Alcator C-Mod Run 1100707 Information

Back to runs

Miniproposals
Miniproposal:605
Date Filed: 6/10/2010
Title:LH2 lower hybrid launcher checkout and conditioning
First Author:Greg Wallace
Session Leader:Greg Wallace (shots 1-22)

Operators
Session leader(s):Greg Wallace
Physics operator(s):Jim Irby
Engineering operator(s):Bill Cochran,Bill Parkin,Ed Fitzgerald

Engineering Operator Run Comment
MP: 605 LH2 Lower Hybrid Launcher Checkout and Conditioning

Session Leader Plans
Entered: Jul 6 2010 02:49:58:470PM
Author: Greg Wallace
Session leader plan for 1100707
Session Leader: G. Wallace
Physics Operator: J. Irby
MP: 605 LH2 Lower Hybrid Launcher Checkout and Conditioning

LH Setup: Launcher 1.0 mm behind limiter; 90 degree current-drive phasing; 600+ kW net power; LH on from 0.7 to 1.2s.

Reference shot: 1100701032

Shot Plan:
Begin with reliable discharge from last week. Set klystrons to 100 kW with ramp from 50 kW at beginning of pulse. (Set klystrons 4, 5, 6, 7 to half power.) Pulse timing from 0.7 to 1.2 s. 90 deg current drive phasing.

After reliable discharges are established, turn on cryopump for density control. Desired nl04=4.5e19.

Raise LH power in ~10 kW/klystron steps (0.5 s pulse length) to 600 kW, then increase in 50 kW steps to maximum power without arcing. If arcing occurs, reduce power level by 50% and proceed upward in power as before.

If source power is exhausted on one klystron, continue to increase power on other klystron channels. The following is the peak calibrated klystron power at 50 kV, as measured at the IDC:
A1V1 195 kW
A1V2 200 kW
A1V3 177 kW
A1V4 208 kW
A2V1 234 kW
A2V2 199 kW
A2V3 181 kW
A2V4 234 kW
A3V1 199 kW
A3V2 209 kW
Total: 2036 kW

Physics Operators Plans
Entered: Jul 6 2010 04:41:07:860PM
Author: Jim Irby
-----------------
Engineering Setup
-----------------

Run begins at 09:00 and ends at 17:00

Power systems as on: 1100701032

Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:

Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
fill NINJA with 10 psi D2 DISABLED

Enable gatevalves and shutters: ECE, VUV, HiREX Sr

***
Please check status of Z-Bolo shutter before enabling
***

Torvac gatevalve toggle (yes/no): no

Boronization(yes/no): no
Overnight ECDC (yes/no): yes
ICRF(yes/no): no
LH(yes/no): yes
Cryopump (yes/no): yes (after first few discharges)

Vessel temperature: 35/35/35

------------------------------
ECDC Parameters
------------------------------
gas and pressure: D2 at 2e-4 Torr
sweep: 44/45/103 cm
scan: 20/120 s

Session Leader Summaries
Entered: Jul 8 2010 10:57:02:147AM
Author: Greg Wallace
Late start today due to computer problems. First plasma at 10:30. Total of 22 shots.

Early LH shots showed sudden jump in forward power on klystron 7 which caused nuisance trips on klystron 6. Problem was fixed by replacing SFOL board for klystron 7. Interestingly, replacing SFOL caused 180 degree phase shift on vector modulator, just as with replacement of klystron 8 SFOL. Looks like it might be due to replacement of an inverting buffer with a non-inverting buffer on the board or vice versa. A bug was encountered with respect to the phase offset adjustment subroutine of the setpoints generator. Offset adjustment only works once when generator is first opened, then does not update values after that. Need to look into this on off days.

After getting the SFOL fixed, we tried to lower reflection coefficients by changing outer gap and using cryopump. Best coupling results were on shot 18 with 1.5cm outer gap and nl04~6e19 during lh (5.75e19 before lh). Minimum reflection coefficient of about 22% at 70 degree phasing. Phase scan on shot 9 confirmed proper phasing from WG probes. Will need to look into the reflection problem more during dedicated MP following all WG probe calibrations next week. No signs of arcs but did not try for > 400 kW net power. One hot spot seen on septum between 16B and dummy column at small outer gap ~0.8 cm. Did not appear to cause any damage to the launcher. Also, there was a flash in the B side D row dummy column just after LH turn on time on shot 21. No signatures of this were seen on waveguide probes or directional couplers. Optical protection system also showed no anomaly.

Physics Operator Summaries
Entered: Jul 7 2010 05:21:26:247PM
Author: Jim Irby
We continued the LH conditioning MP starting from 1100701032 from last
Thursday. The machine was much cleaner, and we had no problems getting
the density down to 4e19/m^2 w/o the cryopump (at least early in the
day). Later in the day comparisons were made with and w/o the pump.
Scans of the outer gap were performed to see effects on coupling.

We started out with some moderate levels of hards on the first few
shots. Increasing the pg3 seg 1 puff (start time more negative) seems
to have fixed the problem. Later in the day the hards returned on a
couple of discharges and an additional 1 ms of gas eliminated them
again. So pg3 gas starting around -20 ms seems to be a good tool for
controlling the hards.

Problems:

. We spent much of the morning fixing data system and PLC problems

. EF2 supply misbehaved again --- cleaned some contacts

. It took a couple of tries to get the cryopump running again with PLC and
LN2 vacuum shield issues. We did have several successful shots with
the cryopump, but PLC problems returned at the end of the run.

Session Leader Comments
Jul 7 2010 10:51:25:200AM1100707004Greg WallaceAll trips. Density much lower than last run---got what we asked for 4e19. Density at probes was lower as well, around 5e17. Will increase density program to 5e19 for next shot and also increased trip levels on RINT/FINT to 45% on all direct feed columns (cause of the trips).
Jul 7 2010 11:14:00:703AM1100707005Greg WallaceBetter this time, but still many trips. All trips on klystron 6 IDC ratio. Sudden increase in reflection coefficient on klystron 6 seems to be caused by sudden jump in forward power on klystron 7. Number 7 SFOL receive monitor hooked up. I-> board 234-8, Q -> board 234-7. Monitor had been connected to board 8 for shot 5 and previous.
Jul 7 2010 11:41:15:900AM1100707006Greg WallaceBetter but still 3 faults near end of shot. Looks like sudden increase on klystron 7 forward power again caused ratio fault on klystron 6. Reflection coefficient 30-35%. Density on LH probes around 1e18. Will repeat on next shot to see if we can figure out what's going on with klystron 7.
Jul 7 2010 11:49:27:183AM1100707007Greg WallaceDisruption at .34 s.
Jul 7 2010 12:10:22:897PM1100707008Greg Wallace3 trips, again caused by increase in forward power on klystron 7. Ratio on klystron 6 was cause of fault. Next shot will move onto phase scan.
Jul 7 2010 12:28:38:290PM1100707009Greg WallacePhase scan from 60-150 degrees. Phases from 70-100 degrees went through, trips at 60 and 110+ degrees. SFOL board is being swapped out for next shot. Will go to 70 degrees for next shot.
Jul 7 2010 01:08:58:630PM1100707010Greg WallaceMore trips at 70 degrees with new SFOL board on klystron 7. Reflected power on klystron 6 at 100%. Problem looks to be due to new SFOL which changed phase on klystron 7 by 180 degrees. (Signs of I and Q both reversed?) Adjusting phase offset on test shots to verify correct phasing before shot 11.
Jul 7 2010 01:56:38:830PM1100707011Greg WallaceClean shot at 70 deg phasing. Phase of klystron 7 is back where it should be. Will decrease outer gap for next shot to 1.0cm to decrease refco.
Jul 7 2010 02:04:32:297PM1100707012Greg WallaceGood shot. Clean LH with outer gap around 1.1cm. Refco starts a bit high then decreases to 25% after 100ms. Next shot will decrease outer gap to 0.8cm to see if coupling gets better.
Jul 7 2010 02:13:56:193PM1100707013Greg WallaceFizzle.
Jul 7 2010 02:37:08:553PM1100707014Greg WallaceAnother clean shot with 0.8cm outer gap. Reflections a little higher, around 30% this time. Small hot spot on septum between 16 and dummy column on row B during LH. Does not look like enough to have melted the weld. Will move on to 2.0cm outer gap for next shot.
Jul 7 2010 02:44:51:623PM1100707015Greg WallaceGood shot with 2cm outer gap. Refco increases from 20-30% as density rises. Will turn on cryopump for next shot to try to control the density.
Jul 7 2010 03:08:14:903PM1100707016Greg WallaceAnother clean shot. Cryopump did not operate on this shot and as a result it was almost identical to shot 15. Shot 17 should have cryopump.
Jul 7 2010 03:54:38:757PM1100707017Greg WallaceClean LH for this shot with gap of 2cm. Will decrease outer gap to 1.5 cm with cryopump for next shot.
Jul 7 2010 04:07:35:683PM1100707018Greg WallaceReflections a little lower (20-25%) at 1.5 cm outer gap with cryo. Moving to 1.0 cm outer gap for shot 19.
Jul 7 2010 04:19:11:220PM1100707019Greg WallaceFizzle.
Jul 7 2010 04:40:46:400PM1100707020Greg WallaceRefco a little higher with 1cm outer gap (25-29%). Will keep same conditions except reduce requested density from 5e19 to 4e19 for next shot.
Jul 7 2010 04:52:16:710PM1100707021Greg WallaceClean shot, reflections decreasing from 28-26% during pulse. Probe density around 1.5e18 during lh. Moving back to 1.5cm outer gap for next shot.
Jul 7 2010 05:17:36:900PM1100707022Greg WallaceDensity a bit lower before LH turn on (4.5e19 on nl04), increased to 5.75e19 during LH. Most HXR and ECE today due to low density. Last shot of the day.

Physics Operator Comments
Jul 7 2010 10:13:54:367AM1100707001Jim IrbyECDC at 2e-4 Torr D2 and 60 C overnight
Cryopump has problem cooling down ln2 shield

loaded from 1100701032
loaded: open tree done

parameters from start up shot:
pg4 18 ms
large pg3 puff in seg one to control runaways
150 kA TF
Ip ramp from 650 to 750 kA
dpcs_piezo_chopper enabled for gas feedback control of nl_04


start with cycle test

problems with data system and PLCs : 09:35



Jul 7 2010 10:14:59:900AM1100707002Jim IrbyNo-power cycle test - looking better, but not ready for power shot

Note that main gas puff went this time, but not on shot 1, even though dpcs pulses were there on both shots.

Cryopump vacuum line was not pumped down. Now trying to cool-down again with vacuum.
Jul 7 2010 10:26:58:903AM1100707003Jim IrbyNo power test --- ready to run!


Jul 7 2010 10:45:44:143AM1100707004Jim Irbychanges --------------------------------

1st plasma attempt

cryopump successfully pre-cooled --- should be ready when needed


results --------------------------------

plasma into rampdown

density pretty low, neutral pressure down from last week.

no neuts/hards until rampdown --- SSD_X02 and SSD_X03 are now at the same location and are indicating the same signal level.
Jul 7 2010 11:15:15:570AM1100707005Jim Irbychanges --------------------------------

LH coupling was poor on shot 4.

nl_04 request from 0.4 to 0.5e20/m^2
loaded


results --------------------------------

plasma into rampdown --- some early hards

cryopump was running unexpectedly --- issue with regen

prefill pressure was at least a factor of two low, but we still had a plasma

Jul 7 2010 11:37:43:163AM1100707006Jim Irbychanges --------------------------------

no dpcs changes

LH group entered cell to look for problems with #6 klystron


results --------------------------------

plasma into rampdown --- no cryopump, but still some hards early.
Good neuts/hards to SSD cal shot


Jul 7 2010 11:57:00:677AM1100707007Jim Irbychanges --------------------------------

looking into problem with logbook ---- seems to be confused about the shot number.

prefill from 18 to 20 ms
open tree done


results --------------------------------

plasma for 0.34 s --- br0 drifted up? --- too little gas?
Jul 7 2010 12:13:00:883PM1100707008Jim Irbychanges --------------------------------

prefill from 20 to 22 ms
br0 from +0.001 to 0.000 T

results --------------------------------

plasma into rampdown --- some hards -- slower current rise



Jul 7 2010 12:37:23:640PM1100707009Jim Irbychanges --------------------------------

br0 from 0.000 to 0.0005 T
fill from 22 to 23 ms
loaded

results --------------------------------

plasma into rampdown --- hards actually worse with more gas, though they start up later.



Jul 7 2010 12:46:29:060PM1100707010Jim Irbychanges --------------------------------

no dpcs changes

results --------------------------------

plasma into rampdown
Jul 7 2010 01:52:20:880PM1100707011Jim Irbychanges --------------------------------

argon enabled from 0.3 to 0.4 s (PG1)
enabled at PLC
loaded

start of pg3 seg 1 puff moved 2 ms earlier (from -16 to -18 ms)
loaded

long wait to check out SFOL problem with #7 klystron

results --------------------------------

plasma into rampdown ---- no hards --- nice LH trace

Jul 7 2010 02:04:58:463PM1100707012Jim Irbychanges --------------------------------

RCUR in seg 2 from 0.6600 to 0.6625 m
loaded

results --------------------------------

plasma into rampdown --- no hards --- got smaller outer gap as requested
Jul 7 2010 02:20:07:020PM1100707013Jim Irbychanges --------------------------------

RCUR from 0.6625 to 0.665 m
loaded

results --------------------------------

fizzle -- bounce


Jul 7 2010 02:30:08:790PM1100707014Jim Irbychanges --------------------------------

no dpcs changes

results --------------------------------

plasma into rampdown --- 5e13 neuts/hards early --- outer gap smaller as requested


Jul 7 2010 02:49:18:907PM1100707015Jim Irbychanges --------------------------------

RCUR from 0.6650 to 0.6575 m --- make outer gap abt 0.02 m
loaded

results --------------------------------

plasma into rampdown --- got the requested right gap --- neuts up


Jul 7 2010 03:17:33:547PM1100707016Jim Irbychanges --------------------------------

tried to turn on cryopump -- possible plc problem
prefill set back to 23 ms
pg3 start from -18 to -19 ms for hards
loaded

results --------------------------------

plasma into rampdown --- hards gone

Jul 7 2010 03:46:37:783PM1100707017Jim Irbychanges --------------------------------

try again with cryopump --- took some work, bp to 9.1e-8 Torr
EF2 issue has been looked at --- cleaned some contacts again

prefill from 23 to 50 ms
loaded

results --------------------------------

plasma into rampdown
Jul 7 2010 04:09:20:020PM1100707018Jim Irbychanges --------------------------------

RCUR back to 0.66 m (0.015 cm outer gap)
loaded

cryopump requested for this shot

results --------------------------------

plasma into rampdown
Jul 7 2010 04:22:27:703PM1100707019Jim Irbychanges --------------------------------

RCUR from 0.6600 m to 0.6625 m (1 cm outer gap)
loaded

cryopump enabled --- bp 4.0e-7 Torr in check

results --------------------------------

fizzle --- pressure same as on 18. Looks like a bounce


Jul 7 2010 04:40:01:030PM1100707020Jim Irbychanges --------------------------------

prefill from 50 to 52 ms
loaded

cryopump enabled --- bp 2.3e-7 Torr

results --------------------------------

plasma into rampdown --- hards are back
Jul 7 2010 04:49:19:510PM1100707021Jim Irbychanges --------------------------------

nl_04 request from 0.5 to 0.4e20 /m^2
pg3 seg 1 puff from -18 to -19 ms
loaded

cryopump enabled -- 4e-7 Torr


results --------------------------------

plasma into rampdown --- early hards gone


Jul 7 2010 05:18:16:327PM1100707022Jim Irbychanges --------------------------------

PLC issue with Cryopump --- No Joe, no Yuri

RCUR to 0.66 m (0.015 m outer gap)

nl_04 request to 0.3e20/m^2 (make density as low as we can get w/o cryo)
prefill from 50 to 23 ms
loaded

results --------------------------------

plasma into rampdown --- density lower


Engineering Operator Comments
ShotTimeTypeStatusComment
108:51:46:440AMTestBadState computer hung
209:47:17:813AMTestOk
310:23:52:347AMTestOk
410:31:05:150AMPlasmaOk
510:52:38:917AMPlasmaOk
611:59:41:527AMTestBad
711:59:52:443AMTestBad
812:01:51:953PMPlasmaOk
912:21:03:650PMPlasmaOk
1012:39:31:207PMPlasmaOk
1101:42:10:400PMPlasmaOk
1201:57:45:980PMPlasmaOk
1302:11:37:517PMPlasmaOk
1402:25:00:717PMPlasmaOk
1502:38:02:283PMPlasmaOk
1603:01:55:847PMPlasmaOk
1703:40:55:837PMPlasmaOk
1804:02:35:943PMPlasmaOk
1904:15:49:897PMPlasmaOk
2004:30:51:760PMPlasmaOk
2104:44:04:960PMPlasmaOk
2205:12:30:260PMPlasmaOk

System Availability
Jul 7 2010 08:50:43:520AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESnoBES system is ready for Up-to-air (Apr, 2010)Mar 31 2010 10:36AM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (D+F) working. All midplane and off-midplane diode arrays working except WB1AX. No midplane or divertor foils yet.Jul 01 2010 11:58AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno3/26/10 Bottle Removed From Cell, monitors powered down, Autodialer function bypassedMar 26 2010 05:29PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged.Apr 06 2010 10:51AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoWide-view CXRS system is power down and ready for up-to-air (Apr, 2010)Mar 31 2010 10:36AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned; new calibrations (relative brightness and position) not yet implementedJun 29 2010 10:27AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperationalJun 26 2010 09:28PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll channels working - calibration in progressJul 02 2010 09:30AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauges are operational.Jun 28 2010 08:02PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPlugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access.Apr 05 2010 11:18AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational. Ch 5 preamp replaced 6/18.Jun 22 2010 03:03PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesoperating normallyJun 29 2010 10:26AM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Jun 26 2010 11:19PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex Sryessystem installed and alignedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes Jun 28 2010 12:12PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayessystem checked out ok on 11006728. Jun 28 2010 04:57PM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayessystem checked out ok on 1100628Jun 28 2010 04:57PM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayessystem checked out ok. conditioned to vacuum. Jun 28 2010 04:58PM (ylin)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-OffnoLaser is disconnected and the vacuum system is removed.Apr 06 2010 10:01PM (nthoward)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridyesLH was tested into dummy loads synced to shot. Shorts have been removed. Probe Cal. 6/29/10 evening.Jun 29 2010 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesLYMID, WB4LY and LLY working. WB1LY not attached due to pickup problems.Jul 01 2010 11:58AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesData being collected, but MCP voltages not being reported so analyzed data is unavailable.Jul 01 2010 11:57AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Start at reduced speed.Jun 22 2010 03:02PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are operationalJun 28 2010 08:02PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesAll systems are on and functionalJun 29 2010 12:56PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03Jun 26 2010 09:21PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoCapillaries tested in-vessel.Jun 28 2010 08:08PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational. AM 2 * 38.19 MHz.Jul 02 2010 09:46AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,ennever,ntsujii,porkolab
Penning GaugesnoHigh voltage power supplies are turned off, waiting for work at A-port horizontal to be finished.Jun 28 2010 08:07PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air Switchyes Jun 26 2010 11:19PM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Jun 26 2010 11:19PM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyes Jun 26 2010 11:19PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power Systemsyes Jun 26 2010 11:20PM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesOperational.Jun 28 2010 08:03PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperational.Jun 28 2010 08:03PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesF and J outer divertor probes are operational.Jun 28 2010 08:04PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperational, except probe#13Jun 28 2010 08:04PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffJun 26 2010 10:02AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational. New Langmuir-Mach probe head installed.Jun 28 2010 08:05PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesOperational.Jun 28 2010 08:05PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesBoth A and K units are operational. Coil polarity needs to be checked.Jun 28 2010 08:06PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesHV supply on, cable run to sparker at k-horJun 23 2010 02:41PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS installed and leak tested, individual probes not installedJun 28 2010 01:28PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesNo new CO2 detector, so still missing edge channelsJun 23 2010 02:40PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoLasers are shuttered and interlocked. All beams are blocked from entering the cell.Mar 31 2010 05:10PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma,zhang
TS - EdgenoLasers are shuttered and interlocked. All beams are blocked from entering the cell.Mar 31 2010 05:11PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma,zhang
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesOperationalJul 01 2010 11:57AM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermlreinke
XTOMOyesCore system working. Edge system waiting for H-modes.Jul 01 2010 11:55AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke