Alcator C-Mod Run 1100727 Information

Back to runs

Miniproposals
Miniproposal:296
Date Filed: 5/14/2001
Title:Confirmation of Thomson scattering density calibration using electron cyclotron emission cutoffs
First Author:Jerry Hughes
Session Leader:Yunxing Ma (shots 1-10)
Session Leader:Yunxing Ma (shots 25-28)
Miniproposal:355b
Date Filed: 6/15/2010
Title:ICRF Testing and Conditioning, with Detection of Mode-Conversion Location
First Author:Steve Wukitch
Session Leader:Yijun Lin (shots 11-24)
Session Leader:Yijun Lin (shots 29-33)

Operators
Session leader(s):Yunxing Ma,Yijun Lin,Yunxing Ma,Yijun Lin
Physics operator(s):Jim Irby
Engineering operator(s):Bill Cochran,Sam Pierson,Ed Fitzgerald

Engineering Operator Run Comment
SL plan for MP296 -TS calibration using ECE cutoffs at 4T

Session Leader Plans
Entered: Jul 26 2010 04:45:47:483PM
Author: Yunxing Ma
SL plan for MP296 -TS calibration using ECE cutoffs at 4T
PO: Irby
SL: Ma

The first half of today's run will execute MP296 for TS density calibration using ECE cutoffs at 4.0T. This MP ran routinely before physics operation or any time TS density calibration is off and need to be corrected.

5~8 discharges are required in order to be statistically meaningful.

PO may load target discharge from shot 1091216032. Plasma params: Ip=800kA, Bt=4.0T, nl04 rise from 1.0n20 to 2.0n20 during flat-top.

After the target discharge being successfully produced, repeat it for 5~8 shots. The plasma will be subject to minor vertical position adjustment in different shots in order to maximize the overlap of ECE and TS channels in midplane mapping.

GPC grating need adjustment to view in 4.0T before the run. Some GPC2 channels will undergo LFS cutoffs which could be useful for calibrating some core channels measuring near plasma edge as well as edge TS system.

The MP is expected to be accomplished before noon if things go well.






Entered: Jul 27 2010 12:28:24:150PM
Author: Yunxing Ma
1100727006: GPC2 cutoffs corrections:
Fudge factors--
Core TS 1: 0.83 +/- 0.02
Core TS 2: 1.04 +/- 0.03
Core TS 3: 1.00 +/- 1.00
Core TS 4: 0.81 +/- 0.02
Core TS 5: 1.00 +/- 1.00
Core TS 6: 0.71 +/- 0.03
Core TS 7: 1.00 +/- 1.00
Core TS 8: 0.77 +/- 0.04
Core TS 9: 0.71 +/- 0.03
Core TS 10: 0.95 +/- 0.04
Core TS 11: 1.11 +/- 0.06
Core TS 12: 0.91 +/- 0.03
Core TS 13: 1.00 +/- 1.00
Core TS 14: 0.65 +/- 0.02
Core TS 15: 1.30 +/- 0.07
Edge TS : 1.00 +/- 1.00
Core TS 1: 0.44 +/- 0.01
Core TS 2: 0.56 +/- 0.01
Core TS 3: 1.00 +/- 1.00
Core TS 4: 0.49 +/- 0.01
Core TS 5: 1.00 +/- 1.00
Core TS 6: 0.39 +/- 0.01
Core TS 7: 1.00 +/- 1.00
Core TS 8: 0.41 +/- 0.01
Core TS 9: 0.39 +/- 0.01
Core TS 10: 0.54 +/- 0.02
Core TS 11: 0.63 +/- 0.03
Core TS 12: 0.51 +/- 0.01
Core TS 13: 1.00 +/- 1.00
Core TS 14: 0.35 +/- 0.01
Core TS 15: 0.78 +/- 0.03
Edge TS : 1.00 +/- 1.00
gpc2_cal_1100727006_all.sav created

Physics Operators Plans
Entered: Jul 26 2010 07:48:07:530PM
Author: Jim Irby
-----------------
Engineering Setup
-----------------

Run begins at 09:00 and ends at 17:00

Power systems as on: 1091216032

Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:

Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
fill NINJA with 10 psi D2 DISABLED

Enable gatevalves and shutters: ECE, VUV, HiREX Sr, Z-bolo, Xeus

Torvac gatevalve toggle (yes/no): no

Boronization(yes/no): no
Overnight ECDC (yes/no): yes
ICRF(yes/no): morning no, afternoon yes
LH(yes/no): no
Cryopump (yes/no): no

Vessel temperature: 35/35/35

------------------------------
ECDC Parameters
------------------------------
gas and pressure: D2 at 2e-4 Torr
sweep: 44/45/103 cm
scan: 20/120 s

Session Leader Summaries
Entered: Jul 28 2010 08:52:35:320AM
Author: Yijun Lin
The antenna conditioning has progressed well.

J antenna was able to run at 2 MW level to L-mode plasma.
D and E were able to run together at 2.4 MW.

H-modes were obtained in Lower single null.

H/(H+D) started below 10% earlier, then rose to ~20% near the end of the run.



Physics Operator Summaries

Session Leader Comments
Jul 27 2010 08:05:31:340AMSteve WukitchPart II

ICRF antenna conditioning will continue where it left off on Friday but will start with BT=5.4 T based on 1100723030 (last discharge not to disrupt). If we need to avoid H-modes we will move to USN based on 1100720033 and may raise the BT to 5.8-6 T. Our aim to maximize coupled joules through the antennas.
Jul 27 2010 08:16:11:597PMYunxing MaIDL> mdsopen,'electrons',1100727027
% Compiled module: MDSOPEN.
% Compiled module: MDSVALUE.
% Compiled module: MDSCHECKARG.
% Compiled module: MDSISCLIENT.
% Compiled module: MDSIDLIMAGE.
IDL> zsort=mdsvalue('ELECTRONS::TOP.YAG_NEW.RESULTS.PROFILES:Z_SORTED')
IDL> help,zsort
ZSORT FLOAT = Array[15]
IDL> print,zsort
-0.00000 -0.0270000 0.0440000 -0.0540000 -0.0820000 0.0820000 0.108000 -0.112000
0.138000 -0.139000 0.166000 -0.168000 -0.197000 -0.227000 -0.254000
IDL> z=mdsvalue('calib:z_nom')
IDL> ind=intarr(15)
IDL> for i=0,14 do ind(i)=where(z eq zsort(i))
IDL> print,ind
10 2 1 12 4 11 6 13 9 5 0 14 3 15
7
IDL> print,ind+1
11 3 2 13 5 12 7 14 10 6 1 15 4 16
8

Jul 27 2010 08:26:10:980PMYunxing Mafudge factors in the ordering of TS channel incremental:
average over GPC1 91100727026~28) and GPC2 (1100727006~10,26~28) cutoffs

IDL> fg1=[1.153,0.850,1.08,0.978,1.12,0.985,1.03,1.215,1.0,0.745,0.835,0.704,0.810,0.792,0.965,0.603]
IDL> fg2=[0.664,0.554,0.588,0.571,0.645,0.575,0.599,0.735,1.0,0.410,0.453,0.394,0.480,0.425,0.531,0.328]

Jul 27 2010 08:30:14:930PMYunxing MaApply new calibration factors to the tree
as a test, try implement in shot 33 today

IDL> mdsopen,'electrons',1100727033
IDL> abs_calib=mdsvalue('calib:abs_calib')
IDL> print,abs_calib
4.65732e+13 8.06800e+13
5.67954e+13 8.66784e+13
5.22117e+13 8.97275e+13
5.35039e+13 8.89336e+13
4.71499e+13 8.01775e+13
4.20662e+13 6.94544e+13
5.29733e+13 8.82490e+13
4.46526e+13 7.25962e+13
7.87007e+14 1.45556e+15
9.46242e+14 1.67243e+15
8.52150e+14 1.53567e+15
1.21600e+15 2.10181e+15
8.32156e+14 1.36196e+15
9.26344e+14 1.64050e+15
7.24277e+14 1.26455e+15
1.09673e+15 1.97907e+15
IDL> help,abs_calib
ABS_CALIB FLOAT = Array[2, 16]
IDL> abs_calib10=fltarr(2,16)
IDL> abs_calib10(0,*)=abs_calib(0,*)*fg1
IDL> abs_calib10(1,*)=abs_calib(1,*)*fg2
IDL> print,abs_calib10/abs_calib
1.15300 0.664000
0.850000 0.554000
1.08000 0.588000
0.978000 0.571000
1.12000 0.645000
0.985000 0.575000
1.03000 0.599000
1.21500 0.735000
1.00000 1.00000
0.745000 0.410000
0.835000 0.453000
0.704000 0.394000
0.810000 0.480000
0.792000 0.425000
0.965000 0.531000
0.603000 0.328000
IDL> mdsput,'calib:abs_calib','$',abs_calib10
% Compiled module: MDSPUT.
IDL> mdsclose
% Compiled module: MDSCLOSE.

Jul 27 2010 08:46:27:160PMYunxing MaRefit older shots this campaign, from shot 1100629001 with new density calibration

IDL> put_abs_calib,1100727033,1100630001,1100727001
% Compiled module: PUT_ABS_CALIB.
% Compiled module: MDSOPEN.
% Compiled module: MDSVALUE.
% Compiled module: MDSCHECKARG.
% Compiled module: MDSISCLIENT.
% Compiled module: MDSIDLIMAGE.
% Compiled module: MDSCLOSE.
% Compiled module: FIND_VALID_SHOTS.
% Compiled module: CALDAT.
% Compiled module: MDSGETMSG.
% Compiled module: UNIQ.
% Compiled module: MDSPUT.
IDL> re_fit,1100629001,1100727001
Jul 27 2010 08:48:10:113PMYunxing Mamodify model tree:

IDL> print,abs_calib10
5.36989e+13 5.35715e+13
4.82761e+13 4.80198e+13
5.63886e+13 5.27598e+13
5.23268e+13 5.07811e+13
5.28079e+13 5.17145e+13
4.14352e+13 3.99363e+13
5.45625e+13 5.28612e+13
5.42529e+13 5.33582e+13
7.87007e+14 1.45556e+15
7.04950e+14 6.85697e+14
7.11545e+14 6.95658e+14
8.56065e+14 8.28113e+14
6.74046e+14 6.53740e+14
7.33664e+14 6.97214e+14
6.98928e+14 6.71474e+14
6.61328e+14 6.49135e+14
IDL> mdsopen,'electrons',-1
IDL> mdsput,'calib:abs_calib','$',abs_calib10
IDL> mdsclose

Jul 27 2010 11:22:39:350AM1100727011Yijun LinOverlapping D/E at 0.8x2 MW
J steps: 0.9/1.1/1.4 MW
5.4 T, 0.8 MA, nl04 ~ 0.9, programed strike point sweep.
Result:
E did not run. No gate. Test shot to dummy load, OK.
J ran at 0.9 MW. also two periods at 1.2 MW. No worse than 1100723.

next: repeat.
Jul 27 2010 11:43:54:780AM1100727012Yijun LinOverlapping D/E at 0.8x2 MW
J steps: 0.9/1.1/1.4 MW
5.4 T, 0.8 MA, nl04 ~ 0.9, programed strike point sweep.
Result:
All antennas ran. H/(H+D)~ 10%

next: raise power.
Jul 27 2010 12:05:22:780PM1100727013Yijun LinOverlapping D/E at 1.2x2 MW
J steps: 1.2/1.4/1.6 MW
5.4 T, 0.8 MA, nl04 ~ 0.9, programed strike point sweep.
Result:
All antennas ran. D/E were OK.
J reasonable at 1.2 MW, starting faulting at 1.4 MW.
next: raise J power again.
Jul 27 2010 12:26:39:230PM1100727014Yijun LinOverlapping D/E at 1.2x2 MW
J steps: 1.3/1.5/1.6 MW
5.4 T, 0.8 MA, nl04 ~ 0.9, programed strike point sweep.
Result:
All antennas ran. D/E were OK. D faulted in H-mode.
J reasonable at 1.3 MW, More faults at 1.5 MW.
next: repeat.
Jul 27 2010 12:46:55:890PM1100727015Yijun Linno power shot. Data system problem.
Jul 27 2010 01:00:15:720PM1100727016Yijun LinOverlapping D/E at 1.2x2 MW, also a long 0.3x2 portion to put more joules in the machine.
J steps: 1.3/1.5/1.6 MW
5.4 T, 0.8 MA, nl04 ~ 0.9, programed strike point sweep.
Result:
All antennas ran. D faulted out earlier. E ran ok.
J ran. (missing some data on J3)
next: repeat.
Jul 27 2010 01:26:05:203PM1100727017Yijun LinOverlapping D/E at 1.2x2 MW, also a long 0.3 MW portion to put more joules in the machine.
J steps: 1.3/1.5/1.6 MW
5.4 T, 0.8 MA, nl04 ~ 0.9, programed strike point sweep.
Result:
All antennas ran. D/E were OK.
J many faults.
next: Up-single-null shot to avoid H-mode.
(also program 200 ms 90 degree phasing on J. Will this help conditioning??)
Jul 27 2010 01:42:15:983PM1100727018Yijun LinOverlapping D/E at 1.2x2 MW, also a long 0.3 MW portion to put more joules in the machine.
J steps: 1.3/1.5/1.6 MW
5.4 T, 0.8 MA, nl04 ~ 0.8, upper single null
Result:
All antennas ran. D/E were OK.
J better (No J4 power room data). (The +90 phase worked).
next: Program part of J to -90 phase. Raise power.
Jul 27 2010 01:55:20:690PM1100727019Yijun LinOverlapping D/E at 1.2x2 MW, also a long 0.3 MW portion to put more joules in the machine.
J steps: 1.5/1.7/2 MW. Part of the waveform at -90 phase
5.4 T, 0.8 MA, nl04 ~ 0.9, upper single null
Result:
All antennas ran. D/E no fault
J OK. reasonable at 1.5 MW level. Faulting at 1.7 MW level.
next: program 90/180/270 phases in the waveform. same power.
Jul 27 2010 02:05:08:063PM1100727020Yijun LinOverlapping D/E at 1.2x2 MW, also a long 0.3 MW portion to put more joules in the machine.
J steps: 1.5/1.7/2 MW. program 90/180/270 phases in the waveform
5.4 T, 0.8 MA, nl04 ~ 0.9, upper single null
Result:
All antennas ran. D/E no fault
J faulted early due to a big marfe.
next: Move D/E earlier, and hope to avoid the marfe.
Jul 27 2010 02:17:23:007PM1100727021Yijun LinOverlapping D/E at 1.2x2 MW, also a long 0.3 MW portion to put more joules in the machine.
J steps: 1.5/1.7/2 MW. program 90/180/270 phases in the waveform
5.4 T, 0.8 MA, nl04 ~ 0.9, upper single null
Result:
All antennas ran. D/E no fault
J faulting at this power level.
next: repeat.
Jul 27 2010 02:34:14:197PM1100727022Yijun LinOverlapping D/E at 1.3x2 MW, also a long 0.3 MW portion to put more joules in the machine.
J steps: 1.4/1.6/2 MW. program 90/180/270 phases in the waveform
5.4 T, 0.8 MA, nl04 ~ 0.9, upper single null
Result:
All antennas ran. D/E no fault
J ran. better than last shot, but still faulting at 1.4 MW.
H/(H+D) ~ 18%
next: repeat.
Jul 27 2010 02:50:32:397PM1100727023Yijun LinOverlapping D/E at 1.3x2 MW, also a long 0.3x2 MW portion to put more joules in the machine.
J steps: 1.5/1.7/2 MW. program 90/180/270 phases in the waveform
5.4 T, 0.8 MA, nl04 ~ 0.9, upper single null
Result:
All antennas ran. D/E no fault
J ran. better than 21. but still faulting due to marfe.
next: repeat.
Jul 27 2010 02:59:44:283PM1100727024Yijun LinOverlapping D/E at 1.3x2 MW, also a long 0.3x2 MW portion to put more joules in the machine.
J steps: 1.5/1.7/2 MW. program 90/180/270 phases in the waveform
5.4 T, 0.8 MA, nl04 ~ 0.9, upper single null
Result:
All antennas ran. D/E no fault
J ran. Better. reasonable at the 1.6 MW level.
next: For TS calibration. No RF for several shots.
Jul 27 2010 03:02:15:177PM1100727024Yijun LinOverlapping D/E at 1.3x2 MW, also a long 0.3x2 MW portion to put more joules in the machine.
J steps: 1.5/1.7/2 MW. 180 phasing.
5.4 T, 0.8 MA, nl04 ~ 0.9, upper single null
Result:
All antennas ran. D/E no fault
J ran. Better. reasonable at the 1.6 MW level.
next: For TS calibration. No RF for several shots.
Jul 27 2010 03:01:13:727PM1100727025Yunxing MaSwitch to TS calibration this shot
load from shot 9 today.

Jul 27 2010 03:24:00:580PM1100727026Yunxing Maload target shot from shot 8 today
Jul 27 2010 03:45:24:453PM1100727028Yunxing Mashot 27 is very good. Clear GPC1 cutoff all the way to ch7.
shot 28: repeat shot 27, Bt adjusted to 4.0T

Jul 27 2010 04:19:35:593PM1100727029Yijun LinOverlapping D/E at 1.3x2 MW, also a long 0.3x2 MW portion to put more joules in the machine.
J steps: 1.5/1.7/2 MW. 180 phasing.
5.4 T, 0.8 MA, nl04 ~ 0.9, upper single null
Result:
All antennas ran. D/E no fault
J ran. reasonable at the 1.6 MW level.

Saw heating up on K-Limiter after this shot. (Highest joule this campaign?).
next: raise J power, lower D/E power.
Jul 27 2010 04:22:42:340PM1100727030Yijun LinOverlapping D/E at 0.7x2 MW, also a long 0.3x2 MW portion to put more joules in the machine.
J steps: 1.6/2.0/2.4 MW. 180 phasing.
5.4 T, 0.8 MA, nl04 ~ 0.9, upper single null
Result:
All antennas ran. D/E no fault
J ran. no fault at 1.6 MW, 5 faults at 2 MW. Not yet good at 2.4 MW.
next: Raise power some more.
Jul 27 2010 04:38:59:243PM1100727031Yijun LinOverlapping D/E at 0.7x2 MW, also a long 0.3x2 MW portion to put more joules in the machine.
J steps: 2.0/2.2/2.4 MW. 180 phasing.
5.4 T, 0.8 MA, nl04 ~ 0.9, upper single null
Result:
All antennas ran. D/E no fault
J ran. reasonable at 2-2.2 MW. Not yet at 2.4 MW.
next: Same J. Lower D/E.
Jul 27 2010 04:49:29:730PM1100727032Yijun LinOverlapping D/E at 0.5x2 MW, also a long 0.3x2 MW portion to put more joules in the machine.
J steps: 2.0/2.2/2.4 MW. 180 phasing.
5.4 T, 0.8 MA, nl04 ~ 0.9, upper single null
Result:
All antennas ran. D/E no fault
J ran. Got worse (like shot 21)
next: repeat.
Jul 27 2010 05:02:14:483PM1100727033Yijun LinOverlapping D/E at 0.5x2 MW, also a long 0.3x2 MW portion to put more joules in the machine.
J steps: 2.0/2.2/2.4 MW. 180 phasing.
5.4 T, 0.8 MA, nl04 ~ 0.9, upper single null
Result:
All antennas ran. D/E no fault
J ran. Slightly better.
next: End of run.

Physics Operator Comments
Jul 28 2010 07:50:39:420AMJim IrbyThe machine ran extremely well today. There were 28 plasmas and no fizzles or duds continuing the trend from last Friday. There was one shot with significant runaway activity. A 1 ms increase in the pg3 seg 1 gas may have fixed the problem. Note that in most cases the runaways are associated with, and proceeded by several milliseconds by a drop in nl_04 during startup.

We began with several cycle tests to get the data system going and to
check out pg3. We were unable to get any gas out of pg3 until I
programmed in a 100% 50 ms pulse on shot 4. It then worked well for the
first plasma shot (5). This valve may be getting a little more
"sticky". Tommy has a spare he is testing out.

Shots 5 to 10 comprised the first part of the Thomson Scattering ECE cutoff run.
Generally went smoothly with only a small adjustment in ZX_L to bring
the plasma into better view by the edge channels. Density took off at
0.83 s for no clear reason, but was acceptable to the SL. All these
shots disrupted around 1.3 to 1.4 s. With some adjustments to the gas
programming the pulse lengths could probably have been extended.

We began ICRF conditioning on shot 11 by loading from 1100723030 and
adjusting Bt to 5.4T. Plasma ran full length.

H/(H+D) started out at around 6% at the beginning of the run and dropped
down to 4% by shot 10. When we switched to ICRF it began to climb as
expected. It was at 10% by shot 12 eventually rising above 15 to 20 %.

We switched back to TS cal on shot 25 and back to ICRF on shot 29.
Amanda worked on ECE grating changes during the first set of ICRF
conditioning shots.

There were no cooling issues today. Shot cycles were mostly determined
by cell/lab access and the PO being slow to push the button.


problems:

. took a few cycle tests to get the data system and the gas puff going
. ratiomatic tripped off for a few shots. Signal became noisy. Tommy
swithched filaments. Pressure indicated dropped a factor of two
following this change.
. AC breaker opened during init on shot 22 --- shot ok

score:

no power: 15

test shots: 1,2,3,4

plasma:
05,06,07,08,09,10,11,12,13,14
16,17,18,19,20,21,22,23,24,25
26,27,28,29,30,31,32,33
Jul 27 2010 08:40:44:847AM1100727001Jim IrbyLoad from 1091216032
loaded
added dpcs_piezo_chopper routine to output_pros: pulse_gas3 added as output
loaded
import seg 1 from 1100723032 to seg 1
loaded

I was unable to enable dpcs_xjump from the DPCS home screen. Steve pointed out that it has to be turned on in its edit screen. We also needed to load the default settings.

The dpcs_piezo_chopper routine requires "pulse_gas3" with the quotes to be added to the output box. I had added pulse_gas3 w/o quotes.

open tree done

**********************************
This shot will be a cycle test of the data system and the gas puff

Lots of data system errors. No gas.




Jul 27 2010 08:55:27:980AM1100727002Jim IrbyTry cycle test again

got prepuff, but nothing from PG3 (voltage was applied)


Jul 27 2010 09:10:32:873AM1100727003Jim Irbychanges --------------------------------

try for another gas puff

results --------------------------------

still no gas
Jul 27 2010 09:14:44:353AM1100727004Jim Irbychanges --------------------------------

added 50 ms to seg 1 pg3 gas puff at 100%

results --------------------------------

got gas
Jul 27 2010 09:33:04:537AM1100727005Jim Irbychanges --------------------------------

pg3 back to 1100723032 programming
loaded

results --------------------------------

plasma for 1.337 s --- did not reach 2e20/m^2 by 1 s
Jul 27 2010 09:48:18:230AM1100727006Jim Irbychanges --------------------------------

argon puff from 300 to 350 ms
enabled

nl_04 programming dropped after 1 s
loaded

results --------------------------------

plasma for 1.385 s --- density now very similar to 1091216032

Jul 27 2010 10:12:42:063AM1100727007Jim Irbychanges --------------------------------

repeat

results --------------------------------

plasma for 1.39 s --- density control not as good as on shot 6
Jul 27 2010 10:22:05:120AM1100727008Jim Irbychanges --------------------------------

Bt from 3.9 to 3.95 T --- 106000 to 107660 A
loaded

results --------------------------------

plasma for 1.401 s, Bt at 3.947 T


Jul 27 2010 10:46:29:643AM1100727009Jim Irbychanges --------------------------------

Bt back to 3.9 T
lowered ZXL by 0.005 m
loaded

results --------------------------------

plasma for 1.39 s, elongation from 1.6 to 1.65


Jul 27 2010 11:00:02:483AM1100727010Jim Irbychanges --------------------------------

repeat

results --------------------------------

plasma for 1.309 s

Ready to go to ICRF conditioning
Jul 27 2010 11:20:54:470AM1100727011Jim Irbychanges --------------------------------

load from 1100723030
loaded

Bt to 5.4 T --- 150 kA
loaded

Tommy checking out Ratiomatic --- it stopped working a few shots ago. It may operate for this shot, but signal is very noisy.


results --------------------------------

plasma into rampdown
Jul 27 2010 12:08:38:257PM1100727012Jim Irbychanges --------------------------------

repeat

results --------------------------------

plasma into rampdown
Jul 27 2010 12:08:47:160PM1100727013Jim Irbychanges --------------------------------

repeat

results --------------------------------

plasma into rampdown
Jul 27 2010 12:36:17:827PM1100727014Jim Irbychanges --------------------------------

repeat

results --------------------------------

plasma into rampdown

Jul 27 2010 01:47:34:590PM1100727015Jim Irbychanges --------------------------------

repeat

results --------------------------------

no power shot --- data system issue
Jul 27 2010 01:01:32:147PM1100727016Jim Irbychanges --------------------------------

repeat

results --------------------------------

plasma into rampdown
Jul 27 2010 01:29:52:920PM1100727017Jim Irbychanges --------------------------------

repeat

results --------------------------------

plasma into rampdown ---- H/(H+D) 12% at 1 s
Jul 27 2010 01:44:43:740PM1100727018Jim Irbychanges --------------------------------

going to upper null

load from 1100720033
import seg 1 from 1100727017 into seg 1
loaded

Bt from 6.0 to 5.4 T (150 kA)
loaded

results --------------------------------

plasma into rampdown --- nice MARFE --- H/(H+D) to 20%


Jul 27 2010 01:59:03:927PM1100727019Jim Irbychanges --------------------------------

repeat

results --------------------------------

plasma into rampdown --- H/(H+D) at 15 to 20 %
Jul 27 2010 02:10:22:223PM1100727020Jim Irbychanges --------------------------------

repeat

results --------------------------------

plasma into rampdown --- big MARFE early
Jul 27 2010 02:17:44:820PM1100727021Jim Irbychanges --------------------------------

repeat

results --------------------------------

plasma into rampdown --- MARFE gone but hards way up


Jul 27 2010 02:45:43:027PM1100727022Jim Irbychanges --------------------------------

pg3 seg1 puff increased by 1 ms
loaded

results --------------------------------


Jul 27 2010 02:49:56:897PM1100727023Jim Irbychanges --------------------------------

repeat

results --------------------------------

plasma into rampdown
Jul 27 2010 03:01:17:337PM1100727024Jim Irbychanges --------------------------------

repeat

results --------------------------------

plasma into rampdown

Jul 27 2010 03:19:41:680PM1100727025Jim Irbychanges --------------------------------

Going back to Thomson Calibration for a couple of shots
load from 1100727009
loaded

results --------------------------------

plasma for 0.88 s
Jul 27 2010 03:27:49:373PM1100727026Jim Irbychanges --------------------------------

load from 1100727008 (before ZXL modification)
loaded

results --------------------------------

plasma for 1.33 s
Jul 27 2010 03:46:17:707PM1100727027Jim Irbychanges --------------------------------

repeat

results --------------------------------

plasma for 1.42 s

Jul 27 2010 03:54:18:793PM1100727028Jim Irbychanges --------------------------------

Increase Bt by .05T to 4.0 T, current from 107660 to 109320 A
loaded

results --------------------------------

plasma for 1.42 s --- 4.0 T
Jul 27 2010 04:07:53:673PM1100727029Jim Irbychanges --------------------------------

Back to ICRF conditioning

load from 1100727024
loaded

results --------------------------------

plasma into rampdown
Jul 27 2010 04:34:24:390PM1100727030Jim Irbychanges --------------------------------

repeat

results --------------------------------

plasma into rampdown
Jul 27 2010 04:38:42:863PM1100727031Jim Irbychanges --------------------------------

repeat

results --------------------------------

plasma into rampdown


Jul 27 2010 04:48:29:087PM1100727032Jim Irbychanges --------------------------------

repeat

results --------------------------------

plasma into rampdown


Jul 27 2010 05:03:49:137PM1100727033Jim Irbychanges --------------------------------

repeat

results --------------------------------

plasma into rampdown

All done...

Engineering Operator Comments
ShotTimeTypeStatusComment
108:29:16:850AMTestBadShot cycle hung up
208:49:17:097AMTestOkGas Test
308:59:24:337AMTestOkGas Test shot
409:11:28:287AMTestOkGas Test Shot
509:18:50:557AMPlasmaOk
609:42:29:583AMPlasmaOk
709:56:12:277AMPlasmaOk
810:13:59:180AMPlasmaOk
910:39:41:850AMPlasmaOk
1010:54:04:957AMPlasmaOk
1111:14:09:763AMPlasmaOk
1211:35:50:923AMPlasmaOk
1311:57:41:880AMPlasmaOk
1412:19:09:830PMPlasmaOk
1612:52:13:923PMPlasmaOk
1701:09:34:377PMPlasmaOk
1801:32:29:503PMPlasmaOk
1901:45:30:557PMPlasmaOk
2001:59:00:190PMPlasmaOk
2102:11:50:940PMPlasmaOk
2202:25:01:000PMPlasmaOk
2302:41:38:453PMPlasmaOk
2402:55:16:603PMPlasmaOk
2503:09:56:303PMPlasmaOk
2603:23:33:510PMPlasmaOk
2703:37:12:560PMPlasmaOk
2803:50:43:227PMPlasmaOk
2904:04:17:643PMPlasmaOk
3004:18:03:733PMPlasmaOk
3104:32:05:423PMPlasmaOk
3204:45:40:633PMPlasmaOk
3304:59:11:017PMPlasmaOk

System Availability
Jul 27 2010 08:28:55:963AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESnoBES system is ready for Up-to-air (Apr, 2010)Mar 31 2010 10:36AM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (D+F) working. All midplane and off-midplane diode arrays working except WB1AX. Midplane foils calibrated and PRAD_MAIN is being filled. Divertor/Ledge foils not yet ready.Jul 15 2010 08:27AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno3/26/10 Bottle Removed From Cell, monitors powered down, Autodialer function bypassedMar 26 2010 05:29PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged.Apr 06 2010 10:51AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoWide-view CXRS system is power down and ready for up-to-air (Apr, 2010)Mar 31 2010 10:36AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned; new calibrations (relative brightness and position) not yet implementedJun 29 2010 10:27AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperationalJun 26 2010 09:28PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll channels working - calibration in progressJul 02 2010 09:30AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauges are operational.Jun 28 2010 08:02PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPlugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access.Apr 05 2010 11:18AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational. Ch 5 preamp replaced 6/18.Jun 22 2010 03:03PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesoperating normallyJun 29 2010 10:26AM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Jun 26 2010 11:19PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesSystem installed and aligned. Inverted profiles are still not available.Jul 22 2010 08:41AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes Jun 28 2010 12:12PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayessystem checked out ok on 11006728. Jun 28 2010 04:57PM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayessystem checked out ok on 1100628Jun 28 2010 04:57PM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayessystem checked out ok. conditioned to vacuum. Jun 28 2010 04:58PM (ylin)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-Offyesoperational and testedJul 20 2010 04:42PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridyesLH was tested into dummy loads synced to shot. Shorts have been removed. Probe Cal. 6/29/10 evening.Jun 29 2010 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid Reflectometerno60 GHz system to detect upshifted signalJul 22 2010 08:54AM (sgbaek)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesLYMID, WB4LY and LLY working. WB1LY not attached due to pickup problems.Jul 01 2010 11:58AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesSpectra being collected and tree filled. Wavelength scan is broken so fixed on the Mo XXXI and XXXII lines.Jul 15 2010 08:28AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Start at reduced speed.Jun 22 2010 03:02PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are operationalJun 28 2010 08:02PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesAll systems are on and functionalJun 29 2010 12:56PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03Jun 26 2010 09:21PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoCapillaries tested in-vessel.Jun 28 2010 08:08PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational. AM (2 * 39.51) MHz.Jul 19 2010 05:54PM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,ennever,ntsujii,porkolab
Penning GaugesnoHigh voltage power supplies are turned off, waiting for work at A-port horizontal to be finished.Jun 28 2010 08:07PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air Switchyes Jun 26 2010 11:19PM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Jun 26 2010 11:19PM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyes Jun 26 2010 11:19PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power Systemsyes Jun 26 2010 11:20PM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesOperational.Jun 28 2010 08:03PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperational.Jun 28 2010 08:03PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesF and J outer divertor probes are operational.Jun 28 2010 08:04PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperational, except probe#13Jun 28 2010 08:04PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesOn 1100723xxx the variable, 50, 60, 75, 88u and 88l are not operational. The 112 and 140 are online.Jul 23 2010 08:08AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational. New Langmuir-Mach probe head installed.Jun 28 2010 08:05PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesOperational.Jun 28 2010 08:05PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesBoth A and K units are operational. Coil polarity needs to be checked.Jun 28 2010 08:06PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesHV supply on, cable run to sparker at k-horJun 23 2010 02:41PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS installed and leak tested, individual probes not installedJun 28 2010 01:28PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesNo new CO2 detector, so still missing edge channelsJun 23 2010 02:40PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CoreyesOperating with 2 lasers, but density is **uncalibrated**Jul 14 2010 11:54AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgeyesOperationalJul 14 2010 11:54AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesOperationalJul 01 2010 11:57AM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermlreinke
XTOMOyesCore system working. Edge system waiting for H-modes.Jul 01 2010 11:55AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Jul 27 2010 09:18:40:710AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESnoBES system is ready for Up-to-air (Apr, 2010)Mar 31 2010 10:36AM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (D+F) working. All midplane and off-midplane diode arrays working except WB1AX. Midplane foils calibrated and PRAD_MAIN is being filled. Divertor/Ledge foils not yet ready.Jul 15 2010 08:27AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno3/26/10 Bottle Removed From Cell, monitors powered down, Autodialer function bypassedMar 26 2010 05:29PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged.Apr 06 2010 10:51AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoWide-view CXRS system is power down and ready for up-to-air (Apr, 2010)Mar 31 2010 10:36AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned; new calibrations (relative brightness and position) not yet implementedJun 29 2010 10:27AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperationalJun 26 2010 09:28PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll channels working - calibration in progressJul 02 2010 09:30AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauges are operational.Jun 28 2010 08:02PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPlugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access.Apr 05 2010 11:18AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational. Ch 5 preamp replaced 6/18.Jun 22 2010 03:03PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesoperating normallyJun 29 2010 10:26AM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Jun 26 2010 11:19PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesSystem installed and aligned. Inverted profiles are still not available.Jul 22 2010 08:41AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes Jun 28 2010 12:12PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayessystem checked out ok on 11006728. Jun 28 2010 04:57PM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayessystem checked out ok on 1100628Jun 28 2010 04:57PM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayessystem checked out ok. conditioned to vacuum. Jun 28 2010 04:58PM (ylin)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-Offyesoperational and testedJul 20 2010 04:42PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridyesLH was tested into dummy loads synced to shot. Shorts have been removed. Probe Cal. 6/29/10 evening.Jun 29 2010 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid Reflectometerno60 GHz system to detect upshifted signalJul 22 2010 08:54AM (sgbaek)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesLYMID, WB4LY and LLY working. WB1LY not attached due to pickup problems.Jul 01 2010 11:58AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesSpectra being collected and tree filled. Wavelength scan is broken so fixed on the Mo XXXI and XXXII lines.Jul 15 2010 08:28AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Start at reduced speed.Jun 22 2010 03:02PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are operationalJun 28 2010 08:02PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesAll systems are on and functionalJun 29 2010 12:56PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03Jun 26 2010 09:21PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoCapillaries tested in-vessel.Jun 28 2010 08:08PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational. AM (2 * 39.51) MHz.Jul 19 2010 05:54PM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,ennever,ntsujii,porkolab
Penning GaugesnoHigh voltage power supplies are turned off, waiting for work at A-port horizontal to be finished.Jun 28 2010 08:07PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air Switchyes Jun 26 2010 11:19PM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Jun 26 2010 11:19PM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyes Jun 26 2010 11:19PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power Systemsyes Jun 26 2010 11:20PM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesOperational.Jun 28 2010 08:03PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperational.Jun 28 2010 08:03PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesF and J outer divertor probes are operational.Jun 28 2010 08:04PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperational, except probe#13Jun 28 2010 08:04PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesOn 1100727xxx the 60, 75, 88l, 88u, 112, 140 and variable should be operational. The 50GHz channel is offline in order to prepare for the LH run days on 7/28 and 7/29Jul 27 2010 09:16AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational. New Langmuir-Mach probe head installed.Jun 28 2010 08:05PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesOperational.Jun 28 2010 08:05PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesBoth A and K units are operational. Coil polarity needs to be checked.Jun 28 2010 08:06PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesHV supply on, cable run to sparker at k-horJun 23 2010 02:41PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS installed and leak tested, individual probes not installedJun 28 2010 01:28PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesNo new CO2 detector, so still missing edge channelsJun 23 2010 02:40PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CoreyesOperating with 2 lasers, but density is **uncalibrated**Jul 14 2010 11:54AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgeyesOperationalJul 14 2010 11:54AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesOperationalJul 01 2010 11:57AM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermlreinke
XTOMOyesCore system working. Edge system waiting for H-modes.Jul 01 2010 11:55AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke