| Miniproposals | ||||||||||
|
| Operators | |
| Session leader(s): | Brian Labombard |
| Physics operator(s): | Robert Granetz |
| Engineering operator(s): | Bill Cochran,Bill Cochran,Sam Pierson,Gary Dekow |
| Engineering Operator Run Comment |
| MP591 - Boundary layer heat transport experiments in H-mode plasmas |
| Session Leader Plans |
| Physics Operators Plans |
| Entered: Feb 22 2010 11:16:23:327PM |
| Author: Robert Granetz |
Engineering setup for Tuesday 2010/02/23
MP591 - Boundary layer heat transport experiments in H-mode plasmas
Session leaders: B. LaBombard
Physics operator: R. Granetz
Overnight: standard boronization followed by 2 hours of ECDC in helium and
and then 1 hour of ECDC in D2, along with a 60 C bake
Run will start at 09:00 and end at 17:00.
Power systems as on 1100212032 (LSN, 0.8 MA, 5.4 T)
A-coil configuration: +Dtop -Dbot -Jtop +Jbot; Enabled (standard
configuration)
Gas Setup:
fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 2 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
leave NINJA as is DISABLED
Enable the following gate valves and shutters, assuming no vacuum problems:
ECE, VUV, Z-bolo, HIREX-Sr
Torvac setup: keep gate valves open during PULSE
Specific diagnostics: edge and SOL diagnostics, divertor heat load
diagnostics including the IR camera
------------------------------------------------------------------------------
Impurity injector: no
Boronization: no between-shot boronization
ICRF Setup: up to 4.5 MW with all transmitter systems
LH Setup: no
DNB: no
Cryopump: yes, ready for the start of the run
------------------------------------------------------------------------------
Run plan: start from 1100212032, which was a LSN, 0.8 MA, 5.4 T shot with
a ramp programmed into RXL. Set nl_04 target to 0.9e20 m-2.
Run a bunch of shots until the RF and the divertor diagnostics
recover from the overnight boronization. Then begin filling in
the parameter matrix, i.e. vary Psol, nl_04, Ip.
|
| Session Leader Summaries |
| Physics Operator Summaries |
| Entered: Feb 23 2010 04:50:44:107PM |
| Author: Robert Granetz |
Run summary for Tuesday 2010/02/23
MP591 - Boundary layer heat transport experiments in H-mode plasmas
Session leaders: B. LaBombard
Physics operator: R. Granetz
The tokamak, cryopump, and RF systems worked quite well today. Nearly all
shots were full length discharges. We spent the first 10 shots doing
post-boronization recovery for the divertor diagnostics and the RF, and
then ran a variety of densities and currents in EDA H-modes. For most of
the day the startups were not good, with one or two outward bumps on most
shots, but I wasn't able to improve it, and it didn't seem to matter
anyway.
Scorecard: 29 plasmas
0 duds
1 fizzle
0 power supply tests
0 no-power MDS shot cycles
--------------
Total: 30 shot cycles
|
| Session Leader Comments | |||
| Feb 22 2010 03:49:30:770PM | Brian Labombard | MP#591 - Boundary layer heat transport experiments in H-mode plasmas Primary goals for today are: (1) Set up optimized plasma shape and strike point position for heat flux footprint measurements in 0.8 MA LSN EDA discharges. Condition RF to 4.5 MW, condition outer divertor for heat flux measurements using strike point sweep. (2) Having established above, begin filling in the parameter matrix of MP#591 - scan Psol, density, and plasma current, starting at 0.8 MA Setup: Overnight boronization with ECDC cleanup, using parameters identical to evening of 02/11/10. All shots today will be 5.4 tesla. NINJA will be used. Set up will be done at run-time by GPI scientists. ICRF up to 4.5 MW Cryopump will be used to assist boronization recovery; it may not be needed after the first ~10 shots. Shot Plan: Reload from shot#1100212032. This was a 0.8 MA, 5.4 tesla shot with a sweep programmed into RXL. Set L-mode target density to NL04 ~ 0.9e20 at RF turn-on Set ICRF on from 0.7 to 1.5 seconds. Condition RF as needed to 3.0 MW flattop. A. 0.8 MA, conditioning shots, L-mode target NL04~0.9e20 1. Establish steady EDA, PICRF~ 3.0 MW Multiple shots to condition RF to 3.0 MW and sweep strike point over divertor to remove boron layer. Optimize plasma shape, IR camera ~8 shots 2. Program fixed strike point. ~2 shots B. 0.8 MA, RF Power and density Scans 1. NL04~0.9e20, ICRF Power: 2.0, 1.0, then 4.5 MW Alternate between fixed and swept strike point shots. ~8 shots 2. Raise density if possible, respecting neutral pressure limits for ICRF. NL04~1.2e20?, ICRF Power: 1.5, 4.5 MW Alternate between fixed and swept strike point shots. ~4 shots C. 0.5 MA, RF Power and density Scans Change to 0.5 MA. Adjust strike sweep programming as needed. 1. NL04~0.6e20, ICRF Power: 3.0, 1.0, then 4.5 MW Alternate between fixed and swept strike point shots. ~6 shots 2. NL04~0.9e20, ICRF Power: 1.5, 4.5 MW Alternate between fixed and swept strike point shots. ~4 shots ... | |
| Feb 23 2010 09:26:43:440AM | 1100223001 | Brian Labombard | 1-LSN, 5.4 tesla, 0.8 MA, NL04~1.0 L-mode, ICRF conditioning strike-point sweep probes are boron-coated bug in IR camera software - need to rerun by hand |
| Feb 23 2010 09:46:11:540AM | 1100223002 | Brian Labombard | 2-LSN, 5.4 tesla, 0.8 MA, NL04~1.0 short H-mode, ICRF conditioning strike-point sweep ICRF ramp up to 2 MW (J) probes are reading bogus high te values (boron-coated) Two IR integration times, some pixels saturated |
| Feb 23 2010 09:57:56:630AM | 1100223003 | Brian Labombard | 3-LSN, 5.4 tesla, 0.8 MA, NL04~0.9 at RF turn-on EDA, ICRF conditioning ramp, with trips, to 2+ MW strike-point sweep probes are boron-coated One integration time on IR |
| Feb 23 2010 10:25:58:850AM | 1100223004 | Brian Labombard | 4-LSN, 5.4 tesla, 0.8 MA, NL04~0.9 at RF turn-on EDA NL04~1.9 ICRF conditioning ramp, J looks clean, D+E conditioning up strike-point sweep probes are getting better No thermocouple data - CPCI problem at F-port |
| Feb 23 2010 10:59:19:107AM | 1100223005 | Brian Labombard | 5-LSN, 5.4 tesla, 0.8 MA, NL04~0.85 at RF turn-on EDA NL04~1.8 ICRF conditioning ramp strike-point sweep Still no thermocouple data - CPCI problem at F-port We may need to swap out a card. |
| Feb 23 2010 11:26:39:840AM | 1100223006 | Brian Labombard | 6-LSN, 5.4 tesla, 0.8 MA, NL04~0.85 at RF turn-on multi H-modes ICRF conditioning, multiple trips, 3 to 4 MW Prad foil ~ 2 MW strike-point sweep Thermocouple data ok on this shot. |
| Feb 23 2010 11:27:02:360AM | 1100223007 | Brian Labombard | 7-LSN, 5.4 tesla, 0.8 MA, NL04~0.85 at RF turn-on two H-modes, EDAs NL04~1.8 ICRF conditioning, 2 to 4 MW Prad foil ~ 2 MW strike-point sweep Thermocouple data ok on this shot. |
| Feb 23 2010 11:48:51:743AM | 1100223008 | Brian Labombard | 8-LSN, 5.4 tesla, 0.8 MA, NL04~0.85 at RF turn-on EDA NL04~1.8 ICRF conditioning, trips, 3 to 4 MW Prad foil ~ 2.4 to 3.2 MW strike-point sweep Thermocouple data ok |
| Feb 23 2010 12:04:16:793PM | 1100223009 | Brian Labombard | 9-LSN, 5.4 tesla, 0.8 MA, NL04~0.85 at RF turn-on EDA NL04~1.8 ICRF conditioning, trips, 3 to 4 MW Prad foil ~ 2.4 to 3.2 MW strike-point sweep No thermocouple data |
| Feb 23 2010 12:31:15:167PM | 1100223010 | Brian Labombard | 10-LSN, 5.4 tesla, 0.8 MA, NL04~0.85 at RF turn-on three EDAs ICRF 3MW, some trips. Prad foil up to 2.7 MW strike-point sweep No thermocouple data |
| Feb 23 2010 12:32:30:683PM | 1100223011 | Brian Labombard | 11-LSN, 5.4 tesla, 0.8 MA, NL04~0.85 at RF turn-on two EDAs ICRF 3MW, some trips. Prad foil up to 2.4 MW fixed strike point - on the nose Thermocouple data is ok. |
| Feb 23 2010 12:48:29:390PM | 1100223012 | Brian Labombard | 12-LSN, 5.4 tesla, 0.8 MA, NL04~0.85 at RF turn-on steady EDA, nice shot. ICRF 3MW, clean, starting at 0.7 seconds Prad foil ~2.1 MW fixed strike point - below the nose, with slight ramp up in time Thermocouple data is ok. |
| Feb 23 2010 01:02:57:110PM | 1100223013 | Brian Labombard | 13-LSN, 5.4 tesla, 0.8 MA, NL04~0.85 at RF turn-on steady EDA. ICRF 3MW, E has some trips Prad foil ~2 MW fixed strike point on tile #4 Thermocouple data is ok. |
| Feb 23 2010 01:12:37:323PM | 1100223014 | Brian Labombard | 14-LSN, 5.4 tesla, 0.8 MA, NL04~0.85 at RF turn-on evolving EDA. ICRF 2MW Prad foil stair-steps from 1 to ~1.6 MW for some reason fixed strike point on tile #4 Thermocouple data is ok. Saturated frames on IR camera. |
| Feb 23 2010 02:02:02:600PM | 1100223016 | Brian Labombard | 16-LSN, 5.4 tesla, 0.8 MA, NL04~0.9 at RF turn-on evolving EDA. ICRF 2MW clean Prad foil rises ~1.7 MW fixed strike point on tile #4 Thermocouple data ok. |
| Feb 23 2010 02:02:25:930PM | 1100223016 | Brian Labombard | 16-LSN, 5.4 tesla, 0.8 MA, NL04~0.9 at RF turn-on evolving EDA. ICRF 2MW clean Prad foil rises ~1.7 MW fixed strike point on tile #4 Thermocouple data ok. |
| Feb 23 2010 02:02:44:727PM | 1100223017 | Brian Labombard | 17-LSN, 5.4 tesla, 0.8 MA, NL04~0.9 at RF turn-on L-H transition at 1.3 seconds to EDA. ICRF 1MW with trips Prad foil rises ~0.4 to 0.7 MW in H-mode fixed strike point on tile #4 Thermocouple data ok. |
| Feb 23 2010 02:57:15:117PM | 1100223019 | Brian Labombard | 19-LSN, 5.4 tesla, 0.8 MA, NL04~0.9 at RF turn-on Steady EDA, NL04~1.8 ICRF 1.5 MW clean Prad foil rises ~1.6 MW fixed strike point on tile #4 Thermocouple data ok. Next: go to 0.5 MA |
| Feb 23 2010 02:57:52:663PM | 1100223020 | Brian Labombard | 20-LSN, 5.4 tesla, 0.5 MA, NL04~0.6 at RF turn-on Initial EDA, NL04~1.0, then impurity-induced disruption at 0.9 seconds ICRF 1.5 MW clean up to disruption Prad foil rises ~0.8 MW Fixed strike point is a bit low. Thermocouple data ok. |
| Feb 23 2010 02:58:25:727PM | 1100223021 | Brian Labombard | 21-LSN, 5.4 tesla, 0.5 MA, NL04~0.6 at RF turn-on Initial EDA, NL04~1.0, impurity injection, then steady EDA after that, NL04~0.9 ICRF 1.5 MW clean Prad foil ~ 1.2 MW after impurity spike Fixed strike point on tile#4 Thermocouple data ok |
| Feb 23 2010 03:19:38:627PM | 1100223022 | Brian Labombard | 22-LSN, 5.4 tesla, 0.5 MA, NL04~0.6 at RF turn-on steady EDA, NL04~0.9 ICRF 1.6 MW clean Prad foil ~ 0.8 MW Fixed strike point on tile#4 Thermocouple data ok. |
| Feb 23 2010 03:34:29:067PM | 1100223023 | Brian Labombard | 23-LSN, 5.4 tesla, 0.5 MA, NL04~0.6 at RF turn-on LH transition at 1.3 seconds to steady EDA ICRF 1.2 MW clean Prad foil ~ 0.5 MW rising to 0.7 MW at EDA Fixed strike point on tile#4 Thermocouple data ok |
| Feb 23 2010 03:50:24:647PM | 1100223024 | Brian Labombard | 24-LSN, 5.4 tesla, 0.5 MA, NL04~0.55 at RF turn-on steady EDA ICRF 2.5 MW clean Prad foil ~ 1.1 MW Fixed strike point on tile#4 IR camera is slightly saturated. Evidence of a broader footprint at this lower current. Thermocouple data ok |
| Feb 23 2010 04:08:38:400PM | 1100223025 | Brian Labombard | 25-LSN, 5.4 tesla, 0.5 MA, NL04~0.57 at RF turn-on EDA, impurity injection, EDA again ICRF 2.5 MW with one drop out Prad foil settles to ~ 1.3 MW Fixed strike point Thermocouple data ok |
| Feb 23 2010 04:15:44:520PM | 1100223026 | Brian Labombard | 26-LSN, 5.4 tesla, 0.5 MA, NL04~0.57 at RF turn-on Steady EDA, nice shot ICRF 2.5 MW clean Prad foil ~ 1 MW Fixed strike point Thermocouple data ok. |
| Feb 23 2010 05:04:25:817PM | 1100223027 | Brian Labombard | 27-LSN, 5.4 tesla, 0.5 MA, NL04~0.57 at RF turn-on Steady EDA ICRF 3 to 3.5 MW, E tripping Prad foil ~ 1.7 MW Fixed strike point Thermocouple data ok |
| Feb 23 2010 05:04:51:730PM | 1100223028 | Brian Labombard | 28-LSN, 5.4 tesla, 0.5 MA, NL04~0.57 at RF turn-on Steady EDA until 1.3 seconds when impurities hit ICRF 3.5 steady to 1.3 s Prad foil ~ 1.5 MW Fixed strike point Thermocouple data ok |
| Feb 23 2010 05:05:03:400PM | 1100223029 | Brian Labombard | 29-LSN, 5.4 tesla, 0.5 MA, NL04~0.71 at RF turn-on Steady EDA ICRF 3.5 steady to 1.25 s then E drops out plus other trips Prad foil ~ 1.5 MW Fixed strike point Thermocouple data ok. |
| Feb 23 2010 05:36:49:857PM | 1100223030 | Brian Labombard | 30-LSN, 5.4 tesla, 0.5 MA, NL04~0.85 ICRF out of tune. L-mode Prad foil ~ 0.3 MW Fixed strike point Thermocouple data ok. IR strike point is too dim to see |
| Physics Operator Comments | |||
| Feb 23 2010 08:53:40:103AM | Robert Granetz | Loaded all segments from 1100212032; set nl_04 to 0.9e20 m-2. Cryopump is ready for shot 01, so set prefill to 52 ms. | |
| Feb 23 2010 09:18:50:133AM | 1100223001 | Robert Granetz |
Shot 01 -- Plasma, full length. 0.8 MA, 5.4 T, nl_04=0.8-0.9e20 m-2, LSN, cryopump. Good RXL ramp.
A little RF from J, nothing from D nor E.
Next shot: We'll be repeating these shots for awhile in order to clean off the boron from the divertor
diagnostics and to condition the RF post-boronization.
|
| Feb 23 2010 09:32:33:867AM | 1100223002 | Robert Granetz |
Shot 02 -- Plasma, full length. 0.8 MA, 5.4 T, nl_04=0.8-0.9e20 m-2, LSN, cryopump. Good RXL ramp.
Prf=1-2 MW from D & J. Startup not as good.
Next shot: reduce prefill by 3 ms; repeat for post-boronization recovery of RF and divertor diagnostics
|
| Feb 23 2010 09:52:53:017AM | 1100223003 | Robert Granetz |
Shot 03 -- Plasma, full length. 0.8 MA, 5.4 T, nl_04=0.8-0.9e20 m-2, LSN, cryopump. Good RXL ramp.
Prf=2+ MW from D, E, J.
Next shot: reduce prefill by 2 ms; repeat for post-boronization recovery of RF and divertor diagnostics
|
| Feb 23 2010 10:12:08:710AM | 1100223004 | Robert Granetz |
Shot 04 -- Plasma, full length. 0.8 MA, 5.4 T, nl_04=0.8-0.9e20 m-2, LSN, cryopump. Good RXL ramp.
Prf=2+ MW from D, E, J. Startup is not as good.
Next shot: add -15 A to IC_EF4; repeat for post-boronization recovery of RF and divertor diagnostics
|
| Feb 23 2010 10:42:58:730AM | 1100223005 | Robert Granetz |
Shot 05 -- Plasma, full length. 0.8 MA, 5.4 T, nl_04=0.8-0.9e20 m-2, LSN, cryopump. Good RXL ramp.
Prf=2+ MW from D, E, J.
Next shot: Add -10 A to IC_EF4; repeat for post-boronization recovery of RF and divertor diagnostics;
Also, D2 will be puffed from NINJA at t=1.3 s
|
| Feb 23 2010 11:05:09:537AM | 1100223006 | Robert Granetz |
Shot 06 -- Plasma, full length. 0.8 MA, 5.4 T, nl_04=0.8-0.9e20 m-2, LSN, cryopump. Good RXL ramp.
Prf=2+ MW from D, E, J. NINJA puffed D2 starting at t=1.3 s. Noticeable high-Z impurity
injection at t=0.97 s. Startup is continuing to deteriorate.
Next shot: reduce pre-fill by 4 ms; repeat for post-boronization recovery of RF and divertor diagnostics
|
| Feb 23 2010 11:16:39:253AM | 1100223007 | Robert Granetz |
Shot 07 -- Plasma, full length. 0.8 MA, 5.4 T, nl_04=0.8-0.9e20 m-2, LSN, cryopump. Good RXL ramp.
Prf=2+ MW from D, E, J. NINJA puffed D2 starting at t=1.3 s. Startup improved.
Next shot: repeat for post-boronization recovery of RF and divertor diagnostics
|
| Feb 23 2010 11:36:23:980AM | 1100223008 | Robert Granetz |
Shot 08 -- Plasma, full length. 0.8 MA, 5.4 T, nl_04=0.8-0.9e20 m-2, LSN, cryopump. Good RXL ramp.
Prf=2+ MW from D, E, J. NINJA puffed D2 starting at t=1.3 s.
Next shot: repeat for post-boronization recovery of RF and divertor diagnostics
|
| Feb 23 2010 11:51:33:963AM | 1100223009 | Robert Granetz |
Shot 09 -- Plasma, full length. 0.8 MA, 5.4 T, nl_04=0.8-0.9e20 m-2, LSN, cryopump. Good RXL ramp.
Prf=2+ MW from D, E, J. NINJA puffed D2 starting at t=1.3 s.
Next shot: repeat for post-boronization recovery of RF and divertor diagnostics
|
| Feb 23 2010 12:10:58:580PM | 1100223010 | Robert Granetz |
Shot 10 -- Plasma, full length. 0.8 MA, 5.4 T, nl_04=0.8-0.9e20 m-2, LSN, cryopump. Good RXL ramp.
Prf=3 MW from D, E, J. NINJA puffed D2 starting at t=1.3 s.
Next shot: Modify RXL programming to stop its ramp at t=0.9 s and hold that value for the rest of
the flattop.
|
| Feb 23 2010 12:30:20:557PM | 1100223011 | Robert Granetz |
Shot 11 -- Plasma, full length. 0.8 MA, 5.4 T, nl_04=0.8-0.9e20 m-2, LSN, cryopump. Abbreviated RXL ramp.
Prf=3 MW from D, E, J. NINJA puffed D2 starting at t=1.3 s.
Next shot: Stop the RXL ramp at t=0.8 s and then hold it constant at that value
|
| Feb 23 2010 12:46:41:840PM | 1100223012 | Robert Granetz |
Shot 12 -- Plasma, full length. 0.8 MA, 5.4 T, nl_04=0.8-0.9e20 m-2, LSN, cryopump. Abbreviated RXL ramp.
Prf=3 MW from D, E, J. NINJA puffed D2 starting at t=1.3 s. One long EDA H-mode.
Next shot: change ZXL programming to keep ZXL constant during the flattop
|
| Feb 23 2010 12:56:35:617PM | 1100223013 | Robert Granetz |
Shot 13 -- Plasma, full length. 0.8 MA, 5.4 T, nl_04=0.8-0.9e20 m-2, LSN, cryopump. Abbreviated RXL ramp.
Prf=3 MW from D, E, J. NINJA puffed D2 starting at t=1.3 s. One long EDA H-mode.
Next shot: add +10 A to IC_EF4; reduce Prf to 2 MW
|
| Feb 23 2010 01:09:34:023PM | 1100223014 | Robert Granetz |
Shot 14 -- Plasma, full length. 0.8 MA, 5.4 T, nl_04=0.8-0.9e20 m-2, LSN, cryopump.
Prf=2 MW from D, E, J. NINJA puffed D2 starting at t=1.3 s. One long EDA H-modebut not as
steady as the last few shots.
Next shot: repeat; no DPCS changes
|
| Feb 23 2010 01:21:40:380PM | 1100223015 | Robert Granetz | Shot 15 -- Fizzle. Nothing obviously wrong. Next shot: add 2 ms to prefill, just to do something |
| Feb 23 2010 01:44:58:783PM | 1100223016 | Robert Granetz |
Shot 16 -- Plasma, full length. 0.8 MA, 5.4 T, nl_04=0.8-0.9e20 m-2, LSN, cryopump.
Prf=2 MW from D, E, J. NINJA puffed D2 starting at t=1.3 s. One long EDA H-mode.
Next shot: reduce Prf to 1 MW; no DPCS changes
|
| Feb 23 2010 02:55:05:957PM | 1100223017 | Robert Granetz |
Shot 17 -- Plasma, full length. 0.8 MA, 5.4 T, nl_04=0.8-0.9e20 m-2, LSN, cryopump.
Prf=1 MW from D, E. NINJA puffed D2 starting at t=1.3 s. One short H-mode.
Bad startup.
Next shot: add 3 ms to prefill; increase Prf to 1.5 MW in order to get longer H-mode
|
| Feb 23 2010 02:54:47:363PM | 1100223018 | Robert Granetz |
Shot 18 -- Plasma, full length. 0.8 MA, 5.4 T, nl_04=0.8-0.9e20 m-2, LSN, cryopump.
Prf=1.5 MW from D, E. NINJA puffed D2 starting at t=1.3 s. One long EDA H-mode.
Bad startup.
Next shot: add +10 A to IC_EF4; turn J-port antenna back on
|
| Feb 23 2010 02:54:14:050PM | 1100223019 | Robert Granetz |
Shot 19 -- Plasma, full length. 0.8 MA, 5.4 T, nl_04=0.8-0.9e20 m-2, LSN, cryopump.
Prf=1.5 MW from D, J. NINJA puffed D2 starting at t=1.3 s. One long EDA H-mode.
Bad startup.
Next shot: drop Ip to 0.5 MA; drop nl_04 to 0.6e20 m-2
|
| Feb 23 2010 02:53:36:393PM | 1100223020 | Robert Granetz |
Shot 20 -- Plasma, disrupted at t=0.93 s due to an injection. 0.5 MA, 5.4 T, nl_04=0.6e20 m-2, LSN, cryopump.
Prf=1.5 MW from D, J. NINJA puffed D2 starting at t=1.3 s.
Bad startup. Brian points out that the injection might have happened because we hit the
tungsten tile row.
Next shot: tweak RXL out by a few mm to avoid hitting the tunsten tile row
|
| Feb 23 2010 03:06:08:313PM | 1100223021 | Robert Granetz |
Shot 21 -- Plasma, full length. 0.5 MA, 5.4 T, nl_04=0.6e20 m-2, LSN, cryopump.
Prf=1.5 MW from D, J. NINJA puffed D2 starting at t=1.3 s.
Bad startup.
Next shot: add +5 A to IC_EF4; raise ZXL by 5 mm
|
| Feb 23 2010 03:17:50:187PM | 1100223022 | Robert Granetz |
Shot 22 -- Plasma, full length. 0.5 MA, 5.4 T, nl_04=0.6e20 m-2, LSN, cryopump.
Prf=1.5 MW from D, J. NINJA puffed D2 starting at t=1.3 s.
Bad startup.
Next shot: no DPCS changes; reduce Prf to 1 MW (from J-port)
|
| Feb 23 2010 03:32:42:940PM | 1100223023 | Robert Granetz |
Shot 23 -- Plasma, full length. 0.5 MA, 5.4 T, nl_04=0.6e20 m-2, LSN, cryopump.
Prf=1.1 MW from D, J. NINJA puffed D2 starting at t=1.3 s. Short H-mode.
Bad startup.
Next shot: no DPCS changes; increase Prf to 2.5 MW
|
| Feb 23 2010 03:40:21:337PM | 1100223024 | Robert Granetz |
Shot 24 -- Plasma, full length. 0.5 MA, 5.4 T, nl_04=0.6e20 m-2 (target), LSN, cryopump.
Prf=2.5 MW from D, J. NINJA puffed D2 starting at t=1.3 s. Long EDA H-mode.
Bad startup.
Next shot: no DPCS changes
|
| Feb 23 2010 04:08:14:307PM | 1100223025 | Robert Granetz |
Shot 25 -- Plasma, full length. 0.5 MA, 5.4 T, nl_04=0.6e20 m-2 (target), LSN, cryopump.
Prf=2.5 MW from D, J. NINJA puffed D2 starting at t=1.3 s. Long EDA H-mode.
Bad startup. There were a couple of noticeable impurity injections around 1 s.
Next shot: no DPCS changes
|
| Feb 23 2010 04:14:25:283PM | 1100223026 | Robert Granetz |
Shot 26 -- Plasma, full length. 0.5 MA, 5.4 T, nl_04=0.6e20 m-2 (target), LSN, cryopump.
Prf=2.5 MW from D, J. NINJA puffed D2 starting at t=1.3 s. Long EDA H-mode.
Bad startup.
Next shot: no DPCS changes; increase Prf to 3.5 MW
|
| Feb 23 2010 04:23:12:277PM | 1100223027 | Robert Granetz |
Shot 27 -- Plasma, full length. 0.5 MA, 5.4 T, nl_04=0.6e20 m-2 (target), LSN, cryopump.
Prf<=3.5 MW from D, E, J. NINJA puffed D2 starting at t=1.3 s. Long EDA H-mode.
Bad startup.
Next shot: no DPCS changes
|
| Feb 23 2010 04:45:08:130PM | 1100223028 | Robert Granetz |
Shot 28 -- Plasma, full length. 0.5 MA, 5.4 T, nl_04=0.6e20 m-2 (target), LSN, cryopump.
Prf=3.5 MW from D, E, J. NINJA puffed D2 starting at t=1.3 s. Long EDA H-mode.
Bad startup.
Next shot: increase nl_04 to 0.75e20 m-2
|
| Feb 23 2010 04:53:40:170PM | 1100223029 | Robert Granetz |
Shot 29 -- Plasma, full length. 0.5 MA, 5.4 T, nl_04=0.7e20 m-2 (target), LSN, cryopump.
Prf=3.5 MW from D, E, J. NINJA puffed D2 starting at t=1.3 s. Long EDA H-mode.
Bad startup.
Next shot: increase nl_04 to 0.9e20 m-2
|
| Feb 23 2010 05:09:00:220PM | 1100223030 | Robert Granetz |
Shot 30 -- Plasma, full length. 0.5 MA, 5.4 T, nl_04=0.8e20 m-2 (target), LSN, cryopump.
Almost no RF. No H-modes. NINJA puffed D2 starting at t=1.3 s. Bad startup.
End of run
|
| Engineering Operator Comments | ||||
| Shot | Time | Type | Status | Comment |
| 1 | 09:07:01:573AM | Plasma | Ok | |
| 2 | 09:21:15:853AM | Plasma | Ok | |
| 3 | 09:44:53:723AM | Plasma | Ok | |
| 4 | 10:03:15:870AM | Plasma | Ok | |
| 5 | 10:25:29:867AM | Plasma | Ok | |
| 6 | 10:54:35:663AM | Plasma | Ok | |
| 7 | 11:12:41:857AM | Plasma | Ok | |
| 8 | 11:26:01:090AM | Plasma | Ok | |
| 9 | 11:39:16:420AM | Plasma | Ok | |
| 10 | 11:59:29:710AM | Plasma | Ok | |
| 11 | 12:13:47:037PM | Plasma | Ok | |
| 12 | 12:31:10:480PM | Plasma | Ok | |
| 13 | 12:47:43:593PM | Plasma | Ok | |
| 14 | 01:00:51:687PM | Plasma | Ok | |
| 15 | 01:13:55:200PM | Plasma | Ok | |
| 16 | 01:26:59:683PM | Plasma | Ok | |
| 17 | 01:46:12:957PM | Plasma | Ok | |
| 18 | 01:59:28:580PM | Plasma | Ok | |
| 19 | 02:16:36:023PM | Plasma | Ok | |
| 20 | 02:31:43:460PM | Plasma | Ok | |
| 21 | 02:50:42:250PM | Plasma | Ok | |
| 22 | 03:07:05:283PM | Plasma | Ok | |
| 23 | 03:20:12:157PM | Plasma | Ok | |
| 24 | 03:33:26:970PM | Plasma | Ok | |
| 25 | 03:48:19:630PM | Plasma | Ok | |
| 26 | 04:01:40:097PM | Plasma | Ok | |
| 27 | 04:16:59:130PM | Plasma | Ok | |
| 28 | 04:32:47:757PM | Plasma | Ok | |
| 29 | 04:47:49:307PM | Plasma | Ok | |
| 30 | 05:03:40:380PM | Plasma | Ok | |
| System Availability | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Feb 23 2010 09:06:29:853AM | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||