Alcator C-Mod Run 1100420 Information

Back to runs

Miniproposals

Operators
Session leader(s):
Physics operator(s):
Engineering operator(s):

Engineering Operator Run Comment
data system tests - JAS

Session Leader Plans

Physics Operators Plans

Session Leader Summaries

Physics Operator Summaries

Session Leader Comments

Physics Operator Comments

Engineering Operator Comments
ShotTimeTypeStatusComment
109:51:49:147AMTestBad

System Availability
Apr 20 2010 09:49:12:643AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESnoBES system is ready for Up-to-air (Apr, 2010)Mar 31 2010 10:36AM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (diode+foil), AXA, AXJ, WB3AX, WB4AX, LEDGE-AX working fine. MID-FOILS working fine. The LEDGE/DIV foils still need calibrations appliedAug 27 2009 09:09AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno3/26/10 Bottle Removed From Cell, monitors powered down, Autodialer function bypassedMar 26 2010 05:29PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged.Apr 06 2010 10:51AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoWide-view CXRS system is power down and ready for up-to-air (Apr, 2010)Mar 31 2010 10:36AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned and operating; needs to be calibrated before bolo-box is removedMar 30 2010 03:30PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCno3/26/10: Magnetron Powered Down, Power Cord Disconnected from Unit, PEI Powered DownMar 26 2010 05:31PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off, no hazard present.Mar 29 2010 03:10PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauge installed. Controller repaired.Aug 23 2009 10:36PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPlugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access.Apr 05 2010 11:18AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesposes no safety hazard for people working around the machineJun 18 2009 01:04PM (marmar)Earl MarmarH/D Ratiomarmar
HEATno4/5/10 Main Diconnected has been opened, locked and red tagged making the systme safe for in-vessel personnelApr 05 2010 10:22AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installed and testedJun 17 2009 11:54AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryescurrently only one detector is operational, off-axis He-like argon emissionJul 14 2009 10:01AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRnoIn safe mode (high voltage turned off)May 27 2008 09:19PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennanoout of operation - inspection on-goingMar 29 2010 12:42PM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennanoout of operations - inspection on goingMar 29 2010 12:42PM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennanoout of operationMar 31 2010 02:18PM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffnoLaser is disconnected and the vacuum system is removed.Apr 06 2010 10:01PM (nthoward)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoAll waveguides are shorted and disconnected from jungle gym. Jungle gym disconnected from launcher.Mar 29 2010 01:31PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane, WB4-LY, LEDGE-LY all collecting data. WB1-LY not attached.Aug 27 2009 09:10AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesOperating normallyAug 27 2009 09:10AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Recalibrated 7/27/09.Jul 28 2009 04:22PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are on. B-bottom is not operating - bad sensor head?Jul 14 2009 09:12PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsnoVoltages have been turned offMar 29 2010 08:15AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPower back on morning of 11/09 before runNov 09 2009 09:10AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAnoCapillaries were tested in-vessel. Plenum has a leak and needs fixing.Jul 14 2009 09:14PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoPower off. Safe for machine entry.Mar 30 2010 11:46AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,ennever,ntsujii,porkolab
Penning GaugesnoHigh voltage power supplies are turned off and also unplugged from AC line.Apr 06 2010 10:52AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air Switchno3/26/10: Air to Air switch removed and Kirk lockedMar 26 2010 05:36PM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIno3/26/10: PEI powered down, breaker openedMar 26 2010 05:31PM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXno3/26/10: Powered down after run for up to airMar 26 2010 05:34PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power Systemsno3/26/10: Powered down after run for up to airMar 26 2010 05:34PM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDno All probes are unplugged from vacuum vessel.Apr 06 2010 10:53AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoLH launcher not installed. Cables are unplugged at the A-port rack.Jul 14 2009 09:16PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoAll probes are unplugged from vacuum vessel.Apr 06 2010 10:54AM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVnoAll probes are unplugged from vacuum vessel.Apr 06 2010 10:54AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesSince 1100120000 the system is operational except for channel 110 which is not installedJan 20 2010 09:17AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoProbe is full retracted. Air line is disconnected.Apr 06 2010 10:54AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPnoProbe is fully retracted.Apr 06 2010 10:55AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoAll probe cables are disconnected from vacuum vessel.Apr 06 2010 10:55AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
Sparkerno3/26/10: Sparker supply powered down, power cord and HV cable disconnected from supplyMar 26 2010 05:32PM (dekow)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
TCInoCO2 Laser powered down on 3/29/2010Mar 29 2010 01:27PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoLasers are shuttered and interlocked. All beams are blocked from entering the cell.Mar 31 2010 05:10PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgenoLasers are shuttered and interlocked. All beams are blocked from entering the cell.Mar 31 2010 05:11PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSno Mar 29 2010 09:56AM Matt ReinkeX-ray Extended Ultraviolet Spectrometereinke
XTOMOyesOperating normallyAug 27 2009 09:10AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke