Alcator C-Mod Run 1100812 Information

Back to runs

Miniproposals
Miniproposal:468
Date Filed: 3/8/2007
Title:LH-driven fast electron diffusion time measurement
First Author:Andrea Schmidt
Session Leader:Andrea Schmidt (shots 22-31)
Miniproposal:605
Date Filed: 6/10/2010
Title:LH2 lower hybrid launcher checkout and conditioning
First Author:Greg Wallace
Session Leader:Greg Wallace (shots 1-21)

Operators
Session leader(s):Greg Wallace,Andrea Schmidt
Physics operator(s):Ron Parker
Engineering operator(s):Bill Cochran,Bill Parkin,Bill Byford

Engineering Operator Run Comment
automatically entered by signon - please replace with real comment

Session Leader Plans
Entered: Aug 11 2010 01:56:47:290PM
Author: Greg Wallace
Session Leader Plan for 1100812 (am)
Session Leader: G. Wallace
Physics Operator: R. Parker
Miniproposal: 605 LH2 Lower Hybrid Launcher Checkout and Conditioning

The purpose of this half day will be to make sure the LH system is operating properly after fixing several issues over the maintenence days early in the week. Also, we will attempt to get Andrea's square wave modulation waveform working.

LH Setup: 0.5 mm behind limiter, up to 140 kW/klystron, steady pulses and modulated pulses, 90 & 146 deg phasing.

Reference shot: 1100804007

1) Verify proper phase and amplitude of klystron 4 in dummy load. (Before 9am?)
2) Attempt to couple steady LH pulse at 146 deg, 40 kV, 80 kW/klystron. If necessary adjust phasing/amplitude on klystron 4 if necessary. Adjust plasma density, gaps, and launcher position to achieve lowest reflection coefficients on columns which generate trips. If successful increase power to 110 kW/klystron, then 140 kW/klystron.
3) Attempt to couple modulated LH waveform at 90 deg phasing, 40 kV, 80 kW/klystron. If successful increase power to 110 kW/klystron, then 140 kW/klystron at 90 deg phasing.
4) Repeat 3 at 146 deg phasing.
Entered: Aug 12 2010 09:56:35:663AM
Author: Andrea Schmidt
Continuation of MP 468 (LH Modulation)
Second 1/2 of run day


1) Start with 500 kA, nl04=5e19 (1070827007)
Modulate 146 deg phasing LH 12.5 ms on, 12.5 ms off from 0.5 to 1.2 s
Try to get 4-5 clean shots at this condition

2) Increase current to 1000 kA, nl04=5e19
Modulate 146 deg phasing LH 12.5 ms on, 12.5 ms off from 0.5 to 1.2 s
Try to get 4-5 clean shots at this condition

3) If there is time, move to 800 kA, nl04=7.5e19 (1070426013)
Modulate 146 deg phasing LH 12.5 ms on, 12.5 ms off from 0.5 to 1.2 s
Try to get 5 clean shots at these conditions.

Runplan subject to change, depending on how conditioning run goes in the morning. May need to reduce n_|| to 2.9.

Physics Operators Plans
Entered: Aug 11 2010 03:33:27:913PM
Author: Ron Parker
Session Leader: G. Wallace (AM), A. Schmidt (PM)
Physics Operator: R. Parker
MP:605 - LH2 launcher and conditioning (AM)
MP:468 - LH-driven fast electron diffusion time measurement

-----------------
Engineering Setup
-----------------

Run begins at 09:00 and ends at 17:00


Power systems as on: 1100804001


Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:

Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
fill NINJA with 10 psi D2 DISABLED

Enable gate-valves and shutters: ECE, VUV, HiREX Sr, Xeus
Leave z-bolo shutter as is (should be open)

Torvac gatevalve toggle (yes/no): no

Boronization(yes/no): yes
Overnight ECDC (yes/no): yes
ICRF(yes/no): no
LH(yes/no): yes
Cryopump (yes/no): yes

Vessel temperature: 35/35/35

------------------------------
ECDC Parameters (for Boronization)
------------------------------
dP: approx 120 psi

Approx gauge and piezo levels from last boronization
with 10% diborane bottle:

TC6:80.1 mTorr
TC9:66.6 mTorr
TC3:4.6 mTorr
piezo: 42 %

rmin/rdwell/rmax: 44/52/103 cm
tdwell/tsweep: 60/120 s

EF4 current: 0 A

Post boronization ECDC
----------------------------
1st Gas Setup:
Gas: Helium-4
sweep: 44/45/103 cm
scan: 20/120 s
Pressure: 6.0e-5 Torr
Duration:2 Hrs.

2nd Gas Setup
Gas: D2
sweep: 44/45/103 cm
scan: 20/120 s
Pressure: 2.0e-4 Torr
Duration:1 Hr.

Session Leader Summaries
Entered: Aug 13 2010 01:42:38:490PM
Author: Andrea Schmidt
Summary:

Continuation of MP 468 (LH Modulation)
Second 1/2 of run day

The conditioning run in the morning was semi-successful and produced the proper waveform into a higher density plasma for lower phasing than desired. Given the results of the conditioning run, I decided to try to get condition #3 from the session leader plan, the only condition at high density. We were repeatedly unable to get the desired modulated wave form for 146 degree phasing (n_||=3.1), so we decided to move on to 135 degree phasing instead. Even at the lower phasing, there were many LH nuissance trips. As before, LH was tripping frequently during the fall in power. We did get 5 shots at 135 degree phasing with between 5 and 20 complete modulations and 7 shots at 146 degree phasing with between 3 and 6 complete modulations.

Physics Operator Summaries
Entered: Aug 12 2010 05:22:20:143PM
Author: Ron Parker
Machine ran fairly well today, with a few minor problems.The programmed shot was a nominal 800 kA, 5.4 T, nelo4 ~ 5-7e19 m-2 discharge. The objective was to try to get fast electron transport data at high phasing corresponding to n_par ~ 3.1. The problem has been (and continues to be) fairly high reflection coefficient at this relatively high value of n_par. During much of the day,various densities, outer gaps and RXL programs were tried in order to minimize the reflection coefficient. Nevertheless, the best values obtained were still high, ~ 40%.

The first plasma attempt failed due to lack of commutation.Thereafter, most of the shots ran full length, with the exception of a few that suffered early disruptions and one in which the OH2 crowbarred. The ICRF piggybacked up until shot 25 in order to prepare it for tomorrow's run.

Scorecard:

31 plasma attempts, 1 failed commutation, 1 OH2 crowbar, 3 disruptions, 1 fizzle and 25 full length plasmas

Session Leader Comments
Aug 12 2010 09:29:01:143AM1100812002Greg Wallace80kW/klystron, 146 deg phasing. Many trips, possibly caused by ICRF running during LH pulse. Will retry for next shot without ICRF.
Aug 12 2010 09:53:19:313AM1100812003Greg WallaceClean LH pulse at 146 deg and 80 kW/klystron. JGDC signals were unintentionally masked, should have tripped substantially. Reflections on col 2 and 12 JGDC were over 60%. Klystron 1 phase is off by 10 deg. Will try adjusting that to see if reflections on col 2 go down.
Aug 12 2010 10:07:24:263AM1100812004Greg WallaceAll trips at 146 deg, 80 kW. High reflections (>60%) on col 2, 12, 14. Will increase trip level to 80% on those columns. Next shot will repeat with slightly lower density.

No LH Langmuir probe data again. Roman thinks this is related to his problem with other probes.
Aug 12 2010 10:23:37:373AM1100812005Greg Wallace80kW/klystron, 146 deg phasing. More trips, this time from col 7 and 10, but some sustained periods at full power. Will move launcher to 0.1mm behind limiter on next shot.

LH Langmuir probe data is back but looks a little flakey. Density down a little bit (nl04~8.5e19).
Aug 12 2010 10:39:34:620AM1100812006Greg WallaceMany trips again at 80 kW/klystron and 146 deg phasing. Will try decreasing outer gap for next shot by 8mm.
Aug 12 2010 10:53:57:600AM1100812007Greg WallaceBetter during first half of LH pulse, but still all trips during the second half. 80 kW/klystron, 146 deg. Went into cell to put attenuators on klystron 4 and 7 RINTs. Will repeat same plasma and setpoints.
Aug 12 2010 10:57:58:480AM1100812008Greg WallaceFizzle.
Aug 12 2010 11:19:33:600AM1100812009Greg WallaceOnly 1 trip at 80 kW/klystron 146 deg phasing with added attenuators on klystron 4 and 7 RINTs. Next shot will attempt modified modulation waveform at 90 deg phasing, 80 kW/klystron during odd segments, 10 kW/klystron during even segments. Still only 10 segments during LH shot (slow modulation).
Aug 12 2010 11:34:57:997AM1100812009Greg WallaceGood shot at 90 deg phasing 80 kW/klystron and slow modulation (50 ms modulation pulses). Next shot will try 12.5ms modulation pulses.
Aug 12 2010 11:46:05:913AM1100812011Greg WallaceGood shot! No trips with full modulation waveform at 90 deg, 80 kW/klystron. Will move on to 125 deg phasing with modulation waveform.
Aug 12 2010 12:08:56:280PM1100812012Greg WallaceMany trips on col 12 JGDC. 80 kW/klystron, 125 deg phasing. Will add attenuator to col 12 JGDC reflected diode.
Aug 12 2010 12:13:51:740PM1100812012Greg WallaceMany trips on col 12 JGDC. 80 kW/klystron, 125 deg phasing. Will add attenuator to col 12 JGDC reflected diode and try again.
Aug 12 2010 12:38:58:163PM1100812013Greg WallaceThree trips. First one looks like FINT05 power jumped before others, therefore causing the trip. Might want to have masking between segments. Next shot will try again with timing of LH moved to accomodate more ICRF conditioning.
Aug 12 2010 12:43:59:613PM1100812014Greg WallaceA few trips later in the shot. Will decrease nl04 to 6e19 and increase phasing to 146 deg.
Aug 12 2010 01:07:56:250PM1100812015Greg WallaceMany trips at 146 deg 80 kW/klystron. Will try to repeat for the next shot to see if problem gets better. If performance does not improve we will swap 1dB attens for 2dB attens on klystrons 4 and 7.
Aug 12 2010 01:37:45:173PM1100812017Greg WallaceRan clean for first half of shot, then many trips at 146 deg, 80 kW/klystron. Will go to 100 kW/klystron and increase trip levels on cols 2, 3, 14, 15.
Aug 12 2010 02:16:47:500PM1100812019Greg WallaceMore trips again?!?!? Increasing trip levels some more at 100kW/klystron, 146 deg phasing. Tired of playing whack-a-mole... Increasing power during "off" to 15 kW.
Aug 12 2010 02:30:26:697PM1100812020Greg WallaceAll trips. Will decrease outer gap by 5mm to see if some additional density at the grill improves the coupling.
Aug 12 2010 02:45:32:603PM1100812021Greg WallaceA little better when the density is higher at beginning and end of LH pulse. Giving up on trying to get 146 deg phasing at lower density for Andrea. Signing out as SL and giving over the run to Andrea at this point. Next shot will have 120 kW/klystron at 146 deg with nl04 set to 7.5e19.
Aug 12 2010 03:04:17:387PM1100812022Andrea SchmidtLH doesn't seem to be behaving at low density, so we're starting with condition 3. Stepped up the power for this shot and raised the density slightly. Only a few pulses ran cleanly. Next shot will go back to shot 14 plasma from earlier in the day and lower phasing to 135 degrees.
Aug 12 2010 03:13:51:197PM1100812023Andrea SchmidtPretty clean shot. All trips during the low power portion of the modulation. We are having trouble keeping the density constant. For the next shot, we will move the LH to start at 0.9 s for better density control. (ICRF will be off)
Aug 12 2010 03:19:46:417PM1100812024Andrea SchmidtDisruption. Try again.
Aug 12 2010 03:47:48:383PM1100812025Andrea SchmidtMany trips. Recently discovered that the x-point was being swept in this shot. Next shot will have more constant magnetic profile.
Aug 12 2010 03:54:47:363PM1100812026Andrea SchmidtNo plasma. Try again.
Aug 12 2010 04:26:58:110PM1100812027Andrea SchmidtGot 5 clean pulses, then trips. Try again.
Aug 12 2010 04:38:38:427PM1100812028Andrea SchmidtGot 9 clean pulses (not consecutive). Try again.
Aug 12 2010 04:40:43:580PM1100812029Andrea SchmidtNo plasma. Try again.
Aug 12 2010 05:08:09:337PM1100812030Andrea Schmidt9 clean pulses. try again
Aug 12 2010 05:09:07:037PM1100812031Andrea Schmidt11 clean pulses. end of run.

Physics Operator Comments
Aug 12 2010 09:04:52:557AM1100812001Ron ParkerLoaded shot 1100804001, with fill gas pulse stretched to 50 ms since cryo will be on for first shot.
Aug 12 2010 09:17:56:000AM1100812001Ron ParkerFirst shot was a dud, probably too little fill gas. Ooops, this was not the problem -- instead a failed commutation.

Next: Increase fill gas pulse to 55 ms.
Aug 12 2010 09:37:42:987AM1100812002Ron ParkerShot 2 started up well, but disrupted at 1.4 s probably due to ICRF belching.

ICRF was on early, even though it was not supposed to be.

Next: repeat, but ICRF off until 1.2 s (hopefully)
Aug 12 2010 10:12:03:157AM1100812003Ron ParkerShot 3 ran full length. No ICRF
Aug 12 2010 10:12:31:130AM1100812004Ron ParkerShot 4 ran full length
Aug 12 2010 10:12:58:433AM1100812005Ron ParkerFor shot 5, density will be programmed at 7.5e19
Aug 12 2010 10:26:51:133AM1100812005Ron ParkerShot 5 ran full length. Density a bit higher than programmed, reduce to 7.0e19 for next shot.
Aug 12 2010 10:39:23:930AM1100812006Ron ParkerShot 6 ran full length, density close to programmed.

50 ms Ar for next shot.

Also outer gap will be programmed to be reduced by 8 mm (RCUR increased by 4 mm)

Mice will be allowed in cell after this shot.
Aug 12 2010 11:00:50:713AM1100812007Ron ParkerShot 7 ran full length, right gap was ~ 1cm
Aug 12 2010 11:02:14:190AM1100812008Ron ParkerShot 8 disrupted very early , at 33 ms and I_p=150 kA
Aug 12 2010 11:17:12:553AM1100812009Ron ParkerShot 9 ran full length. There were no changes from shot 8 which disrupted early.
Aug 12 2010 11:41:22:913AM1100812010Ron ParkerShot 10 ran full length. No changes
Aug 12 2010 12:03:20:240PM1100812011Ron ParkerShot 11 ran full length. Again no changes. Nice 90 deg modulation shot.
Aug 12 2010 12:03:40:107PM1100812012Ron ParkerShot 12 ran full length, a few modulated LH pulses went through.
Aug 12 2010 12:45:41:520PM1100812013Ron ParkerShot 13 ran full length.

Next: Shot length will be extended by 100 ms for ICRF.
Aug 12 2010 12:47:49:467PM1100812014Ron ParkerShot full 14 ran full length. Flattop extends to 150 ms.

For next shot, density will be lowered to nl04 = 6e19.
Aug 12 2010 12:57:41:270PM1100812015Ron ParkerShot 15 ran full length.
Aug 12 2010 01:14:20:223PM1100812016Ron ParkerShot 16 ran full length. 146 deg phasing still a bit problematic
Aug 12 2010 01:35:43:397PM1100812017Ron ParkerShot 17 ran full length, LH still tripping at 146 deg phasing.
Aug 12 2010 05:20:20:997PM1100812018Ron ParkerShot 18 ran full length
Aug 12 2010 01:58:17:813PM1100812019Ron ParkerAnother full lengther

Cell access available
Aug 12 2010 02:51:32:033PM1100812020Ron ParkerShot 20 ran full length, no useful LH pulses.

Next: Reduce outer gap by 5 mm
Aug 12 2010 05:20:36:370PM1100812021Ron Parkershot 21 ran full length
Aug 12 2010 02:52:01:980PM1100812022Ron Parkershot 22 ran full length, 0.5 cm right gap
Aug 12 2010 03:04:51:980PM1100812022Ron Parker Next: Reload shot 14
Aug 12 2010 03:20:13:013PM1100812023Ron ParkerShot 23 ran full length, but density is not well controlled until ~ 1s.

for next shot, turn ICRF off and move LH to start at 0.9 s and end at 1.4s.
Aug 12 2010 03:35:25:183PM1100812024Ron ParkerDisruption -- OH2 crowbarred. Check fuses in pwr room.

Fuses OK, next shot coming up


Aug 12 2010 03:50:18:763PM1100812025Ron ParkerShot without ICRF. Density control still not good during LH pulse.

Next: Take out sweeping of divertor.
Aug 12 2010 03:58:50:607PM1100812026Ron ParkerShot 26 fizzled, no apparent reason.

Reload for next shot.
Aug 12 2010 04:25:34:873PM1100812027Ron ParkerShot 27 ran full length, only a half dozen usable LH pulses
Aug 12 2010 04:26:55:013PM1100812028Ron ParkerShot 28 ran full length
Aug 12 2010 04:42:00:350PM1100812028Ron ParkerShot 28 ran well, again ~ 10 usable LH pulses
Aug 12 2010 04:43:08:133PM1100812029Ron ParkerShot 29 disrupted early, ~ 60 ms, 300+ kA
Aug 12 2010 05:13:35:897PM1100812030Ron ParkerShot 30 ran full length
Aug 12 2010 05:21:30:917PM1100812031Ron ParkerShot 31 ran full length

Engineering Operator Comments
ShotTimeTypeStatusComment
109:04:49:530AMPlasmaBadCharging Supplies left off
209:21:26:383AMPlasmaOk
309:43:09:627AMPlasmaOk
409:57:46:230AMPlasmaOk
510:11:59:617AMPlasmaOk
610:25:52:730AMPlasmaOk
710:39:41:413AMPlasmaOk
810:54:49:347AMPlasmaOk
911:08:01:187AMPlasmaOk
1011:25:21:523AMPlasmaOk
1111:40:05:293AMPlasmaOk
1211:55:25:360AMPlasmaOk
1312:15:50:653PMPlasmaOk
1412:36:21:970PMPlasmaOk
1512:52:25:250PMPlasmaOk
1601:07:04:050PMPlasmaOk
1701:24:28:170PMPlasmaOk
1801:38:04:640PMPlasmaOk
1901:54:02:903PMPlasmaOk
2002:12:20:783PMPlasmaOk
2102:34:25:790PMPlasmaOk
2202:48:59:477PMPlasmaOk
2303:03:00:137PMPlasmaOk
2403:16:15:000PMPlasmaOk
2503:35:08:387PMPlasmaOk
2603:51:57:897PMPlasmaOk
2704:08:32:543PMPlasmaOk
2804:24:27:563PMPlasmaOk
2904:37:30:657PMPlasmaOk
3004:50:22:937PMPlasmaOk
3105:03:08:410PMPlasmaOk

