Alcator C-Mod Run 1101020 Information

Back to runs

Miniproposals
Miniproposal:619
Date Filed: 9/30/2010
Title:Effects of ICRF and LH power on SOL density pofiles
First Author:Cornwall Lau
Session Leader:Cornwall Lau (shots 1-12)

Operators
Session leader(s):Cornwall Lau
Physics operator(s):Ron Parker
Engineering operator(s):Andy Pfeiffer,Ed Fitzgerald

Engineering Operator Run Comment
MP 619 Effects of ICRF& LH on SOL density profiles SL Cornwall Lau PO Ro

Session Leader Plans
Entered: Oct 21 2010 07:48:01:813AM
Author: Cornwall Lau
This is MP 619: Effects of ICRF and LH on SOL density profiles.

There are two objectives of this MP. Firstly, the SOL reflectometer will be calibrated to other density profile diagnostics by varying the SOL density profiles as much as possible. Secondly, ICRF and/or LH will be added to see their effects on the SOL density profile.

Working gas: D2
No boronization and standard ECDC. ICRF and LH, and cryopump needed. Cryopump may be useful for the first few shots at nl04~ .4.

Required diagnostics are Thomson scattering, A and F port scanning probes, LH langmuir probes. Desired diagnostics are emissive/ion sensitive probes. A-coil will be needed for possible locked modes. DNB can be run if others desire.

All shots will be 5.4T, preferably LSN. If we are getting H-modes early like on 1101015, switch to USN (1101015007). Load shot 1101015002, but change to B=5.4T,outer gap of 1cm, nl04 of .4 x10^20 m^-2. A/F port scanning probes should scan at .8,1,1.3s. Repeated Shot may be necessary for Thomson scattering alignment; repeats will definitely be necessary so that the probes get into the separatrix.

Shot 1: nl04= .4 x 10^20 m-2. I=.8MA, LH at 500kW from .6 to .9s. D at 500kW from 1.1 to 1.4s.

Shot 2: nl04= .4 x 10^20 m-2. I=1MA, LH at 500kW from .6 to .9s. D at 500kW from 1.1 to 1.4s.

Shot 3: nl04= .4 x 10^20 m-2. I=1.2MA, J at 500kW from .6 to .9s. E at 500kW from 1.1 to 1.4s.

Shot 4: nl04= .8 x 10^20 m-2. I=.8MA, LH at 500kW from .6 to .9s. D at 500kW from 1.1 to 1.4s.

Shot 5: nl04= .8 x 10^20 m-2. I=1MA, LH at 500kW from .6 to .9s. D at 500kW from 1.1 to 1.4s.

Shot 6: nl04= .8 x 10^20 m-2. I=1.2MA, J at 500kW from .6 to .9s. E at 500kW from 1.1 to 1.4s.

Shot 7: nl04= 1.2 x 10^20 m-2. I=.8MA, LH at 500kW from .6 to .9s. D at 500kW from 1.1 to 1.4s.

Shot 8: nl04= 1.2 x 10^20 m-2. I=1MA, J at 500kW from .6 to .9s. E at 500kW from 1.1 to 1.4s.

Shot 9: nl04= 1.2 x 10^20 m-2. I=1.2MA, J at 500kW from .6 to .9s. E at 500kW from 1.1 to 1.4s.

A and F port scanning probes no longer needed after this. For the next 5 shots, choose nl04 and current that gives the most change.

Shot 10: D,E, J power ramps from .1 to .2MW (.2 to .4MW for J) over .6-.8 s, .9 to 1.1 s, 1.2 to 1.4 s, respectively.

Shot 11: E power ramp from .2 to 1MW over .6 to .8s. LH at 500kW from .9 to 1.4s. J power ramp from .4 to 2MW over .9 to 1.4s

Shot 12: D power ramp from .2 to 1MW over .6 to .8s. LH at 500kW from .9 to 1.4s. E power ramp from .2 to 1MW over .9 to 1.4s

Shot 13: J power ramp from .4 to 2MW over .6 to .8s. E at 500kW from .9 to 1.4s. LH power ramp from .2 MW to max power over .9 to 1.4s

Shot 14: D and E power ramp from .2 to 1MW each over .6 to .8s. J at 500kW from .9 to 1.4s. LH power ramp from .2 MW to max power over .9 to 1.4s

Shot 15: D and E power ramp from .2 to .5MW, J power ramp from .4 to 1MW over .6 to .8s. LH power ramp from .2 MW to max power over .9 to 1.4s

If there is time, repeat above 5 shots for a different nl04, or if H-modes prove to not be interesting, switch to USN for those 5 shots.

Physics Operators Plans
Entered: Oct 19 2010 03:05:23:120PM
Author: Ron Parker
Session Leader: Cornwall Lau
Physics Operator: R. Parker

MP 619: Effects of ICRF and LH on SOL density profiles.
-----------------
Engineering Setup
-----------------

Run begins at 09:00 and ends at 17:00


Power systems as on: 1101015002


Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:

Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
fill NINJA with 10 psi D2 DISABLED

Enable gate-valves and shutters: ECE, VUV, HiREX Sr, Xeus
Leave z-bolo shutter as is (should be open)

Torvac gatevalve toggle (yes/no): no

Boronization(yes/no): no
Overnight ECDC (yes/no): yes
ICRF(yes/no): yes
LH(yes/no): yes
Cryopump (yes/no): yes

Vessel temperature: 35/35/35


ECDC
----------------------------
Gas: D2
sweep: 44/45/103 cm
scan: 20/120 s
Pressure: 2.0e-4 Torr
Duration:Overnight

PO Plan

Begin with 1101015002 equilibrium

Reduce field to 5.4 T, program density to nl_04 = 4e19 m-2

Follow session leader's plan thereafter

Session Leader Summaries
Entered: Oct 20 2010 04:52:11:003PM
Author: Cornwall Lau
not really a successful day. shots 4 and 5 had F-probe data. shots 1 and 2 had some H-modes data. Starting with shot 6, we ran into a variety of issues (see phys op summary), and we never recovered.

Physics Operator Summaries
Entered: Oct 20 2010 05:02:09:627PM
Author: Ron Parker
Not a good day today. It started well with the first 5 shots running full length, and a change from LSN to USN equilibrium between shots 1 and 2. This was done to avoid H-Mode, conforming to the SL's run plan. These 5 shots were all at 800 kA and nl_04 ~ 4-5e19 m_2.

At shot 6, the current was increased to 1 MA. This shot disrupted early in rampdown; more significantly, there was a discrepancy in the magnetics signals. For example the current indicated the disruption was at 1.3 s, however, other diagnostics indicated it occured in rampdown at ~ 1.6 s.

For the next shot, shot 7, a no-power shot was run and the magnetic signals all appeared normal. However, it was then discovered that the air switch could not be opened. This problem was subsequently associated with a blown fuse. After replacement the airswitch operated properly. However, the same problem recurred indicating that the cause of the blown fuse had not been identified. Subsequent investigation points to a problem with the alternator exciter power. This was still being worked on at the end of the run.

A second problem occured after the air switch problem was thought to be fixed, namely two shots (8 and 9) were run and both disrupted due to pulling of the EF1 lower power supply breakers. It is suspected that this may have had to do with the timing of an ICRF gate pulse relative to the EF waveform; however this could not be tested until the airswitch/exciter problem was resolved.

Scoorecard: 8 attempts at plasma, 5 full length, 3 disruptions, 1 in rampdown and 2 in flatttop.

Session Leader Comments
Oct 20 2010 09:20:34:080AM1101020001Cornwall Lauh-modes during icrf. lower hybrid didn't couple well so moving launcher to .1mm.
switching to USN to avoid the h-modes. Same icrf/lh power as last shot.
Oct 20 2010 09:35:20:827AM1101020002Cornwall Lauaccidental repeat of 1. change to USN for shot 3.
Oct 20 2010 09:50:01:457AM1101020003Cornwall Laugood shot. next shot: change outer gap to 1cm to hopefully improve LH coupling
Oct 20 2010 09:59:38:720AM1101020004Cornwall Laugood shot. repeat one more time so that Brian can move his probes in.
Oct 20 2010 10:19:44:457AM1101020005Cornwall Laugood shot, but did not get A port scanning probe data. moving on to 1MA, and hope everything else is the same.
Oct 20 2010 10:44:05:170AM1101020006Cornwall Lauefit data looks weird, so my density profile reconstruction isn't working. something seems to be wrong with the magnetics as it's showing disruption at 1.35 instead of 1.6, so we are taking a no power shot next.

Oct 20 2010 01:40:34:757PM1101020009Cornwall Laudisruption again. next shot: move back to shot 4 or 5 (800kA) to see if it works.


Physics Operator Comments
Oct 20 2010 09:46:57:903AMRon ParkerChanges:
Switch to upper null from 1101015008.
Changed to nl_04=4e19.
Changed TF current to 150kA (5.4 T).

Result:
Plasma to rampdown. TCI lost some fringes---

Next shot: Rcur increaaased by 0.5 cm

Oct 20 2010 08:52:00:187AM1101020001Ron ParkerEquilibrium from shot 1101015002 has been loaded, with following programmed changes:

TF = 5.4 T (150 kA)
PG1 = 50 ms (Ar)
Fill gas pulse = 42 ms
nl_04 = 4e20 m_2
Oct 20 2010 09:19:25:087AM1101020001Ron ParkerChanges:
Loaded from 1101015002 seg 2.
Loaded from 1101019033 seg 1.

Result:
Plasma to rampdown. nl_04~6.5e19, demand of 4e19. LH tripped out---low density on LH probes.

Next shot:
Move LH launcher to 0.1mm behind limiter.
Switch to upper null from 1101015008.
Changed to nl_04=4e19.
Changed TF current to 150kA (5.4 T).
Oct 20 2010 09:31:41:923AM1101020002Ron ParkerChanges:
Move LH launcher to 0.1mm behind limiter.
Switch to upper null from 1101015008. (Not loaded)
Changed to nl_04=4e19.
Changed TF current to 150kA (5.4 T).

Result:
Plasma to rampdown. No LH---density on LH probes still very low. TCI lost at 0.7 s. DPCS changes not loaded due to physop error.

Next shot:
Load changes to DPCS (i.e. switch to upper null).
Oct 20 2010 09:47:22:547AM1101020003Ron ParkerChanges:
Switch to upper null from 1101015008.
Changed to nl_04=4e19.
Changed TF current to 150kA (5.4 T).

Result:
Plasma to rampdown. TCI lost some fringes---

Next shot: Rcur increaaased by 0.5 cm

Oct 20 2010 10:03:45:260AM1101020004Ron ParkerShot 4 ran full length, right gap reduced to a little over 1 cm, not as tight as expected due to change in RCUR (0.5 cm)

Next: Repeat shot 4
Oct 20 2010 10:18:15:510AM1101020005Ron ParkerShot 5 ran full length.

Next: Program for 1 MA
Oct 20 2010 10:47:59:987AM1101020006Ron ParkerShot 6 ran through flattop, but disrupted during rampdown.

Ooops, current trace disrupts at t = 1.38 s but density disrupts at t = 1.56 s

Problem with magnetics data?

Next: No power shot.
Oct 20 2010 11:18:35:557AM1101020007Ron ParkerNo power shot looked OK.

New problem: Air switch is closed and cannot be opened.

We will hold at least until this problem is resolved.
Oct 20 2010 12:01:23:793PM1101020007Ron ParkerNo update on air switch. Still closed as far as we know.
Oct 20 2010 12:49:16:740PM1101020007Ron ParkerAir switch problem is fixable for now by jumping out the faulty circuit.

After review by Gary, Steve and Jim, we will use jumper, if necessary, to open or close air switch and proceed with run.
Oct 20 2010 01:24:56:673PM1101020008Ron ParkerShot 8 disrupted at t ~ 0.6 s, EF1 lower breaker pulled.

The good news: a blown fuse may have been the problem with the air switch.
Oct 20 2010 01:39:24:887PM1101020009Ron ParkerShot 9 disrupted at t ~ 0.6 s, EF1 lower pulled again.

Reload 1101015004, 800 kA again.
Oct 20 2010 01:57:09:260PM1101020010Ron ParkerThis was a no power shot -- excitation problem on alternator
Oct 20 2010 03:54:11:937PM1101020010Ron ParkerAn alternator cycle coning up, poweering just the excitation

Engineering Operator Comments
ShotTimeTypeStatusComment
109:04:16:280AMPlasmaOk
209:20:39:500AMPlasmaOk
309:33:31:630AMPlasmaOk
409:50:35:360AMPlasmaOk
510:05:17:420AMPlasmaOk
610:20:08:230AMPlasmaOk
710:48:35:107AMTestOk
801:15:25:477PMPlasmaBadEF1 self powered ckt fired fuses OKK
901:33:27:860PMPlasmaBadEF1L Self Powered Fired
1001:53:09:363PMPlasmaBadAlt. Exitation Problemduring Init No Power shot taken
1103:53:34:657PMTestOkAlternator Exciter Test
1205:12:13:933PMTestOkAlternator Exciter Test

System Availability
Oct 20 2010 09:03:56:840AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESnoBES system is ready for Up-to-air (Apr, 2010)Mar 31 2010 10:36AM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (D+F) working. All midplane and off-midplane diode arrays working except WB1AX. Midplane foils calibrated and PRAD_MAIN is being filled. Divertor/Ledge foils not yet ready.Jul 15 2010 08:27AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno3/26/10 Bottle Removed From Cell, monitors powered down, Autodialer function bypassedMar 26 2010 05:29PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged.Apr 06 2010 10:51AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoWide-view CXRS system is power down and ready for up-to-air (Apr, 2010)Mar 31 2010 10:36AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned; new calibrations (relative brightness and position) not yet implementedJun 29 2010 10:27AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperationalJun 26 2010 09:28PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesOnly low frequency channels 1-16 working.Oct 12 2010 11:51AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauges are operational.Jun 28 2010 08:02PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPlugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access.Apr 05 2010 11:18AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational. Ch 5 preamp replaced 6/18.Jun 22 2010 03:03PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesoperating normallyJun 29 2010 10:26AM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Jun 26 2010 11:19PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesSystem installed and aligned. Inverted profiles are still not available.Jul 22 2010 08:41AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes Jun 28 2010 12:12PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayessystem checked out ok on 11006728. Jun 28 2010 04:57PM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayessystem checked out ok on 1100628Jun 28 2010 04:57PM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayessystem checked out ok. conditioned to vacuum. Jun 28 2010 04:58PM (ylin)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-Offyesoperational and testedJul 20 2010 04:42PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridyesLH was tested into dummy loads synced to shot. Shorts have been removed. Probe Cal. 6/29/10 evening.Jun 29 2010 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid Reflectometeryes60 GHz system to detect upshifted signalJul 28 2010 01:39PM (sgbaek)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
Lower Hybrid SOL reflectometeryesdifferential phase (profile) working since 8/27/2010. full phase (fluctuations + profile) is not. If put on a miniproposal, please request LH launcher to be moved inOct 05 2010 11:26AM (cornwall)Cornwall LauLower Hybrid SOL reflectometercornwall,wukitch,ylin
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoWB4LY and LLY working but not during ICRF. WB1LY not attached due to pickup problems. LYMID attached but have profile problems.Aug 24 2010 09:17AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesSpectra being collected and tree filled. Wavelength scan is broken so fixed on the Mo XXXI and XXXII lines.Jul 15 2010 08:28AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Start at reduced speed.Jun 22 2010 03:02PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are operationalJun 28 2010 08:02PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesAll systems are on and functionalJun 29 2010 12:56PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03Jun 26 2010 09:21PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoCapillaries tested in-vessel.Jun 28 2010 08:08PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational. AM (2 * 39.51) MHz.Jul 19 2010 05:54PM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,ennever,ntsujii,porkolab
Penning GaugesnoHigh voltage power supplies are turned off, waiting for work at A-port horizontal to be finished.Jun 28 2010 08:07PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air Switchyes Jun 26 2010 11:19PM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Jun 26 2010 11:19PM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyes Jun 26 2010 11:19PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power Systemsyes Jun 26 2010 11:20PM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesOperational.Jun 28 2010 08:03PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperational.Jun 28 2010 08:03PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesF and J outer divertor probes are operational.Jun 28 2010 08:04PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperational, except probe#13Jun 28 2010 08:04PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesOn 1100817xxx the system is fully connected. These are still some noise issues but the system should be in better shape than the previous week.Aug 17 2010 08:53AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational. New Langmuir-Mach probe head installed.Jun 28 2010 08:05PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesOperational.Jun 28 2010 08:05PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesBoth A and K units are operational. Coil polarity needs to be checked.Jun 28 2010 08:06PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesHV supply on, cable run to sparker at k-horJun 23 2010 02:41PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS installed and leak tested, individual probes not installedJun 28 2010 01:28PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesNo new CO2 detector, so still missing edge channelsJun 23 2010 02:40PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CoreyesOperating with 2 lasers, but density is **uncalibrated**Jul 14 2010 11:54AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgeyesOperationalJul 14 2010 11:54AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesOperational. Raw spectra stored but not line brightness time histories are going into the tree yet.Aug 24 2010 09:17AM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermlreinke
XTOMOyesCore system working. Edge system waiting for H-modes.Jul 01 2010 11:55AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Oct 20 2010 05:11:57:237PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESnoBES system is ready for Up-to-air (Apr, 2010)Mar 31 2010 10:36AM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (D+F) working. All midplane and off-midplane diode arrays working except WB1AX. Midplane foils calibrated and PRAD_MAIN is being filled. Divertor/Ledge foils not yet ready.Jul 15 2010 08:27AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno3/26/10 Bottle Removed From Cell, monitors powered down, Autodialer function bypassedMar 26 2010 05:29PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAnoSingle channel CNPA available as of 12/1707Jun 10 2009 10:22AM (twf)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged.Apr 06 2010 10:51AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoWide-view CXRS system is power down and ready for up-to-air (Apr, 2010)Mar 31 2010 10:36AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned; new calibrations (relative brightness and position) not yet implementedJun 29 2010 10:27AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperationalJun 26 2010 09:28PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll channels working, but still some issues with DAOct 20 2010 05:06PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauges are operational.Jun 28 2010 08:02PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPlugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access.Apr 05 2010 11:18AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational. Ch 5 preamp replaced 6/18.Jun 22 2010 03:03PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesoperating normallyJun 29 2010 10:26AM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Jun 26 2010 11:19PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesSystem installed and aligned. Inverted profiles are still not available.Jul 22 2010 08:41AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes Jun 28 2010 12:12PM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayessystem checked out ok on 11006728. Jun 28 2010 04:57PM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayessystem checked out ok on 1100628Jun 28 2010 04:57PM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayessystem checked out ok. conditioned to vacuum. Jun 28 2010 04:58PM (ylin)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-Offyesoperational and testedJul 20 2010 04:42PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridyesLH was tested into dummy loads synced to shot. Shorts have been removed. Probe Cal. 6/29/10 evening.Jun 29 2010 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid Reflectometeryes60 GHz system to detect upshifted signalJul 28 2010 01:39PM (sgbaek)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
Lower Hybrid SOL reflectometeryesdifferential phase (profile) working since 8/27/2010. full phase (fluctuations + profile) is not. If put on a miniproposal, please request LH launcher to be moved inOct 05 2010 11:26AM (cornwall)Cornwall LauLower Hybrid SOL reflectometercornwall,wukitch,ylin
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoWB4LY and LLY working but not during ICRF. WB1LY not attached due to pickup problems. LYMID attached but have profile problems.Aug 24 2010 09:17AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesSpectra being collected and tree filled. Wavelength scan is broken so fixed on the Mo XXXI and XXXII lines.Jul 15 2010 08:28AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Start at reduced speed.Jun 22 2010 03:02PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are operationalJun 28 2010 08:02PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesAll systems are on and functionalJun 29 2010 12:56PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03Jun 26 2010 09:21PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoCapillaries tested in-vessel.Jun 28 2010 08:08PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational. AM (2 * 39.51) MHz.Jul 19 2010 05:54PM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,ennever,ntsujii,porkolab
Penning GaugesnoHigh voltage power supplies are turned off, waiting for work at A-port horizontal to be finished.Jun 28 2010 08:07PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air Switchyes Jun 26 2010 11:19PM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Jun 26 2010 11:19PM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyes Jun 26 2010 11:19PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power Systemsyes Jun 26 2010 11:20PM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesOperational.Jun 28 2010 08:03PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperational.Jun 28 2010 08:03PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesF and J outer divertor probes are operational.Jun 28 2010 08:04PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperational, except probe#13Jun 28 2010 08:04PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesOn 1100817xxx the system is fully connected. These are still some noise issues but the system should be in better shape than the previous week.Aug 17 2010 08:53AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational. New Langmuir-Mach probe head installed.Jun 28 2010 08:05PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesOperational.Jun 28 2010 08:05PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesBoth A and K units are operational. Coil polarity needs to be checked.Jun 28 2010 08:06PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesHV supply on, cable run to sparker at k-horJun 23 2010 02:41PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS installed and leak tested, individual probes not installedJun 28 2010 01:28PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesNo new CO2 detector, so still missing edge channelsJun 23 2010 02:40PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CoreyesOperating with 2 lasers, but density is **uncalibrated**Jul 14 2010 11:54AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgeyesOperationalJul 14 2010 11:54AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesOperational. Raw spectra stored but not line brightness time histories are going into the tree yet.Aug 24 2010 09:17AM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermlreinke
XTOMOyesCore system working. Edge system waiting for H-modes.Jul 01 2010 11:55AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke