Alcator C-Mod Run 1100826 Information

Back to runs

Miniproposals
Miniproposal:568
Date Filed: 8/10/2009
Title:Plasma Performance Evaluation with Boron coated Molybdenum Tiles
First Author:Steve Wukitch
Session Leader:Steve Wukitch (shots 1-34)

Operators
Session leader(s):Steve Wukitch
Physics operator(s):Steve Wolfe
Engineering operator(s):Bill Cochran,Sam Pierson

Engineering Operator Run Comment
MP568 - Plasma Performance Evaluation with Boron coated Molybdenum Tiles

Session Leader Plans
Entered: Aug 25 2010 01:52:15:967PM
Author: Steve Wukitch
1. Establish fiducial discharge at 5.4 T, IP =1 MA, nl04~1, right gap
~1.5 cm, elongation ~1.6, upper and lower triangularity 0.3 and 0.5
respectively. Similar to 1100824005 but the strike point sweep needs
to be modified to start on tile #2 (from bottom) sweeping to tile #3
and back down.

1a. Recover antenna performance post boronization.

(1) and (1a) can proceed simulatneously and we may lower current to obtain EDA H-modes. (5-8) shots

2. Vary mix of RF antenna powers. Does Mo rise with successive
antenna and then fall when another is dominant? 4-5 discharges per
antenna (8-10 shots)

3. Run the ICRF power at 3 MW from 0.7 to 1.1 sec and increase to 4 MW
from 1.1 to 1.5 sec. - How many joules before performance degrades
(15-20). If necessary and permitted, increase ICRF power to 5 MW

4. Once performance degrades and Mo impurity becomes dominant, seed
with Ne. Does performance continue to degrade? Does Mo
concentration decrease? (8-10) discharges

Will need to adjust neon puff to find appropriate waveform that
allows for good confinement

Physics Operators Plans
Entered: Aug 25 2010 03:55:54:497PM
Author: Jerry Hughes
PO plan for 1100826

MP568 - Plasma Performance Evaluation with Boron coated Molybdenum
Tiles
PO/APO: S. Wolfe / J. Hughes
SL: S. Wukitch
***NOTE 10-hour run!***
Run begins at 08:00 and ends at 18:00

-------------
There will be overnight boronization, followed by morning ECDC.
SL's desired recipe (NOTE change in sweep parameters!):

dP=120 psi
** change in sweep **
rmin/rdwell/rmax: 44/75/80 cm
tdwell/tsweep: 60/120 s
Zero EF4 current
Pulser 0.7 on 0.3 off

Post boronization ECDC
----------------------------
1st Gas Setup:
Gas: He
sweep: 44/45/103 cm
scan: 20/120 s
Pressure: 5e-5 Torr
Duration: 2 hrs

2nd Gas Setup
Gas: D2
sweep: 44/45/103 cm
scan: 20/120 s
Pressure: 2e-4 Torr
Duration:1 hr

----------------------

-----------------
Engineering Setup
-----------------

Run begins at 08:00 and ends at 18:00

Power systems as on: 1100824005

Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:

Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid ENABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
leave NINJA as is DISABLED
fill H-Bottom with 2 psi Neon Hybrid DISABLED

Enable gate-valves and shutters: ECE, VUV, HiREX Sr, Xeus
Leave z-bolo shutter as is (should be open)

Torvac gatevalve toggle (yes/no): no

Boronization(yes/no): yes, see above
Overnight ECDC (yes/no): yes, see above
ICRF(yes/no): yes
LH(yes/no): no
Cryopump (yes/no): no
DNB (yes/no): yes

Vessel temperature: 50/50/50

-----------------------

First shot:

Establish fiducial discharge at 5.4 T, IP =1 MA, nl04~1, right gap
~1.5 cm, elongation ~1.6, upper and lower triangularity 0.3 and 0.5
respectively. Similar to 1100824005 but the strike point sweep needs
to be modified to start on tile #2 (from bottom) sweeping to tile #3
and back down.

While the discharge is refined, SL will recover the ICRF antennas and
try to obtain EDA H-modes

Seeding with Ne will likely be requested at some point, via H-bottom.

