| Session Leader Comments |
| Feb 18 2010 09:06:27:977AM | 1100218001 | Aaron Bader | fizzle. Next shot, try again.
|
| Feb 18 2010 09:29:19:860AM | 1100218002 | Aaron Bader | Good plasma. Density is moving though. Counts are perhaps too low on CNPA, might be too difficult to get data at this low power.
Next shot: plasma stays the same, Open up aperture more.
|
| Feb 18 2010 09:38:33:470AM | 1100218003 | Aaron Bader | Good plasma again. Density more constant. CNPA signals better.
Next shot: one more like this then start RF power scan.
|
| Feb 18 2010 09:51:47:673AM | 1100218004 | Aaron Bader | Another good plasma again. CNPA looks good.
Next shot: raise ICRF power to 2 MW from J
Enable Argon for Hirex
|
| Feb 18 2010 10:04:48:420AM | 1100218005 | Aaron Bader | Good plasma.
Next shot: change the field slightly to make it closer to 5.4 Shouldn't change the CNPA signals significantly but will help ECE alignment.
Delay because of vessel heater problem.
|
| Feb 18 2010 10:50:52:940AM | 1100218006 | Aaron Bader | Good plasma after the delay.
Next shot: raise ICRF power to 3 MW from J. Change CNPA apertures to avoid cutouts.
|
| Feb 18 2010 10:59:00:717AM | 1100218007 | Aaron Bader | Good plasma RF not clean.
Next shot: retry.
|
| Feb 18 2010 11:13:13:200AM | 1100218008 | Aaron Bader | Plasma fine, but ICRF did shut off.
Next shot: Will try one more time and then switch to D and E.
|
| Feb 18 2010 11:35:51:087AM | 1100218009 | Aaron Bader | Disruption.
More ICRF problems. Next shot: retry with D & E at the end of the shot after the modulation.
|
| Feb 18 2010 11:40:17:623AM | 1100218010 | Aaron Bader | Fizzle, next shot: try again.
|
| Feb 18 2010 11:56:21:953AM | 1100218011 | Aaron Bader | Good plasma and ICRF. Switch to heating from D & E for next shot.
|
| Feb 18 2010 12:15:01:117PM | 1100218012 | Aaron Bader | Good shot. D&E have 6 good pulses out of 8. Next shot: try again.
|
| Feb 18 2010 12:29:51:507PM | 1100218013 | Aaron Bader | Good shot. CNPA and ICRF good for all of the ICRF pulses. Move to 4 MW from D,E & J combined after an aperture change.
Low energy tails that we've been seeing so far are unexplained given past results at these parameters.
|
| Feb 18 2010 12:53:28:300PM | 1100218015 | Aaron Bader | Good shot. CNPA still struggling with the high power despite the stepped down aperture.
Next shot: lower ICRF total power to 3.5 MW
|
| Feb 18 2010 01:06:22:520PM | 1100218016 | Aaron Bader | Fizzle. Next shot: try again.
|
| Feb 18 2010 01:22:47:037PM | 1100218017 | Aaron Bader | Good shot. CNPA and ICRF look good. Start current scan.
Next shot: 800 kA
|
| Feb 18 2010 01:32:04:063PM | 1100218018 | Aaron Bader | fizzle. next shot: try again
|
| Feb 18 2010 01:52:48:620PM | 1100218019 | Aaron Bader | Accidentally had 1 MA instead of 800 kA. Next shot, try again to get 800 kA.
|
| Feb 18 2010 01:59:52:877PM | 1100218020 | Aaron Bader | Early disruption. next shot: try again.
|
| Feb 18 2010 02:17:12:960PM | 1100218021 | Aaron Bader | fizzle fo' shizzle
|
| Feb 18 2010 02:30:26:880PM | 1100218022 | Aaron Bader | another fizzle. next shot: retry
|
| Feb 18 2010 02:51:51:437PM | 1100218023 | Aaron Bader | early disruption.
According to Matt's suggestion. We will move the first three ICRF pulses to the end, because we are getting large Tungsten injections in the first couple pulses.
|
| Feb 18 2010 03:17:05:263PM | 1100218024 | Aaron Bader | Disruption at first ICRF pulse. Move inner gap to make inner wall limited and try again. If the W injection is coming from the strike point this should fix that problem.
|
| Feb 18 2010 03:27:55:243PM | 1100218025 | Aaron Bader | Plasma! CNPA still having trouble. Forced to lower ICRF power some more.
next shot: Lower inner gap more. Lower ICRF power.
|
| Feb 18 2010 03:35:28:270PM | 1100218026 | Aaron Bader | Good plasma. CNPA looks good, F-Top cleared up nicely.
Next shot: 600 kA, ICRF 3 MW. Stay inner wall limited.
|
| Feb 18 2010 03:48:38:173PM | 1100218027 | Aaron Bader | Early disruption. Need to move inner gap in more. Plasma current did not go to 600 kA, still at 800.
|
| Feb 18 2010 04:08:21:820PM | 1100218028 | Aaron Bader | Good shot. Good data
Next shot: try 1.2 MA current.
|
| Feb 18 2010 04:21:07:040PM | 1100218029 | Aaron Bader | Good plasma, good CNPA data and ICRF.
No W injections.
Next shot: Ip 1 MA, Bt = 5.8 T. Try to get those large tails we've seen in the past on J-top.
|
| Feb 18 2010 04:37:27:090PM | 1100218030 | Aaron Bader | Everything ran well. Pulses are more energetic but not up to 1 MeV.
Next shot: Ip 1 MA, Bt = 5.8 T. Lengthen ICRF pulses to be 3 times as large.
|
| Feb 18 2010 04:52:27:420PM | 1100218031 | Aaron Bader | Very good CNPA data on this shot. ICRF is clean as well.
No significant change in tail energy. Seems like 40 ms is plenty for reaching steady state in fast ion development.
Next shot: back to 1 MA, 5.4 T, ICRF from J with different phasing (part 5 of the SL plan) Phasing at 0,pi/2,pi,3pi/2
|
| Feb 18 2010 05:03:37:480PM | 1100218032 | Aaron Bader | Last shot: good, good ICRF density and CNPA data
hats off to Phys-op Parker for getting us through the run day.
|
| Physics Operator Comments |
| Feb 18 2010 09:10:21:450AM | 1100218001 | Ron Parker | First shot fizzled, probably too much gas.
Lower prefill gas from 60 to 50 ms
|
| Feb 18 2010 09:22:13:663AM | 1100218002 | Ron Parker | Shot 2 ran full length. Good shot, ICRF modulated per SL spec
|
| Feb 18 2010 09:40:13:690AM | 1100218003 | Ron Parker | Shot 3 ran full length -- one more shot, then make changes
|
| Feb 18 2010 10:01:14:103AM | 1100218004 | Ron Parker | Shot 4 ran full length, and qualifies as the fiducial shot
Next: Up with power
|
| Feb 18 2010 10:11:14:190AM | 1100218005 | Ron Parker | Shot 5 looked good, full length.
We've lost a vessel heater, Bill Parkin looking into it.
Cell access, but a TF breaker is not opening. Gary is on it.
Meanwhile, the TF is running about 1% higher than SL requested, so the TF current is reprogrammed to 148350 kA from 150000.
|
| Feb 18 2010 10:37:27:973AM | 1100218005 | Ron Parker | The tech team has fixed the heaters and the TF breaker, and we're ready to roll.
|
| Feb 18 2010 10:46:48:060AM | 1100218006 | Ron Parker | Shot 6 looked good, ran full length.
|
| Feb 18 2010 10:59:06:183AM | 1100218007 | Ron Parker | Shot 7 ran full length, but RF was tripping
|
| Feb 18 2010 11:13:10:123AM | 1100218008 | Ron Parker | Shot 8 again ran full length, but RF tripped after one pulse.
|
| Feb 18 2010 11:35:16:273AM | 1100218009 | Ron Parker | Shot 9 disrupted at 1.27 s, D antenna was powered for first time today.
Next: Power J to 2.8 Mw, D on after J turns off.
|
| Feb 18 2010 11:41:38:483AM | 1100218010 | Ron Parker | The obligatory fizzle after the disruption.
No changes for next shot.
|
| Feb 18 2010 12:00:22:897PM | 1100218011 | Ron Parker | Shot 11 ran, but disrupted on rampdown, probably because D was pulsed toward the end of shot and is cleaning up.
|
| Feb 18 2010 12:11:11:423PM | 1100218012 | Ron Parker | Shot 12 ran full length.
|
| Feb 18 2010 12:23:32:313PM | 1100218013 | Ron Parker | Shot 13 ran well, full length.
|
| Feb 18 2010 12:35:21:060PM | 1100218014 | Ron Parker | Shot 14 ran well, full length.
|
| Feb 18 2010 12:54:55:927PM | 1100218015 | Ron Parker | Shot 15 ran full length
|
| Feb 18 2010 01:06:55:567PM | 1100218016 | Ron Parker | The hated F-word -- a burst of something during startup.
|
| Feb 18 2010 01:52:50:417PM | 1100218017 | Ron Parker | After fine and extensive tuning, the plasma in shot 17 ran full length again.
|
| Feb 18 2010 01:32:38:097PM | 1100218018 | Ron Parker | Another F Bomb
|
| Feb 18 2010 01:53:16:870PM | 1100218019 | Ron Parker | Shot 19 came back, ran full length. when it fizzles, H_alpha take slonger to burn out.
Shot with 800 kA not loaded, repeat.
|
| Feb 18 2010 02:07:15:900PM | 1100218020 | Ron Parker | Shot 20 disrupted at 0.78 s.
Next: Reduce gas pre-pulse from 50 to 47 ms.
|
| Feb 18 2010 02:22:31:950PM | 1100218021 | Ron Parker | Fizzle, so we'll increase gas prepulse by 3 ms to 53 ms total
|
| Feb 18 2010 02:36:23:967PM | 1100218022 | Ron Parker | Another fizzle. More gas doesn't, less gas doesn't either.
Reload shot 20
|
| Feb 18 2010 02:49:11:217PM | 1100218023 | Ron Parker | Shot 23 started up, but disrupted.
Next: Load startup from 1100217020
|
| Feb 18 2010 03:29:22:747PM | 1100218024 | Ron Parker | Shot started up up with yesterday's startup, but still disrupts during ICRF.
Matt reports W coming in from ICRF
Next: Move inner gap in 1 cm, try to get inner wall limited. (RCUR also moves in 0.5 cm to keep same outer gap.)
|
| Feb 18 2010 03:30:34:747PM | 1100218025 | Ron Parker | Plasma ran full length on shot 25, Matt still reports W.
Next: Close left gap by 0.5 cm (RCUR in by 0.25 cm)
|
| Feb 18 2010 03:37:58:630PM | 1100218026 | Ron Parker | Finally, a good 800 kA shot for CNPA. W is down, near inner wall limited.
Next: go for 600 kA.
|
| Feb 18 2010 03:55:16:277PM | 1100218027 | Ron Parker | Shot 27 disrupted at 0.68 s
|
| Feb 18 2010 04:30:46:033PM | 1100218028 | Ron Parker | Shot 28 was good 600 kA shot, full length
|
| Feb 18 2010 04:31:36:613PM | 1100218029 | Ron Parker | Shot 29 was good 1.2 MA shot, but disrupted on rampdown.
|
| Feb 18 2010 04:34:21:680PM | 1100218030 | Ron Parker | Shot 30 ran full length, 5.8 T, 1 MA
|
| Feb 18 2010 04:52:25:967PM | 1100218031 | Ron Parker | Shot 31 ran full length @ 1MA, 5.8T
Next: 1 MA @ 5.4T
|
| Feb 18 2010 05:03:14:040PM | 1100218032 | Ron Parker | Shot 32 had a rough startup and disrupted during rampdown, but was satisfactory for Aaron's data.
|
| System Availability |
| Feb 18 2010 07:43:58:460AM |
Andy reoorts a power glitch during turn-on.
pcdaqdpcs3 did not go down and seems to be running ok.
Take test shot 101 (test_init_dpcs2)
Script runs normally
Outputs present, look ok
logfile looks normal
There was a funny error message from logbook when
bringing up the widget to post this entry.
T&J notified.
|
| Feb 18 2010 09:03:15:970AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations applied | Aug 27 2009 09:09AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | | Nov 13 2009 06:37AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | yes | Operational | Nov 09 2009 09:12AM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | | Nov 09 2009 09:13AM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | All channels working and calibrated. | Feb 02 2010 09:56AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controller repaired. | Aug 23 2009 10:36PM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Oct 27 2009 10:39AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | operational at 80 MHz | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | antenna and FFT operational | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | available at 80 MHz and [0,pi,0,pi] phasing | Sep 04 2009 10:01AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | Requires some advance notice for laser start-up | Oct 16 2009 12:46PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached. | Aug 27 2009 09:10AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Recalibrated 7/27/09. | Jul 28 2009 04:22PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Power back on morning of 11/09 before run | Nov 09 2009 09:10AM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. | Nov 12 2009 02:36PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,ennever,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Nov 13 2009 06:38AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Since 1100120000 the system is operational except for channel 110 which is not installed | Jan 20 2010 09:17AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker back in operation before 11/09 run | Nov 09 2009 09:11AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers working. 15 spatial channels operational. Calibrated | Oct 13 2009 07:49PM (yma) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | yes | Operational, and calibrated. | Oct 11 2009 03:01PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Feb 18 2010 09:16:41:957AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations applied | Aug 27 2009 09:09AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | | Nov 13 2009 06:37AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | yes | Operational | Nov 09 2009 09:12AM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | | Nov 09 2009 09:13AM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | All channels working and calibrated. | Feb 02 2010 09:56AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controller repaired. | Aug 23 2009 10:36PM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Oct 27 2009 10:39AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | operational at 80 MHz | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | antenna and FFT operational | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | available at 80 MHz and [0,pi,0,pi] phasing | Sep 04 2009 10:01AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | Requires some advance notice for laser start-up | Oct 16 2009 12:46PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached. | Aug 27 2009 09:10AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Recalibrated 7/27/09. | Jul 28 2009 04:22PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Power back on morning of 11/09 before run | Nov 09 2009 09:10AM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. | Nov 12 2009 02:36PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,ennever,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Nov 13 2009 06:38AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Since 1100120000 the system is operational except for channel 110 which is not installed | Jan 20 2010 09:17AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker back in operation before 11/09 run | Nov 09 2009 09:11AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers working. 15 spatial channels operational. Calibrated | Oct 13 2009 07:49PM (yma) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | yes | Operational, and calibrated. | Oct 11 2009 03:01PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Feb 18 2010 09:30:08:300AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations applied | Aug 27 2009 09:09AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | | Nov 13 2009 06:37AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | yes | Operational | Nov 09 2009 09:12AM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | | Nov 09 2009 09:13AM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | All channels working and calibrated. | Feb 02 2010 09:56AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controller repaired. | Aug 23 2009 10:36PM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Oct 27 2009 10:39AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | operational at 80 MHz | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | antenna and FFT operational | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | available at 80 MHz and [0,pi,0,pi] phasing | Sep 04 2009 10:01AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | Requires some advance notice for laser start-up | Oct 16 2009 12:46PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached. | Aug 27 2009 09:10AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Recalibrated 7/27/09. | Jul 28 2009 04:22PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Power back on morning of 11/09 before run | Nov 09 2009 09:10AM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. | Nov 12 2009 02:36PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,ennever,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Nov 13 2009 06:38AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Since 1100120000 the system is operational except for channel 110 which is not installed | Jan 20 2010 09:17AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker back in operation before 11/09 run | Nov 09 2009 09:11AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers working. 15 spatial channels operational. Calibrated | Oct 13 2009 07:49PM (yma) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | yes | Operational, and calibrated. | Oct 11 2009 03:01PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Feb 18 2010 11:24:10:167AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations applied | Aug 27 2009 09:09AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | | Nov 13 2009 06:37AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | yes | Operational | Nov 09 2009 09:12AM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | | Nov 09 2009 09:13AM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | All channels working and calibrated. | Feb 02 2010 09:56AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controller repaired. | Aug 23 2009 10:36PM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Oct 27 2009 10:39AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | operational at 80 MHz | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | antenna and FFT operational | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | available at 80 MHz and [0,pi,0,pi] phasing | Sep 04 2009 10:01AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | Requires some advance notice for laser start-up | Oct 16 2009 12:46PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached. | Aug 27 2009 09:10AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Recalibrated 7/27/09. | Jul 28 2009 04:22PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Power back on morning of 11/09 before run | Nov 09 2009 09:10AM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. | Nov 12 2009 02:36PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,ennever,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Nov 13 2009 06:38AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Since 1100120000 the system is operational except for channel 110 which is not installed | Jan 20 2010 09:17AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker back in operation before 11/09 run | Nov 09 2009 09:11AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers working. 15 spatial channels operational. Calibrated | Oct 13 2009 07:49PM (yma) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | yes | Operational, and calibrated. | Oct 11 2009 03:01PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Feb 18 2010 02:27:35:863PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations applied | Aug 27 2009 09:09AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | | Nov 13 2009 06:37AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | yes | Operational | Nov 09 2009 09:12AM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | | Nov 09 2009 09:13AM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | All channels working and calibrated. | Feb 02 2010 09:56AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controller repaired. | Aug 23 2009 10:36PM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Oct 27 2009 10:39AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | operational at 80 MHz | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | antenna and FFT operational | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | available at 80 MHz and [0,pi,0,pi] phasing | Sep 04 2009 10:01AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | Requires some advance notice for laser start-up | Oct 16 2009 12:46PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached. | Aug 27 2009 09:10AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Recalibrated 7/27/09. | Jul 28 2009 04:22PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Power back on morning of 11/09 before run | Nov 09 2009 09:10AM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. | Nov 12 2009 02:36PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,ennever,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Nov 13 2009 06:38AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Since 1100120000 the system is operational except for channel 110 which is not installed | Jan 20 2010 09:17AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker back in operation before 11/09 run | Nov 09 2009 09:11AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers working. 15 spatial channels operational. Calibrated | Oct 13 2009 07:49PM (yma) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | yes | Operational, and calibrated. | Oct 11 2009 03:01PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Feb 18 2010 02:41:36:050PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations applied | Aug 27 2009 09:09AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | | Nov 13 2009 06:37AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | yes | Operational | Nov 09 2009 09:12AM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | | Nov 09 2009 09:13AM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | All channels working and calibrated. | Feb 02 2010 09:56AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controller repaired. | Aug 23 2009 10:36PM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Oct 27 2009 10:39AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | operational at 80 MHz | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | antenna and FFT operational | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | available at 80 MHz and [0,pi,0,pi] phasing | Sep 04 2009 10:01AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | Requires some advance notice for laser start-up | Oct 16 2009 12:46PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached. | Aug 27 2009 09:10AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Recalibrated 7/27/09. | Jul 28 2009 04:22PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Power back on morning of 11/09 before run | Nov 09 2009 09:10AM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. | Nov 12 2009 02:36PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,ennever,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Nov 13 2009 06:38AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Since 1100120000 the system is operational except for channel 110 which is not installed | Jan 20 2010 09:17AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker back in operation before 11/09 run | Nov 09 2009 09:11AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers working. 15 spatial channels operational. Calibrated | Oct 13 2009 07:49PM (yma) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | yes | Operational, and calibrated. | Oct 11 2009 03:01PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Feb 18 2010 02:58:18:193PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations applied | Aug 27 2009 09:09AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | | Nov 13 2009 06:37AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | yes | Operational | Nov 09 2009 09:12AM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | | Nov 09 2009 09:13AM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | All channels working and calibrated. | Feb 02 2010 09:56AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controller repaired. | Aug 23 2009 10:36PM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Oct 27 2009 10:39AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | operational at 80 MHz | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | antenna and FFT operational | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | available at 80 MHz and [0,pi,0,pi] phasing | Sep 04 2009 10:01AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | Requires some advance notice for laser start-up | Oct 16 2009 12:46PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached. | Aug 27 2009 09:10AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Recalibrated 7/27/09. | Jul 28 2009 04:22PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Power back on morning of 11/09 before run | Nov 09 2009 09:10AM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. | Nov 12 2009 02:36PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,ennever,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Nov 13 2009 06:38AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Since 1100120000 the system is operational except for channel 110 which is not installed | Jan 20 2010 09:17AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker back in operation before 11/09 run | Nov 09 2009 09:11AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers working. 15 spatial channels operational. Calibrated | Oct 13 2009 07:49PM (yma) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | yes | Operational, and calibrated. | Oct 11 2009 03:01PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Feb 18 2010 03:16:53:480PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | 7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) | Jul 09 2009 05:12PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations applied | Aug 27 2009 09:09AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | | Nov 13 2009 06:37AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | yes | Operational | Nov 09 2009 09:12AM (irby) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm. | Jul 09 2009 05:16PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned and operating; not yet calibrated | Jul 14 2009 02:22PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | | Nov 09 2009 09:13AM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | All channels working and calibrated. | Feb 02 2010 09:56AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauge installed. Controller repaired. | Aug 23 2009 10:36PM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | 6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel Access | Jun 10 2009 01:47PM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Oct 27 2009 10:39AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | operational at 80 MHz | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | antenna and FFT operational | Jul 21 2009 04:49PM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | available at 80 MHz and [0,pi,0,pi] phasing | Sep 04 2009 10:01AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | Requires some advance notice for laser start-up | Oct 16 2009 12:46PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | Breaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted. | May 28 2008 09:47AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached. | Aug 27 2009 09:10AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Recalibrated 7/27/09. | Jul 28 2009 04:22PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Neutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma. | Jun 10 2009 10:35AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | Power back on morning of 11/09 before run | Nov 09 2009 09:10AM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. | Nov 12 2009 02:36PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,ennever,ntsujii,porkolab | | Penning Gauges | yes | High voltage is enabled (on during INIT, off during RECOOL). | Jun 30 2009 09:42PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | Checked and Operational as of 06/18/09 | Jun 19 2009 08:04AM (irby) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Nov 13 2009 06:38AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | Checked out and ready for Magnet Tests as of 06/18/09 | Jun 19 2009 08:07AM (irby) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Array is operational with new cPCI data system. Probe 14 has open circuit. | Jul 14 2009 09:17PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Array is operational with new cPCI data system. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Array is operational with new cPCI data system. Probe 13 has a bad cable (open). | Jul 14 2009 09:17PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Since 1100120000 the system is operational except for channel 110 which is not installed | Jan 20 2010 09:17AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Probe is operational. Needs plasma conditioning. | Jul 14 2009 09:18PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | System connected to A-port WASP. Needs plasma testing. | Jul 14 2009 09:19PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | Sparker back in operation before 11/09 run | Nov 09 2009 09:11AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | TCI | yes | System restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma. | Jun 18 2009 09:15AM (murray) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | 2 lasers working. 15 spatial channels operational. Calibrated | Oct 13 2009 07:49PM (yma) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang | | TS - Edge | yes | Operational, and calibrated. | Oct 11 2009 03:01PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XTOMO | yes | Operating normally | Aug 27 2009 09:10AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|