| Miniproposals | ||||||||||
|
| Operators | |
| Session leader(s): | Yijun Lin |
| Physics operator(s): | Steve Wolfe |
| Engineering operator(s): | Bill Parkin,Andy Pfeiffer,Gary Dekow |
| Engineering Operator Run Comment |
| automatically entered by signon - please replace with real comment |
| Session Leader Plans |
| Entered: Jul 22 2010 11:04:44:687AM |
| Author: Yijun Lin |
| Run plan: (similar to run 1100702)
Start from 1100702001, 5.4 T, 800 kA, nl=0.8e20 m^-2. If we find excessive heating on GH or K limiter, or on the ramped divertor tiles, we may change to an inner wall limited discharge, or raise the density. We will start with the antennas running at separate times with J receiving a larger fraction of the available time. If the antennas behave reasonably, we will overlap all the antennas. Depending on the progress of conditioning (number of faults, max voltage and power handling, antenna cross-coupling, etc), we may vary plasma density, current, plasma shape, and outer gap. If the H/D level is still rather high, we will raise B field in order for PCI to see the mode conversion layer. |
| Physics Operators Plans |
| Entered: Jul 22 2010 02:23:59:563PM |
| Author: Steve Wolfe |
| Physics Operator Plan and Engineering Setup for Friday, July 23, 2010
MP#355b ICRF Conditioning (plus MC localization) SL: Y. Lin PO: wolfe ----------------- Engineering Setup ----------------- Standard Overnight ECDC: gas and pressure: D2 at 2e-4 Torr sweep: 44/45/103 cm scan: 20/120 s Run begins at 09:00 and ends at 17:00 Power systems as on: 1100702001, EXCEPT: TF current limit at 175kA Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled Gas setup: Fill B-Top with 6 psi D2 Hybrid enabled (PG4) fill B-side lower with 1 psi Ar Hybrid enabled (PG1) leave B-side upper as is Hybrid DISABLED (PG2) fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3) fill NINJA with 10 psi D2 DISABLED Enable gatevalves and shutters: ECE, VUV, HiREX Sr, B-Spectrometer (Z-bolo shutter is forced open) Torvac gatevalve toggle (yes/no): no Boronization(yes/no): no Overnight ECDC (yes/no): YES ICRF(yes/no): YES LH(yes/no): no Cryopump (yes/no): NO Vessel temperature: 45/45/45 ============================================================== Physics Operator Plan: ----------------------- Start with 1100702001, 5.4 T, 800 kA, nl=0.8e20 m-2, LSN. If we find excessive heating on GH or K limiter, or on the ramped divertor tiles, we may change to an inner wall limited discharge, or raise the density. Follow the SL plan for staging the ICRF, concentrating on getting J-port working reliably. Vary target plasma parameters to taste (of SL). Depending on H/D, we may raise the B-field to see MC in PCI. |
| Session Leader Summaries |
| Entered: Jul 26 2010 10:04:34:387AM |
| Author: Yijun Lin |
| D and E antennas have been conditioned up to 1.5 MW each, and ran overlapped.
J antenna have been reasonably good up to 1 MW level, but struggling beyond this power level. H/(H+D) started below 10% (and H-modes were obtained), then rose to 20% later in the day. |
| Physics Operator Summaries |
| Entered: Jul 23 2010 05:08:07:620PM |
| Author: Steve Wolfe |
Physop Summary for Friday, July 23, 2010
MP#355b ICRF conditioning and MC localization w/PCI
SL: Lin
PO: wolfe
EO: Parkin, Pfeiffer, Dekow
The machine ran well today, and some slow progress was made
on the RF conditioning, but J-port is still struggling. On the
first couple of shots we actually got some heating from D and E,
and got some brief H-modes. The H fraction came up over the course
of the run, and the heating pretty much went away. The
best shot from J port was the last, which managed some
sustained operation at 1.2MW. D and E ran separately around 1.5MW,
but were having trouble running together.
We ran 800kA, 8e19, LSN discharges all day. I played a little with
sweeping the strike point up the plate to spread what heat there was.
After starting at 5.4T, we changed to 5.8T at shot#4 for the PCI, and
left it at that value the rest of the day.
Cooling was slow, and at shot#10 we moved the f.d. off gate to 1.8sec
so that full shots wouldn't go back to 5.4T and increase the I2t,
since we were strongly double swinging anyway. The coax resistance
was not affected by this change.
Scorecard:
Tests 1
Duds 0
Fizzles 0
Plasmas 31
======== ==
Shots 32
Total plasma duration: 53.62 s
|
| Session Leader Comments | |||
| Jul 23 2010 09:03:15:287AM | 1100723001 | Yijun Lin | no power shot. |
| Jul 23 2010 09:28:07:353AM | 1100723002 | Yijun Lin | Got H-mode. D and E ran fine.
J was miserable. Next: Overlap D+E to 1.6 MW. J by itself. Also added strike point sweep (for higher RF power) |
| Jul 23 2010 09:37:22:080AM | 1100723003 | Yijun Lin | D and E ran fine. J better
Next: Run J earlier than D+E. Max total power 1.6 MW. Also raise field to 5.8 T for PCI measurement. |
| Jul 23 2010 09:47:33:053AM | 1100723004 | Yijun Lin | J was bad. D was bad. E was fine.
Next: Separate J3 and J4. Lower E power (and see if D is better). |
| Jul 23 2010 10:00:56:887AM | 1100723005 | Yijun Lin | J ran.
D ran. E had no power. No gate signal due to FFT2 fault. Next: repeat. |
| Jul 23 2010 10:16:18:147AM | 1100723006 | Yijun Lin | J ran. J4 still struggling.
D ran. matching bad. E ran. Next: repeat. Lower J4 power to let it run. (also tune J4). Also lower D power. |
| Jul 23 2010 10:30:46:327AM | 1100723007 | Yijun Lin | J ran. J4 mismatched.
D ran. matching bad. E ran. Next: repeat. Raise J3 power. tune D and J4. |
| Jul 23 2010 10:47:09:130AM | 1100723008 | Yijun Lin | J ran. J4 ran.
D ran. (its matching changes in the shot). E ran. Next: repeat. Raise J4 power. Raise D power. |
| Jul 23 2010 11:08:36:633AM | 1100723009 | Yijun Lin | Only E ran.
All others had matching problem. Next: change the order of antennas |
| Jul 23 2010 11:23:01:697AM | 1100723010 | Yijun Lin | D mismatched.
J ran. E ran. Next: overlap J3/J4. Tune D. |
| Jul 23 2010 11:39:51:677AM | 1100723011 | Yijun Lin | D ran, but the matching walked away.
J ran. j4 mismatched. E ran. Next: tune D and J4. repeat. |
| Jul 23 2010 11:54:19:080AM | 1100723012 | Yijun Lin | D ran,
J ran. struggling. E ran. Next: Raise D power. Tune J4. |
| Jul 23 2010 12:11:32:523PM | 1100723013 | Yijun Lin | D ran,
J ran. ran at high power. but J4 matching is not good. E ran. Next: Raise D power, lengthen J waveform. Tune J4. |
| Jul 23 2010 12:52:38:907PM | 1100723016 | Yijun Lin | D ran,
J ran. still struggling, but the matching is ok. E ran. Next: repeat. |
| Jul 23 2010 01:14:16:013PM | 1100723017 | Yijun Lin | D ran,
J ran. better than last shots (but worse when D was on). E ran. Next: repeat.raise D and E power. |
| Jul 23 2010 01:28:25:833PM | 1100723018 | Yijun Lin | D ran, to 1.2 MW.
J ran. better E ran.to 1.5 MW Next: repeat. |
| Jul 23 2010 01:43:12:113PM | 1100723019 | Yijun Lin | Plasma. disrupted 1.2 sec. (Mo + W)
D ran, J ran. better Next: repeat. |
| Jul 23 2010 02:03:23:600PM | 1100723020 | Yijun Lin | Plasma.
D ran, faulted when overlapped with E. up to 1.4 MW. J ran. better. Good at 0.6 MW. faulting at 1.2 MW. E ran. good to 1.5 MW. Next: repeat. (make low power part longer for J). |
| Jul 23 2010 02:20:02:913PM | 1100723021 | Yijun Lin | Plasma.
D ran, faulted when overlapped with E. up to 1.4 MW J ran. struggling at 0.8 MW level. E ran. good to 1.5 MW. Next: repeat. Lower J power and let it run. |
| Jul 23 2010 02:35:34:273PM | 1100723022 | Yijun Lin | Plasma. diisruption
D ran, faulted when overlapped with E. up to 1.4 MW J ran. struggling at 0.8 MW level. Next: repeat. |
| Jul 23 2010 02:50:19:840PM | 1100723023 | Yijun Lin | Plasma.
D ran, faulted when overlapped with E. up to 1.4 MW J ran. best shot so far. E ran. Faults together with D. Next: shorten D pulse and lower D/E to 1.2 MW each. Raise J power slightly. |
| Jul 23 2010 02:59:41:690PM | 1100723024 | Yijun Lin | Plasma.
D/E faulting when overlapped. (they were find separately. H/(D+H) ~ 20%) J ran. faulting at this power level (0.9 MW). Next: repeat. |
| Jul 23 2010 03:15:15:650PM | 1100723025 | Yijun Lin | Plasma.
D/E ran at lower power (0.8 MW each) J ran. faulting at this power level (0.9 MW). Next: repeat. |
| Jul 23 2010 03:28:55:973PM | 1100723026 | Yijun Lin | Plasma.
D/E ran at lower power (0.8 MW each) J ran. faulting at this power level (0.9 MW), but better. Next: repeat. Raise J power slightly. |
| Jul 23 2010 03:43:39:047PM | 1100723027 | Yijun Lin | Plasma.
D/E ran at lower power (0.8 MW each) J ran. ran reasonable at 1 MW level, then faulted at higher power. Next: repeat. Raise J power slightly. |
| Jul 23 2010 04:00:07:763PM | 1100723028 | Yijun Lin | Plasma.
D/E ran 0.8 MW each. J ran. faulting at 1.1 MW, but getting better later in the pulse. Next: Only J. D/E are good enough. |
| Jul 23 2010 04:16:17:673PM | 1100723029 | Yijun Lin | Plasma.
J ran. Good at 0.8 MW, faulting at 1.1 MW Next: repeat. |
| Jul 23 2010 04:32:13:640PM | 1100723030 | Yijun Lin | Plasma.
J ran. slightly better at 1.1 MW. Next: repeat. |
| Jul 23 2010 04:45:20:990PM | 1100723031 | Yijun Lin | Plasma.
J ran. disrupted at 0.73 sec. Next: repeat. |
| Jul 23 2010 04:58:36:163PM | 1100723032 | Yijun Lin | Plasma.
J ran. Best shot today. Ran 1.1 MW. Next: End of run. |
| Physics Operator Comments | |||
| Jul 23 2010 07:47:02:150AM | Steve Wolfe | Seting up for MP#355b on 1100723 Seg1: starting from 1100722024, change pg4 to 22msec for non-cryopump startup Leave pg3 from -.019, with point at .01,30 RCUR offset from 3000 to 2500 leave BR_0 offset at .0005 leave IC_EF4U at -1280 Import seg2 from 1100702001 (and screw it up, put it in seg1!) Start over after getting more coffee Load from 1110722024 Seg1: change pg4 to 22msec for non-cryopump startup Leave pg3 from -.019, with point at .01,30 RCUR offset from 3000 to 2500 leave BR_0 offset at .0005 leave IC_EF4U at -1280 Import seg2 from 1100702001, seg2 Change pg1 (argon puff) from 75 to 50msec Extend D=3 gain on nl04 through 1.8sec, leave P=8, I=0 Active procedures: dpcs_fizzle, dpcs_xjump, baseline_sub, dpcs_piezo_chopper Load at 23-Jul-2010 07:45:28.00 Open tree /home/wolfe/pcs_scratch -1 Open tree done PCS should be ready | |
| Jul 23 2010 09:01:38:110AM | 1100723001 | Steve Wolfe | Shot#1: No power shot for testing charging of Comm bank after repair |
| Jul 23 2010 09:17:54:123AM | 1100723002 | Steve Wolfe | Shot#2: First plasma attempt plasma full length no runaways H-modes after 1sec. D and E look pretty good, J faulting repetitively, total power <1.5 MW except for the spikes from J. Next: Adjust RXL, ZXL to start making some strkpoint sweep |
| Jul 23 2010 09:33:34:833AM | 1100723003 | Steve Wolfe | Shot#3: Program RXL to sweep from -.005 to +.005 between .6 and 1.5sec Reduce ZXL from 0 to -.005 Increase argon from 50 to 75msec Result: plasma full length, another couple of h-modes. strikepoint sweeps from -.528 to -.44, just over the nose D-port ran but net power data isn't showing up. J still struggling Next: decrease ZXL some more, also try to divert earlier |
| Jul 23 2010 09:53:26:860AM | 1100723004 | Steve Wolfe | shot#4: decrease ZXL from -.005 to -.015, also clearin to .003 from .426 to .326 RXL at .433 from +.002 to -.002 TF from -150 to -161kA (5.8T) Result: plasma full length, no hmode this time sweep is from -56 to -44.7, still going over the nose diverts earlier, around .3, but recontacts at crossover. J still struggling, D also struggling, only E ran semi-clean nl04 rises during E-port pulse to eof Next: RXL in a little more at the start |
| Jul 23 2010 09:59:16:850AM | 1100723005 | Steve Wolfe | shot#5: RXL to -.008 at .6sec plasma full length, no runaways, no h-mode hardly any heating. strikepoint starts on the floor, went too far D ran, no E, J3 fair and J4 bad separately Next: adjust RXL sweep a little on both ends. |
| Jul 23 2010 10:14:34:000AM | 1100723006 | Steve Wolfe | shot#6: RXL to -.006 at .6sec, +.003 at 1.5sec plasma full length, sweep from the floor to nose E clean, D not, J's still struggling Next: try sweeping up and back |
| Jul 23 2010 10:28:38:757AM | 1100723007 | Steve Wolfe | shot#7: try sweeping, RXL up to .003 at 1.1, back to -.006 at 1.5 (if this works I'll try the rest of my initials) plasma full length, no runaways, no hmodes, reverse sweep didn't happen, it goes to -.477 and sits there as rxl comes back in. D faulty, J3 runs at 800kW, J4 faulty, E runs at .5 Next: play with sweeping some more, move ZXL down |
| Jul 23 2010 10:47:28:023AM | 1100723008 | Steve Wolfe | shot#8: Zxl ramp from -.015 at 1.1 to -.025 at 1.5sec This is fighting the natural sweep, so it may not work well Some delay for cooling, going to 15 min cycle plasma to 1.5sec, disrupts at EOF. possible vertical problem, n/nc gets to 1.18 strike still won't come back down, but elongation grows RF looking better, total power still under 1MW, everybody but D was on for substantial part of programmed time Next: Get rid of ZXL sweep, reversal on rxl |
| Jul 23 2010 11:02:30:407AM | 1100723009 | Steve Wolfe | shot#9: zxl flat, RXL back to one-way sweep to .002 at 1.5sec Most of this sweep is the natural one up the plate. PG4 from 22 to 20msec after disruption, M16 went up to 2e-8 Probably going to fizz anyway Result: plasma full length, no runaways, startup looks ok sweep from bottom to top of plate, J not happy again, D also not happy, E hanging in there at 500kW Next: repeat |
| Jul 23 2010 11:18:57:060AM | 1100723010 | Steve Wolfe | shot#10: repeat Change f.d. off gate from 2.1 to 1.8sec trying to help cooling plasma full length, tf ramps down without f.d. sequence E is working at 1MW, other RF not so much LH will be firing into vacuum between shots Next: repeat |
| Jul 23 2010 11:38:31:313AM | 1100723011 | Steve Wolfe | shot#11: repeat plasma to 1.52sec, just into rampdown D and E ran that time, J now not running together, as opposed to not running separately. li rising at end of pulse, may be pushing n/nc Next: raise zxl to eof |
| Jul 23 2010 11:52:04:360AM | 1100723012 | Steve Wolfe | shot#12:raise zxl at 1.5 from -.015 to -.005 drop pg4 from 20 to 18msec Last shot was another big M16 generator, plasma full length, no runaways, incipient marfe around .25sec E up to 1.5MW, D at .6, J faulting Next: DNB gate valve permissive on, DNB will be firing during shots. LH not firing between 12 and 13; cooling water temp high. No pcs changes |
| Jul 23 2010 12:09:54:137PM | 1100723013 | Steve Wolfe | shot#13: repeat, may need to tweak rampdown next time DNB to fire during pulse at 0.5sec plasma full length, no runaways. EF2U is going to zero in rampdown at ~1.8sec, but it's not causing a problem yet. D&E running, D having some problem after E turns on J still faulting No apparent effect of DNB on plasma. Maybe a tiny change on M2/4 and M3/4 on RGA. OH2L is now going to its rail after rampdown because the invert times are still at 2.3sec; no problem. Next: repeat |
| Jul 23 2010 12:21:04:320PM | 1100723014 | Steve Wolfe | shot#14: repeat plasma full length, no runaways, D, E at 1MW each, J faulting Next: keep trying |
| Jul 23 2010 12:36:15:640PM | 1100723015 | Steve Wolfe | shot#15: repeat INIT at 12.5min, vessel temp ~22C plasma full length, no runaways couple of injections during D&E J faulting Next: repeat |
| Jul 23 2010 12:55:42:100PM | 1100723016 | Steve Wolfe | shot#16: repeat plasma to 1.4sec, injection at 1.18 survives then loses it during E pulse. density spikes up then drops to .5 following injection. Strike jumps up to nose. RGA doesn't show as much dirt as previous disruptions. This one ends up going vertically, but the junk killed it. Next: repeat, I don't want to drop pg4 to 16ms |
| Jul 23 2010 01:06:29:720PM | 1100723017 | Steve Wolfe | shot#17: No PCS changes, hope it doesn't fizz at this fill plasma full length, no runaways - another triumph of benign neglect Got a little out of J that time, D and E ok, short overlap Startup wasn't bad considering the disruption Next: keep plugging away |
| Jul 23 2010 01:25:29:420PM | 1100723018 | Steve Wolfe | shot#18: No PCS changes 14 minutes of cooling, vessel is getting down to 17C plasma full length, no runaways, J looks like a comb. D&E fair, E up to 1.5MW Couple of injections during rf Next: no changes |
| Jul 23 2010 01:44:03:063PM | 1100723019 | Steve Wolfe | shot#19: No pcs changes plasma disrupts at 1.17sec, looks like one of those injections got us. looks like it came from J on the wide2 view, but D was also on. Next: try again |
| Jul 23 2010 02:00:47:223PM | 1100723020 | Steve Wolfe | shot#20: No pcs changes LH back to pulsing into vacuum between shots, water temp ok now. plasma full length, small early marfe, no runaways, J doing a little better, clean at .7MW, faulting higher. D&E coming along. Startup ok, CIII a little elevated. Next: keep it going |
| Jul 23 2010 02:16:56:403PM | 1100723021 | Steve Wolfe | shot#21: No pcs changes plasma full length, no runaways some fireworks from J on wide2 view, looks like one big injection 1.24sec D over 1MW, E 1.5MW, still not running well together; J more faulting Next: and over, and over, and... |
| Jul 23 2010 02:34:01:400PM | 1100723022 | Steve Wolfe | shot#22: No pcs changes plasma disrupts at 1.2sec, done in by injection again. J stays on for a while at .7MW, injection during D pulse Cell access for polar, et al., LH holding off till next shot Next: no changes, rf still trying |
| Jul 23 2010 02:45:37:590PM | 1100723023 | Steve Wolfe | shot#23: No pcs changes plasma full length, no runaways, marfe at .2sec still getting the injection around 1.2sec, but this time it didn't kill it. J better this time, stays on at 0.8MW for over 400msec Next: change rxl sweep after 1.1sec |
| Jul 23 2010 03:00:04:570PM | 1100723024 | Steve Wolfe | shot#24: Hold rxl=-.0016 after 1.1sec, zxl to -.015 flat Keep the strike from riding so far up the plate plasma full length, injection at 1.2sec replaced by a series of smaller ones. J now running square wave ~.9MW 0.6 to 1.2, D&E after 1.2sec, still faulting together Next: repeat |
| Jul 23 2010 03:18:46:470PM | 1100723025 | Steve Wolfe | shot#25: repeat plasma disrupts at 1.4sec, early marfe, then late spew from J, but it lasts until D&E time breakdown was a little late on this one. Next: no changes |
| Jul 23 2010 03:29:51:103PM | 1100723026 | Steve Wolfe | shot#26:no PCS changes That was a dirty disruption on 25, lots of M16 and M28. It's about time for a fizzle Or not: plasma disrupts at 1.5+ sec, just into rampdown. Early marfe, couple of injections Breakdown time back to normal, slowish current rise, no bounce J doing a little better, longer periods at 0.9MW, D&E together up to 1.5MW total with a few faults Next: repeat |
| Jul 23 2010 03:47:40:793PM | 1100723027 | Steve Wolfe | shot#27:no PCS changes There was a critical init failure: TCI decoder INIT bypassed and ran anyway. plasma disrupts at 1.55sec, looks normal except we don't get tci data. Feedback signal to DPCS is ok, although it didn't zero itself correctly; looks like the software baseline subtraction worked. Neuts/hards may be from previous shot; that's in TCI sigs as well. RF better than previous, longer period at 1MW on J before it loses it. Next: repeat |
| Jul 23 2010 04:00:16:253PM | 1100723028 | Steve Wolfe | shot#28:no PCS changes plasma full length no serious injections, still a little bit of an early marfe J on and off repeatedly at 1.1MW, D&E still fighting each other. Pretty good startup, current rise, bd time Next: no changes |
| Jul 23 2010 04:18:33:817PM | 1100723029 | Steve Wolfe | shot#29:no PCS changes RF will only run J this shot Vessel getting down to 16C, couple of lagging TF turns 17 min in RECOOL plasma full length, no bad injections J runs clean for ~.3sec at .85MW, then faults on and off at higher powers Next: do it again |
| Jul 23 2010 04:32:51:743PM | 1100723030 | Steve Wolfe | shot#30:no PCS changes plasma full length, J gets ~100msec with 1.2MW, and a lot of shorter intervals. Getting a little better, at this rate we'll be up to power by Xmas Next: and again... |
| Jul 23 2010 04:50:53:897PM | 1100723031 | Steve Wolfe | shot#31:no PCS changes early disruption, .75sec injection during rf, not obvious from where, maybe upper near corner of J Didn't seem to make a lot of hydrocarbons Next: leave it alone, see if it comes back |
| Jul 23 2010 05:01:53:807PM | 1100723032 | Steve Wolfe | shot#32: No pcs changes plasma disrupts at 1.45sec, J stayed on at 1 and 1.2MW for extended periods, best performance from J of the day. No heating to speak of, cooling actually, but H/H+D running over 20% so probably as expected. Leave well enough alone - END OF RUN |
| Engineering Operator Comments | ||||
| Shot | Time | Type | Status | Comment |
| 1 | 09:01:04:120AM | Test | Ok | OH2 cap bank test |
| 2 | 09:11:03:143AM | Plasma | Ok | |
| 3 | 09:25:27:460AM | Plasma | Ok | |
| 4 | 09:41:15:390AM | Plasma | Ok | |
| 5 | 09:54:00:743AM | Plasma | Ok | |
| 6 | 10:07:28:507AM | Plasma | Ok | |
| 7 | 10:22:18:310AM | Plasma | Ok | |
| 8 | 10:40:53:267AM | Plasma | Ok | |
| 9 | 10:57:24:950AM | Plasma | Ok | |
| 10 | 11:14:07:600AM | Plasma | Ok | |
| 11 | 11:31:36:240AM | Plasma | Ok | |
| 12 | 11:46:03:910AM | Plasma | Ok | |
| 13 | 12:00:32:530PM | Plasma | Ok | |
| 14 | 12:15:34:550PM | Plasma | Ok | |
| 15 | 12:30:34:163PM | Plasma | Ok | |
| 16 | 12:45:37:090PM | Plasma | Ok | |
| 17 | 01:01:06:477PM | Plasma | Ok | |
| 18 | 01:17:43:987PM | Plasma | Ok | |
| 19 | 01:34:58:773PM | Plasma | Ok | |
| 20 | 01:55:42:810PM | Plasma | Ok | |
| 21 | 02:11:43:813PM | Plasma | Ok | |
| 22 | 02:25:38:077PM | Plasma | Ok | |
| 23 | 02:40:28:207PM | Plasma | Ok | |
| 24 | 02:53:26:830PM | Plasma | Ok | |
| 25 | 03:09:19:840PM | Plasma | Ok | |
| 26 | 03:23:14:770PM | Plasma | Ok | |
| 27 | 03:38:47:910PM | Plasma | Ok | |
| 28 | 03:53:16:640PM | Plasma | Ok | |
| 29 | 04:12:51:163PM | Plasma | Ok | |
| 30 | 04:27:31:927PM | Plasma | Ok | |
| 31 | 04:42:05:430PM | Plasma | Ok | |
| 32 | 04:54:52:750PM | Plasma | Ok | |
| System Availability | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Jul 23 2010 09:00:50:257AM | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||