Session Leader Summaries
Entered: Aug 26 2010 05:56:50:430PM
Author: Steve Wukitch
Recovery from boronization was ~5 discharges for D and E antennas. J
antenna was injecting Mo ~1.6 MW so we started Ne seeding on 006.
Despite initial promising discharges, the discharges were plagued by
injections initially from J antenna but we had contributions from the
inner wall (006, 007, and 009).Ne seeding did not prove to be the
elixir it was in the past campaign but we did vary the seeding
location and strength. B-side lower and H-bottom gave similar RF
results when programmed identically. With lower Ne seeding, the Mo
radiation and injections were increased.

Physics Operator Summaries
Entered: Aug 26 2010 06:14:26:643PM
Author: Jerry Hughes
PO summary for 1100826
MP568 - Plasma Performance Evaluation with Boron coated Molybdenum
Tiles

APO/PO: J. Hughes / S. Wolfe
SL: S. Wukitch

This run followed a boronization and was intended to evaluate plasma
performance evolution with ICRF throughout the day. The cryopump was
not used today. Ne seeding was employed on a number of discharges,
with puffs applied from both H-bottom and the B-side lower valves. Gas
programming went well, and the SL was able to compare ICRF and plasma
performance with roughly equivalent Ne puffing from the two locations.

We had a great number of injections today, generally Mo. It was not
easy to determine the source of many of these and to ameliorate
them. One exception was a repeatable injection caused by the
apparently damaged inner wall tile which is directly in view of the
WIDE2 camera. Some particularly spectacular injections at around 200ms
can be seen on shots 6 and 7. We were able to fix this by delaying the
ZCUR jog down until closer to the divert time, thus reducing the
direct heat load to this hot spot (though the glow remained). This
change was made from shot 11 onward.

Also early in the run, a number of modifications were made to the
lower x-point program in order to modify the strike point sweep. The
session leader's desire to sweep the strike first up and then back
down the plate was difficult to implement, since we have to fight
against the flux swing from EF1 lower. However, we had some luck
forcing it back down by significantly lowering ZXL and RXL by
1.5s. However, I don't really recommend this strike point reversal be
used unless you really need it.

A number of shots later in the day were terminated by injections at
the beginning of or just into rampdown. Initially it was thought this
might be associated with nearing double null due to the various sweeps
being applied to the X-point, but these persisted even after this was
fixed on shot 25. The SL also tried to delay these full current
disruptions by extending the RF power pulse, but this met with limited
success.

Startup went fairly well today, though there were a number of early
bounces in the first half, which were beginning to turn into fizzles
around shot 12. We had success getting out of this with minor tweaks
to the pre-fill (it ranged from 20 to 25ms) and an adjustment to the
RCUR offset in Segment 1 (2500-->3500) from shot 16 onward. After shot
22, startup remained unchanged.

An interesting occurrence should be made note of my other Phys Ops in
training and their tutors. Today Wolfe had two instances of PCS open
under his login. The first was open on my workstation and allowed me
to make changes. The second was open in safe mode on his
workstation. Since they were both accessing the same scratch directory
under /home/wolfe/, when he would load a shot or segment to look at
it, he would overwrite any changes I had made, and these could (and
did) creep into the model tree that I was writing. We caught this
before it could do any harm, and he locally unset his pcs_scratch
environment variable so that his PCS would generate a temporary
scratch area that would not interfere with the one I was using.

Tally . . .
Plasmas: 31
Fizzles: 3
Duds: 0
No-power: 0



Session Leader Comments
Aug 26 2010 08:38:04:947AM1100826001Steve Wukitchplasma

strike point sweep is up but did not head back down

H/H+D is 5%

neutral pressure rises throughout discharge from 0.5 to 2 mtorr

repeat hopefully with better RF
Aug 26 2010 09:09:58:350AM1100826002Steve Wukitchplasma

strike point sweep rises but does not go back down

D power not reporting - unrecoverable - transmitter data indicated it ramped from 0.5 MW to 1 MW from 0.7 s to 1.4 s

next: try to improve downward sweep, lower initial J pulse
Aug 26 2010 09:01:13:533AM1100826003Steve Wukitchplasma

injection at ~1.05 s

J was much better - J4 cell data not reporting

next: seek better RF performance
Aug 26 2010 09:17:17:147AM1100826004Steve Wukitchplasma - long H-mode, low H-mode threshold

multiple small injections

next: repeat - waiting for J antenna to clean up a bit more
Aug 26 2010 09:50:17:897AM1100826005Steve Wukitchplasma

early injection at 0.6 s and bigger/nastier one at ~1.1 s

injection is regular around 1.05-1.1 s and seems to correlate with J antenna

next: start Ne seeding -
Aug 26 2010 09:54:57:670AM1100826006Steve Wukitchplasma - early disruption
Aug 26 2010 10:05:12:227AM1100826007Steve Wukitchearly disruption
Aug 26 2010 10:21:39:400AM1100826008Steve Wukitchfizzle
Aug 26 2010 10:46:57:953AM1100826009Steve Wukitchplasma

early injections - inner wall near Thomson dump and around the central column; both Mo

injections during H-mode result in cooling and density increase

next: raise J ramp to 2.8 MW and start Ne seeding
Aug 26 2010 11:07:55:610AM1100826010Steve Wukitchplasma

early injection nearly took this one out

lost J to J3 xbar around 0.9 s

next: lower Ne seed by half
Aug 26 2010 11:18:50:047AM1100826011Steve Wukitchplasma

good pulse up to 1 s then impurities seem to become problematic.

injections still correlated to J

next: move Ne seeding pulse to 0.4-0.6 s from 0.5-0.7 s
Aug 26 2010 11:26:33:030AM1100826012Steve Wukitchfizzle
Aug 26 2010 11:41:38:037AM1100826013Steve Wukitchplasma

still do not have control of injections

next: change antenna mix - D and E antenna at 0.7 s at 3 MW total


Aug 26 2010 11:53:15:603AM1100826014Steve Wukitchfizzle
Aug 26 2010 12:14:52:697PM1100826015Steve Wukitchplasma

good 2 MW H-mode; had issues going to 3 MW
injection at ~1.05 s

next: repeat
Aug 26 2010 12:29:10:157PM1100826016Steve Wukitchplasma

good 2 MW H-mode again but an injection ~1.05 s limits higher power H-mode

next: delay strike point sweep to 0.8 s from 0.6 s
Aug 26 2010 12:57:06:810PM1100826018Steve Wukitchplasma

good 2 MW H-mode again but impurity accumulation is too quick

next: lower Ip to 0.9 MA
Aug 26 2010 01:18:12:873PM1100826019Steve Wukitchplasma - Ip 0.9 MA

still multiple H-modes

next: keep strike point on tiles 2 and 3 on the vertical divertor plate
Aug 26 2010 01:20:41:190PM1100826019Steve Wukitchplasma - Ip 0.9 MA

still multiple H-modes - injection terminated high power phase

next: keep strike point on tiles 2 and 3 on the vertical divertor plate
Aug 26 2010 01:48:05:143PM1100826020Steve Wukitchplasma

looks okay until RF starts faulting

no match problem - so nothing to fix on D or E

next:repeat
Aug 26 2010 01:50:09:950PM1100826020Steve Wukitchplasma

looks okay until RF starts faulting

no match problem - so nothing to fix on D or E

next:repeat - without Ne seeding
Aug 26 2010 02:00:50:663PM1100826021Steve Wukitchplasma

looks okay until disruption

next: increase outer gap to ~1.5 cm from 1 cm
Aug 26 2010 02:31:59:643PM1100826022Steve Wukitchplasma

multiple H-modes

no D and E RF power for this discharge - server crashed

Data recovery was not possible at this time

do not use for analysis.

next: enable Ne seeding with more vigor

Delay due to data server crash
Aug 26 2010 02:58:56:283PM1100826023Steve Wukitchplasma

4 H-modes - still not better

how about more power early

next: step from 3 MW to 4 MW
Aug 26 2010 03:09:55:457PM1100826024Steve Wukitchplasma

similar discharge - injection/back transition at ~1.05 s

next: try E and J only
Aug 26 2010 03:46:37:430PM1100826025Steve Wukitchplasma

not a trophy discharge

disruption before rampdown

E was reasonable

next: recall RF programming from 005
Aug 26 2010 03:47:38:657PM1100826026Steve Wukitchplasma

still not a trophy and things clearly look worse than 005

next: switch neon puff to B side lower 2 psi, 0.4-0.6 s full on
Aug 26 2010 04:03:01:453PM1100826027Steve Wukitchplasma

RF looks better except we lost E due to FFT fault

next: retry with E (FFT has been reset)
Aug 26 2010 04:20:58:980PM1100826028Steve Wukitchplasma

RF looks better

next: enable H bottom 2 psi Ne, 0.4-0.6 s with 40% chop
Aug 26 2010 04:43:24:967PM1100826029Steve Wukitchplasma

RF is decent but Mo is up

next: H bottom 2 psi Ne, 0.4-0.6 s with no chop
Aug 26 2010 05:00:10:820PM1100826030Steve Wukitchplasma

imperfect - plasma went further into ramp down with ramp down on RF pulse
no McPherson data - need to retake

next: repeat - stretch RF rampdown to 1.6 s
Aug 26 2010 05:17:52:523PM1100826031Steve Wukitchplasma

imperfect - RF rampdown did not extend pulse

Mo is down but not as far as using B side lower

next: rf power steps - 3-4-5 MW and RF rampdown to 1.6 s
Aug 26 2010 05:38:45:690PM1100826032Steve Wukitchplasma

best discharge in a long time

stored energy is low 4 MW => < 150 kJ

next: lower B-side lower to 0.1 s

Aug 26 2010 05:43:10:543PM1100826033Steve Wukitchplasma

not as good from stored energy

next: raise B-side lower to 0.2 s

Aug 26 2010 05:55:41:717PM1100826034Steve Wukitchplasma

not as good as 032 and RF was poorer

next: end of run

Physics Operator Comments
Aug 25 2010 03:20:11:650PMJerry HughesSetting up for first shot on 1100826.
Load from 1100824005. (a shot with cryopump)

In segment 1, reduce PULSE_GAS4 width from 60ms to 20ms. (No cryopump, fresh boronization.)

Now change strike point sweep. In segment 2, remove the downward jog in RXL
at 0.5s. Then reduce upward sweep of RXL to a total excursion of +0.005m, and
bring RXL back to 0 at 1.5s. This should sweep the strike in the vicinity of
the 2nd and 3rd tile row.

Also at Wolfe's suggestion, put in a modest rampdown of ZXL demand during
flattop (dZXL=-0.002m).

SL requests target nl04 of 1.0e20. Making this change in Segment 2 as well.

Saving as shot 1100826888 in /home/jwhughes/physop/pcs_scratch/

Aug 26 2010 07:15:19:933AMSteve Wolfe
There was a problem with the cooling water to the PEI supply last night.
A fitting on the pump to the supply cracked and leaked about 200gal. of
DI water.

Boronization was completed, along with the He ECDC and all but about
15 minutes of D2 ECDC before the system was shut down. 

Repair of the pump fitting is requied to run the PEI for the TF scanner.
Resistivity needs to return to acceptable levels in the DI loop before 
it can be used for the transmitters.

Start time for the run may be delayed, but at the moment we are proceeding
as if we will begin on time. Lockup announcement for 7:30AM has been issued.



Aug 26 2010 07:26:53:330AMJerry HughesLock-up delayed to 7:45.
Aug 26 2010 07:43:51:643AMSteve Wolfe
Andy reports that the PEI pump has been fixed, and the water resistivity
is acceptable. 

Two blown fuses were found in the TF cabinet and are being replaced. 
Start of run may be slightly delayed. 

Aug 26 2010 08:00:45:033AMJerry Hughes8:00. Fuses have been tested and the search is starting now.
Aug 26 2010 08:40:51:640AM1100826001Jerry HughesSteve Wolfe has started command line PCS from his login. I will use this to
program the shots.

Load shot 1100826888 set up yesterday from /home/jwhughes/physop/pcs_scratch/

Load at 26-Aug-2010 07:33:00.00

Subsequently made a title change to segment 2 and reloaded.

Load at 26-Aug-2010 08:15:59.00

Result: Plasma to 1.9s

Reasonable startup. Density program ok.
Strike point sweep needs some adjustment. It is putting flux primarily
on the third and fourth row, and not the 2nd and 3rd row as requested.

Aug 26 2010 08:53:56:353AM1100826002Jerry HughesShot 2.

Changes made:
The RXL in flattop was moved inboard by net -0.005m.
ZXL in flattop was moved down by net -0.010m.

Result: Plasma to 1.9.
G-side rat is corrupt.
Strike point is pulling up to 3rd tile and hanging. Fighting the flux
swing in EF1L.
Aug 26 2010 09:08:37:977AM1100826003Jerry HughesShot 3.

Changes made:
Increased RXL ramp down in the 2nd half of flattop.
Increased ZXL ramp down throughout flattop, but also raised its start point
by 0.005m in order to raise the strike early.

Result: Plasma to 1.9s.
Bounce in startup. Will watch and see if it recurs on the next shot.
Strike point sweep seems to be reversing a little, as desired. But it is hard to
evaluate this due to the H-L-H from 1.1 to 1.2s.

Aug 26 2010 09:17:44:440AM1100826004Jerry HughesShot 4

Changes: None

Result: Plasma to 1.96s
Still bounces.
Aug 26 2010 10:07:48:970AM1100826005Jerry HughesShot 5:

Changes: Increase pre-fill from 20ms to 21ms to try to slow current rise,
prevent bounce. Also in Segment 2, raise peak demand on RXL (@1s) by 0.005m and
Raise ZXL in the early flattop by 0.005m. This is try to spread more heat to
tile row 3, and also to get the strike off the floor before 0.7s.
>> Load at 26-Aug-2010 09:23:32.00

Result: Plasma, full length


Aug 26 2010 09:57:18:630AM1100826006Jerry HughesShot 6:

Changes: SL wants Neon.
Having EO enable H-bottom.
Adding PG5 pulse of 40V from 0.5 to 0.7s.
Modifying DPCS_PIEZO_CHOPPER output to read ["pulse_gas3","h-bot "]
Load at 26-Aug-2010 09:44:09.00

Result: Plasma with significant injections disruption at 0.42s.
It doesn't appear that the DPCS_PIEZO_CHOPPER change got loaded, although this
would have had no effect, since the plasma didn't make it to the Ne injection
time.
Startup seems okay.
Aug 26 2010 10:17:54:140AM1100826007Jerry HughesShot 7.

Changes: Made sure that the DPCS_PIEZO_CHOPPER output includes "h-bot" this time.
Load at 26-Aug-2010 09:53:14.00

Result: Plasma, with a very ugly injection at at 0.17s, dead by 0.42s.
This is very concerning. It is possible that something drastically wrong occurred
while we were doing load_from's on multiple PCS instances launched from the
same account (wolfe's)

Aug 26 2010 10:25:17:537AM1100826008Jerry HughesShot 8.

Changes: Load from 1100826005. Disable H-bottom.
Load at 26-Aug-2010 10:15:05.00

Result: Fizzle, post-disruption.

Aug 26 2010 10:44:12:667AM1100826009Jerry HughesShot 9.

Changes: none.

Results: Plasma, full length.
Injection at 0.2s is repeated, but the plasma survives. There is another at 0.5s.
It is very clear that the early injections are caused by local heating at
a spot near the midplane to the right of the Thomson view dump. WIDE2 shows
this clearly on shots 6,7 and 9, along with the ejection pattern of the liberated
metal.



Aug 26 2010 10:57:43:197AM1100826010Jerry HughesShot 10.

Changes: Added 40V pulse on PG5 from 0.5 to 0.7s
Changed output on DPCS_PIEZO_CHOPPER to read ["pulse_gas3","h-bot "]
Load at 26-Aug-2010 10:45:30.00
Ask for H-bottom enable.
Also DNB gate valve is enabled.

Result: Plasma to 1.77s.
Early startup ok.




Aug 26 2010 11:15:54:933AM1100826011Jerry HughesShot 11.

Changes: Delay ZCUR drop to 0.3--0.4s. It was before 0.2s. This may help relieve
the heat load to the hot spot.
Reinke requests lowering Ne puff. Reduce PG5 V demand from 40 to 20.

Load at 26-Aug-2010 11:00:20.00

Result: Plasma to 1.86s.
Startup ok. The 0.2s injection haas been ameliorated for now.
Strike point sweep seems to be distributing power acceptably well.

Aug 26 2010 11:24:52:560AM1100826012Jerry HughesShot 12:

Changes: Moving PG5 pulse to 0.4--0.6s, since it seems to tak 150ms for the
H-bottom gas to hit the plasma.
Load at 26-Aug-2010 11:18:36.00

Results: Fizzle. Early bouncer.


