ramped down properly. We still lost the plasma early on the last
shot of the day (17). So there is still work to do on the vertical
control issue.

The engineers worked very hard today to understand the type 2 fault. It
seems to be caused by temperature excursions in some of the TF silicon.

We ran with 20 to 25 minute shot cyles to keep the TF resistance


plasma 01,02,03,04,05,06,07,08,10,
11,12,13,14,15,16


fizzle 09,17

Session Leader Comments
Feb 11 2010 09:34:33:110AM1100211001Yijun LinEarly disruption. But no RF waveform output (same problem as yesterday).

Josh has figured out the problem with the RF waveform generator.

"For some reason the waveform code did not create the temporary files, or generate any error messages about creating those files. "

he is working on it. Possibly another system is overwriting the temporary file...

Josh fixed the problem.
Feb 11 2010 09:41:04:193AM1100211002Yijun LinEarly disruption. No RF (but the waveform generator is working again).
Feb 11 2010 10:30:38:250AM1100211003Yijun Lin7.8 T, 1 .2MA, USN, nl0 = 0.5, te0 = 5 keV, ne0 = 1.5

No Helium puff by mistake. (also Helium monitor was not on).
No Ar puff either.
But it is heating...

Hirex DV [km/s] : Argon to 100 km/s (not reliable), Mo 65 km/s
Rice scaling [km/s]: DW = 93 , dw/Ip = 75 km/s

next: repeat with Helium-3 150 ms puff. Argon puff.
Feb 11 2010 11:07:33:590AM1100211004Yijun Lin7.8 T, 1 .2MA, USN, nl0 = 0.6, te0 = 5 keV, ne0 = 2.0

He-3 puff 150 ms. 0.035 @ 0.8 sec, 0.031 @ 1.0 sec.

PCI MC at 65 cm.

Hirex DV [km/s] : Argon/Mo ~80 km/s
Rice scaling [km/s]: DW = 107 , dw/Ip = 90 km/s

Compared to shot 1100210013, at 8.0 T, the rotation is about the same.
(Maybe the He3 is just too little...)

next: 150 ms He3 at 0.2 sec, and 2nd 100 ms puff at 0.7 sec.
Feb 11 2010 11:08:08:090AM1100211005Yijun Lin7.8 T, 1.2MA, USN, nl0 = 0.6, te0 = 5 keV, ne0 = 2.0

He-3 puff 150 ms @ 0.2 sec+ 100 ms @ 0.7 sec.
He monitor at 0.06 @ 0.8 sec, 0.07 @ 1.0 sec.

PCI MC at 64 cm

Got less dW change. And also smaller rotation
(following the intrinsic rotation).

Hirex DV [km/s] : Argon/Mo ~50 km/s
Rice scaling [km/s]: DW = 70 , dw/Ip = 60 km/s

next: 150 ms He3 at 0.2 sec. Run only J port. 8.0 Tesla.
Feb 11 2010 03:53:35:490PM1100211006Yijun Lin8.0 T, 1.2MA, USN, nl0 = 0.5, te0 = 4 keV, ne0 = 1.4

He-3 puff 150 ms @ 0.2 sec
He monitor at 0.03 @ 0.8 sec, 0.02 @ 1.0 sec.

+90 phase

Hirex DV [km/s] : Argon/Mo ~45 km/s
Rice scaling [km/s]: DW = 50 , dw/Ip = 41 km/s

Nice short sawtooth.
next: Reverse J antenna phase to -90 degree, and see the effect.
Feb 11 2010 12:20:37:893PM1100211007Yijun LinEarly disruption.
Feb 11 2010 03:53:07:990PM1100211008Yijun Lin8.0 T, 1.2MA, USN, nl0 = 0.5, te0 to 8 keV, ne0 = 1.4, disrupted 1.22 sec.

He-3 puff 150 ms @ 0.2 sec
He monitor at 0.03 @ 0.8 sec, 0.02 @ 1.0 sec.

PCI MC waves at 0.665 m

-90 degree phase

Hirex DV [km/s] : Argon/Mo ~17 km/s
Rice scaling [km/s]: DW = 50, dw/Ip = 41 km/s

So this is less than half of the intrinsic rotation.
(So the antenna phase matters....)

Nice, big (4 keV p-p) and long (> 100 ma) sawteeth.
Up to 8 keV ECE from J only through mode conversion.
(Another new physics regime...)

(core barrier has been speculated...for these plasmas..)

next: dipole phase. same plasma.
Feb 11 2010 01:12:36:577PM1100211009Yijun LinFizzle
Feb 11 2010 01:42:57:163PM1100211010Yijun LinFizzle
Feb 11 2010 01:53:41:600PM1100211011Yijun Linearly disruption.
Feb 11 2010 03:52:49:570PM1100211012Yijun Lin8.0 T, 1.2MA, USN, nl0 = 0.5, te0 = 5 keV, ne0 = 1.8
He-3 puff 150 ms @ 0.2 sec
He monitor at 0.015 @ 0.8 sec, 0.013 @ 1.0 sec (lower He3?)-

dipole phase
Hirex DV [km/s] : Argon/Mo ~30 km/s
Rice scaling [km/s]: DW = 60, dw/Ip = 50 km/s

Rotation between shot 6 (+90) and shot 8 (-90).

Sawtooth between shot 6 and shot 8.

next: +90 degree. 7.9 T, 1.2 MA. Constant RF 2.5 MW.
Feb 11 2010 03:52:38:413PM1100211013Yijun Lin7.9 T, 1.2MA, USN, nl0 = 0.5, te0 = 5 keV, ne0 = 1.8
He-3 puff 150 ms @ 0.2 sec
He monitor at 0.023 @ 0.8 sec, 0.014 @ 1.0 sec

+90 phase
Hirex DV [km/s] : ~41 km/s
Rice scaling [km/s]: DW = 65, dw/Ip = 54 km/s

Rotation same as shot 6 (which has stepped up J power).

shortish sawtooth.

next: -90 degree.
Feb 11 2010 04:04:25:253PM1100211014Yijun Lin7.9 T, 1.2MA, USN, nl0 = 0.5, te0 = 4 keV, ne0 = 1.8
He-3 puff 150 ms @ 0.2 sec
He monitor at 0.026 @ 0.8 sec, 0.018 @ 1.0 sec

-90 phase.

Hirex DV [km/s] : ~27 km/s
Rice scaling [km/s]: DW = 60, dw/Ip = 50 km/s

Rotation is indeed slower at this -90 phase.

longer sawtooth.

next: +90 degree. 125 ms He. I would like to see whether the He3 level is optimized. (I cannot raise Ip any more).
Feb 11 2010 04:25:34:577PM1100211015Yijun Lin7.9 T, 1.2MA, USN, nl0 = 0.5, te0 = 7 keV, ne0 = 1.8
He-3 puff 125 ms @ 0.2 sec

He monitor at 0.025 @ 0.8 sec, 0.017 @ 1.0 sec

+90 phase.

Hirex DV [km/s] : ~43 km/s
Rice scaling [km/s]: DW = 60, dw/Ip = 50 km/s

To compare with shot 13, same rotation. No difference.

(I don't think the He3 level changed). PCI see a few mm change in MC location.

next: 50 ms He.
Feb 11 2010 04:51:48:263PM1100211016Yijun Lin7.9 T, 1.2MA, USN, nl0 = 0.5, te0 = 6.5 keV, ne0 = 1.9
He-3 puff 50 ms @ 0.2 sec

He monitor at 0.012 @ 0.8 sec, 0.011 @ 1.0 sec

+90 phase.

Hirex DV [km/s] : ~43 km/s
Rice scaling [km/s]: DW = 65, dw/Ip = 55 km/s

To compare with shot 13 and 14, same rotation, slightly higher dW (in heating).

next: 150 ms at 0.2 sec, then 100 ms at 0.7 sec. Do a large He3 shot, and see whether the rotation is slower (cf. shot 5)
Feb 11 2010 05:07:42:873PM1100211017Yijun Linearly disruption.

Physics Operator Comments
Feb 11 2010 09:14:42:220AM1100211001Jim IrbyStarting from 1100210017

prefill at 65 ms starting at 0.300 s
ef4 at -1280 A
rcur 2500
Bz0 0.0000 T
Br0 0.0005 T
Ip -1200 kA
nl_04 request 0.50e20/m^2

Tf 7.8 T (218400 A)

Cryopump on

****************************
plasma for 175 ms

big injection begins by 165 ms, increase in density 2Pi etc

Feb 11 2010 09:44:39:573AM1100211002Jim Irbychanges ------------------------------

RXU from 0.0 to -0.04 flat starting at t=0 --- Steve thinks it was starting out where we wanted it and asking for something else puts unneeded demand on the OH supplies

open tree done

results --------------------------------

delayed for a while fixing problem with ICRF timing module --- Josh thinks it should be okay now (impurity injector corrupting ICRF data file?)

plasma for 145 ms --- another injection

big burst on z-meter early (18 ms)
ciii burst at 130 ms (z thrash also)









Feb 11 2010 10:18:10:690AM1100211003Jim Irbychanges --------------------------------

ef4 from -1280 to -1260 A
loaded

results --------------------------------

plasma into rampdown

Yijun just noticed I had not enabled He3
Feb 11 2010 10:46:59:927AM1100211004Jim Irbychanges --------------------------------

enabled He3 and Argon for this shot --- b-side upper and lower

results --------------------------------

plasma into rampdown


Feb 11 2010 11:02:05:787AM1100211005Jim Irbychanges --------------------------------

pg2 (He3) now puffing from 0.200 to 0.350 and 0.700 to 0.800 s
loaded

results --------------------------------

plasma for 1.525 s --- 800 kA disruption

getting: 50% stress on EF2L





Feb 11 2010 11:43:48:587AM1100211006Jim Irbychanges --------------------------------

removed second He3 puff --- may have degraded performance??
loaded

Bz0 drifting up --- ef4 from -1260 to -1270 A
loaded

Tf from 7.8 to 8.0 T (224000 A)
loaded

waiting 25 minutes before shot to cooldown TF

results --------------------------------

disruption at 1.4 s (1.05 MA)

type 2 fault following shot (no TF current)

plenty of neuts/hards early

alt_rpm from 1716 down to 1533

TF cooling down now (< 2 mOhm)

Feb 11 2010 12:25:42:370PM1100211007Jim Irbychanges --------------------------------

no DPCS changes
Rick checks TCI in cell
Jerry checks TS in cell

Gary and Bill C move probes in hunt for type 2...

results --------------------------------

plasma for 140 ms

first sign of trouble at 30 ms
Feb 11 2010 12:55:02:277PM1100211008Jim Irbychanges --------------------------------

ef4 from -1270 to -1260 A
loaded

results --------------------------------

plasma for 1.215 s

injections starting by 70 ms

Matt claims injections from J-Port --- see it on wide 2


Feb 11 2010 01:22:06:697PM1100211009Jim Irbychanges --------------------------------

no DPCS changes
spent 25 minutes in recool

results --------------------------------

fizzle --- a little current carried by 2 electrons

Feb 11 2010 01:49:46:890PM1100211010Jim Irbychanges --------------------------------

no DPCS changes --- assume previous disruption caused the fizzle

results --------------------------------

plasma for 75 ms --- injections again
poor TCI subtractions for last few shots??







Feb 11 2010 02:17:41:867PM1100211011Jim Irbychanges --------------------------------

no dpcs changes

results --------------------------------

plasma for 200 ms

Large EFC oscillation early --- control lost by 30 ms or so


Feb 11 2010 02:58:26:023PM1100211012Jim Irbychanges --------------------------------

Br0 from 0.0005 to 0.0000 T
EF4 from -1260 to -1280 A
loaded

EF1L and EF1U from -5790 to -5770 A
loaded

RCUR in seg 1 from 0.64 to 0.65 at 0.96 s
loaded

RXL gain in seg 2 from 2.4 to 1.0 until 0.2 s then up to 2.4
loaded


results --------------------------------

plasma for 1.42 s


Feb 11 2010 03:28:15:430PM1100211013Jim Irbychanges --------------------------------

nl_04 ramped down starting at 1.3 s to 2.0 s
with gains extended to match
EF4 in seg 2 extended to 1.5 s
Bt from 8.0 to 7.9 T (221 kA)
loaded

prefill from 65 to 62 ms
loaded



results --------------------------------

plasma for 1.45 s
Feb 11 2010 03:54:18:587PM1100211014Jim Irbychanges --------------------------------

RCUR ramp start from 1.5 to 1.3 s
CLEARIN ramp start from 1.5 to 1.3 s
ZXU ramp start from 1.5 to 1.3 s
loaded

TF invert time from 1.3 to 1.2 s (don't bother with DPCS)


results --------------------------------

plasma well into rampdown --- at last


Feb 11 2010 04:20:47:540PM1100211015Jim Irbychanges --------------------------------

He3 puff from 0.200 to 0.325 s
loaded

results --------------------------------

plasma for 1.42 s --- 1 MA disruption

neuts/hards high early
Feb 11 2010 04:50:06:120PM1100211016Jim Irbychanges --------------------------------

CLEARIN ramped down faster
loaded
ZCUR ramp start from 1.5 to 1.3 s

He3 from 0.200 to 0.250 s

loaded

results --------------------------------

plasma into rampdown
Feb 11 2010 05:16:48:777PM1100211017Jim Irbychanges --------------------------------

He3 puff from 0.200 to 0.350 and from 0.700 and 0.800 s
loaded

results --------------------------------

fizzle

done

Engineering Operator Comments
ShotTimeTypeStatusComment
109:02:25:510AMPlasmaOk
209:36:06:563AMPlasmaOk
310:06:05:537AMPlasmaOk
410:32:17:003AMPlasmaOk
510:51:12:010AMPlasmaOk
611:19:29:747AMPlasmaOkTF breakers opened after the shot
712:11:22:117PMPlasmaOk
812:40:32:697PMPlasmaOkI2T fault after plasma disrupted
901:10:18:280PMPlasmaOk
1001:37:23:483PMPlasmaOk
1101:51:02:793PMPlasmaOk
1202:40:51:110PMPlasmaBadTF ramped down early after Junc Over temp fault
1303:19:10:890PMPlasmaOk
1403:48:01:360PMPlasmaOk
1504:14:08:453PMPlasmaOk
1604:41:17:157PMPlasmaOk
1705:04:58:713PMPlasmaOk

System Availability
Feb 11 2010 09:01:47:680AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Nov 13 2009 06:37AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll channels working and calibrated.Feb 02 2010 09:56AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational.Nov 12 2009 02:36PM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Nov 13 2009 06:38AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1100120000 the system is operational except for channel 110 which is not installedJan 20 2010 09:17AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Feb 11 2010 11:41:16:580AM
Large gap. The entire APD array is sampling the SOL.
Some curious action is going on today. Before the RF trips,
most of the SOL is seen to propagate in the EDD sense,
close to the separatrix (0.4cm) there are multiple lobes on this
side of the k_pol-f-spectra, farther out (~1.7cm) it becomes
a single lobe at very high velocity (~7.5km/s) in the EDD
direction and CHANGES into IDD propagation at ~rho=2.5cm!

This is not reproduced after the RF trips, and the plasma
starts to leak with no clear reason (density falls).
In this phase almost NO poloidal propagation is observed.
Feb 11 2010 11:43:21:193AM
Same phenomenology as shot -004 and -003 until the RF tripped.
The 3MW step in the RF still exhibits all the features seen in
those shots, albeit the high freq part is weakened.
Moving trigger 0.1s earlier in order to see if the 2MW stage is similar.
Feb 11 2010 12:25:20:633PM
We may be seeing an extreme high velocity IDD feature
(>15km/s), the overall profile is similar to those in
previous shots (EDD feature in SOL, switch in the far
SOL).

At the RF trip at t=1.25s the SOL is evacuated.
As soon as the RF turns on, the plasma is back.
Is the RF making plasma in the SOL?
Feb 11 2010 12:25:47:493PM
No plasma shot. Background test.
Feb 11 2010 12:39:56:777PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Nov 13 2009 06:37AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll channels working and calibrated.Feb 02 2010 09:56AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational.Nov 12 2009 02:36PM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Nov 13 2009 06:38AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1100120000 the system is operational except for channel 110 which is not installedJan 20 2010 09:17AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Feb 11 2010 12:49:54:803PM
Same effect in the trip as in -006.
General shape of the spectra is also similar.
Feb 11 2010 01:50:28:407PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Nov 13 2009 06:37AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll channels working and calibrated.Feb 02 2010 09:56AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational.Nov 12 2009 02:36PM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Nov 13 2009 06:38AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1100120000 the system is operational except for channel 110 which is not installedJan 20 2010 09:17AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Feb 11 2010 02:40:16:203PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Nov 13 2009 06:37AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll channels working and calibrated.Feb 02 2010 09:56AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational.Nov 12 2009 02:36PM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Nov 13 2009 06:38AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1100120000 the system is operational except for channel 110 which is not installedJan 20 2010 09:17AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Feb 11 2010 03:18:28:233PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Nov 13 2009 06:37AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll channels working and calibrated.Feb 02 2010 09:56AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational.Nov 12 2009 02:36PM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Nov 13 2009 06:38AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1100120000 the system is operational except for channel 110 which is not installedJan 20 2010 09:17AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Feb 11 2010 03:47:25:657PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Nov 13 2009 06:37AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll channels working and calibrated.Feb 02 2010 09:56AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational.Nov 12 2009 02:36PM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Nov 13 2009 06:38AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1100120000 the system is operational except for channel 110 which is not installedJan 20 2010 09:17AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Feb 11 2010 04:13:32:687PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Nov 13 2009 06:37AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll channels working and calibrated.Feb 02 2010 09:56AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational.Nov 12 2009 02:36PM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Nov 13 2009 06:38AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1100120000 the system is operational except for channel 110 which is not installedJan 20 2010 09:17AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke