Miniproposal:605
Date Filed: 6/10/2010
Title:LH2 lower hybrid launcher checkout and conditioning
First Author:Greg Wallace
Session Leader:Greg Wallace (shots 10-29)

Operators
Session leader(s):Greg Wallace
Physics operator(s):Earl Marmar
Engineering operator(s):Andy Pfeiffer,Bill Byford,Gary Dekow

Engineering Operator Run Comment
MP: 605 LH2 Lower Hybrid Launcher Checkout and Conditioning Session Lead

Session Leader Plans
Entered: Jun 29 2010 02:09:09:937PM
Author: Greg Wallace
Session leader plan for 1100630
Session Leader: G. Wallace
Physics Operator: E. Marmar
MP: 605 LH2 Lower Hybrid Launcher Checkout and Conditioning

LH Setup: Launcher 1.5 mm behind limiter; 60, 90, 120 degree current-drive phasing; 100-200 kW net power; LH on from 0.7 to 1.2s.

Reference shot: At phys-op's discretion. Looking for an L-mode, nl_04 ~ 3-8e19, 800 kA, 5.4 T.

Shot Plan:
Pulse LH system into dummy loads until full length plasmas become available.
Begin with co-current 90 degree ideal phasing; disable CPS; set LH2 launcher to 1.5 mm behind LH limiters
Establish operations at ~100 kW, 20 ms pulses with bypassed CPS (3 shots)
Vary plasma density during pulse (ramp nl04 from ~3-8e19) (if possible), or if not adequate to trip CPS, vary plasma position (outer gap) to verify CPS operation (trip annunciation) (3-5 shots)
Reset CPS trip points as necessary (should not require cell access unless trip level is above 50% reflected power)
Repeat shots with CPS ratio arc protection enabled to verify new trip points (3-5 shots)
Repeat shots with CPS ratio and time derivative arc protection enabled to verify new CPS trip points (3-5 shots)
Take shots at 60, 90, 120 current drive phasing to verify operation at a range of n|| (3 shots)
Increase pulse length at low power (~200 kW) to 0.5 s; verify proper operation of CPS (3 shots)
Day 1 total:

Physics Operators Plans
Entered: Jun 29 2010 02:45:21:373PM
Author: Earl Marmar
June 30, 2010
MP298A Plasma Startup
PO: E. Marmar


We will continue C-Mod startup today. If we get reliable full-length pulses, we will switch to

MP605 - LH2 launcher and conditioning (SL: G. Wallace).

Run begins at 9:00 and ends at 17:00

Engineering Setup
-----------------
Power systems as on: 1100629019
Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:
Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
fill NINJA with 10 psi D2 DISABLED

Enable gatevalves and shutters: ECE, VUV, Z-bolo

Torvac gatevalve toggle (yes/no): no

Boronization(yes/no): no
Overnight ECDC (yes/no): yes
ICRF(yes/no): no
LH(yes/no): no
Cryopump (yes/no): no

Vessel temperature: 35/35/35

------------------------------
Overnight ECDC Parameters
------------------------------
gas and pressure: D2 at 2e-4 Torr
sweep: 44/45/103 cm
scan: 20/120 s

Session Leader Summaries
Entered: Jun 30 2010 05:14:23:610PM
Author: Greg Wallace
MP: 605 LH2 Lower Hybrid Launcher Checkout and Conditioning

Progress on initial operation of the LH2 launcher was as expected. C-Mod was running well after the first few shots. The CPS trip levels are properly adjusted for 60 and 90 degree phases. Nuisance trips are still problematic at 120 degrees. Tomorrow will be another run on this MP to continue adjusting the CPS for 120 degree operation and to increase power/pulse length.

Physics Operator Summaries
Entered: Jun 30 2010 05:31:53:190PM
Author: Earl Marmar
For the second full run day after a long vent, plasma operation went very well. The machine is starting to clean up, and by the end of the day we had 11 full length pulses in a row. No problems with hard x-rays today, just spikes at disruptions. The Lower Hybrid managed a number of short, low power pulses into plasma. H/(H+D) is running in the 50% range.

After shot 9, one of the probe/thermocouple racks had to be turned off (shorted/burned component(s)), and we did not have any limiter T.C. data for the rest of the day.

At the very end of the day, we had two no-power shots (28 and 29) due to alternator vibration trips during excitation.

Scorecard:

Shot,Duration(s),Ipmax(MA),Result Shot,Duration(s),Ipmax,Result
| 01 0.360 0.648 Plasma | 02 0.000 0.033 Fizzle |
| 03 0.243 0.600 Plasma | 04 0.679 0.632 Plasma |
| 05 1.545 0.643 Plasma | 06 0.574 0.639 Plasma |
| 07 0.406 0.638 Plasma | 08 1.952 0.650 Plasma |
| 09 1.757 0.665 Plasma | 10 0.000 0.035 Fizzle |
| 11 1.755 0.651 Plasma | 12 0.755 0.645 Plasma |
| 13 0.000 0.034 Fizzle | 14 1.875 0.655 Plasma |
| 15 0.849 0.650 Plasma | 16 0.000 0.036 Fizzle |
| 17 1.865 0.644 Plasma | 18 1.883 0.651 Plasma |
| 19 1.872 0.651 Plasma | 20 1.899 0.653 Plasma |
| 21 1.900 0.654 Plasma | 22 1.901 0.741 Plasma |
| 23 1.905 0.745 Plasma | 24 1.890 0.741 Plasma |
| 25 1.889 0.742 Plasma | 26 1.898 0.744 Plasma |
| 27 1.900 0.744 Plasma | 28 0.000 0.002 no-power|
| 29 0.000 0.002 no-power
Date 1100630: 29 shots. 23 plasmas. 4 fizzles. 0 duds. 2 no-power
0 System Error.
(Plasma = Ip gt 60.0 kA Dud/no-power = H_alpha lt 0.40 V)
Total plasma duration: 33.55 s (exceeding -64 kA)

Session Leader Comments
Jun 30 2010 11:36:00:010AM1100630010Greg WallaceFirst attempt at operation of LH2 launcher.

Launcher position = 1.5 mm behind limiter
Requested power = 10 kW/klystron
Pulse time = 0.7-0.72 s

Fizzle
Jun 30 2010 01:09:02:073PM1100630011Greg WallaceGood shot! No visible problems on LH camera. Net power ~85 kW with refco ~15 %.

Launcher position = 1.5 mm behind limiter
Requested power = 10 kW/klystron
Pulse time = 0.7-0.72 s

Problem with JGDC FWD 13, reads ~10^6 kW-->clearly a problem need to look into it. Netpow will be wrong until we fix this problem. Going to enable cps on next shot.

Also, timebase for CPS is wrong (starts at t=0). This timebase is used for net pow etc. Need to fix timebase in order to have netpower at correct time.
Jun 30 2010 12:56:45:377PM1100630012Greg WallaceDisruption right after LH. Lots of trips, probably due to bad phasing on klystron 8 (power too low for good calibration). Fixing phasing by changing phase offset to appropriate value.

Launcher position = 1.5 mm behind limiter
Requested power = 10 kW/klystron
Pulse time = 0.7-0.72 s

Jun 30 2010 01:06:06:873PM1100630013Greg WallaceFizzle.
Jun 30 2010 01:23:43:480PM1100630014Greg WallacePlasma, no LH.
Jun 30 2010 01:48:19:117PM1100630015Greg WallaceTrips again on LH. JGDCF 13 still reading incorrectly, causing extremely high net power. Time base on CPS needs to be fixed as well to get correct timing of LH pulse in netpow.
Jun 30 2010 01:50:35:807PM1100630016Greg WallaceFizzle
Jun 30 2010 02:30:06:160PM1100630017Greg WallaceFull length plasma, no trips. Need to fix JGDCF13 to get correct net power.
Jun 30 2010 02:24:17:217PM1100630018Greg WallaceJGDCF 13 fixed. Net power now correct. Still have timing issue in net power.

Full length plasma, no trips. Moving to 60 degree phasing for next shot.
Jun 30 2010 02:47:36:970PM1100630019Greg Wallace60deg phasing, 20 kW per klystron, 20ms pulse at 0.7 s. Multiple LH trips. Full length plasma. Trip caused by ratio fault on JGDC 12. CPS set to 50% on that column. High reflections overall (~30%).

Increasing trip level to 60% on JGDC 12 for next shot.
Jun 30 2010 03:02:39:460PM1100630020Greg Wallace60deg phasing, 20 kW per klystron, 20ms pulse at 0.7 s. More trips. Klystron 8, col 12 is the culprit again. Increasing trip level did not solve problem. Looking into CPS to determine cause of faulting. Taking next shot without LH.
Jun 30 2010 03:14:46:810PM1100630021Greg WallaceFull length shot, no LH. LH Net Power is zero (into dummy loads) despite what tree says. Need to update lh2post to handle shots into dummy load.
Jun 30 2010 03:20:58:010PM1100630022Greg WallaceClean LH shot at 60 deg. Moving on to 120 deg phasing.
Jun 30 2010 03:50:18:877PM1100630023Greg Wallace120 deg phasing. Several trips caused by klystron 5 IDC ratio fault. Increasing trip level to 40 %, keeping 120 phasing for next shot.
Jun 30 2010 04:00:49:707PM1100630024Greg WallaceMore trips, better than shot 23. High reflections overall (~40%). Still tripping on Klystron 5 IDC ratio fault. Increasing power to 40 kW per klystron on next shot to get better calibration on power measured by diodes.
Jun 30 2010 04:15:42:210PM1100630025Greg WallaceMore trips and high reflections again. Increasing ratio fault level on klystron 5 to 50% for next shot. Staying at 120 deg phasing.
Jun 30 2010 04:25:48:627PM1100630026Greg WallaceMore tripping. Klystron 7 this time. Increasing ratio trip level on klystron 6+7.
Jun 30 2010 04:46:53:860PM1100630027Greg WallaceMore tripping. Increasing trip levels for next shot.
Jun 30 2010 04:54:03:877PM1100630028Greg WallaceNo power shot---alternator fault.

Physics Operator Comments
Jun 30 2010 09:05:38:457AM1100630001Earl MarmarLoad From 1100629027
increase prefill puff to 23 msec (from 20 msec)
reduce Ip target to 600 kA at 0.23 s, then ramping to 650 kA at end of flattop

plasma
decent startup
very resistive, disrupt at 0.36 s
h/(h+d) rising through shot, 0.38 during disruption
no hards
Jun 30 2010 09:18:13:623AM1100630002Earl Marmarprefill puff to 18 msec (from 23 msec)
fizzle
z-meter up about a factor of 2 at breakdown
Jun 30 2010 09:31:18:440AM1100630003Earl MarmarBR_0 offset to +0.001 T (from +0.0005)

Ip to 600 kA at 0.23 s, then ramping to 500 kA at end of flattop

plasma
disrupt at 0.24 s
perhaps less gassy
plenty of radiated power
Jun 30 2010 09:52:04:990AM1100630004Earl Marmarno dpcs changes

plasma
disrupt at 0.53 s (preceded by marfe and density increase)
Zave ~ 3, Vloop around 1.3 V
Jun 30 2010 10:07:22:150AM1100630005Earl MarmarIp target to 600 kA straight across

plasma
just made it to end of flattop
disruption preceded by marfe and density increase
Jun 30 2010 10:20:55:573AM1100630006Earl MarmarIp target ramping to 700 kA at end of flattop
decrease ZXL by 5 mm (now +0.01 meter)

plasma
never got above 640 kA, drooping during "flattop"
disrupt at 0.57 s (preceded by marfe and density increase)
Jun 30 2010 10:28:17:213AM1100630007Earl MarmarIp flat at 600 kA

plasma
disrupt at 0.4 s, earlier lumpiness/marfes/current droop
Jun 30 2010 10:43:43:267AM1100630008Earl Marmarno dpcs changes

plasma
ramps all the way down
density slowly decreasing through the shot

Jun 30 2010 11:11:56:970AM1100630009Earl Marmarturn on dpcs_piezo_chopper (set to "pulse_gas3")
Bt to 5.0 T during segment 2 (-139 kA)
argon enabled, 50 msec pulse, starting at 0.3 s

plasma, ramps about halfway down
pulsed-gas looks like it modulated
Jun 30 2010 11:37:58:170AM1100630010Earl Marmarswitching to MP 605 Lower Hybrid launcher checkout and conditioning

Bt back to 5.4 T (-150 kA)

delay before the shot to investigate a smell in one of the probe racks in the cell

we expect not to have limiter thermocouple data for the rest of the day

fizzle
Jun 30 2010 12:19:53:087PM1100630011Earl Marmarprefill puff to 20 msec (from 18 msec)

plasma, ramps half-way down
Jun 30 2010 12:26:00:050PM1100630012Earl Marmarno dpcs changes

plasma
disrupt at 0.75 s, preceded by marfe and density increase
roughly coincident with LH pulse
Jun 30 2010 01:04:34:947PM1100630013Earl Marmarno dpcs changes

fizzle, current hardly rises
Jun 30 2010 01:27:51:080PM1100630014Earl Marmarprefill puff to 18 msec (from 20 msec)

plasma, full length
Jun 30 2010 01:38:15:580PM1100630015Earl Marmarno dpcs changes

big increase in Prad starting at 0.77; disrupt at 0.85 s
Jun 30 2010 01:52:14:823PM1100630016Earl Marmarno dpcs changes
fizzle
Jun 30 2010 02:07:23:417PM1100630017Earl MarmarEF4 20 A more negative just before t=0 (now -1280 A)

plasma, almost full length
Jun 30 2010 02:34:42:113PM1100630018Earl Marmarno dpcs changes

plasma, almost full length
Jun 30 2010 02:35:01:430PM1100630019Earl Marmarno dpcs changes

plasma, almost full length
Jun 30 2010 02:50:06:093PM1100630020Earl Marmarno dpcs changes

plasma, nearly full length
Jun 30 2010 03:04:01:240PM1100630021Earl Marmarno dpcs changes
no LH on this shot

plasma, full length
Jun 30 2010 03:24:58:097PM1100630022Earl Marmarramp Ip to 750 kA at end of flattop

plasma, full length
Jun 30 2010 03:41:48:653PM1100630023Earl Marmarmove ZXL down 1 cm (target is now 0.000 meter)

plasma, full length
Jun 30 2010 03:58:36:640PM1100630024Earl Marmarincrease clearin 0.005 m

plasma, full length
Jun 30 2010 04:11:04:000PM1100630025Earl Marmarno dpcs changes
plasma, full length
Jun 30 2010 04:27:53:223PM1100630026Earl Marmarno dpcs changes
plasma, full length
Jun 30 2010 04:38:14:287PM1100630027Earl Marmarno dpcs changes
plasma, full length
Jun 30 2010 04:52:10:787PM1100630028Earl Marmarno dpcs changes
alternator vibration fault, no power
Jun 30 2010 05:09:20:210PM1100630029Earl Marmarno dpcs changes

alternator vibration trip, no power

Engineering Operator Comments
ShotTimeTypeStatusComment
108:55:54:443AMPlasmaOk
209:10:52:080AMPlasmaOk
309:23:43:383AMPlasmaOk
409:36:22:890AMPlasmaOk
509:56:36:233AMPlasmaOk
610:09:14:213AMPlasmaOk
710:21:54:833AMPlasmaOk
810:34:32:660AMPlasmaOk
910:58:59:023AMPlasmaOk
1011:33:03:090AMPlasmaOk
1111:46:16:603AMPlasmaOk
1212:19:28:060PMPlasmaOk
1301:00:00:153PMPlasmaOk
1401:17:56:340PMPlasmaOk
1501:31:50:937PMPlasmaOk
1601:47:36:617PMPlasmaOk
1702:00:32:520PMPlasmaOk
1802:14:17:300PMPlasmaOk
1902:27:31:750PMPlasmaOk
2002:47:25:753PMPlasmaOk
2103:00:19:377PMPlasmaOk
2203:16:47:667PMPlasmaOk
2303:29:35:903PMPlasmaOk
2403:50:11:793PMPlasmaOk
2504:05:31:853PMPlasmaOk
2604:18:28:313PMPlasmaOk
2704:31:12:860PMPlasmaOk
2804:45:51:967PMPlasmaBadAlternator had a vibration Fault on Bearing 2
2905:05:40:357PMPlasmaBadAlternator Vibration Problem on Bearing 2

System Availability
Jun 30 2010 08:55:39:983AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESnoBES system is ready for Up-to-air (Apr, 2010)Mar 31 2010 10:36AM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (D+F) and diode arrays attached, awaiting 1st plasma for debugging.Jun 22 2010 04:56PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno3/26/10 Bottle Removed From Cell, monitors powered down, Autodialer function bypassedMar 26 2010 05:29PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged.Apr 06 2010 10:51AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoWide-view CXRS system is power down and ready for up-to-air (Apr, 2010)Mar 31 2010 10:36AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned; new calibrations (relative brightness and position) not yet implementedJun 29 2010 10:27AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperationalJun 26 2010 09:28PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoData acquisition problems - system readyJun 29 2010 02:13PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauges are operational.Jun 28 2010 08:02PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPlugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access.Apr 05 2010 11:18AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational. Ch 5 preamp replaced 6/18.Jun 22 2010 03:03PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesoperating normallyJun 29 2010 10:26AM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Jun 26 2010 11:19PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryessystem installed and alignedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
HXRyes Jun 28 2010 12:12PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayessystem checked out ok on 11006728. Jun 28 2010 04:57PM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayessystem checked out ok on 1100628Jun 28 2010 04:57PM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayessystem checked out ok. conditioned to vacuum. Jun 28 2010 04:58PM (ylin)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffnoLaser is disconnected and the vacuum system is removed.Apr 06 2010 10:01PM (nthoward)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridyesLH was tested into dummy loads synced to shot. Shorts have been removed. Probe Cal. 6/29/10 evening.Jun 29 2010 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesLYMID, WB4LY, LLY attached, awaiting 1st plasma for debuggingJun 22 2010 04:57PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesVacuum ready but wavelength scan hardware broken. Set to Mo XXXII, Mo XXXI and will not move.Jun 22 2010 04:58PM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Start at reduced speed.Jun 22 2010 03:02PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are operationalJun 28 2010 08:02PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesAll systems are on and functionalJun 29 2010 12:56PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03Jun 26 2010 09:21PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoCapillaries tested in-vessel.Jun 28 2010 08:08PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoPower off. Safe for machine entry.Mar 30 2010 11:46AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,ennever,ntsujii,porkolab
Penning GaugesnoHigh voltage power supplies are turned off, waiting for work at A-port horizontal to be finished.Jun 28 2010 08:07PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air Switchyes Jun 26 2010 11:19PM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Jun 26 2010 11:19PM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyes Jun 26 2010 11:19PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power Systemsyes Jun 26 2010 11:20PM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesOperational.Jun 28 2010 08:03PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperational.Jun 28 2010 08:03PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesF and J outer divertor probes are operational.Jun 28 2010 08:04PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperational, except probe#13Jun 28 2010 08:04PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffJun 26 2010 10:02AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational. New Langmuir-Mach probe head installed.Jun 28 2010 08:05PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesOperational.Jun 28 2010 08:05PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesBoth A and K units are operational. Coil polarity needs to be checked.Jun 28 2010 08:06PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesHV supply on, cable run to sparker at k-horJun 23 2010 02:41PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS installed and leak tested, individual probes not installedJun 28 2010 01:28PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesNo new CO2 detector, so still missing edge channelsJun 23 2010 02:40PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoLasers are shuttered and interlocked. All beams are blocked from entering the cell.Mar 31 2010 05:10PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgenoLasers are shuttered and interlocked. All beams are blocked from entering the cell.Mar 31 2010 05:11PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesXEUS data system checked out, vacuum close to ops level, awaiting 1st plasmaJun 24 2010 11:02AM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermlreinke
XTOMOyesAwaiting 1st plasma for debuggingJun 22 2010 04:59PM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke