| Session Leader Comments |
| Oct 19 2010 08:57:25:637AM | 1101019001 | Ron Parker | First shot was a test of the gas valve. It was OK.
|
| Oct 19 2010 09:29:47:890AM | 1101019002 | Ron Parker | Shot 2 fizzled, too much fill gas.
|
| Oct 19 2010 10:12:48:597AM | 1101019003 | Ron Parker | Shot 3 ran OK,I ~ 500 kA, nl_04 ~ 3 e19 m-2.
Next: Turn on LH @ 400 kW. But density at grill may be too low.
|
| Oct 19 2010 10:13:16:190AM | 1101019004 | Ron Parker | Shot 4 looked promissing, LH broought v_loop to ~ 0.25 V with about 630 kW of forward power, 300 kW of net LH power.
Next: Moved launcher to 0.1 mm behind limiter.
|
| Oct 19 2010 10:13:47:727AM | 1101019005 | Ron Parker | Shot 5 fizzled
|
| Oct 19 2010 10:41:38:823AM | 1101019006 | Ron Parker | Shot 6 ran OK, v_loop still around .3 V.
Next: close right gap 1.0 cm to improve coupling.
|
| Oct 19 2010 10:54:51:033AM | 1101019007 | Ron Parker | Shot 7 was a good LH shot.
Next: Increase LH power to ~ 500 kW.
|
| Oct 19 2010 10:57:56:807AM | 1101019008 | Ron Parker | Shot 8 ran well, good LH shot, v_loop < 0.2 V. Sawtooth stabilized.
Next: Increase LH power to ~ 700 kW
|
| Oct 19 2010 11:21:37:883AM | 1101019009 | Ron Parker | Good LH shot. Need a bit more power.
|
| Oct 19 2010 11:20:47:560AM | 1101019010 | Ron Parker | We are getting there, v_loop ~ 0 for 100 ms, current rises during LH pulse.
|
| Oct 19 2010 11:36:06:130AM | 1101019011 | Ron Parker | Shot 11 disrupted shortly after LH turned on. v_loop went positive by ~0.2 V.
|
| Oct 19 2010 12:16:01:473PM | 1101019012 | Ron Parker | Shot 12 disrupted again shortly after LH turned on
|
| Oct 19 2010 12:16:54:097PM | 1101019013 | Ron Parker | Shot 13 was the best yet, v_loop ~ 0 for 150 ms.
|
| Oct 19 2010 12:21:42:740PM | 1101019014 | Ron Parker | A new trophy shot! v_loop = 0, 75 deg phasing for ~ 400 ms
|
| Oct 19 2010 12:42:37:577PM | 1101019015 | Ron Parker | Another good shot, not quite as good as shot 14.
Nathan fired two impurity injections into the LH driven phase with zero loop voltage.
Next: repeat, also try to tune gap so that density stays aroound 1.e18 at the grill.
|
| Oct 19 2010 01:39:26:430PM | 1101019016 | Ron Parker | Repeat of 15
|
| Oct 19 2010 01:38:06:840PM | 1101019017 | Ron Parker | Repeat of 16
|
| Oct 19 2010 01:39:48:987PM | 1101019018 | Ron Parker | Repeat of 17
|
| Oct 19 2010 02:01:49:520PM | 1101019019 | Ron Parker | Shot 19 was programmed for higher power. LH ran full length
|
| Oct 19 2010 02:03:08:603PM | 1101019020 | Ron Parker | Power was increased again for shot 20. It ran with one LH trip
Net power was ~ 1 MW
|
| Oct 19 2010 02:12:44:363PM | 1101019021 | Ron Parker | LH tripped early, didn't recover.
|
| Nov 16 2010 04:55:46:140PM | 1101019022 | Ron Parker | More LH power trips
|
| Nov 16 2010 04:54:53:963PM | 1101019023 | Ron Parker | LH still tripping, asking for too much power. Backoff for next shot
|
| Nov 16 2010 04:53:43:087PM | 1101019024 | Ron Parker | Good shot, no LH trips, ~ 700 kW
Next: increase power to 850 kW
|
| Nov 16 2010 04:52:54:457PM | 1101019025 | Ron Parker | Shot fizzled, problem with gas/pumping
|
| Nov 16 2010 04:52:00:880PM | 1101019026 | Ron Parker | A good LH shot, P_LH ~ 800 kW, v_loop ~ 0
Next: An Ohmic shot for MSE.
|
| Nov 16 2010 04:01:39:170PM | 1101019027 | Ron Parker | Ohmic shot ran full length.
Next: Increase LH power to 108 kW in center four columns, split column klystrons at 180 kW.
|
| Nov 16 2010 03:59:37:170PM | 1101019028 | Ron Parker | Density went up slightly, v_loop slightly negative during most of shot, peak LH power = 1 MW. Next: 180 kW on splits, 135 kW on center
|
| Nov 16 2010 03:58:14:937PM | 1101019029 | Ron Parker | Shot 29 ran well, a very good LHCD shot.
Next: Increase power to 185 kW on splits, 148 on center
|
| Nov 16 2010 03:57:22:887PM | 1101019030 | Ron Parker | Shot 30 was a bit ratty, needs some conditioning?
|
| Nov 16 2010 03:56:19:583PM | 1101019031 | Ron Parker | Another pseudo-trophy shot. 1 MW full current drive.
Next: Raise density to nl_04 to 4e19 m-2.(Does rotation change?)
|
| Nov 16 2010 03:55:04:237PM | 1101019032 | Ron Parker | LH tripped early, did not recover. Density was nl_04 ~ 4e19 m-2 as requested.
Next: try again with lower power, 170 kW in splits, 85 kW in center
|
| Physics Operator Comments |
| Oct 19 2010 08:56:23:303AM | 1101019001 | Greg Wallace | ECDC was turned off overnight and not restarted. 1.5 hours ECDC this morning before the run.
Starting shot: 1101015028
Changes:
Reduce density during flattop to nl_04= 3.0e19.
Reduce Ip to 500 kA in flat top, extended to 1.7 s.
Reduce Bt to 5.4 T (150 kA TF bus current), extended to 1.7 s.
Import cryo startup into seg 1 from 1101013029.
Result:
Gas valve test shot. Valves OK.
|
| Oct 19 2010 09:14:03:110AM | 1101019002 | Greg Wallace | ECDC was turned off overnight and not restarted. 1.5 hours ECDC this morning before the run.
Starting shot: 1101015028
Changes:
Reduce density during flattop to nl_04= 3.0e19.
Reduce Ip to 500 kA in flat top, extended to 1.7 s.
Reduce Bt to 5.4 T (150 kA TF bus current), extended to 1.7 s.
Import cryo startup into seg 1 from 1101013029.
Result:
Fizzle. Too much prepuff.
Next shot:
Reduce PG4 from 60 ms puff to 50 ms puff.
|
| Oct 19 2010 09:52:07:730AM | 1101019003 | Greg Wallace | Changes:
Reduce PG4 from 60 ms puff to 50 ms puff.
Result:
Plasma! Disruption during rampdown. Power supply limits were set at 2.0 s.
Next shot:
Extend power supply limits by 0.2 s. LH will be on for next shot 0.9-1.4 s. No DPCS changes.
|
| Oct 19 2010 09:52:17:320AM | 1101019003 | Greg Wallace | Changes:
Reduce PG4 from 60 ms puff to 50 ms puff.
Result:
Plasma! Disruption during rampdown. Power supply limits were set at 2.0 s.
Next shot:
Extend power supply limits by 0.2 s. LH will be on for next shot 0.9-1.4 s.
|
| Oct 19 2010 10:05:21:710AM | 1101019004 | Greg Wallace | Changes:
Extend power supply limits by 0.2 s. LH will be on for next shot 0.9-1.4 s. No DPCS changes.
Result:
Plasma until halfway through rampdown. Some LH tripping but still signs of current drive. Coupling not great. May have gone over power supply time limits. Looking into this.
Next shot:
Move in launcher to 0.1mm behind limiter. No DPCS changes.
|
| Oct 19 2010 09:56:58:780AM | 1101019005 | Greg Wallace | Changes:
Move in launcher to 0.1 mm behind limiter. No DPCS changes.
Result:
Fizzle. Too much prefill. (Am I becoming a gashead?)
Next shot:
Reduce PG4 prefill from 50 ms to 40 ms.
|
| Oct 19 2010 10:30:35:943AM | 1101019006 | Greg Wallace | Changes:
Move in launcher to 0.1 mm behind limiter.
Reduce PG4 prefill from 50 ms to 40 ms.
Result:
Plasma with lots of HXR during LH. Hit power supply limit timers. LH coupling still not great (~30%) with trips.
Next shot:
Increase RCUR by 0.5 cm to reduce outer gap by 1cm.
Trip levels increased on klystrons 4 and 5.
Add 40 ms of Ar from 0.3 to 0.34 s on PG1.
Fixed power supply time limits?
|
| Oct 19 2010 10:41:59:760AM | 1101019007 | Greg Wallace | Changes:
Increase RCUR by 0.5 cm to reduce outer gap by 1cm.
Trip levels increased on klystrons 4 and 5.
Add 40 ms of Ar from 0.3 to 0.34 s on PG1.
Result:
Plasma. Startup looks good. LH ran clean with better density on grill with 1cm outer gap.
Next shot:
Increase LH power to 120 kW/klystron.
|
| Oct 19 2010 10:56:51:887AM | 1101019008 | Greg Wallace | Changes:
Increase LH power to 120 kW/klystron.
Result:
Plasma. Strong current drive at 525 kW net power. Still not finishing ramp down.
Next shot:
No DPCS changes.
Increase LH power to 150 kW/klystron.
Beam pulse timing moved up by 30 ms for MSE.
|
| Oct 19 2010 11:11:54:347AM | 1101019009 | Greg Wallace | Changes:
No DPCS changes.
Increase LH power to 150 kW/klystron.
Beam pulse timing moved up by 30 ms for MSE.
Result:
Disruption at 1.14 s. Doesn't look like it came from the LH grill based on camera view. Matt says W injection caused disruption.
Next shot:
No changes.
|
| Oct 19 2010 11:27:54:380AM | 1101019010 | Greg Wallace | Changes:
No changes.
Result:
Plasma. Almost crossed 0 V. Late disruptions might be due to lack of control gains after 2.0 s.
Next shot:
Increase to 170 kW/klystron.
Extend control gains out to ~2.2 s.
|
| Oct 19 2010 11:53:53:440AM | 1101019011 | Greg Wallace | Changes:
Increase to 170 kW/klystron.
Extend control gains out to ~2.2 s.
Result:
Disruption at 1.0 s. OH2L crowbars at 0.85 s. Probably cause of the disruption.
Next shot:
Repeat.
|
| Oct 19 2010 12:03:36:700PM | 1101019012 | Greg Wallace | Changes:
Repeat.
Result:
Disruption at 1.28 s. Disruption starts with injection at ~1.8 s. Matt says W injection. Plasma almost recovers from initial injection then goes south again.
Next shot:
Move RXL in by 0.5 cm to see if we can keep heat off the divertor shelf.
|
| Oct 19 2010 12:11:20:227PM | 1101019013 | Greg Wallace | Changes:
Move RXL in by 0.5 cm to see if we can keep heat off the divertor shelf.
Result:
Plasma. No W injection after changing RXL programming.
Next shot:
Decrease phasing to 75 deg (n_||~1.6).
No DPCS changes.
|
| Oct 21 2010 04:16:31:940PM | 1101019014 | Greg Wallace | Changes:
Decrease phasing to 75 deg (n_||~1.6).
No DPCS changes.
Result:
Trophy shot!!! Sustained zero loop voltage.
Next shot:
Repeat.
|
| Oct 19 2010 12:42:26:670PM | 1101019015 | Greg Wallace | Changes:
Repeat.
Result:
Plasma. Good current drive. 2 Ca injections for transport measurement during LH, one after LH.
Next shot:
Decrease RCUR by 2.5 mm to increase outer gap by 5 mm.
|
| Oct 19 2010 12:52:06:663PM | 1101019016 | Greg Wallace | Changes:
Decrease RCUR by 2.5 mm to increase outer gap by 5 mm.
Result:
Another great shot. No HIREXSR data on this shot.
Next shot:
Decrease RCUR by 1.5 mm after 1.1 s.
|
| Oct 19 2010 01:27:01:020PM | 1101019017 | Greg Wallace | Changes:
Decrease RCUR by 1.5 mm after 1.1 s.
Result:
Good shot again! Sustained near zero loop voltage. HIREXSR still not working.
Next shot:
Repeat.
|
| Oct 19 2010 01:32:31:880PM | 1101019018 | Greg Wallace | Changes:
Repeat.
Result:
Good shot again! Sustained near zero loop voltage. HIREXSR still not working.
Next shot:
Increase klystron power to 190 kW/klystron.
|
| Oct 19 2010 01:48:12:293PM | 1101019019 | Greg Wallace | Changes:
Increase klystron power to 190 kW/klystron.
Result:
Another trophy shot! Clean LH at 190 kW/klystron, just shy of 1.0 MW net power.
Next shot:
Increase LH to 200 kW/klystron except #1@194 and #3@190.
|
| Oct 19 2010 02:00:20:057PM | 1101019020 | Greg Wallace | Changes:
Increase LH to 200 kW/klystron except #1@194 and #3@190.
Result:
Good shot at just over 1MW net power at beginning of pulse.
Next shot:
No DPCS changes.
|
| Oct 19 2010 02:25:33:200PM | 1101019021 | Greg Wallace | Changes:
No DPCS changes.
Result:
Plasma. Klystron 10 circulator arc fault caused trips after 0.95 s.
Cryopump LN2 leak.
Next shot:
Repeat.
|
| Oct 19 2010 02:39:37:947PM | 1101019022 | Greg Wallace | Changes:
Repeat.
Result:
Plasma. LH trips out due to klystron 7?
Next shot:
Decrease to 190 kW/klystron.
|
| Oct 19 2010 02:52:53:730PM | 1101019023 | Greg Wallace | Changes:
Decrease to 190 kW/klystron.
Result:
Plasma. Many trips in middle of LH pulse but still Vloop~0. Klystron 7 still turning off later than other klystrons by 300 us.
Next shot:
Decrease power to 150 kW/klystron.
No DPCS changes.
|
| Oct 19 2010 03:06:04:130PM | 1101019024 | Greg Wallace | Changes:
Decrease power to 150 kW/klystron.
No DPCS changes.
Result:
Good full length shot. 700 kW net LH power.
Next shot:
Increasing to 170 kW/klystron.
No DPCS changes.
|
| Oct 19 2010 03:21:05:740PM | 1101019025 | Greg Wallace | Changes:
Increasing to 170 kW/klystron.
No DPCS changes.
Result:
Fizzle. Ratiomatic not working on this shot. Cryo problem during init?
Next shot:
Repeat.
|
| Oct 19 2010 03:39:31:270PM | 1101019026 | Greg Wallace | Changes:
Repeat.
Result:
Good current drive shot! Full length plasma. No LH trips at 170 kW/klystron.
Next shot:
Ohmic baseline (no LH) for MSE.
|
| Oct 19 2010 03:43:30:797PM | 1101019027 | Greg Wallace | Changes:
Ohmic baseline (no LH) for MSE.
Result:
No LH. Good baseline shot.
Next shot:
Split columns 180 kW/klystron, center columns 108 kW/klystron.
No DPCS changes
|
| Oct 19 2010 03:57:44:280PM | 1101019028 | Greg Wallace | Changes:
Split columns 180 kW/klystron, center columns 108 kW/klystron.
No DPCS changes.
Result:
Good shot, full length with strong current drive. 180 kW/klystron on split columns, 108 kW/klystron on others. ~1.0 MW net LH power.
Next shot:
180 kW/klystron on split columns, 135 kW/klystron on center 4 columns.
|
| Oct 19 2010 04:12:08:790PM | 1101019029 | Greg Wallace | Changes:
180 kW/klystron on split columns, 135 kW/klystron on center 4 columns.
No DPCS changes.
Result:
Trophy shot! ~1.0 MW net LH power, Vloop~0 for full LH pulse.
Next shot:
Increase power to 185 kw/klystron on split columns and 148 kw/klystron on direct columns.
|
| Oct 19 2010 04:25:05:197PM | 1101019030 | Greg Wallace | Changes:
Increase power to 185 kw/klystron on split columns and 148 kw/klystron on direct columns.
Result:
Plasma. Some tripping early and late in LH pulse. 185 kW/klystron on split columns and 148 kW/klystron on direct columns.
Next shot:
Repeat. No DPCS changes.
|
| Oct 19 2010 04:38:44:280PM | 1101019031 | Greg Wallace | Changes:
Repeat. No DPCS changes.
Result:
Trophy shot! A few early trips then steady LH during the rest of the pulse. Very steady 1.0 MW net LH power.
Next shot:
Increase programmed nl_04 to 4e19.
|
| Oct 19 2010 04:52:46:353PM | 1101019032 | Greg Wallace | Changes:
Increase programmed nl_04 to 4e19.
Result:
Plasma to rampdown. Many LH trips. Circulator arc fault on klystron 7?
Next shot:
Reduce power to 170 kW/klystron balanced.
|
| Oct 19 2010 05:02:32:833PM | 1101019033 | Greg Wallace | Changes:
Reduce power to 170 kW/klystron balanced.
Result:
Plasma to rampdown. LH ran clean at 170 kW/klystron balanced. Last shot of the day.
|
| System Availability |
| Oct 19 2010 08:49:27:170AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | no | BES system is ready for Up-to-air (Apr, 2010) | Mar 31 2010 10:36AM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (D+F) working. All midplane and off-midplane diode arrays working except WB1AX. Midplane foils calibrated and PRAD_MAIN is being filled. Divertor/Ledge foils not yet ready. | Jul 15 2010 08:27AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | 3/26/10 Bottle Removed From Cell, monitors powered down, Autodialer function bypassed | Mar 26 2010 05:29PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged. | Apr 06 2010 10:51AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | Wide-view CXRS system is power down and ready for up-to-air (Apr, 2010) | Mar 31 2010 10:36AM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned; new calibrations (relative brightness and position) not yet implemented | Jun 29 2010 10:27AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational | Jun 26 2010 09:28PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | Only low frequency channels 1-16 working. | Oct 12 2010 11:51AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauges are operational. | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Plugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access. | Apr 05 2010 11:18AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. Ch 5 preamp replaced 6/18. | Jun 22 2010 03:03PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | operating normally | Jun 29 2010 10:26AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | System installed and aligned. Inverted profiles are still not available. | Jul 22 2010 08:41AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | | Jun 28 2010 12:12PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | system checked out ok on 11006728. | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | system checked out ok on 1100628 | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | system checked out ok. conditioned to vacuum. | Jun 28 2010 04:58PM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | operational and tested | Jul 20 2010 04:42PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | yes | LH was tested into dummy loads synced to shot. Shorts have been removed. Probe Cal. 6/29/10 evening. | Jun 29 2010 03:51PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | yes | 60 GHz system to detect upshifted signal | Jul 28 2010 01:39PM (sgbaek) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | Lower Hybrid SOL reflectometer | yes | differential phase (profile) working since 8/27/2010. full phase (fluctuations + profile) is not. If put on a miniproposal, please request LH launcher to be moved in | Oct 05 2010 11:26AM (cornwall) | Cornwall Lau | Lower Hybrid SOL reflectometer | cornwall,wukitch,ylin | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | WB4LY and LLY working but not during ICRF. WB1LY not attached due to pickup problems. LYMID attached but have profile problems. | Aug 24 2010 09:17AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Spectra being collected and tree filled. Wavelength scan is broken so fixed on the Mo XXXI and XXXII lines. | Jul 15 2010 08:28AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Start at reduced speed. | Jun 22 2010 03:02PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are operational | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | All systems are on and functional | Jun 29 2010 12:56PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | PMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03 | Jun 26 2010 09:21PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Capillaries tested in-vessel. | Jun 28 2010 08:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. AM (2 * 39.51) MHz. | Jul 19 2010 05:54PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,ennever,ntsujii,porkolab | | Penning Gauges | no | High voltage power supplies are turned off, waiting for work at A-port horizontal to be finished. | Jun 28 2010 08:07PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | | Jun 26 2010 11:20PM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | F and J outer divertor probes are operational. | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Operational, except probe#13 | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | On 1100817xxx the system is fully connected. These are still some noise issues but the system should be in better shape than the previous week. | Aug 17 2010 08:53AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Operational. New Langmuir-Mach probe head installed. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Operational. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | Both A and K units are operational. Coil polarity needs to be checked. | Jun 28 2010 08:06PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | HV supply on, cable run to sparker at k-hor | Jun 23 2010 02:41PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | no | SSS installed and leak tested, individual probes not installed | Jun 28 2010 01:28PM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | No new CO2 detector, so still missing edge channels | Jun 23 2010 02:40PM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | Operating with 2 lasers, but density is **uncalibrated** | Jul 14 2010 11:54AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | yes | Operational | Jul 14 2010 11:54AM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | Operational. Raw spectra stored but not line brightness time histories are going into the tree yet. | Aug 24 2010 09:17AM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | mlreinke | | XTOMO | yes | Core system working. Edge system waiting for H-modes. | Jul 01 2010 11:55AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Oct 19 2010 09:07:11:463AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | no | BES system is ready for Up-to-air (Apr, 2010) | Mar 31 2010 10:36AM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (D+F) working. All midplane and off-midplane diode arrays working except WB1AX. Midplane foils calibrated and PRAD_MAIN is being filled. Divertor/Ledge foils not yet ready. | Jul 15 2010 08:27AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | 3/26/10 Bottle Removed From Cell, monitors powered down, Autodialer function bypassed | Mar 26 2010 05:29PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged. | Apr 06 2010 10:51AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | Wide-view CXRS system is power down and ready for up-to-air (Apr, 2010) | Mar 31 2010 10:36AM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned; new calibrations (relative brightness and position) not yet implemented | Jun 29 2010 10:27AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational | Jun 26 2010 09:28PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | Only low frequency channels 1-16 working. | Oct 12 2010 11:51AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauges are operational. | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Plugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access. | Apr 05 2010 11:18AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. Ch 5 preamp replaced 6/18. | Jun 22 2010 03:03PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | operating normally | Jun 29 2010 10:26AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | System installed and aligned. Inverted profiles are still not available. | Jul 22 2010 08:41AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | | Jun 28 2010 12:12PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | system checked out ok on 11006728. | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | system checked out ok on 1100628 | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | system checked out ok. conditioned to vacuum. | Jun 28 2010 04:58PM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | operational and tested | Jul 20 2010 04:42PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | yes | LH was tested into dummy loads synced to shot. Shorts have been removed. Probe Cal. 6/29/10 evening. | Jun 29 2010 03:51PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | yes | 60 GHz system to detect upshifted signal | Jul 28 2010 01:39PM (sgbaek) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | Lower Hybrid SOL reflectometer | yes | differential phase (profile) working since 8/27/2010. full phase (fluctuations + profile) is not. If put on a miniproposal, please request LH launcher to be moved in | Oct 05 2010 11:26AM (cornwall) | Cornwall Lau | Lower Hybrid SOL reflectometer | cornwall,wukitch,ylin | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | WB4LY and LLY working but not during ICRF. WB1LY not attached due to pickup problems. LYMID attached but have profile problems. | Aug 24 2010 09:17AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Spectra being collected and tree filled. Wavelength scan is broken so fixed on the Mo XXXI and XXXII lines. | Jul 15 2010 08:28AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Start at reduced speed. | Jun 22 2010 03:02PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are operational | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | All systems are on and functional | Jun 29 2010 12:56PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | PMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03 | Jun 26 2010 09:21PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Capillaries tested in-vessel. | Jun 28 2010 08:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. AM (2 * 39.51) MHz. | Jul 19 2010 05:54PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,ennever,ntsujii,porkolab | | Penning Gauges | no | High voltage power supplies are turned off, waiting for work at A-port horizontal to be finished. | Jun 28 2010 08:07PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | | Jun 26 2010 11:20PM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | F and J outer divertor probes are operational. | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Operational, except probe#13 | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | On 1100817xxx the system is fully connected. These are still some noise issues but the system should be in better shape than the previous week. | Aug 17 2010 08:53AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Operational. New Langmuir-Mach probe head installed. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Operational. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | Both A and K units are operational. Coil polarity needs to be checked. | Jun 28 2010 08:06PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | HV supply on, cable run to sparker at k-hor | Jun 23 2010 02:41PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | no | SSS installed and leak tested, individual probes not installed | Jun 28 2010 01:28PM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | No new CO2 detector, so still missing edge channels | Jun 23 2010 02:40PM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | Operating with 2 lasers, but density is **uncalibrated** | Jul 14 2010 11:54AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | yes | Operational | Jul 14 2010 11:54AM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | Operational. Raw spectra stored but not line brightness time histories are going into the tree yet. | Aug 24 2010 09:17AM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | mlreinke | | XTOMO | yes | Core system working. Edge system waiting for H-modes. | Jul 01 2010 11:55AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Oct 19 2010 09:20:03:323AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | no | BES system is ready for Up-to-air (Apr, 2010) | Mar 31 2010 10:36AM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (D+F) working. All midplane and off-midplane diode arrays working except WB1AX. Midplane foils calibrated and PRAD_MAIN is being filled. Divertor/Ledge foils not yet ready. | Jul 15 2010 08:27AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | 3/26/10 Bottle Removed From Cell, monitors powered down, Autodialer function bypassed | Mar 26 2010 05:29PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged. | Apr 06 2010 10:51AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | Wide-view CXRS system is power down and ready for up-to-air (Apr, 2010) | Mar 31 2010 10:36AM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned; new calibrations (relative brightness and position) not yet implemented | Jun 29 2010 10:27AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational | Jun 26 2010 09:28PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | Only low frequency channels 1-16 working. | Oct 12 2010 11:51AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauges are operational. | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Plugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access. | Apr 05 2010 11:18AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. Ch 5 preamp replaced 6/18. | Jun 22 2010 03:03PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | operating normally | Jun 29 2010 10:26AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | System installed and aligned. Inverted profiles are still not available. | Jul 22 2010 08:41AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | | Jun 28 2010 12:12PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | system checked out ok on 11006728. | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | system checked out ok on 1100628 | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | system checked out ok. conditioned to vacuum. | Jun 28 2010 04:58PM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | operational and tested | Jul 20 2010 04:42PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | yes | LH was tested into dummy loads synced to shot. Shorts have been removed. Probe Cal. 6/29/10 evening. | Jun 29 2010 03:51PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | yes | 60 GHz system to detect upshifted signal | Jul 28 2010 01:39PM (sgbaek) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | Lower Hybrid SOL reflectometer | yes | differential phase (profile) working since 8/27/2010. full phase (fluctuations + profile) is not. If put on a miniproposal, please request LH launcher to be moved in | Oct 05 2010 11:26AM (cornwall) | Cornwall Lau | Lower Hybrid SOL reflectometer | cornwall,wukitch,ylin | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | WB4LY and LLY working but not during ICRF. WB1LY not attached due to pickup problems. LYMID attached but have profile problems. | Aug 24 2010 09:17AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Spectra being collected and tree filled. Wavelength scan is broken so fixed on the Mo XXXI and XXXII lines. | Jul 15 2010 08:28AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Start at reduced speed. | Jun 22 2010 03:02PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are operational | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | All systems are on and functional | Jun 29 2010 12:56PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | PMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03 | Jun 26 2010 09:21PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Capillaries tested in-vessel. | Jun 28 2010 08:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. AM (2 * 39.51) MHz. | Jul 19 2010 05:54PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,ennever,ntsujii,porkolab | | Penning Gauges | no | High voltage power supplies are turned off, waiting for work at A-port horizontal to be finished. | Jun 28 2010 08:07PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | | Jun 26 2010 11:20PM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | F and J outer divertor probes are operational. | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Operational, except probe#13 | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | On 1100817xxx the system is fully connected. These are still some noise issues but the system should be in better shape than the previous week. | Aug 17 2010 08:53AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Operational. New Langmuir-Mach probe head installed. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Operational. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | Both A and K units are operational. Coil polarity needs to be checked. | Jun 28 2010 08:06PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | HV supply on, cable run to sparker at k-hor | Jun 23 2010 02:41PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | no | SSS installed and leak tested, individual probes not installed | Jun 28 2010 01:28PM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | No new CO2 detector, so still missing edge channels | Jun 23 2010 02:40PM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | Operating with 2 lasers, but density is **uncalibrated** | Jul 14 2010 11:54AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | yes | Operational | Jul 14 2010 11:54AM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | Operational. Raw spectra stored but not line brightness time histories are going into the tree yet. | Aug 24 2010 09:17AM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | mlreinke | | XTOMO | yes | Core system working. Edge system waiting for H-modes. | Jul 01 2010 11:55AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Oct 19 2010 09:33:08:903AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | no | BES system is ready for Up-to-air (Apr, 2010) | Mar 31 2010 10:36AM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (D+F) working. All midplane and off-midplane diode arrays working except WB1AX. Midplane foils calibrated and PRAD_MAIN is being filled. Divertor/Ledge foils not yet ready. | Jul 15 2010 08:27AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | 3/26/10 Bottle Removed From Cell, monitors powered down, Autodialer function bypassed | Mar 26 2010 05:29PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | no | Single channel CNPA available as of 12/1707 | Jun 10 2009 10:22AM (twf) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged. | Apr 06 2010 10:51AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | Wide-view CXRS system is power down and ready for up-to-air (Apr, 2010) | Mar 31 2010 10:36AM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned; new calibrations (relative brightness and position) not yet implemented | Jun 29 2010 10:27AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational | Jun 26 2010 09:28PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | Only low frequency channels 1-16 working. | Oct 12 2010 11:51AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauges are operational. | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Plugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access. | Apr 05 2010 11:18AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. Ch 5 preamp replaced 6/18. | Jun 22 2010 03:03PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | operating normally | Jun 29 2010 10:26AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | System installed and aligned. Inverted profiles are still not available. | Jul 22 2010 08:41AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | | Jun 28 2010 12:12PM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | system checked out ok on 11006728. | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | system checked out ok on 1100628 | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | system checked out ok. conditioned to vacuum. | Jun 28 2010 04:58PM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | operational and tested | Jul 20 2010 04:42PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | yes | LH was tested into dummy loads synced to shot. Shorts have been removed. Probe Cal. 6/29/10 evening. | Jun 29 2010 03:51PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | yes | 60 GHz system to detect upshifted signal | Jul 28 2010 01:39PM (sgbaek) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | Lower Hybrid SOL reflectometer | yes | differential phase (profile) working since 8/27/2010. full phase (fluctuations + profile) is not. If put on a miniproposal, please request LH launcher to be moved in | Oct 05 2010 11:26AM (cornwall) | Cornwall Lau | Lower Hybrid SOL reflectometer | cornwall,wukitch,ylin | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | WB4LY and LLY working but not during ICRF. WB1LY not attached due to pickup problems. LYMID attached but have profile problems. | Aug 24 2010 09:17AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Spectra being collected and tree filled. Wavelength scan is broken so fixed on the Mo XXXI and XXXII lines. | Jul 15 2010 08:28AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Start at reduced speed. | Jun 22 2010 03:02PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are operational | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | All systems are on and functional | Jun 29 2010 12:56PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | PMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03 | Jun 26 2010 09:21PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Capillaries tested in-vessel. | Jun 28 2010 08:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. AM (2 * 39.51) MHz. | Jul 19 2010 05:54PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,ennever,ntsujii,porkolab | | Penning Gauges | no | High voltage power supplies are turned off, waiting for work at A-port horizontal to be finished. | Jun 28 2010 08:07PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | | Jun 26 2010 11:20PM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | F and J outer divertor probes are operational. | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Operational, except probe#13 | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | On 1100817xxx the system is fully connected. These are still some noise issues but the system should be in better shape than the previous week. | Aug 17 2010 08:53AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Operational. New Langmuir-Mach probe head installed. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Operational. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | Both A and K units are operational. Coil polarity needs to be checked. | Jun 28 2010 08:06PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | HV supply on, cable run to sparker at k-hor | Jun 23 2010 02:41PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | no | SSS installed and leak tested, individual probes not installed | Jun 28 2010 01:28PM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | No new CO2 detector, so still missing edge channels | Jun 23 2010 02:40PM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | Operating with 2 lasers, but density is **uncalibrated** | Jul 14 2010 11:54AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | yes | Operational | Jul 14 2010 11:54AM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | Operational. Raw spectra stored but not line brightness time histories are going into the tree yet. | Aug 24 2010 09:17AM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | mlreinke | | XTOMO | yes | Core system working. Edge system waiting for H-modes. | Jul 01 2010 11:55AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|