| Aug 5 2010 09:30:40:320AM | 1100805001 | Jerry Hughes | Shot 1.
Try to run our baseline EDA H-mode from yesterday.
J-port is faultering.
H-L transition occurs after what looks like an injection at 0.97s.
Will need to try this again before turning on LH.
Extra ~10 minute delay is the result of data problems with RF.
|
| Aug 5 2010 10:08:32:150AM | 1100805002 | Jerry Hughes | Shot 2.
Retry. This time with feeling.
Hung in INIT. No power shot.
Rough start.
|
| Aug 5 2010 10:27:42:127AM | 1100805003 | Jerry Hughes |
Shot 3.
Shots are back on. J-port is not particularly happy in the H-mode.
Rick will try to work on the H-mode tune on J.
Next shot: Start RF at 0.5s instead of 0.6s.
|
| Aug 5 2010 10:46:54:940AM | 1100805004 | Jerry Hughes | Shot 4.
Rf is better, although the faults are hard to rcover from after about 1s.
Next: PO will move ZCUR ramp earlier in the discharge.
LH will fire at lowish power
|
| Aug 5 2010 10:59:57:780AM | 1100805005 | Jerry Hughes | Shot 5.
SSEP reaches target by ~0.85s. LH on from 0.9 to 1.4s at P=137kW.
H-mode lost after LH turn on. Wolfe notes that an ELM seems to knock out E-port.
Next shot. More LH power. Also have Rick step up E-port by 300kW at 1.2s.
|
| Aug 5 2010 11:19:18:783AM | 1100805006 | Jerry Hughes | Shot 6.
Like shot 5, but LH power gets to 200kW. Greg thinks we can get more.
We are still to marginal with input power.
Next: Have Rick increase E-port demand earlier in the shot.
LH power will be increased as well.
|
| Aug 5 2010 11:39:21:733AM | 1100805007 | Jerry Hughes | Shot 7.
2 H-modes. The 2nd one forms with LH on, and seems to want to rise to a lower
density. (see t=1.2s) As Prad keeps rising, the density approaches a higher
value (t=1.3s).
Impurities seem to be becoming a greater problem as we go. Since we seem to be
marginal on ICRF power here, let's try to raise Ip on next shot. (Effectively
skipping to Step 5 of run plan.)
|
| Aug 5 2010 11:55:37:800AM | 1100805008 | Jerry Hughes | Shot 8.
800kA attempt. Mo injection at 0.75 kills first H-mode.
Comparing the H-modes at 0.82s and 1.23s, the dn/dt is lower in the one
with 300kW of LH power.
The H-modes have weak QCMs, and have substantial impurity accumulation.
|
| Aug 5 2010 12:08:35:343PM | 1100805009 | Jerry Hughes | Shot 9.
Very similar to shot 8. Injection happens again at 0.75s. Seems to correspond
with crossing through DN.
3rd H-mode is very radiative.
Next shot: Let's delay ICRF pulse until 0.85s and have the LH come in later as
well.
|
| Aug 5 2010 12:08:44:580PM | 1100805010 | Jerry Hughes | Shot 10
Fizzle
|
| Aug 5 2010 12:54:26:340PM | 1100805011 | Jerry Hughes | Shot 11.
Attempt to make H-mode while already biased USN, then bring in LH.
H-mode at 1.04s. 2nd H-mode at 1.34s.
Rate of rise of density appears lower with LH on.
|
| Aug 5 2010 01:00:13:853PM | 1100805012 | Jerry Hughes |
Shot 12.
Intentionally generated two RF pulses to get an L-H transition
with and w/o LH.
This basically worked. 2nd H-mode seems to have a lower dn/dt.
|
| Aug 5 2010 01:14:46:867PM | 1100805013 | Jerry Hughes | Shot 13.
Got 2 H-modes. First has LH at 120kW, and then 270kW. The ICRF pulse
ends at 1.1s, as desired, and the H-mode is sustained with a bit longer
with 270kW of LH. The H-mode is very steady following ICRF turn off (and Mo
source turn off, presumably)
2nd H-mode has zero LH, 2MW ICRF. ELM-free.
Handing over run to Andrea now.
|
| Aug 5 2010 02:02:00:507PM | 1100805014 | Andrea Schmidt | Trying to set up lh modulation pulse similar to previous ones. New CPS software handles modulated power differently.
No plasma. Try again.
|
| Aug 5 2010 01:57:04:273PM | 1100805015 | Andrea Schmidt | LH trips. Try again.
|
| Aug 5 2010 02:00:59:657PM | 1100805016 | Andrea Schmidt | LH trips. Moving launcher in further. Try again.
|
| Aug 5 2010 02:24:39:257PM | 1100805017 | Andrea Schmidt | LH trips again. Not much luck at these conditions. We will try to move to 1000 kA for the next shot and see if that works any better.
|
| Aug 5 2010 02:41:19:340PM | 1100805018 | Andrea Schmidt | Higher current shot did not work either. We are going to try to reproduce shot 1100804007 from yesterday which ran at this phasing with no trips.
|
| Aug 5 2010 03:05:45:260PM | 1100805019 | Andrea Schmidt | trips again. We are going to try running central 8 collums at this phasing.
|
| Aug 5 2010 03:13:52:533PM | 1100805020 | Andrea Schmidt | no plasma. try again.
|
| Aug 5 2010 03:39:46:997PM | 1100805021 | Andrea Schmidt | No coupling. Move to n_|| = 1.55 for next shot.
|
| Aug 5 2010 03:50:50:430PM | 1100805022 | Andrea Schmidt | 5 clean pulses - LH timing is a little bit off.
Reduce power to 80%, try a new method for modulation for next shot.
Lower requested density for next shot.
|
| Aug 5 2010 04:18:40:733PM | 1100805023 | Andrea Schmidt | LH trips repeatedly until it runs out of retries. Adjusting the trip parameters for next shot.
|
| Aug 5 2010 04:35:09:517PM | 1100805024 | Andrea Schmidt | LH ran whole shot, but continuous trips again. Next shot try constant power LH.
|
| Aug 5 2010 04:50:04:983PM | 1100805025 | Andrea Schmidt | LH trips out again. Next shot will be retry of 1100729005, which ran well.
|
| Aug 5 2010 04:56:06:067PM | 1100805026 | Andrea Schmidt | First clean shot of the afternoon, LH ran with no trips.
Next shot request constant density, and try modulation.
|
| Aug 5 2010 05:05:21:190PM | 1100805027 | Andrea Schmidt | No plasma. End of run.
|
| Physics Operator Comments |
| Aug 5 2010 09:19:52:833AM | 1100805001 | Earl Marmar | load from 1100804032
disable argon (PG1, B-side lower)
may be a small delay for cryopump
plasma, full length
startup has a problem (not obviously a bounce, but eventually goes in (starting around 17 msec), followed by significant hards)
|
| Aug 5 2010 10:15:57:460AM | 1100805002 | Earl Marmar | EF4 10 A more negative prior to t=0 (now -1280A)
start TF rampdown at 1.5 s (instead of 2 s)
problems during init
no power
|
| Aug 5 2010 10:21:58:500AM | 1100805003 | Earl Marmar | no additional dpcs changes
plasma, disrupt just after end of flattop
bounce at startup, some hards
|
| Aug 5 2010 10:38:32:053AM | 1100805004 | Earl Marmar | EF4 to -1270 A
plasma
no bounce, no hards
disrupt just after end of flattop
|
| Aug 5 2010 10:57:42:700AM | 1100805005 | Earl Marmar | zcur excursion moved earlier by 0.1 s
clearin reference changed at 1.0 s
various tweaks after 1.5 s
plasma, full length
no obvious bounce, but some early hards
|
| Aug 5 2010 11:13:40:450AM | 1100805006 | Earl Marmar | no dpcs changes
plasma, full length
bounce, hards
|
| Aug 5 2010 11:27:10:300AM | 1100805007 | Earl Marmar | EF4 to -1260 A
plasma, full length
bounce, no hards
|
| Aug 5 2010 11:45:57:150AM | 1100805008 | Earl Marmar | prefill puff to 57 ms (from 54 ms)
Ip to 0.8 MA
nl_04 target to 0.8e19
plasma, disrupt just after end of flattop
no bounce, no hards
|
| Aug 5 2010 11:56:54:757AM | 1100805009 | Earl Marmar | no dpcs changes
plasma, disrupt just after end of flattop
no bounce, no hards
|
| Aug 5 2010 12:16:49:200PM | 1100805010 | Earl Marmar | zcur increase moved 0.1 s earlier
clearin reference change at 0.9 s
zcur tweak after 1.5 s
weak fizzle, late breakdown
fields look ok: EF2U, EF2L and EF1U all changed by small amounts compared to shot 9
cryoburp?
|
| Aug 5 2010 12:36:32:580PM | 1100805011 | Earl Marmar | no dpcs changes
plasma, disrupt early in rampdown
no bounce, no hards
|
| Aug 5 2010 01:02:51:233PM | 1100805012 | Earl Marmar | rampdown tweaks
plasma, disrupt early in rampdown
no hards
|
| Aug 5 2010 01:02:26:290PM | 1100805013 | Earl Marmar | continue to tweak the rampdown
plasma, full length
no hards
|
| Aug 5 2010 01:34:18:163PM | 1100805014 | Earl Marmar | switching to mp468 LH modulation
load 1070827007 segment 2 into SEGMENT 4
turn off segment 3, turn on segment 4
recalculate magnetics
cryopump off
prefill puff to 20 ms
dud
fields look ok
ratiomatic is dead, so can't tell what's happening with fill
|
| Aug 5 2010 01:48:21:550PM | 1100805015 | Earl Marmar | prefill puff to 24 ms (from 20 ms)
plasma, full length
startup looks ok
no hards
|
| Aug 5 2010 02:19:40:030PM | 1100805016 | Earl Marmar | increase Ip prop gain before 0.65 s, to try to get down to 0.5 MA earlier
plasma, full length
startup ok, no hards
|
| Aug 5 2010 02:20:03:110PM | 1100805017 | Earl Marmar | no dpcs changes
plasma, full length
no hards
|
| Aug 5 2010 02:40:36:923PM | 1100805018 | Earl Marmar | Ip to 1.0 MA
plasma, full length
no hards
|
| Aug 5 2010 03:09:31:833PM | 1100805019 | Earl Marmar | load 1100804007
800 kA, LSN, nl_04=9e19
segments 1 and 2 active
import segment 1 from 1100805018 into segment 1
plasma, full length
no hards
|
| Aug 5 2010 03:10:10:720PM | 1100805020 | Earl Marmar | no dpcs changes
weak fizzle, late breakdown
can't easily blame this one on the cryopump
|
| Aug 5 2010 03:24:07:087PM | 1100805021 | Earl Marmar | prefill puff to 26 ms (from 24 ms)
plasma, full length
breakdown still a tad tardy
no hards
|
| Aug 5 2010 04:08:16:250PM | 1100805022 | Earl Marmar | reload shot 18 (actually import segment 4 into segment 4, turn off segment 2, turn on segment 4).
plasma, full length
late breakdown, 7.8 ms
short burst of hards at 0.16 seconds
ohmic h-mode from 1.3 to 1.7 seconds
|
| Aug 5 2010 04:07:37:597PM | 1100805023 | Earl Marmar | EF4 to -1270 A (from -1260 A)
nl_04 target to 4e19
plasma
breakdown is at more usual time, 5.3 ms
no hards
|
| Aug 5 2010 04:43:59:173PM | 1100805024 | Earl Marmar | no dpcs changes
plasma, full length
no hards
|
| Aug 5 2010 04:45:09:827PM | 1100805025 | Earl Marmar | no dpcs changes
plasma, disrupts shortly into ramp-down
significant hards after trippy LH
possible locked mode around 1.3 s
startup ok, no early hards
|
| Aug 5 2010 04:57:33:860PM | 1100805026 | Earl Marmar | load from 1100729005
import segment 1 from 1100805025 into segment 1
prefill puff to 24 ms (from 26 ms)
plasma, full length
breakdown ok, no early hards
|
| Aug 5 2010 05:41:16:237PM | 1100805027 | Earl Marmar | nl_04 program changed to be flat at 0.4e20 through 1.2 s
plasma
mega early runaways
gets to about 200 kA, then disrupts (0.09 s)
wide2 shows three glowing, flying objects; also on G-H limiter view.
no heating on the instrumented parts of any limiters
|
| System Availability |
| Aug 5 2010 09:06:17:033AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | no | BES system is ready for Up-to-air (Apr, 2010) | Mar 31 2010 10:36AM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (D+F) working. All midplane and off-midplane diode arrays working except WB1AX. Midplane foils calibrated and PRAD_MAIN is being filled. Divertor/Ledge foils not yet ready. | Jul 15 2010 08:27AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | 3/26/10 Bottle Removed From Cell, monitors powered down, Autodialer function bypassed | Mar 26 2010 05:29PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged. | Apr 06 2010 10:51AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | Wide-view CXRS system is power down and ready for up-to-air (Apr, 2010) | Mar 31 2010 10:36AM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned; new calibrations (relative brightness and position) not yet implemented | Jun 29 2010 10:27AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational | Jun 26 2010 09:28PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | All channels working and calibrated. | Jul 30 2010 08:13AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauges are operational. | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Plugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access. | Apr 05 2010 11:18AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. Ch 5 preamp replaced 6/18. | Jun 22 2010 03:03PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | operating normally | Jun 29 2010 10:26AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | System installed and aligned. Inverted profiles are still not available. | Jul 22 2010 08:41AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | | Jun 28 2010 12:12PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | system checked out ok on 11006728. | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | system checked out ok on 1100628 | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | system checked out ok. conditioned to vacuum. | Jun 28 2010 04:58PM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | operational and tested | Jul 20 2010 04:42PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | yes | LH was tested into dummy loads synced to shot. Shorts have been removed. Probe Cal. 6/29/10 evening. | Jun 29 2010 03:51PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | yes | 60 GHz system to detect upshifted signal | Jul 28 2010 01:39PM (sgbaek) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | LYMID, WB4LY and LLY working. WB1LY not attached due to pickup problems. | Jul 01 2010 11:58AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Spectra being collected and tree filled. Wavelength scan is broken so fixed on the Mo XXXI and XXXII lines. | Jul 15 2010 08:28AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Start at reduced speed. | Jun 22 2010 03:02PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are operational | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | All systems are on and functional | Jun 29 2010 12:56PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | PMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03 | Jun 26 2010 09:21PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Capillaries tested in-vessel. | Jun 28 2010 08:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. AM (2 * 39.51) MHz. | Jul 19 2010 05:54PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,ennever,ntsujii,porkolab | | Penning Gauges | no | High voltage power supplies are turned off, waiting for work at A-port horizontal to be finished. | Jun 28 2010 08:07PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | | Jun 26 2010 11:20PM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | F and J outer divertor probes are operational. | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Operational, except probe#13 | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | On 1100803xxx 60-140 channels are all connected. The 50I/Q are being used by the 75GHz channel in order to track down a noise issue. | Aug 03 2010 09:31AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Operational. New Langmuir-Mach probe head installed. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Operational. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | Both A and K units are operational. Coil polarity needs to be checked. | Jun 28 2010 08:06PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | HV supply on, cable run to sparker at k-hor | Jun 23 2010 02:41PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | no | SSS installed and leak tested, individual probes not installed | Jun 28 2010 01:28PM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | No new CO2 detector, so still missing edge channels | Jun 23 2010 02:40PM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | Operating with 2 lasers, but density is **uncalibrated** | Jul 14 2010 11:54AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | yes | Operational | Jul 14 2010 11:54AM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | Operational | Jul 01 2010 11:57AM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | mlreinke | | XTOMO | yes | Core system working. Edge system waiting for H-modes. | Jul 01 2010 11:55AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Aug 5 2010 09:59:41:437AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | no | BES system is ready for Up-to-air (Apr, 2010) | Mar 31 2010 10:36AM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (D+F) working. All midplane and off-midplane diode arrays working except WB1AX. Midplane foils calibrated and PRAD_MAIN is being filled. Divertor/Ledge foils not yet ready. | Jul 15 2010 08:27AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | 3/26/10 Bottle Removed From Cell, monitors powered down, Autodialer function bypassed | Mar 26 2010 05:29PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged. | Apr 06 2010 10:51AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | Wide-view CXRS system is power down and ready for up-to-air (Apr, 2010) | Mar 31 2010 10:36AM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned; new calibrations (relative brightness and position) not yet implemented | Jun 29 2010 10:27AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational | Jun 26 2010 09:28PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | All channels working and calibrated. | Jul 30 2010 08:13AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauges are operational. | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Plugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access. | Apr 05 2010 11:18AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. Ch 5 preamp replaced 6/18. | Jun 22 2010 03:03PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | operating normally | Jun 29 2010 10:26AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | System installed and aligned. Inverted profiles are still not available. | Jul 22 2010 08:41AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | | Jun 28 2010 12:12PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | system checked out ok on 11006728. | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | system checked out ok on 1100628 | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | system checked out ok. conditioned to vacuum. | Jun 28 2010 04:58PM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | operational and tested | Jul 20 2010 04:42PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | yes | LH was tested into dummy loads synced to shot. Shorts have been removed. Probe Cal. 6/29/10 evening. | Jun 29 2010 03:51PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | yes | 60 GHz system to detect upshifted signal | Jul 28 2010 01:39PM (sgbaek) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | LYMID, WB4LY and LLY working. WB1LY not attached due to pickup problems. | Jul 01 2010 11:58AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Spectra being collected and tree filled. Wavelength scan is broken so fixed on the Mo XXXI and XXXII lines. | Jul 15 2010 08:28AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Start at reduced speed. | Jun 22 2010 03:02PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are operational | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | All systems are on and functional | Jun 29 2010 12:56PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | PMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03 | Jun 26 2010 09:21PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Capillaries tested in-vessel. | Jun 28 2010 08:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. AM (2 * 39.51) MHz. | Jul 19 2010 05:54PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,ennever,ntsujii,porkolab | | Penning Gauges | no | High voltage power supplies are turned off, waiting for work at A-port horizontal to be finished. | Jun 28 2010 08:07PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | | Jun 26 2010 11:20PM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | F and J outer divertor probes are operational. | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Operational, except probe#13 | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | On 1100803xxx 60-140 channels are all connected. The 50I/Q are being used by the 75GHz channel in order to track down a noise issue. | Aug 03 2010 09:31AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Operational. New Langmuir-Mach probe head installed. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Operational. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | Both A and K units are operational. Coil polarity needs to be checked. | Jun 28 2010 08:06PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | HV supply on, cable run to sparker at k-hor | Jun 23 2010 02:41PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | no | SSS installed and leak tested, individual probes not installed | Jun 28 2010 01:28PM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | No new CO2 detector, so still missing edge channels | Jun 23 2010 02:40PM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | Operating with 2 lasers, but density is **uncalibrated** | Jul 14 2010 11:54AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | yes | Operational | Jul 14 2010 11:54AM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | Operational | Jul 01 2010 11:57AM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | mlreinke | | XTOMO | yes | Core system working. Edge system waiting for H-modes. | Jul 01 2010 11:55AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Aug 5 2010 10:14:14:890AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | no | BES system is ready for Up-to-air (Apr, 2010) | Mar 31 2010 10:36AM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (D+F) working. All midplane and off-midplane diode arrays working except WB1AX. Midplane foils calibrated and PRAD_MAIN is being filled. Divertor/Ledge foils not yet ready. | Jul 15 2010 08:27AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | 3/26/10 Bottle Removed From Cell, monitors powered down, Autodialer function bypassed | Mar 26 2010 05:29PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged. | Apr 06 2010 10:51AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | Wide-view CXRS system is power down and ready for up-to-air (Apr, 2010) | Mar 31 2010 10:36AM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned; new calibrations (relative brightness and position) not yet implemented | Jun 29 2010 10:27AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational | Jun 26 2010 09:28PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | All channels working and calibrated. | Jul 30 2010 08:13AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauges are operational. | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Plugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access. | Apr 05 2010 11:18AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. Ch 5 preamp replaced 6/18. | Jun 22 2010 03:03PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | operating normally | Jun 29 2010 10:26AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | System installed and aligned. Inverted profiles are still not available. | Jul 22 2010 08:41AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | | Jun 28 2010 12:12PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | system checked out ok on 11006728. | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | system checked out ok on 1100628 | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | system checked out ok. conditioned to vacuum. | Jun 28 2010 04:58PM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | operational and tested | Jul 20 2010 04:42PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | yes | LH was tested into dummy loads synced to shot. Shorts have been removed. Probe Cal. 6/29/10 evening. | Jun 29 2010 03:51PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | yes | 60 GHz system to detect upshifted signal | Jul 28 2010 01:39PM (sgbaek) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | LYMID, WB4LY and LLY working. WB1LY not attached due to pickup problems. | Jul 01 2010 11:58AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Spectra being collected and tree filled. Wavelength scan is broken so fixed on the Mo XXXI and XXXII lines. | Jul 15 2010 08:28AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Start at reduced speed. | Jun 22 2010 03:02PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are operational | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | All systems are on and functional | Jun 29 2010 12:56PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | PMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03 | Jun 26 2010 09:21PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Capillaries tested in-vessel. | Jun 28 2010 08:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. AM (2 * 39.51) MHz. | Jul 19 2010 05:54PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,ennever,ntsujii,porkolab | | Penning Gauges | no | High voltage power supplies are turned off, waiting for work at A-port horizontal to be finished. | Jun 28 2010 08:07PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | | Jun 26 2010 11:20PM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | F and J outer divertor probes are operational. | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Operational, except probe#13 | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | On 1100803xxx 60-140 channels are all connected. The 50I/Q are being used by the 75GHz channel in order to track down a noise issue. | Aug 03 2010 09:31AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Operational. New Langmuir-Mach probe head installed. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Operational. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | Both A and K units are operational. Coil polarity needs to be checked. | Jun 28 2010 08:06PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | HV supply on, cable run to sparker at k-hor | Jun 23 2010 02:41PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | no | SSS installed and leak tested, individual probes not installed | Jun 28 2010 01:28PM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | No new CO2 detector, so still missing edge channels | Jun 23 2010 02:40PM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | Operating with 2 lasers, but density is **uncalibrated** | Jul 14 2010 11:54AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | yes | Operational | Jul 14 2010 11:54AM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | Operational | Jul 01 2010 11:57AM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | mlreinke | | XTOMO | yes | Core system working. Edge system waiting for H-modes. | Jul 01 2010 11:55AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Aug 5 2010 10:28:46:353AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | no | BES system is ready for Up-to-air (Apr, 2010) | Mar 31 2010 10:36AM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (D+F) working. All midplane and off-midplane diode arrays working except WB1AX. Midplane foils calibrated and PRAD_MAIN is being filled. Divertor/Ledge foils not yet ready. | Jul 15 2010 08:27AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | 3/26/10 Bottle Removed From Cell, monitors powered down, Autodialer function bypassed | Mar 26 2010 05:29PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged. | Apr 06 2010 10:51AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | Wide-view CXRS system is power down and ready for up-to-air (Apr, 2010) | Mar 31 2010 10:36AM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned; new calibrations (relative brightness and position) not yet implemented | Jun 29 2010 10:27AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational | Jun 26 2010 09:28PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | All channels working and calibrated. | Jul 30 2010 08:13AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauges are operational. | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Plugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access. | Apr 05 2010 11:18AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. Ch 5 preamp replaced 6/18. | Jun 22 2010 03:03PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | operating normally | Jun 29 2010 10:26AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | System installed and aligned. Inverted profiles are still not available. | Jul 22 2010 08:41AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | | Jun 28 2010 12:12PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | system checked out ok on 11006728. | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | system checked out ok on 1100628 | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | system checked out ok. conditioned to vacuum. | Jun 28 2010 04:58PM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | operational and tested | Jul 20 2010 04:42PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | yes | LH was tested into dummy loads synced to shot. Shorts have been removed. Probe Cal. 6/29/10 evening. | Jun 29 2010 03:51PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | yes | 60 GHz system to detect upshifted signal | Jul 28 2010 01:39PM (sgbaek) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | LYMID, WB4LY and LLY working. WB1LY not attached due to pickup problems. | Jul 01 2010 11:58AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Spectra being collected and tree filled. Wavelength scan is broken so fixed on the Mo XXXI and XXXII lines. | Jul 15 2010 08:28AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Start at reduced speed. | Jun 22 2010 03:02PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are operational | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | All systems are on and functional | Jun 29 2010 12:56PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | PMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03 | Jun 26 2010 09:21PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Capillaries tested in-vessel. | Jun 28 2010 08:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. AM (2 * 39.51) MHz. | Jul 19 2010 05:54PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,ennever,ntsujii,porkolab | | Penning Gauges | no | High voltage power supplies are turned off, waiting for work at A-port horizontal to be finished. | Jun 28 2010 08:07PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | | Jun 26 2010 11:20PM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | F and J outer divertor probes are operational. | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Operational, except probe#13 | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | On 1100803xxx 60-140 channels are all connected. The 50I/Q are being used by the 75GHz channel in order to track down a noise issue. | Aug 03 2010 09:31AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Operational. New Langmuir-Mach probe head installed. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Operational. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | Both A and K units are operational. Coil polarity needs to be checked. | Jun 28 2010 08:06PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | HV supply on, cable run to sparker at k-hor | Jun 23 2010 02:41PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | no | SSS installed and leak tested, individual probes not installed | Jun 28 2010 01:28PM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | No new CO2 detector, so still missing edge channels | Jun 23 2010 02:40PM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | Operating with 2 lasers, but density is **uncalibrated** | Jul 14 2010 11:54AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | yes | Operational | Jul 14 2010 11:54AM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | Operational | Jul 01 2010 11:57AM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | mlreinke | | XTOMO | yes | Core system working. Edge system waiting for H-modes. | Jul 01 2010 11:55AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Aug 5 2010 10:45:22:467AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | no | BES system is ready for Up-to-air (Apr, 2010) | Mar 31 2010 10:36AM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (D+F) working. All midplane and off-midplane diode arrays working except WB1AX. Midplane foils calibrated and PRAD_MAIN is being filled. Divertor/Ledge foils not yet ready. | Jul 15 2010 08:27AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | 3/26/10 Bottle Removed From Cell, monitors powered down, Autodialer function bypassed | Mar 26 2010 05:29PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged. | Apr 06 2010 10:51AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | Wide-view CXRS system is power down and ready for up-to-air (Apr, 2010) | Mar 31 2010 10:36AM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned; new calibrations (relative brightness and position) not yet implemented | Jun 29 2010 10:27AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational | Jun 26 2010 09:28PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | All channels working and calibrated. | Jul 30 2010 08:13AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauges are operational. | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Plugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access. | Apr 05 2010 11:18AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. Ch 5 preamp replaced 6/18. | Jun 22 2010 03:03PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | operating normally | Jun 29 2010 10:26AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | System installed and aligned. Inverted profiles are still not available. | Jul 22 2010 08:41AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | | Jun 28 2010 12:12PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | system checked out ok on 11006728. | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | system checked out ok on 1100628 | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | system checked out ok. conditioned to vacuum. | Jun 28 2010 04:58PM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | operational and tested | Jul 20 2010 04:42PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | yes | LH was tested into dummy loads synced to shot. Shorts have been removed. Probe Cal. 6/29/10 evening. | Jun 29 2010 03:51PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | yes | 60 GHz system to detect upshifted signal | Jul 28 2010 01:39PM (sgbaek) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | LYMID, WB4LY and LLY working. WB1LY not attached due to pickup problems. | Jul 01 2010 11:58AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Spectra being collected and tree filled. Wavelength scan is broken so fixed on the Mo XXXI and XXXII lines. | Jul 15 2010 08:28AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Start at reduced speed. | Jun 22 2010 03:02PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are operational | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | All systems are on and functional | Jun 29 2010 12:56PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | PMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03 | Jun 26 2010 09:21PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Capillaries tested in-vessel. | Jun 28 2010 08:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. AM (2 * 39.51) MHz. | Jul 19 2010 05:54PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,ennever,ntsujii,porkolab | | Penning Gauges | no | High voltage power supplies are turned off, waiting for work at A-port horizontal to be finished. | Jun 28 2010 08:07PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | | Jun 26 2010 11:20PM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | F and J outer divertor probes are operational. | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Operational, except probe#13 | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | On 1100803xxx 60-140 channels are all connected. The 50I/Q are being used by the 75GHz channel in order to track down a noise issue. | Aug 03 2010 09:31AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Operational. New Langmuir-Mach probe head installed. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Operational. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | Both A and K units are operational. Coil polarity needs to be checked. | Jun 28 2010 08:06PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | HV supply on, cable run to sparker at k-hor | Jun 23 2010 02:41PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | no | SSS installed and leak tested, individual probes not installed | Jun 28 2010 01:28PM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | No new CO2 detector, so still missing edge channels | Jun 23 2010 02:40PM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | Operating with 2 lasers, but density is **uncalibrated** | Jul 14 2010 11:54AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | yes | Operational | Jul 14 2010 11:54AM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | Operational | Jul 01 2010 11:57AM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | mlreinke | | XTOMO | yes | Core system working. Edge system waiting for H-modes. | Jul 01 2010 11:55AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Aug 5 2010 11:03:03:870AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | no | BES system is ready for Up-to-air (Apr, 2010) | Mar 31 2010 10:36AM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (D+F) working. All midplane and off-midplane diode arrays working except WB1AX. Midplane foils calibrated and PRAD_MAIN is being filled. Divertor/Ledge foils not yet ready. | Jul 15 2010 08:27AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | 3/26/10 Bottle Removed From Cell, monitors powered down, Autodialer function bypassed | Mar 26 2010 05:29PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged. | Apr 06 2010 10:51AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | Wide-view CXRS system is power down and ready for up-to-air (Apr, 2010) | Mar 31 2010 10:36AM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned; new calibrations (relative brightness and position) not yet implemented | Jun 29 2010 10:27AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational | Jun 26 2010 09:28PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | All channels working and calibrated. | Jul 30 2010 08:13AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauges are operational. | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Plugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access. | Apr 05 2010 11:18AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. Ch 5 preamp replaced 6/18. | Jun 22 2010 03:03PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | operating normally | Jun 29 2010 10:26AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | System installed and aligned. Inverted profiles are still not available. | Jul 22 2010 08:41AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | | Jun 28 2010 12:12PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | system checked out ok on 11006728. | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | system checked out ok on 1100628 | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | system checked out ok. conditioned to vacuum. | Jun 28 2010 04:58PM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | operational and tested | Jul 20 2010 04:42PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | yes | LH was tested into dummy loads synced to shot. Shorts have been removed. Probe Cal. 6/29/10 evening. | Jun 29 2010 03:51PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | yes | 60 GHz system to detect upshifted signal | Jul 28 2010 01:39PM (sgbaek) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | LYMID, WB4LY and LLY working. WB1LY not attached due to pickup problems. | Jul 01 2010 11:58AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Spectra being collected and tree filled. Wavelength scan is broken so fixed on the Mo XXXI and XXXII lines. | Jul 15 2010 08:28AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Start at reduced speed. | Jun 22 2010 03:02PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are operational | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | All systems are on and functional | Jun 29 2010 12:56PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | PMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03 | Jun 26 2010 09:21PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Capillaries tested in-vessel. | Jun 28 2010 08:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. AM (2 * 39.51) MHz. | Jul 19 2010 05:54PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,ennever,ntsujii,porkolab | | Penning Gauges | no | High voltage power supplies are turned off, waiting for work at A-port horizontal to be finished. | Jun 28 2010 08:07PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | | Jun 26 2010 11:20PM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | F and J outer divertor probes are operational. | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Operational, except probe#13 | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | On 1100803xxx 60-140 channels are all connected. The 50I/Q are being used by the 75GHz channel in order to track down a noise issue. | Aug 03 2010 09:31AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Operational. New Langmuir-Mach probe head installed. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Operational. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | Both A and K units are operational. Coil polarity needs to be checked. | Jun 28 2010 08:06PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | HV supply on, cable run to sparker at k-hor | Jun 23 2010 02:41PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | no | SSS installed and leak tested, individual probes not installed | Jun 28 2010 01:28PM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | No new CO2 detector, so still missing edge channels | Jun 23 2010 02:40PM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | Operating with 2 lasers, but density is **uncalibrated** | Jul 14 2010 11:54AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | yes | Operational | Jul 14 2010 11:54AM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | Operational | Jul 01 2010 11:57AM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | mlreinke | | XTOMO | yes | Core system working. Edge system waiting for H-modes. | Jul 01 2010 11:55AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Aug 5 2010 11:16:12:813AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | no | BES system is ready for Up-to-air (Apr, 2010) | Mar 31 2010 10:36AM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (D+F) working. All midplane and off-midplane diode arrays working except WB1AX. Midplane foils calibrated and PRAD_MAIN is being filled. Divertor/Ledge foils not yet ready. | Jul 15 2010 08:27AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | 3/26/10 Bottle Removed From Cell, monitors powered down, Autodialer function bypassed | Mar 26 2010 05:29PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged. | Apr 06 2010 10:51AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | Wide-view CXRS system is power down and ready for up-to-air (Apr, 2010) | Mar 31 2010 10:36AM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned; new calibrations (relative brightness and position) not yet implemented | Jun 29 2010 10:27AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational | Jun 26 2010 09:28PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | All channels working and calibrated. | Jul 30 2010 08:13AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauges are operational. | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Plugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access. | Apr 05 2010 11:18AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. Ch 5 preamp replaced 6/18. | Jun 22 2010 03:03PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | operating normally | Jun 29 2010 10:26AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | System installed and aligned. Inverted profiles are still not available. | Jul 22 2010 08:41AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | | Jun 28 2010 12:12PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | system checked out ok on 11006728. | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | system checked out ok on 1100628 | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | system checked out ok. conditioned to vacuum. | Jun 28 2010 04:58PM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | operational and tested | Jul 20 2010 04:42PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | yes | LH was tested into dummy loads synced to shot. Shorts have been removed. Probe Cal. 6/29/10 evening. | Jun 29 2010 03:51PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | yes | 60 GHz system to detect upshifted signal | Jul 28 2010 01:39PM (sgbaek) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | LYMID, WB4LY and LLY working. WB1LY not attached due to pickup problems. | Jul 01 2010 11:58AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Spectra being collected and tree filled. Wavelength scan is broken so fixed on the Mo XXXI and XXXII lines. | Jul 15 2010 08:28AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Start at reduced speed. | Jun 22 2010 03:02PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are operational | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | All systems are on and functional | Jun 29 2010 12:56PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | PMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03 | Jun 26 2010 09:21PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Capillaries tested in-vessel. | Jun 28 2010 08:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. AM (2 * 39.51) MHz. | Jul 19 2010 05:54PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,ennever,ntsujii,porkolab | | Penning Gauges | no | High voltage power supplies are turned off, waiting for work at A-port horizontal to be finished. | Jun 28 2010 08:07PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | | Jun 26 2010 11:20PM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | F and J outer divertor probes are operational. | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Operational, except probe#13 | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | On 1100803xxx 60-140 channels are all connected. The 50I/Q are being used by the 75GHz channel in order to track down a noise issue. | Aug 03 2010 09:31AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Operational. New Langmuir-Mach probe head installed. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Operational. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | Both A and K units are operational. Coil polarity needs to be checked. | Jun 28 2010 08:06PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | HV supply on, cable run to sparker at k-hor | Jun 23 2010 02:41PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | no | SSS installed and leak tested, individual probes not installed | Jun 28 2010 01:28PM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | No new CO2 detector, so still missing edge channels | Jun 23 2010 02:40PM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | Operating with 2 lasers, but density is **uncalibrated** | Jul 14 2010 11:54AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | yes | Operational | Jul 14 2010 11:54AM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | Operational | Jul 01 2010 11:57AM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | mlreinke | | XTOMO | yes | Core system working. Edge system waiting for H-modes. | Jul 01 2010 11:55AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|