System Availability
Aug 12 2010 09:04:30:950AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESnoBES system is ready for Up-to-air (Apr, 2010)Mar 31 2010 10:36AM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (D+F) working. All midplane and off-midplane diode arrays working except WB1AX. Midplane foils calibrated and PRAD_MAIN is being filled. Divertor/Ledge foils not yet ready.Jul 15 2010 08:27AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno3/26/10 Bottle Removed From Cell, monitors powered down, Autodialer function bypassedMar 26 2010 05:29PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged.Apr 06 2010 10:51AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoWide-view CXRS system is power down and ready for up-to-air (Apr, 2010)Mar 31 2010 10:36AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned; new calibrations (relative brightness and position) not yet implementedJun 29 2010 10:27AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperationalJun 26 2010 09:28PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll channels working and calibrated.Jul 30 2010 08:13AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauges are operational.Jun 28 2010 08:02PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPlugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access.Apr 05 2010 11:18AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational. Ch 5 preamp replaced 6/18.Jun 22 2010 03:03PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesoperating normallyJun 29 2010 10:26AM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Jun 26 2010 11:19PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesSystem installed and aligned. Inverted profiles are still not available.Jul 22 2010 08:41AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes Jun 28 2010 12:12PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayessystem checked out ok on 11006728. Jun 28 2010 04:57PM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayessystem checked out ok on 1100628Jun 28 2010 04:57PM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayessystem checked out ok. conditioned to vacuum. Jun 28 2010 04:58PM (ylin)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-Offyesoperational and testedJul 20 2010 04:42PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridyesLH was tested into dummy loads synced to shot. Shorts have been removed. Probe Cal. 6/29/10 evening.Jun 29 2010 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid Reflectometeryes60 GHz system to detect upshifted signalJul 28 2010 01:39PM (sgbaek)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesLYMID, WB4LY and LLY working. WB1LY not attached due to pickup problems.Jul 01 2010 11:58AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesSpectra being collected and tree filled. Wavelength scan is broken so fixed on the Mo XXXI and XXXII lines.Jul 15 2010 08:28AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Start at reduced speed.Jun 22 2010 03:02PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are operationalJun 28 2010 08:02PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesAll systems are on and functionalJun 29 2010 12:56PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03Jun 26 2010 09:21PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoCapillaries tested in-vessel.Jun 28 2010 08:08PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational. AM (2 * 39.51) MHz.Jul 19 2010 05:54PM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,ennever,ntsujii,porkolab
Penning GaugesnoHigh voltage power supplies are turned off, waiting for work at A-port horizontal to be finished.Jun 28 2010 08:07PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air Switchyes Jun 26 2010 11:19PM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Jun 26 2010 11:19PM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyes Jun 26 2010 11:19PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power Systemsyes Jun 26 2010 11:20PM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesOperational.Jun 28 2010 08:03PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperational.Jun 28 2010 08:03PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesF and J outer divertor probes are operational.Jun 28 2010 08:04PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperational, except probe#13Jun 28 2010 08:04PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesOn 1100811xxx the 50GHz channel has been reconnected with the original setup. The I/Q for the 50GHz is still in the previous setup (500kHz antialiasing).Aug 11 2010 08:33AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational. New Langmuir-Mach probe head installed.Jun 28 2010 08:05PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesOperational.Jun 28 2010 08:05PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesBoth A and K units are operational. Coil polarity needs to be checked.Jun 28 2010 08:06PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesHV supply on, cable run to sparker at k-horJun 23 2010 02:41PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS installed and leak tested, individual probes not installedJun 28 2010 01:28PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesNo new CO2 detector, so still missing edge channelsJun 23 2010 02:40PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CoreyesOperating with 2 lasers, but density is **uncalibrated**Jul 14 2010 11:54AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgeyesOperationalJul 14 2010 11:54AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesOperationalJul 01 2010 11:57AM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermlreinke
XTOMOyesCore system working. Edge system waiting for H-modes.Jul 01 2010 11:55AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Aug 12 2010 11:09:02:397AM
After shot #7, upshifted signal measurement for 75 GHz system is off to check the baseband measurement system.

The splitter for the 60 Ghz system now is connected now, so both the baseband and upshifted measurment( w/ S.A.) is available now.
freq: 3.4e9~3.6e9, sweep time=0.05, RBW=100 kHz, sweep points=1001, delayed until 0.8sec

Aug 12 2010 11:10:21:837AM
-68.5 dBm at 3.5GHz (due to cross talks after adding the splitter)
Aug 12 2010 11:11:11:607AM
digitizer #19: sweeping frequency, freq=81.3*volt+591
VCO setup: offset=6400mV, amplitude=0.8V, freq=10Hz
#20: reflected (75 GHz) detection, pow=21*volt-117,peak expected around at 1110 MHz of sweeping VCO
the splitters are connected so the fluctuation data available
(after shot #7, no available)


S.A. connected to 60GHz upshifted measurments. After several LH shots, confirming that no clear peaks are seen, the splitter will be put back to connect to the baseband measurement system. VBW=RBW=30kHz, sweep 138.9 ms, 401pts, noise floor ~-84dBm

using S.A. in the morning
50: sig IF: 300MHz: -28 dBm
60: sig IF: 1.102 GHz: -47 dBm after the 2way splitter
75: sig IF: 1.1 GHz: -70 dBm after the 2way splitter
88: sig IF: 443 MHz: -46 dBm, 561 MHz=-46dBm
112: sig IF: 2.01GHz: -37dBm
variable: sig IF: 306 MHz: -9 dBm
140: sig IF: 791MHz: -37 dBm