Aug 26 2010 11:44:25:387AM1100826013Jerry HughesShot 13.

Changes: Increase pre-fill from 21ms to 22ms.
Load at 26-Aug-2010 11:28:39.00

Result: Plasma, full length
Bounce during startup.

Aug 26 2010 11:57:32:170AM1100826014Jerry HughesShot 14.

Changes: Increase pre-fill pulse from 22 to 23ms.
Load at 26-Aug-2010 11:45:38.00

Result: Fizzle. A later bounce, not survivable.

Aug 26 2010 12:15:09:680PM1100826015Jerry HughesShot 15.

Changes: Increase pre-fill from 23 to 25ms.
Load at 26-Aug-2010 11:56:49.00

Result: Plasma to 1.9s
Still bounces. Wolfe says if we don't do something we'll be stuck in a
fizzle/plasma cycle.
Aug 26 2010 12:27:00:817PM1100826016Jerry HughesShot 16.

Changes: In Segment 1, set the offset in the RCUR program from 2500 to 3500.
This is Wolfe's second trick for ameliorating the outward bounce.
Load at 26-Aug-2010 12:12:37.00

Result: Plasma to 1.9s.
No bounce this time.
Aug 26 2010 12:52:23:293PM1100826017Jerry HughesShot 17.

Changes: Delay beginning of strike point sweep until 0.8, per SL's request.
Change RXL program to begin sweeping at 0.8; change peak of sweep to 1.1s
Also, change ZXL program to ramp down an additional 0.005m by 1.5s.

Load at 26-Aug-2010 12:32:51.00

Result: Plasma to 1.85s.
Startup looks ok. Strike point changes seem to have worked, at least early
before the H-L back-transitions.

Aug 26 2010 01:01:29:217PM1100826018Jerry HughesShot 18

Changes: None

Result: Plasma to 1.87s
H-modes continue to back-transition.


Aug 26 2010 01:18:26:933PM1100826019Jerry HughesShot 19.

Changes: Reduce peak Ip demand to 900kA
Load at 26-Aug-2010 13:03:14.00

Result: Plasma to 1.9s.


Aug 26 2010 01:47:55:753PM1100826020Steve Wolfe
Shot#20: Decreased peak rxl by 5mm to -.001
ZXL at 1sec decreased by 1cm to -.0165

Jerry is having a keyboard problem, Wolfe taking over 
as Physop.
Result: strikes changed, as expected. No injection at 1.05sec
this time, RF still faulting out around 1.1sec

Next: no change

Aug 26 2010 02:10:33:127PM1100826020Jerry Hughes

Steve Wolfe takes over for shots 20 thru 22 due to my sticky keys being stuck.

Aug 26 2010 02:00:00:267PM1100826021Steve Wolfe
Shot#21: Disable H-bottom (turn off H-bottom) per SL request
Disrupts at 1.19sec, looks like an rf-induced injection to me. 

Next: increase right gap by 5mm


Aug 26 2010 02:08:43:463PM1100826022Steve Wolfe
Shot#22: increase right gap by 5mm
Rcur from .66,.6625 to .6575,.660 (t=.5,1.5sec)
pg4 from 25 to 23msec


Aug 26 2010 02:58:51:243PM1100826023Jerry HughesShot 23.

We were delayed for over 1/2hr to un-hang some data acquisition, the RF monitor.

Changes to shot: Increase PG5 demand from 20 to 40, keeping same timing.
Have H-bottom enabled.
Load at 26-Aug-2010 14:22:47.00

Result: Plasma to 1.75s.
Somewhat late breakdown. Should keep an eye on it.

Aug 26 2010 03:12:37:150PM1100826024Jerry HughesShot 24.

Changes: None.
(SL will change the RF program.)

Result: Plasma to 1.5s. Disruption due to injection.


Aug 26 2010 03:33:36:520PM1100826025Jerry HughesShot 25.

Change: Increase ZXU during flattop by about 1cm to 0.028.
This is intended to keep us from going close to DN

Load at 26-Aug-2010 15:17:30.00

Result: Plasma to 1.47s. Not as close to DN as last time.
Several unpleasant H-modes. ICRF is unhappy.


Aug 26 2010 03:41:32:457PM1100826026Jerry HughesShot 26.

Changes: No PO changes.

Result: Plasma makes it to 1.72s.



Aug 26 2010 04:05:11:327PM1100826027Jerry HughesShot 27.

Changes: Having H-bottom disabled and Putting Ne in B-side-lower and enabling.
In segment 2, setting PG1 to 100 from 0.4s to 0.6s.
Set output of DPCS_PIEZO_CHOPPER to ["pulse_gas3","h-bot ","pulse_gas1"].

Load at 26-Aug-2010 15:48:11.00

This is just crazy enough to work.

Result: Plasma, only to 1.5s. These disruptions seems to correspond to going to
DN. I'll try to prevent this.

Aug 26 2010 04:16:34:150PM1100826028Jerry HughesShot 28.

Changes: Raise ZXU demand at 1.5s 1cm to 0.038. (Try to keep the plasma LSN.)

Load at 26-Aug-2010 16:06:08.00

Result: Plasma, still disrupts at 1.47s.
Breakdown is kind of late.


Aug 26 2010 04:34:55:917PM1100826029Jerry HughesShot 29.

Changes. Having B-side lower disabled and H-bottom re-enabled.
Leave PG5 programing chopped at 40.

Result: Plasma to 1.42s.
Shot still looks crummy.
Aug 26 2010 05:00:07:280PM1100826030Jerry HughesShot 30.

Changes: Turn on H-bottom full. Take PG5 pulse from 40 to 100, still going
from 0.4s to 0.6s.
Load at 26-Aug-2010 16:38:26.00


Result: Plasma to 1.54s. Started to tickle rampdown that time, perhaps due to
the increased ICRF out to 1.5s.

Aug 26 2010 05:17:33:287PM1100826031Jerry HughesShot 31.

Cell access for Jim Irby.

Changes: No PO changes. Wukitch will give us more ICRF into rampdown.

Result: Plasma to 1.51s.
Aug 26 2010 05:26:05:170PM1100826032Jerry HughesShot 32.

Changes: Have H-bottom disabled, B-side lower re-enabled.
+ some ICRF changes from Wukitch

Results: Plasma to 1.66. Better EDA H-modes were obtained. Wmhd peaks at 147kJ.




Aug 26 2010 05:41:17:787PM1100826033Jerry HughesShot 33.

Changes: Decrease Ne pulse. Leave PG1 on full but decrease gate from [0.4,0.6]
to [0.5,0.6].
Load at 26-Aug-2010 17:28:42.00

Result: Plasma to 1.75s. Wolfe notes excessive hards around 200ms.
A decent looking EDA H-mode killed by an injection after 1.1s.
Aug 26 2010 06:13:12:750PM1100826034Jerry HughesShot 34.

Changes: SL wants to repeat shot 32 with the original Ne pulse. Load from
1100826032.

Load at 26-Aug-2010 17:43:15.00

Result: Plasma to 1.66s.

End of run.


Engineering Operator Comments
ShotTimeTypeStatusComment
108:24:30:107AMPlasmaOk
208:39:17:350AMPlasmaOk
308:53:21:543AMPlasmaOk
409:10:15:853AMPlasmaOk
509:28:02:830AMPlasmaOk
609:46:05:070AMPlasmaOk
710:01:59:500AMPlasmaOk
810:16:38:700AMPlasmaOk
910:30:15:140AMPlasmaOk
1010:48:26:453AMPlasmaOk
1111:04:38:650AMPlasmaOk
1211:20:10:190AMPlasmaOk
1311:33:00:367AMPlasmaOk
1411:48:42:453AMPlasmaOk
1512:02:37:267PMPlasmaOk
1612:19:18:457PMPlasmaOk
1712:35:52:387PMPlasmaOk
1812:52:31:057PMPlasmaOk
1901:13:04:493PMPlasmaOk
2001:37:18:310PMPlasmaOk
2101:51:56:003PMPlasmaOk
2202:07:55:360PMPlasmaOk
2302:52:25:867PMPlasmaOk
2403:05:27:513PMPlasmaOk
2503:20:09:410PMPlasmaOk
2603:36:34:007PMPlasmaOk
2703:53:14:763PMPlasmaOk
2804:09:30:017PMPlasmaOk
2904:29:44:717PMPlasmaOk
3004:45:58:623PMPlasmaOk
3105:04:32:033PMPlasmaOk
3205:19:14:570PMPlasmaOk
3305:34:53:560PMPlasmaOk
3405:50:46:020PMPlasmaOk

System Availability
Aug 26 2010 08:24:12:830AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESnoBES system is ready for Up-to-air (Apr, 2010)Mar 31 2010 10:36AM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (D+F) working. All midplane and off-midplane diode arrays working except WB1AX. Midplane foils calibrated and PRAD_MAIN is being filled. Divertor/Ledge foils not yet ready.Jul 15 2010 08:27AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno3/26/10 Bottle Removed From Cell, monitors powered down, Autodialer function bypassedMar 26 2010 05:29PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged.Apr 06 2010 10:51AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoWide-view CXRS system is power down and ready for up-to-air (Apr, 2010)Mar 31 2010 10:36AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned; new calibrations (relative brightness and position) not yet implementedJun 29 2010 10:27AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperationalJun 26 2010 09:28PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll channels working and calibrated.Jul 30 2010 08:13AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauges are operational.Jun 28 2010 08:02PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPlugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access.Apr 05 2010 11:18AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational. Ch 5 preamp replaced 6/18.Jun 22 2010 03:03PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesoperating normallyJun 29 2010 10:26AM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Jun 26 2010 11:19PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesSystem installed and aligned. Inverted profiles are still not available.Jul 22 2010 08:41AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes Jun 28 2010 12:12PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayessystem checked out ok on 11006728. Jun 28 2010 04:57PM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayessystem checked out ok on 1100628Jun 28 2010 04:57PM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayessystem checked out ok. conditioned to vacuum. Jun 28 2010 04:58PM (ylin)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-Offyesoperational and testedJul 20 2010 04:42PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridyesLH was tested into dummy loads synced to shot. Shorts have been removed. Probe Cal. 6/29/10 evening.Jun 29 2010 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid Reflectometeryes60 GHz system to detect upshifted signalJul 28 2010 01:39PM (sgbaek)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoWB4LY and LLY working but not during ICRF. WB1LY not attached due to pickup problems. LYMID attached but have profile problems.Aug 24 2010 09:17AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesSpectra being collected and tree filled. Wavelength scan is broken so fixed on the Mo XXXI and XXXII lines.Jul 15 2010 08:28AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Start at reduced speed.Jun 22 2010 03:02PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are operationalJun 28 2010 08:02PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesAll systems are on and functionalJun 29 2010 12:56PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03Jun 26 2010 09:21PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoCapillaries tested in-vessel.Jun 28 2010 08:08PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational. AM (2 * 39.51) MHz.Jul 19 2010 05:54PM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,ennever,ntsujii,porkolab
Penning GaugesnoHigh voltage power supplies are turned off, waiting for work at A-port horizontal to be finished.Jun 28 2010 08:07PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air Switchyes Jun 26 2010 11:19PM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Jun 26 2010 11:19PM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyes Jun 26 2010 11:19PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power Systemsyes Jun 26 2010 11:20PM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesOperational.Jun 28 2010 08:03PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperational.Jun 28 2010 08:03PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesF and J outer divertor probes are operational.Jun 28 2010 08:04PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperational, except probe#13Jun 28 2010 08:04PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesOn 1100817xxx the system is fully connected. These are still some noise issues but the system should be in better shape than the previous week.Aug 17 2010 08:53AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational. New Langmuir-Mach probe head installed.Jun 28 2010 08:05PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesOperational.Jun 28 2010 08:05PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesBoth A and K units are operational. Coil polarity needs to be checked.Jun 28 2010 08:06PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesHV supply on, cable run to sparker at k-horJun 23 2010 02:41PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS installed and leak tested, individual probes not installedJun 28 2010 01:28PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesNo new CO2 detector, so still missing edge channelsJun 23 2010 02:40PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CoreyesOperating with 2 lasers, but density is **uncalibrated**Jul 14 2010 11:54AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgeyesOperationalJul 14 2010 11:54AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesOperational. Raw spectra stored but not line brightness time histories are going into the tree yet.Aug 24 2010 09:17AM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermlreinke
XTOMOyesCore system working. Edge system waiting for H-modes.Jul 01 2010 11:55AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke