| Miniproposals |
| Operators | |
| Session leader(s): | |
| Physics operator(s): | Jim Irby |
| Engineering operator(s): | |
| Engineering Operator Run Comment |
| Cycle Tests for Gas And Engineering Systems Checks |
| Session Leader Plans |
| Physics Operators Plans |
| Entered: Jun 23 2010 02:34:06:360PM |
| Author: Jim Irby |
| Running cycle tests to check out:
1) gas system 2) scanners 3) Rogowski integrators 4) sparker 5) test cycle/data system pg4 start -0.5 s for about 20 ms pg3 start +0.95s for 50 ms pg2 start 0.00s for 75 ms pg1 start 0.40s for 100 ms moving fizzle detector out to 7 s |
| Session Leader Summaries |
| Physics Operator Summaries |
| Session Leader Comments |
| Physics Operator Comments |
| Engineering Operator Comments | ||||
| Shot | Time | Type | Status | Comment |