| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change |
| Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes |
| BES | no | BES system is ready for Up-to-air (Apr, 2010) | Mar 31 2010 10:36AM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan |
| Bolometers | yes | 2pi (D+F) and diode arrays attached, awaiting 1st plasma for debugging. | Jun 22 2010 04:56PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke |
| Boronization | no | 3/26/10 Bottle Removed From Cell, monitors powered down, Autodialer function bypassed | Mar 26 2010 05:29PM (dekow) | Jim Irby | Boronization | dekow,irby |
| CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker |
| Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged. | Apr 06 2010 10:51AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard |
| CXRS | no | Wide-view CXRS system is power down and ready for up-to-air (Apr, 2010) | Mar 31 2010 10:36AM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan |
| D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe |
| Dalsa | yes | system is aligned and operating; needs to be calibrated before bolo-box is removed | Mar 30 2010 03:30PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar |
| Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte |
| Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry |
| Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry |
| DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung |
| ECDC | no | 3/26/10: Magnetron Powered Down, Power Cord Disconnected from Unit, PEI Powered Down | Mar 26 2010 05:31PM (dekow) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer |
| FRC-ECE | no | Power off, no hazard present. | Mar 29 2010 03:10PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips |
| G-Side Ratiomatic | yes | Gauge installed. Controller repaired. | Aug 23 2009 10:36PM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland |
| Glow Discharge | no | Plugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access. | Apr 05 2010 11:18AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby |
| GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt |
| GPC2 | yes | Most channels operational. Ch 5 preamp replaced 6/18. | Jun 22 2010 03:03PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt |
| GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben |
| H/D | yes | poses no safety hazard for people working around the machine | Jun 18 2009 01:04PM (marmar) | Earl Marmar | H/D Ratio | marmar |
| HEAT | no | 4/5/10 Main Diconnected has been opened, locked and red tagged making the systme safe for in-vessel personnel | Apr 05 2010 10:22AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow |
| Hirex Jr | yes | Hirex-Jr has been installed and tested | Jun 17 2009 11:54AM (rice) | John Rice | High Resolution X-Ray | ince,rice |
| Hirex Sr | yes | currently only one detector is operational, off-axis He-like argon emission | Jul 14 2009 10:01AM (rice) | John Rice | High Resolution X-Ray | ince,rice |
| HXR | no | In safe mode (high voltage turned off) | May 27 2008 09:19PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt |
| ICRF D-Antenna | no | out of operation - inspection on-going | Mar 29 2010 12:42PM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin |
| ICRF E-Antenna | no | out of operations - inspection on going | Mar 29 2010 12:42PM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin |
| ICRF J-Antenna | no | out of operation | Mar 31 2010 02:18PM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin |
| Laser Blow-Off | no | Laser is disconnected and the vacuum system is removed. | Apr 06 2010 10:01PM (nthoward) | Martin Greenwald | Impurity Injection System | g,nthoward |
| Lower Hybrid | no | All waveguides are shorted and disconnected from jungle gym. Jungle gym disconnected from launcher. | Mar 29 2010 01:31PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg |
| LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar |
| Ly-alpha | yes | LYMID, WB4LY, LLY attached, awaiting 1st plasma for debugging | Jun 22 2010 04:57PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke |
| McPherson | yes | Vacuum ready but wavelength scan hardware broken. Set to Mo XXXII, Mo XXXI and will not move. | Jun 22 2010 04:58PM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry |
| Michelson | yes | Operational. Start at reduced speed. | Jun 22 2010 03:02PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt |
| MKS | yes | Gauges are on. B-bottom is not operating - bad sensor head? | Jul 14 2009 09:12PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard |
| MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard |
| MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott |
| Neutrons | no | Voltages have been turned off | Mar 29 2010 08:15AM (fiore) | Catherine Fiore | Neutron Detectors | fiore |
| Neuts and Hards | no | | Jun 18 2010 07:49AM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby |
| NINJA | no | Capillaries were tested in-vessel. Plenum has a leak and needs fixing. | Jul 14 2009 09:14PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry |
| PCI | no | Power off. Safe for machine entry. | Mar 30 2010 11:46AM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,ennever,ntsujii,porkolab |
| Penning Gauges | no | High voltage power supplies are turned off and also unplugged from AC line. | Apr 06 2010 10:52AM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard |
| Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe |
| Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby |
| Power - Alternator Air Switch | no | 3/26/10: Air to Air switch removed and Kirk locked | Mar 26 2010 05:36PM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby |
| Power - PEI | no | 3/26/10: PEI powered down, breaker opened | Mar 26 2010 05:31PM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby |
| Power - TMX | no | 3/26/10: Powered down after run for up to air | Mar 26 2010 05:34PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby |
| Power Systems | no | 3/26/10: Powered down after run for up to air | Mar 26 2010 05:34PM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby |
| Probe Array - ISD | no | All probes are unplugged from vacuum vessel. | Apr 06 2010 10:53AM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard |
| Probe Array - LH | no | LH launcher not installed. Cables are unplugged at the A-port rack. | Jul 14 2009 09:16PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard |
| Probe Array - OSD | no | All probes are unplugged from vacuum vessel. | Apr 06 2010 10:54AM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard |
| Probe Array - UDIV | no | All probes are unplugged from vacuum vessel. | Apr 06 2010 10:54AM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard |
| Reflectometer | yes | Since 1100120000 the system is operational except for channel 110 which is not installed | Jan 20 2010 09:17AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar |
| Scanning Probe - ASP | no | Probe is full retracted. Air line is disconnected. | Apr 06 2010 10:54AM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard |
| Scanning Probe - FSP | no | Probe is fully retracted. | Apr 06 2010 10:55AM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard |
| Scanning Probe - WASP | no | All probe cables are disconnected from vacuum vessel. | Apr 06 2010 10:55AM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick |
| Sparker | yes | HV supply on, cable run to sparker at k-hor | Jun 23 2010 02:41PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin |
| TCI | yes | No new CO2 detector, so still missing edge channels | Jun 23 2010 02:40PM (irby) | Jim Irby | Two-Color Interferometer | irby,murray |
| TS - Core | no | Lasers are shuttered and interlocked. All beams are blocked from entering the cell. | Mar 31 2010 05:10PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma,zhang |
| TS - Edge | no | Lasers are shuttered and interlocked. All beams are blocked from entering the cell. | Mar 31 2010 05:11PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma,zhang |
| Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf |
| XEUS | yes | XEUS data system checked out, vacuum close to ops level, awaiting 1st plasma | Jun 24 2010 11:02AM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | mlreinke |
| XTOMO | yes | Awaiting 1st plasma for debugging | Jun 22 2010 04:59PM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |