Alcator C-Mod Run 1100309 Information

Back to runs

Miniproposals
Miniproposal:562
Date Filed: 7/30/2009
Title:Characterization of the decay time of the fast-ion tail
First Author:Aaron Bader
Session Leader:Aaron Bader (shots 1-33)

Operators
Session leader(s):Aaron Bader
Physics operator(s):Jim Irby
Engineering operator(s):Andy Pfeiffer,Ed Fitzgerald,Gary Dekow

Engineering Operator Run Comment
MP562 - Characterization of the decay time of the fast-ion tail SL: Bade

Session Leader Plans
Entered: Mar 7 2010 06:10:49:807PM
Author: Aaron Bader
SL Plan for run on MP 562

1. Start with shot 1100218028 but with Ip at 1 MA instead of 600 kA.
ICRF timing from 1100218028. Power should be 2 MW from J
and 1 MW from D (assuming there is no possibility of using E).
This will be the fiducial shot for this run.
CNPA setup: set F-top aperture to 204.5 and J-top aperture to
8.5. (2-3 shots)

2. RF power scan. This assumes we cannot use E Antenna.
First 2.8 MW from J alone. Then 1.5 MW from J alone (may require
aperture change). Then 1.5 MW from D alone. (5 shots)


3. Current scan. We had a lot of trouble with Ip at 800 kA so we'll
try getting data at 600 kA and 1.2 MA. If these shots go well,
we'll get another point at 750 kA. If we're struggling we'll move
on to the field/phase scan. ICRF power should be the same as in
the fiducial established in shot 1. 2 MW from J, 1 MW from D&E (5 shots)

4. Field and phasing scan: Change field to 5.6 T, current at 1 MA,
ICRF power entirely from J but we want to switch the phase halfway
through the shot. Half the ICRF pulses should be at
0,pi/2,pi,3pi/2 phasing and half the pulses should be at
0,3pi/2,pi,pi/2 phasing. Maybe repeat at 5.75 T (2-3 shots)

5. Density scan, increase density to nl04 = 0.9E20. If the CNPA
signals are still reasonable, try increasing it to 1.2E20. (3-5 shots)

6. Modulation on top of steady state signal (if time): Keep D&E constant at 1
MW, modulate J 2 MW on top of the steady D&E signal. First shot
should be at same plasma conditions as the fiducial. If this
scheme produces interesting results, try at different currents. (1-? shots)

Physics Operators Plans

Session Leader Summaries
Entered: Mar 9 2010 05:38:41:340PM
Author: Aaron Bader
Summary for MP 562

We had a very successful run day hitting all the main points in the SL_Plan.

RF scan: Got data at 0.75 MW, 2 MW, 3 MW and 4 MW of modulated power. Also got a comparison between D&E antennas and J antenna.

Current scan: Got data at 1.2 MA, 1 MA, 0.8 MA and 0.6 MA. Had some trouble with CNPA noise at 0.6 and 0.8 MA

Density scan: got data at nl_04= 1E20, the rest of the day was at 0.7E20.

We also were able to get data on +90 vs. -90 J-Ant phasing at 5.6 Tesla and 5.4 Tesla.

At the end of the run we were able to run another current scan, with 2 MW of ICRF power steady and 2 MW modulated.

Had lots of runaways early in discharges, and some trouble with disruptions at the end of the day.

Physics Operator Summaries
Entered: Mar 10 2010 08:43:42:097AM
Author: Jim Irby
Machine generally ran well today. FMIT#2 was back on-line, and the rf also performed well providing 4 MW of modulated power for the MP. There were no startup field tweaks required today. The pre fill was changed only in an attempt to reduce runaways, not to improve startup, but changes in pre-fill and pg3 seg 1 puff produced no provable effect on the runaways. We had one fizzle today that may have been because of my reluctance to change the pre fill following disruption. No changes were required following the other disruptions (we had many). On shot 06 I changed ZCUR from -0.005 to 0.0 m to see if we could reduce W injections. This change seems to have worked.

As we lowered the plasma current, I programmed an overshoot, keeping the current rise approx constant during startup. This procedure seems to have improved our control of the target density.

Disruptions sometimes as early as 150 ms were caused mostly maybe completely by injections. Early in the run, we had a few W injections. At least one disruption seemed to be caused by massive boron injections in which Matt saw very bright second order lines. Others were moly.

Runaways seem to be becoming more difficult to suppress. Shot 21 had very few runaways and also a high startup density and ratiomatic pressure around 30 ms when the x-ray signal begins to rise. Note that the standard neuts_hards detector with a BGO scintillator and PMT detector saturated often during the run at approx 600 (units of 10^12/s). The solid state detectors which did not saturate ranged up to 10,000 on some shots. We should spend some time understanding this problem (more time).


jim


Problems:

EF1 failed to commutate on shot 01

EF1 reached current limits on several shots today which may have contributed to disruptions at higher currents.

Main gas valve did not work on shots 01 and 02 --- re-seat of board again worked.

No TF on shot 13 --- ok on shot 14

Data system hangs on a couple of shots

Score:

disruptions 03,05,11,20,26,27,28,29,30,33

dud 01,13
fizzle 26
plasma 02,03,04,05,06,07,08,09,10,11
12,14,15,16,17,18,19,20,21,22
23,24,25,26,27,28,29,30,31,32
33


Session Leader Comments
Mar 9 2010 09:08:47:627AM1100309001Aaron Bader dud.

EF1 issue.

Next shot: fix ef1 and try again.
Mar 9 2010 09:25:01:803AM1100309002Aaron Bader D ran well. But E and J both did not work.

Next shot: try again to get 3 MW, increase later gas to get more constant density.
Mar 9 2010 09:44:13:260AM1100309003Aaron Bader Early disruption, from Boron injection.

F-top CNPA not happy at this power level, close aperture a little.

Next shot: repeat
Mar 9 2010 10:03:52:207AM1100309004Aaron Bader Good shot. ICRF good, and gas issue seems to be resolved.

Tails may not reach steady state, they're close, so next shot we will increase on pulse length and reduce F-top aperture.
Mar 9 2010 10:18:18:380AM1100309005Aaron Bader Early tungsten injection kills the plasma.

Next shot: raise nl_04 to 0.7E20, raise zcur by 0.5 cm. Try to get rid of these W injections.
Mar 9 2010 12:15:52:437PM1100309006Aaron Bader Good shot. No W injection. We can use this as a fiducial.

Ip 1 MA, ICRF 3 MW, nl04 0.7E20

Next shot: ICRF power from J alone.
Mar 9 2010 12:16:28:377PM1100309007Aaron Bader Plasma ran well, J-top a bit ratty.

Ip 1 MA, ICRF 2.8 MW (from J only), nl04 0.7E20

Next shot: Lower to 2.5 MW from J and try again.
Mar 9 2010 12:17:21:203PM1100309008Aaron Bader Plasma ran well, J-Ant ran well, CNPA ran well. A trifecta of useful data.

No noticeable difference between tail energies on shots 8 and 6.

Ip 1 MA, ICRF 2.5 MW (from J only), nl04 0.7E20

Next shot: 2.5 MW from D & E
Mar 9 2010 12:18:13:703PM1100309009Aaron Bader E good, D has a lot of trouble. Startup also a bit rocky.

Ip 1 MA, ICRF: 1.25 from E, 0-1.25 from D, nl04 0.7E20

Next shot: Repeat but put a little more of the power load on E. Invoke Irby magicks on startup.
Mar 9 2010 12:19:25:363PM1100309010Aaron Bader Good plasma, antenna scan complete.

Will forego the power scan for now, we'll return to it later. Start with current scan.

Ip 1 MA, ICRF 1.35 from E 1.15 from D, nl04 0.7E20

Next shot: Raise current to 1.2 MA
Mar 9 2010 12:19:56:190PM1100309011Aaron Bader Good plasma, density a little high and not constant. We had this same issue last time we tried this plasma, it's unclear that we will be able to get better density control.

Ip 1.2 MA, ICRF 3 MW, nl04 0.9-0.7E20

Next shot: Move to 800 kA
Mar 9 2010 12:20:20:410PM1100309012Aaron Bader Good plasma and RF. CNPA has some noise, but it's unclear that we can do better, so we go onwards with the run plan.

Ip 800 kA, ICRF 3 MW, nl04 0.7E20

Next shot: move to 600 kA
Mar 9 2010 12:13:56:683PM1100309013Aaron Bader no TF.

next shot: redo 600 kA shot.
Mar 9 2010 12:30:41:813PM1100309014Aaron Bader Good plasma. Lot's of noise on J-Top CNPA, as expected with this current level. We can get statistics for the higher energy ions but we're pretty hosed on the lower energy stuff.

Ip 600 kA, ICRF 3 MW, nl04 0.7E20

Next shot: back to 1 MA and raise density to 1E20

Mar 9 2010 02:06:24:377PM1100309015Aaron Bader Good plasma. Again, noise occurs on CNPA, but there is good signal on J-top Ch 6, which is probably the best we can hope for at this density.

Ip 1 MA, ICRF 3 MW, nl04 1E20

Next shot: back to 0.7E20 and finish up the RF power scan we didn't complete earlier. So, 2 MW ICRF.

Mar 9 2010 02:07:38:503PM1100309016Aaron Bader Good plasma and ICRF. Noise down on CNPA as expected.

Ip 1 MA, ICRF 2 MW, nl04 1E20

Next shot: Start the phase scan. We'll increase field to 5.6 T to move the resonance in the middle of the J-Top CNPA. Change phase to +90 (0, pi/2, pi, 3pi/2)
Mar 9 2010 01:15:17:677PM1100309017Aaron Bader Good plasma and ICRF. Noise is higher on J-Top than expected. We'll get around this by trying again with 2.5 MW from J only.

Ip 1MA, ICRF 3 MW (J at +90 phase), nl04 0.7E20 (field 5.6 T)

Next shot: same field, current and density. ICRF 2.5 MW from J only at 90 phasing.
Mar 9 2010 01:25:36:953PM1100309018Aaron Bader Noise down on CNPA. Good plasma and ICRF.

Ip 1MA, ICRF 2.5 MW (J only at +90 phase), nl04 0.7E20 (field 5.6 T)

Next shot: J-Ant at opposite phasing.
Mar 9 2010 01:56:31:490PM1100309019Aaron Bader There is a difference in the two phase values.

Ip 1 MA, ICRF 2.5 MW (from J, phase -90) nl04 0.7E20

Next shot: redo fiducial shot 6.
Mar 9 2010 01:56:43:943PM1100309020Aaron Bader early disruption

next shot: retry
Mar 9 2010 02:16:37:107PM1100309021Aaron Bader everything looks good.

Ip 1 MA, ICRF 3 MW, nl04 0.7E20

next shot: change ICRF power to 4 MW
Mar 9 2010 02:32:18:437PM1100309022Aaron Bader CNPA looks good. Seems to have survived the 4 MW
Surprisingly little change in the CNPA signal between 3 and 4 MW

Ip 1 MA, ICRF 4 MW, nl04 0.7E20

next shot: change ICRF power to 3 MW modulated and 1 MW solid.
Mar 9 2010 02:44:16:950PM1100309023Aaron Bader CNPA looks good. A couple very brief cut outs on J-top, but we can work around them. Noise levels good. F-top has a couple more problems.

Ip 1 MA, ICRF 4 MW (3 Modulated, 1 stead), nl04 0.7E20

next shot: change ICRF power to 2 MW modulated and 2 MW solid. close F-top aperture some more.
Mar 9 2010 02:59:28:530PM1100309024Aaron Bader Everything good. F-top survived without any cutouts. J-top good as well. 1 trip on ICRF on the 8th pulse.

Ip 1 MA, ICRF 4 MW (2 steady 2 modulated), nl04=0.7E20

Next shot: raise current to 1.2 MA
Mar 9 2010 03:13:21:127PM1100309025Aaron Bader Plasma disrupts late. CNPA cuts out when ICRF trips on the 6th pulse. 9th pulse is also iffy.

Ip 1.2 MA, ICRF 4 MW (2 steady 2 modulated), nl04=0.7E20

Next shot: lower current to 800 kA. Not sure if we'll survive this.
Mar 9 2010 03:25:57:890PM1100309026Aaron Bader Fizzle

Next shot: try again, lower current to 800 kA.
Mar 9 2010 03:43:49:833PM1100309027Aaron Bader Good plasma and RF, but we forgot to change to 800 kA.

CNPA saturated on most J-Top channels.

Next shot: lower current to 800 kA.
Mar 9 2010 04:07:35:080PM1100309029Aaron Bader Disruption

Next shot: retry.
Mar 9 2010 04:22:59:753PM1100309030Aaron Bader Disruption, but we may have enough data from this shot.

Ip 800 kA, ICRF 4 MW (2 steady, 2 modulated) nl04 0.7E20

Next shot: try 700 kA
Mar 9 2010 04:42:38:790PM1100309031Aaron Bader Early disruption

Next shot: 900 kA shot. Keep D&E constant at 2 MW. Modulate J at 2MW with half the pulses at +90 phase and half at -90 phase.
Mar 9 2010 04:56:06:073PM1100309032Aaron Bader Good shot. CNPA good.

Ip 900 kA, ICRF D&E constant at 2 MW. Modulate J at 2MW with half the pulses at +90 phase and half at -90 phase, nl04 0.7E20

Next shot, same with field at 5.6T
Mar 9 2010 05:02:11:750PM1100309033Aaron Bader Early disruption.

Next shot: end of run.

Physics Operator Comments
Mar 8 2010 08:55:26:230AMJim IrbyMP562 - Characterization of the decay time of the fast-ion tail

SL: Bader
PO: Irby


-----------------
Engineering Setup
-----------------

Run begins at 09:00 and ends at 17:00

Power systems as on: 1100218028

Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:

Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
fill NINJA with 10 psi D2 DISABLED

Enable gatevalves and shutters: ECE, VUV, HiREX Sr, Z-bolo

Torvac gatevalve toggle (yes/no): no

Boronization(yes/no): no
Overnight ECDC (yes/no): YES
ICRF(yes/no): YES
LH(yes/no): no
Cryopump (yes/no): YES

Vessel temperature: 35/35/35

------------------------------
ECDC Parameters
------------------------------
gas and pressure: D2 at 2e-4 Torr
sweep: 44/45/103 cm
scan: 20/120 s
Mar 9 2010 09:28:30:480AM1100309001Jim IrbyLoaded from 1100218028
Ip from 600 to 1000 kA in seg 3 ---- Upper Null
Open Tree Done

Parameters from 1100218028:
EF4 -1315 A
nl04 request 0.6e20 /m^2
prefill at 75 ms
Bt 5.41 T with current demand of 148350.00 A (150.593 Rogowski) at 1 s

Import seg 1 from 1100308033
prefill at 65 ms from -365 to -300 ms
EF4 -1315 A
Bz0 0. T
Br0 +0.0005 T
RCUR 2500
ZCUR 0
loaded

results:

dud --- EF1 problem --- no commutation








Mar 9 2010 09:28:45:370AM1100309002Jim Irbychanges --------------------------------

no DPCS changes
try again

results --------------------------------

plasma into rampdown --- missing J and E port

main gas puff did not go --- density low --- Willy will check
Mar 9 2010 09:44:14:717AM1100309003Jim Irbychanges --------------------------------

Willy pulled gas board and put it back

Bill Cochran instrumenting EF1 so if we have problems with commutation again we will see what caused the problem.

results --------------------------------

gas board fixed --- we got requested density

disruption at 0.66 s --- Matt sees very bright second order Boron lines, not W.


Mar 9 2010 09:58:58:810AM1100309004Jim Irbychanges --------------------------------

no DPCS changes
assume it was just an injection that lost us 03
Aaron adjusted aperture on CNPA

results --------------------------------

plasma into rampdown --- gas puff good --- got density request
3 MW of rf --- all antennas running!


Mar 9 2010 10:18:23:647AM1100309005Jim Irbychanges --------------------------------

Argon enabled in seg 03 --- puff from 0.300 to 0.350 s
loaded

results --------------------------------

disruption again at 0.66 s --- now it W
Mar 9 2010 10:23:02:417AM1100309006Jim Irbychanges --------------------------------

nl04 request to 0.7e20 from 0.6e20
ZCUR moved up 0.005 m --- flat at 0.0 m now
loaded

results --------------------------------

plasma into rampdown

SL happy, we are moving on...

Mar 9 2010 10:47:07:867AM1100309007Jim Irbychanges --------------------------------

no DPCS changes

results --------------------------------

plasma into rampdown --- W has gone away

ratiomatic was off on this shot and several before --- should be back next shot
Mar 9 2010 10:55:16:123AM1100309008Jim Irbychanges --------------------------------

no DPCS changes


results --------------------------------

plasma into rampdown
Mar 9 2010 11:21:19:670AM1100309009Jim Irbychanges --------------------------------

increased seg 1 pg3 puff a little to help with hards (I hope)

results --------------------------------

plasma into rampdown --- hards down, but almost lost startup at 0.13 s

EF1 at limits? OH currents up?
Mar 9 2010 11:27:29:287AM1100309010Jim Irbychanges --------------------------------

no DPCS changes, but a little worried about that. Last shot reached EF1 limits probably because of injections during startup (lost current rise for a while)

results --------------------------------

plasma into rampdown --- hards are back --- startup still not very good, but no early injections and magnet currents are back to normal.
Mar 9 2010 11:44:35:430AM1100309011Jim Irbychanges --------------------------------

Ip request from 1000 to 1200 kA
loaded

results --------------------------------

disruption at 1.595 s --- plenty of hards early
density target higher, going up with ICRF (Ip effect)


Mar 9 2010 11:58:27:027AM1100309012Jim Irbychanges --------------------------------

Ip to 800 kA from 1200 kA
loaded

results --------------------------------

plasma into rampdown --- density good, hards high but coming down


Mar 9 2010 12:07:36:960PM1100309013Jim Irbychanges --------------------------------

Ip request from 800 to 600 kA
loaded


results --------------------------------

No TF?
Mar 9 2010 12:29:34:373PM1100309014Jim Irbychanges --------------------------------

Try again with TF --- should be 600 kA Ip

results --------------------------------

plasma into rampdown --- Ip good

Mar 9 2010 12:46:10:627PM1100309015Jim Irbychanges --------------------------------

Ip from 600 to 1000 kA
nl04 request from 0.7 to 1.0e20 /m^2
loaded

results --------------------------------

plasma into rampdown --- Ip good --- Early injection again around 0.123 s

Mar 9 2010 12:57:28:063PM1100309016Jim Irbychanges --------------------------------

nl04 request from 1 to 0.7e20/m^2
loaded

less rf power

results --------------------------------

plasma into rampdown --- hards are gone??
Mar 9 2010 01:12:02:800PM1100309017Jim Irbychanges --------------------------------

TF field from 5.4 T to 5.6 T
TF current request from 148350 A to 153787 A
loaded

results --------------------------------

plasma into rampdown --- 5.59 T

hards are back
Mar 9 2010 01:31:27:007PM1100309018Jim Irbychanges --------------------------------

no DPCS changes

results --------------------------------

plasma into rampdown
Mar 9 2010 01:54:56:990PM1100309019Jim Irbychanges --------------------------------

no DPCS changes

results --------------------------------

plasma into rampdown, but almost lost it early again --- large MARFE/injection


Mar 9 2010 02:03:08:887PM1100309020Jim Irbychanges --------------------------------

reproduce shot 06 from today --- fiducial

Bt from 5.6 to 5.4 T (TF current back down to 148350 A)
loaded

results --------------------------------

plasma for 0.43 s ---
Mar 9 2010 02:11:45:350PM1100309021Jim Irbychanges --------------------------------

pg 3 puff raised between 30 and 100 ms in seg 1
loaded

results --------------------------------

plasma into rampdown --- hards gone, at least for this shot
Mar 9 2010 02:28:25:310PM1100309022Jim Irbychanges --------------------------------

no DPCS changes

results --------------------------------

plasma into rampdown

hards are back starting around 0.030 s --- density and pressure lower at this point than on shot 21 which had no hards.
Mar 9 2010 02:45:07:483PM1100309023Jim Irbychanges --------------------------------

prefill increased by 2 ms --- -0.367 to -0.300 s
loaded


results --------------------------------

plasma into rampdown

fewer hards
Mar 9 2010 02:57:54:873PM1100309024Jim Irbychanges --------------------------------

no DPCS changes

results --------------------------------

plasma into rampdown

hards up a little
Mar 9 2010 03:10:50:483PM1100309025Jim Irbychanges --------------------------------

Ip from 1000 to 1200 kA
pg3 rise time decreased in seg 1 --- gas in a little earlier
loaded

results --------------------------------

plasma for 1.57 s

hards down
Mar 9 2010 03:27:51:783PM1100309026Jim Irbychanges --------------------------------

no DPCS changes

results --------------------------------

fizzle --- no changes made following the disruption, but I have gotten away with that all day -- try again...
Mar 9 2010 03:48:29:290PM1100309027Jim Irbychanges --------------------------------

no DPCS changes

results --------------------------------

plasma for 1.57 s

Mar 9 2010 03:56:43:427PM1100309028Jim Irbychanges --------------------------------

Ip from 1200 to 800 kA
prefill reduced by 2 ms --- help disruption recovery?
loaded

results --------------------------------

plasma for 1.34 s --- injection...



Mar 9 2010 04:11:42:787PM1100309029Jim Irbychanges --------------------------------

no DPCS changes

results --------------------------------

disruption at 0.894 s --- 30 MW on twopi -- Matt says moly
Mar 9 2010 04:22:34:500PM1100309030Jim Irbychanges --------------------------------

no DPCS changes (no good ideas)

results --------------------------------

plasma for 1.165 s
Mar 9 2010 04:36:18:360PM1100309031Jim Irbychanges --------------------------------

Ip from 800 to 700 kA
loaded

results --------------------------------

plasma for 150 ms --- 400 kA ???
Mar 9 2010 04:48:21:813PM1100309032Jim Irbychanges --------------------------------

Ip to 900 kA
loaded

results --------------------------------

plasma into rampdown --- rf looks great


Mar 9 2010 05:02:39:860PM1100309033Jim Irbychanges --------------------------------

Bt from 5.4 to 5.6 T (153.787 kA)
loaded


results --------------------------------

plasma for 0.464 s


Engineering Operator Comments
ShotTimeTypeStatusComment
109:05:35:530AMPlasmaBadEF1U Early Commutation Problem
209:19:26:700AMPlasmaOk
309:35:28:080AMPlasmaOk
409:49:10:660AMPlasmaOk
510:02:33:237AMPlasmaOk
610:19:13:600AMPlasmaOk
710:35:05:663AMPlasmaOk
810:48:56:820AMPlasmaOk
911:08:43:687AMPlasmaOk
1011:21:49:420AMPlasmaOk
1111:35:26:390AMPlasmaOk
1211:49:06:953AMPlasmaOk
1312:01:57:403PMPlasmaBadTF did not run
1412:23:06:320PMPlasmaOk
1512:36:09:790PMPlasmaOk
1612:51:16:930PMPlasmaOk
1701:05:14:463PMPlasmaOk
1801:19:49:603PMPlasmaOk
1901:39:36:190PMPlasmaOk
2001:53:18:893PMPlasmaOk
2102:06:04:627PMPlasmaOk
2202:19:41:313PMPlasmaOk
2302:35:56:957PMPlasmaOk
2402:52:49:383PMPlasmaOk
2503:06:32:180PMPlasmaOk
2603:23:36:903PMPlasmaOk
2703:37:02:637PMPlasmaOk
2803:50:10:090PMPlasmaOk
2904:03:44:307PMPlasmaOk
3004:17:03:323PMPlasmaOk
3104:30:55:167PMPlasmaOk
3204:43:49:027PMPlasmaOk
3304:58:56:543PMPlasmaOk

System Availability
Mar 9 2010 08:19:40:443AM
After not being able to get signals from the 60 and 75GHz channels, Seung Gyou and I checked the power from the diodes and it was determined that both the 60GHz XMTR and 75 XMTR diodes have internal shorts. They are being sent for repair.
The 50 and 88GHz channels, as well as the variable and 140GHz channels are functioning but will be reinstalled today after the run.
Mar 9 2010 09:05:07:407AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Nov 13 2009 06:37AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll channels working and calibrated.Feb 02 2010 09:56AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational.Nov 12 2009 02:36PM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Nov 13 2009 06:38AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1100120000 the system is operational except for channel 110 which is not installedJan 20 2010 09:17AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Mar 9 2010 09:18:59:700AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Nov 13 2009 06:37AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll channels working and calibrated.Feb 02 2010 09:56AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational.Nov 12 2009 02:36PM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Nov 13 2009 06:38AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1100120000 the system is operational except for channel 110 which is not installedJan 20 2010 09:17AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Mar 9 2010 09:35:07:313AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyes7 horizontal views spread out R_maj=[0.72-0.9m], 3 cm over the tokamak midplane (beam) Jul 09 2009 05:12PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Nov 13 2009 06:37AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperationalNov 09 2009 09:12AM (irby)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe wide-view toroidal array was installed, spatially and absolutely calibrated. There are 7 toroidal chords intersect the beam at the major_R_range=[74.2:83.6]cm. Spatial resolution: 1.2 cm. The F-top wide-view poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[0.65:0.9.]m. Spatial resolution: 1.22 cm.Jul 09 2009 05:16PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; not yet calibratedJul 14 2009 02:22PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyes Nov 09 2009 09:13AM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll channels working and calibrated.Feb 02 2010 09:56AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow Dischargeno6/10/09: Paddles meggered at 1000 v to machine ground (>300 Mohm) prior to closing the vacuum chamber. Plugs for Power Supply and Controls Unplugged and Red Tagged, Safe for In-Vessel AccessJun 10 2009 01:47PM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Oct 27 2009 10:39AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayesoperational at 80 MHzJul 21 2009 04:49PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayesantenna and FFT operationalJul 21 2009 04:49PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayesavailable at 80 MHz and [0,pi,0,pi] phasingSep 04 2009 10:01AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffyesRequires some advance notice for laser start-upOct 16 2009 12:46PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoBreaker locked and tagged out. Waveguide disassembly started. Open Waveguides have been shorted.May 28 2008 09:47AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesNeutron detectors are calibrated and ready to go. Voltages will be turned on prior to first plasma.Jun 10 2009 10:35AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational.Nov 12 2009 02:36PM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,ennever,ntsujii,porkolab
Penning GaugesyesHigh voltage is enabled (on during INIT, off during RECOOL).Jun 30 2009 09:42PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchyesChecked and Operational as of 06/18/09Jun 19 2009 08:04AM (irby)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Nov 13 2009 06:38AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsyesChecked out and ready for Magnet Tests as of 06/18/09Jun 19 2009 08:07AM (irby)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesArray is operational with new cPCI data system. Probe 14 has open circuit.Jul 14 2009 09:17PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesArray is operational with new cPCI data system.Jul 14 2009 09:16PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesArray is operational with new cPCI data system. Probe 13 has a bad cable (open).Jul 14 2009 09:17PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1100120000 the system is operational except for channel 110 which is not installedJan 20 2010 09:17AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesProbe is operational. Needs plasma conditioning.Jul 14 2009 09:18PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesSystem connected to A-port WASP. Needs plasma testing.Jul 14 2009 09:19PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesSparker back in operation before 11/09 runNov 09 2009 09:11AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCIyesSystem restarted and aligned. Several chords available including NL04. Density Feedback available. Ready for plasma.Jun 18 2009 09:15AM (murray)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers working. 15 spatial channels operational. Calibrated Oct 13 2009 07:49PM (yma)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgeyesOperational, and calibrated.Oct 11 2009 03:01PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke