| Session Leader Comments |
| Nov 18 2010 10:01:22:823AM | 1101118001 | Ron Parker | Shot 1 was a full length shot, but LH fired during rampup. Maybe interesting for Chuck, but not on my run plan.
|
| Nov 18 2010 10:02:07:513AM | 1101118002 | Ron Parker | Shot 2 ran well, timing good wrt laser but locked mode.
|
| Nov 18 2010 10:03:43:670AM | 1101118003 | Ron Parker | Shot 3 ran well, timing good wrt laser and no locked mode.
Modulation on laser Te not obvious, nonthermal ECE, obvious current drive
Good shot for run plan
|
| Nov 18 2010 10:05:19:207AM | 1101118004 | Ron Parker | Shot 4 ran, laser pulses interpolating LH pulse, but again a locked mode so not good to combine with shot 2.
|
| Nov 18 2010 10:12:08:240AM | 1101118005 | Ron Parker | Early disruption.
Next: Raise density to .5e20 m-2 to see if we can avoid locking.
|
| Nov 18 2010 10:23:10:883AM | 1101118006 | Ron Parker | A fizzle
|
| Nov 18 2010 06:12:02:503PM | 1101118007 | Ron Parker | Shot 7 disrupted
|
| Nov 18 2010 06:11:08:673PM | 1101118008 | Ron Parker | Shot 8 ran, but a very small density modulation causes large changes in non-thermal ECE.
|
| Nov 18 2010 06:10:29:977PM | 1101118009 | Ron Parker | Shot 9 ran with nl_04 = 4+e19 m-2, but was locked.
We'll try one more time, if it still locks we'll go to higher density.
|
| Nov 18 2010 06:09:48:700PM | 1101118010 | Ron Parker | Shot 10 ran, unlocked, nl_04 ~4.5-4.8. It can be used to interpolate with shot 3.
|
| Nov 18 2010 06:08:45:110PM | 1101118011 | Ron Parker | Shot 11 was a good shot, unlocked, nl_04 ~ 5.7 m-2.
|
| Nov 18 2010 06:08:13:090PM | 1101118012 | Ron Parker | Shot 12 was a good repeat fo shot 11 with th elaser interpolated between the shot 11 pulses.
There was a LH fault in the last pulse so we'll repeat.
|
| Nov 18 2010 06:07:39:267PM | 1101118013 | Ron Parker | Good shot, shot 13 repeated shot 12 without LH faults.
Ready to move to the next density, nl_04 ~ 8e19 m-2.
|
| Nov 18 2010 06:06:47:633PM | 1101118014 | Ron Parker | Shot 14 was a good shot @ ~ 7e19 m-2.
Repeat with synchronous laser.
|
| Nov 18 2010 06:06:10:640PM | 1101118015 | Ron Parker | A good repeat of shot 14, laser pulses synchronoous with LH pulses.
|
| Nov 18 2010 06:05:31:097PM | 1101118016 | Ron Parker | Good shot, higher RF power (~500 kW)
Next: repeat with asynchronous laser (wrt LH)
|
| Nov 18 2010 06:04:49:447PM | 1101118017 | Ron Parker | Good shot, same as 16.
Next: More power -- where is it going?
|
| Nov 18 2010 06:04:14:963PM | 1101118018 | Ron Parker | Shot was good, but LH faulted with flashes on the grill.
Next: Increase outer gap by 5 mm.
|
| Nov 18 2010 06:03:22:140PM | 1101118019 | Ron Parker | Increasing the gap helped but still only 3 clean pulses. Try again with another 5 mm.
|
| Nov 18 2010 06:02:38:480PM | 1101118020 | Ron Parker | Shot ran well and so did LH. 750 kW pulses, but where does power go?
|
| Nov 18 2010 06:01:51:060PM | 1101118021 | Ron Parker | Early disruption
|
| Nov 18 2010 06:00:33:980PM | 1101118022 | Ron Parker | Shot 22 ran well and produced good LH data, modulo an intial fault on the 2nd LH pulse.
Next: we need to repeat shot 21, the one that disrupted, with asynchronous timing.
|
| Nov 18 2010 05:59:53:350PM | 1101118023 | Ron Parker | Shot 23 fizzled -- late breakdown. Either too little gas or too much Bz?
|
| Nov 18 2010 05:59:16:070PM | 1101118024 | Ron Parker | Shot 24 ran and is good enough to move on. Back to inner gap scan.
|
| Nov 18 2010 05:58:35:330PM | 1101118025 | Ron Parker | Shot 25 ran full length, reproducing shot 22 which began an inner gap scan.
|
| Nov 18 2010 05:57:49:853PM | 1101118026 | Ron Parker | Shot 26 ran well and LH ran well, inner gap ~ ~ 5.5 - 6.5 mm
Next: repeat with synchronous timing
|
| Nov 18 2010 05:57:13:447PM | 1101118027 | Ron Parker | Shot ran full length, but LH had some faulting. We'll move ahead anyway, reducing inner gap by 3 mm. Also, a big drop in T_e at 0.72 s
|
| Nov 18 2010 05:54:36:697PM | 1101118028 | Ron Parker | Shot ran OK, LH faulted on last pulse.
In the spirit of finding something new, we are going to run inner wall limited on the next shot. Hopefully nonthermal ECE and current drive will come back.
|
| Nov 18 2010 05:55:14:853PM | 1101118029 | Ron Parker | Shot 28 ran well, good LH pulses, some voltage modulation
|
| Nov 18 2010 05:48:46:390PM | 1101118030 | Ron Parker | Disruption -- presumably an injection.
Lower density with inner wall limited is difficult, so instead we'll try running n_par = 2.3 (up from 1.9) with the inner wall limited shot 29
|
| Nov 18 2010 05:48:01:953PM | 1101118031 | Ron Parker | Shot 31 ran well, good LH pulses and some voltage modulation
|
| Nov 18 2010 05:46:26:093PM | 1101118032 | Ron Parker | Shot 32 ran, was full length, but LH faulted presumably because outer gap was too small. For next shot we'll increase the outer gap by 5 mm.
|
| Nov 18 2010 05:44:10:103PM | 1101118033 | Ron Parker | Shot 33 ran well, LH had only one trip. No locked mode.
|
| Nov 18 2010 05:45:55:310PM | 1101118034 | Ron Parker | Shot 34 ran OK until locking and disrupting.
LH pulses were clean with the exception of one late trip in 3rd pulse.
There is evidence of nonthermals, tiny current drive and probably some heating.
|
| Physics Operator Comments |
| Nov 18 2010 09:20:07:607AM | 1101118001 | Anne White | Loaded shot 111801 from /home/whitea/pcs_scratch into live shot model at 8:06 am,
nl04 changed to 4e19 instead of 1e19, reloaded 8:56 am
USN, 800 kA, 5.4T, with cryopump startup
Shot has segment 1 CRYO startup from Tuesdays last shot 1101116031
Shot has segment 2 from SL ref shot 1101019014 but with these changes:
nl04 set to 4e19, IP set to -800 kA.
Result:
Shot ran. Early runaways cuased by LH firing into startup
No magnetics data coming back (no data in efit scope, no loop voltage, no plasma current...).
Start-up looks good, no bounces.
Plan for next shot:
in DPCS on nl04 change demand for 4e19 to t ~ 0.4 instead on t~0.25, i.e.
slow the request for density rise early in shot to try and avoid the early overshoot in nebar and the subsequent slow decay in time during the shot.
|
| Nov 18 2010 10:02:06:160AM | 1101118002 | Anne White | Changes from last shot:
Adjusted rate of early nl04 rise request to avoid overshoot.
Result:
Shot ran
start up had high pressure but we made it through. need to remember
cryo cycle when we sait a while between shots.
locked mode
Next shot:
no DPCS changes
|
| Nov 18 2010 09:49:35:167AM | 1101118003 | Anne White | Changes from last shot:
no DPCS changes, density was fine with SL. shot 2 seemed to have locked mode
LH and TS timing is being adjusted for synchornization
Result:
shot ran, good startup
Next shot:
no dpcs changes
|
| Nov 18 2010 10:01:56:100AM | 1101118004 | Anne White | Changes from last shot:
no DPCS changes.
loaded shot 3 for repeat.
Result:
shot ran.
startup looks good. disrupted in ramp down
locked mode
Next shot:
try to reduce the early density overshoot during current ramp.
It seems like the consequent undershoot
puts us into the lower ne zone and we get the locked mode.
reduce proportional gain on nl04 to 4 (it was 9-8).
keep nl04 the same request timing.
|
| Nov 18 2010 10:16:19:147AM | 1101118005 | Anne White | Changes from last shot:
attempt to avoid density overshoot/undershoot, which may be causing locked mode arpund 0.4 sec in shot 2 and shot 4:
keep nl04 request timing the same. changed proportional gain from 8 to 4.
Result:
shot disrupted at t = 0.4 sec
density still overshoots, but comes down only to 4e19 , not below as before.
not sure why it disrupted. possible moly injection...
Next shot:
increase nl04 request to 5e19, keep timing and gains as in shot 5
|
| Nov 18 2010 10:25:16:207AM | 1101118006 | Anne White | Changes from last shot:
increase nl04 request to 5e19, keep timing and gains as in shot 5
result:
shot fizzle. too much pressure in startup. chamber pressure was too high before shot, keep an eye on cyro regen timing and changes in pressure just before shot.
next shot:
no dpcs changes
|
| Nov 18 2010 10:40:55:740AM | 1101118007 | Anne White | Changes from last shot:
no dpcs changes. nl04 request is 5e`9, gains are as on shot 5
Result:
early disruption, start-up was ok, chamber pressure okay 1e-7 - 9e-8 torr before shot
Next shot:
load shot 3 from today. increase density to nl04 request to 5e19, revert back to original high proportional gain settings (9-8). increase nl04 at t ~ 0.2 to 3.5e19 from 3e19
|
| Nov 18 2010 11:03:13:943AM | 1101118008 | Anne White | Changes from last shot:
load shot 3 from today. increase density to nl04 request to 5e19, revert back to original high proportional gain settings (9-8). increase nl04 at t ~ 0.2 to 3.5e19 from 3e19
Result:
shot ran.
there was an early injection, the startup looks bad,there appear to rapid bursts in Tang Z meter at t = 0.02 s, looks like fast bounces, but gpc bounce scope does not reflect that, Te steady rise during the tang Z meter bursts
Next shot:
wolfe says our density control looks to be unstable, that is why we are getting
oscillations during flat top.
try to get rid of nl04 oscillations during flat top, so we have chanegd the prop gain to 9-8 before t = 0.6 and to 4 starting at t = 0.6, then steady through flattop
|
| Nov 18 2010 11:12:19:313AM | 1101118009 | Anne White | Changes from last shot:
wolfe says our density control looks to be unstable, that is why we are getting
oscillations during flat top.
try to get rid of nl04 oscillations during flat top, so we have chanegd the prop gain to 9 before t = 0.6 and to 4 starting at t = 0.6, then steady through flattop
Result:
shot ran, but still get locking and density oscillations
Next shot:
set nl04 request for 5e19 to come at t = 0.275 sec instead of t= 0.4 sec
try to bring density up sooner to avoid locking
|
| Nov 18 2010 11:23:41:037AM | 1101118010 | Anne White | Changes from last shot:
set nl04 request for 5e19 to come at t = 0.275 sec instead of t= 0.4 sec
try to bring density up sooner to avoid locking
result:
shot ran, sawtoothing before and after LH so no locked mode evidently.
density oscillations in current ramp still there.
next shot:
increase nl04 request to 6e19
|
| Nov 18 2010 11:39:33:990AM | 1101118011 | Anne White | Changes from last shot:
increase nl04 request to 6e19
Result:
Shot ran
on nlo04 got around 5.6e19 during LH modulation time of interest
Next shot:
no dpcs changes
|
| Nov 18 2010 11:58:24:397AM | 1101118012 | Anne White | Changes from last shot::
no dpcs changes
Result:
Shot ran
Next Shot:
no dpcs changes
|
| Nov 18 2010 12:08:11:537PM | 1101118013 | Anne White | Changes from last shot:
no dpcs changes
Result:
Shot ran
Next shot:
increase nl04 request to 8e19
|
| Nov 18 2010 12:24:02:597PM | 1101118014 | Anne White | Changes from last shot:
increase nl04 request to 8e19
Result:
Shot ran
nl04 was 7e19, request was 8e19
Next shot:
no dpcs changes
|
| Nov 18 2010 12:37:50:997PM | 1101118015 | Anne White | Changes from last shot:
no dpcs changes
Result:
Shot ran
nl04 request was 8e19, nl04 obtained was 7e19 again in time of interest
Next shot:
no dpcs changes
|
| Nov 18 2010 12:48:14:180PM | 1101118016 | Anne White | Changes from last shot:
no dpcs changes
Result:
Shot ran
nl04 was again 7e19 in time of interest, request was 8e19
Next shot
no changes
|
| Nov 18 2010 01:32:17:073PM | 1101118017 | Anne White | Changes from last shot:
no dpcs changes
Result:
shot ran
next shot:
no dpcs changes
|
| Nov 18 2010 01:32:53:143PM | 1101118018 | Anne White | Changes from last shot:
no dpcs changes
Result:
shot ran
next shot:
increase outer gap by 0.5 cm (0.005 m) so decrease RCUR by 0.0025 m
|
| Nov 18 2010 01:38:03:630PM | 1101118019 | Anne White | Changes from last shot:
increase outer gap by 0.5 cm (0.005 m) so decrease RCUR by 0.0025 m
Result:
Shot ran
Right gap on shot 18 was ~ 1.37 and on shot 19 was about 1.7 cm
so got an increase of about 0.3-0.4 cm
Next shot :
Increase outer gap again by another 0.005 m so decrease RCUR by 0.0025 m
|
| Nov 18 2010 01:51:52:453PM | 1101118020 | Anne White | Changes from last shot:
Increase outer gap again by another 0.005 m so decrease RCUR by 0.0025 m
Result:
shot ran
but not a pretty breakdown, it is late and there is a jump in R and
z very early in time. Wolfe points out that shot 20 and 19 had hollow Te profiles early in time.
Next shot:
no dpcs changes
|
| Nov 18 2010 02:05:39:020PM | 1101118021 | Anne White | Changes from last shot:
no dpcs changes
Result:
shot disrupted at 0.35 sec or so
next shot:
Bring Ip up more slowly, set it to 600 kA at t ~ 0.1 sec
in order to avoid big kick from jump to 800 kA we had programmed in all day
Also, reduce inner gap by 0.006 m per SL request
reduce clearin by 0.006 cm (was +0.003, now is -0.003)
reduce rcur by 0.003 cm (was 0.657 now is 0.654)
|
| Nov 18 2010 02:20:24:157PM | 1101118022 | Anne White | Changes from last shot:
Bring Ip up more slowly, set it to 600 kA at t ~ 0.1 sec
in order to avoid big kick from jump to 800 kA we had programmed in all day
Also, reduce inner gap by 0.006 m per SL request (reduced comapred to shot 20)
reduce clearin by 0.006 cm (was +0.003, now is -0.003)
reduce rcur by 0.003 cm (was 0.657 now is 0.654)
Result:
Shot ran
Next shot:
repeat shot 20, but import the new and improved current ramp
from shot 22, wire 16 in segment 2
|
| Nov 18 2010 02:51:19:453PM | 1101118023 | Anne White | Changes from last shot:
repeat shot 20 (dpcs repeat, should be a change in timing for TS and LH), but import the new and improved current ramp
from shot 22, wire 16 in segment 2
Result:
disruption
Next shot:
increase prefill pulse gas 4 from 53 ms to 58 ms pulse
If gas does not work, try reducing BZ_0
To reduce Bz0 use the EF4 coil: make IC_EFU4 more negative by 10 amps. It is -1290.0 leading up to t = 0 s in previous shot (shot 23).
|
| Nov 18 2010 02:51:10:370PM | 1101118024 | Anne White | Changes from last shot:
increase prefill pulse gas 4 from 53 ms to 58 ms pulse
Result:
shot ran,
breakdown still late a bit before 0.01 should be at 0.005
Next shot:
Load shot 22.
But increase pulse gas 4 to a 63 ms pulse
(was 58 ms on shot 24 and was 53 on shot 22)
|
| Nov 18 2010 03:03:32:850PM | 1101118025 | Anne White | Changes from last shot:
Load shot 22.
But increase pulse gas 4 to a 63 ms pulse (was 58 ms on shot 24 and was 53 on shot 22)
Result:
Shot ran,
but breakdown is still too late, 0.01 sec instead of 0.005 sec
Next shot:
reduce pulse gas 4 to a 58 ms pulse and make IC_EF4U more negative by 10, it was -1290 and now will be set to -1300. Thsi is doen in order to reduce BZ0
in start up and try to get earlier breakdown.
Also, Reduce inner gap by 0.003 m.
Reduce CLearin 0.003 m from -0.003 to -0.006
Reduce RCUR by 0.0015 m from 0.654 to 0.6525
|
| Nov 18 2010 03:15:36:217PM | 1101118026 | Anne White | Changes from last shot:
Reduce pulse gas 4 to a 58 ms pulse and make IC_EFU4 more negative by 10, it was -1290 and now will be set to -1300
Also, Reduce inner gap by 0.003 m.
Reduce CLearin 0.003 m from -0.003 to -0.006
Reduce RCUR by 0.0015 m from 0.654 to 0.6525
Result:
Shot ran, better breakdown, earlier around t = 0.006 s
Next shot:
no dpcs changes,
timing change on TS and LH
|
| Nov 18 2010 03:24:42:160PM | 1101118027 | Anne White | Changes from last shot:
no dpcs changes,
timing change on TS and LH
result:
shot ran
breakdown ok
Next shot:
reduce inner gap by 0.003 m
Reduce CLEARIN by 0.003 (was -0.006 is now -0.009)
Reduce RCUR by 0.0015 (was 0.6525 is now 0.6510)
|
| Nov 18 2010 03:46:04:533PM | 1101118028 | Anne White | Changes from last shot:
reduce inner gap by 0.003 m
Reduce CLEARIN by 0.003 (was -0.006 is now -0.009)
Reduce RCUR by 0.0015 (was 0.6525 is now 0.6510)
result:
Shot ran
Next shot:
go inner wall limited now. aropund t = 0.5 sec ramp CLEARIn down by 7 mm and RCUR by 3.5 mm. During LH pulses time CLEARIN is now -0.016m and RCUR is 0.6475
|
| Nov 18 2010 03:57:20:560PM | 1101118029 | Anne White | Changes from last shot:
go inner wall limited now. aropund t = 0.5 sec ramp CLEARIn down by 7 mm and RCUR by 3.5 mm. During LH pulses time CLEARIN is now -0.016m and RCUR is 0.6475
Result:
shot ran
Next shot:
reduce density request to 7e19 nl04, was set to 8e19
|
| Nov 18 2010 04:11:32:140PM | 1101118030 | Anne White | Changes from last shot:
reduce density request to 7e19 nl04
(has been at 8e19)
Result:
disrupted around t = 0.75 sec, at t = 0.66 looks like start of locked mode
Next shot:
reload shot 29
|
| Nov 18 2010 04:31:58:523PM | 1101118031 | Anne White | Changes from last shot:
reload shot 29
Result:
Shot ran
Next shot:
Load segment 2 from shot 24: 1101118024
|
| Nov 18 2010 04:48:52:447PM | 1101118032 | Anne White | Changes from last shot:
Loaded segment 2 from shot 24: 1101118024
Result:
shot ran
got back to larger inner gap case, ~ 1.3 cm, larger outer gap case ~ 2cm
next shot:
increase outer gap by 0.005 m:
so reduce RCUR by 0.0025 m
|
| Nov 18 2010 04:55:23:363PM | 1101118033 | Anne White | Changes from last shot:
increase outer gap by 0.005 m:
so reduce RCUR by 0.0025 m
Result:
shot ran
inner gap ~ 1.2 cm outer gap ~ 2.2 cm
Next shot:
go to lower density
try a request of 6.5e19
in an attempt to avoid early locked modes,keep the nl04
request at 8e19 until about t = 0.45 sec then bring down
to 6.5e19 at t = 0.5 sec
|
| System Availability |
| Nov 18 2010 09:01:02:727AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | BES system is online | Oct 21 2010 11:33AM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (D+F) working. All midplane and off-midplane diode arrays working except WB1AX. Midplane foils calibrated and PRAD_MAIN is being filled. Divertor/Ledge foils not yet ready. | Jul 15 2010 08:27AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | | Nov 16 2010 02:36PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Multiple channel CNPA available | Oct 21 2010 07:11PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged. | Apr 06 2010 10:51AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | Wide-view CXRS system is online | Oct 21 2010 11:33AM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned; new calibrations (relative brightness and position) not yet implemented | Jun 29 2010 10:27AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational | Jun 26 2010 09:28PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | All channels working and calibrated. | Oct 27 2010 03:41PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauges are operational. | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Plugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access. | Apr 05 2010 11:18AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Oct 22 2010 11:46AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | operating normally | Jun 29 2010 10:26AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | System installed and aligned. Inverted profiles are still not available. | Jul 22 2010 08:41AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | 32 Channels operational | Oct 23 2010 01:41PM (parker) | Ron Parker | Hard X-Ray Array | faust,parker,schmidt | | ICRF D-Antenna | yes | system checked out ok on 11006728. | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | system checked out ok on 1100628 | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | system checked out ok. conditioned to vacuum. | Jun 28 2010 04:58PM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | operational and tested | Jul 20 2010 04:42PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | yes | LH working. New directional couplers installed at input to each klystron. | Oct 21 2010 11:42AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | yes | 50GHz: up-, 60 GHz up- and down- | Oct 21 2010 11:31AM (sgbaek) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | Lower Hybrid SOL reflectometer | yes | differential phase (profile) working since 8/27/2010. full phase (fluctuations + profile) is not. If put on a miniproposal, please request LH launcher to be moved in | Oct 05 2010 11:26AM (cornwall) | Cornwall Lau | Lower Hybrid SOL reflectometer | cornwall,wukitch,ylin | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | WB4LY and LLY working but not during ICRF. WB1LY not attached due to pickup problems. LYMID attached but have profile problems. | Aug 24 2010 09:17AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Spectra being collected and tree filled. Wavelength scan is broken so fixed on the Mo XXXI and XXXII lines. | Jul 15 2010 08:28AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Oct 22 2010 11:46AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are operational | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | All systems are on and functional | Jun 29 2010 12:56PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | PMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03 | Jun 26 2010 09:21PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Capillaries tested in-vessel. | Jun 28 2010 08:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. AM (2 * 39.51) MHz. | Jul 19 2010 05:54PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,ennever,ntsujii,porkolab | | Penning Gauges | no | High voltage power supplies are turned off, waiting for work at A-port horizontal to be finished. | Jun 28 2010 08:07PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | | Jun 26 2010 11:20PM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | F and J outer divertor probes are operational. | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Operational, except probe#13 | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | On 1100817xxx the system is fully connected. These are still some noise issues but the system should be in better shape than the previous week. | Aug 17 2010 08:53AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Operational. New Langmuir-Mach probe head installed. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Operational. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | Both A and K units are operational. Coil polarity needs to be checked. | Jun 28 2010 08:06PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | HV supply on, cable run to sparker at k-hor | Jun 23 2010 02:41PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | yes | SSS installed and leak tested. | Oct 21 2010 11:31AM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | No new CO2 detector, so still missing edge channels | Jun 23 2010 02:40PM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | Operating with 2 lasers | Oct 22 2010 01:06PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | yes | Operational | Jul 14 2010 11:54AM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | Operational. Raw spectra stored but not line brightness time histories are going into the tree yet. | Aug 24 2010 09:17AM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | mlreinke | | XTOMO | yes | Core system working. Edge system waiting for H-modes. | Jul 01 2010 11:55AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Nov 18 2010 12:02:55:187PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | BES system is online | Oct 21 2010 11:33AM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (D+F) working. All midplane and off-midplane diode arrays working except WB1AX. Midplane foils calibrated and PRAD_MAIN is being filled. Divertor/Ledge foils not yet ready. | Jul 15 2010 08:27AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | | Nov 16 2010 02:36PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Multiple channel CNPA available | Oct 21 2010 07:11PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged. | Apr 06 2010 10:51AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | Wide-view CXRS system is online | Oct 21 2010 11:33AM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned; new calibrations (relative brightness and position) not yet implemented | Jun 29 2010 10:27AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational | Jun 26 2010 09:28PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | All channels working and calibrated. | Oct 27 2010 03:41PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauges are operational. | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Plugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access. | Apr 05 2010 11:18AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Oct 22 2010 11:46AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | operating normally | Jun 29 2010 10:26AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | System installed and aligned. Inverted profiles are still not available. | Jul 22 2010 08:41AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | 32 Channels operational | Oct 23 2010 01:41PM (parker) | Ron Parker | Hard X-Ray Array | faust,parker,schmidt | | ICRF D-Antenna | yes | system checked out ok on 11006728. | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | system checked out ok on 1100628 | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | system checked out ok. conditioned to vacuum. | Jun 28 2010 04:58PM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | operational and tested | Jul 20 2010 04:42PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | yes | LH working. New directional couplers installed at input to each klystron. | Oct 21 2010 11:42AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | yes | 50GHz: up-, 60 GHz up- and down- | Oct 21 2010 11:31AM (sgbaek) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | Lower Hybrid SOL reflectometer | yes | differential phase (profile) working since 8/27/2010. full phase (fluctuations + profile) is not. If put on a miniproposal, please request LH launcher to be moved in | Oct 05 2010 11:26AM (cornwall) | Cornwall Lau | Lower Hybrid SOL reflectometer | cornwall,wukitch,ylin | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | WB4LY and LLY working but not during ICRF. WB1LY not attached due to pickup problems. LYMID attached but have profile problems. | Aug 24 2010 09:17AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Spectra being collected and tree filled. Wavelength scan is broken so fixed on the Mo XXXI and XXXII lines. | Jul 15 2010 08:28AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Oct 22 2010 11:46AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are operational | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | All systems are on and functional | Jun 29 2010 12:56PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | PMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03 | Jun 26 2010 09:21PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Capillaries tested in-vessel. | Jun 28 2010 08:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. AM (2 * 39.51) MHz. | Jul 19 2010 05:54PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,ennever,ntsujii,porkolab | | Penning Gauges | no | High voltage power supplies are turned off, waiting for work at A-port horizontal to be finished. | Jun 28 2010 08:07PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | | Jun 26 2010 11:20PM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | F and J outer divertor probes are operational. | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Operational, except probe#13 | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | On 1101103011, the 75GHz and 112GHz channels failed. On 1101116, all channels except the variable frequency (set fixed at ~115GHz) and the 140GHz channels have been removed for repair. An amplifier is also being added to the 60GHz channel for LH operation. | Nov 18 2010 11:51AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Operational. New Langmuir-Mach probe head installed. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Operational. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | Both A and K units are operational. Coil polarity needs to be checked. | Jun 28 2010 08:06PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | HV supply on, cable run to sparker at k-hor | Jun 23 2010 02:41PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | yes | SSS installed and leak tested. | Oct 21 2010 11:31AM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | No new CO2 detector, so still missing edge channels | Jun 23 2010 02:40PM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | Operating with 2 lasers | Oct 22 2010 01:06PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | yes | Operational | Jul 14 2010 11:54AM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | Operational. Raw spectra stored but not line brightness time histories are going into the tree yet. | Aug 24 2010 09:17AM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | mlreinke | | XTOMO | yes | Core system working. Edge system waiting for H-modes. | Jul 01 2010 11:55AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Nov 18 2010 12:15:29:437PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | BES system is online | Oct 21 2010 11:33AM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (D+F) working. All midplane and off-midplane diode arrays working except WB1AX. Midplane foils calibrated and PRAD_MAIN is being filled. Divertor/Ledge foils not yet ready. | Jul 15 2010 08:27AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | | Nov 16 2010 02:36PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Multiple channel CNPA available | Oct 21 2010 07:11PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged. | Apr 06 2010 10:51AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | Wide-view CXRS system is online | Oct 21 2010 11:33AM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned; new calibrations (relative brightness and position) not yet implemented | Jun 29 2010 10:27AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational | Jun 26 2010 09:28PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | All channels working and calibrated. | Oct 27 2010 03:41PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauges are operational. | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Plugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access. | Apr 05 2010 11:18AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Oct 22 2010 11:46AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | operating normally | Jun 29 2010 10:26AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | System installed and aligned. Inverted profiles are still not available. | Jul 22 2010 08:41AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | 32 Channels operational | Oct 23 2010 01:41PM (parker) | Ron Parker | Hard X-Ray Array | faust,parker,schmidt | | ICRF D-Antenna | yes | system checked out ok on 11006728. | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | system checked out ok on 1100628 | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | system checked out ok. conditioned to vacuum. | Jun 28 2010 04:58PM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | operational and tested | Jul 20 2010 04:42PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | yes | LH working. New directional couplers installed at input to each klystron. | Oct 21 2010 11:42AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | yes | 50GHz: up-, 60 GHz up- and down- | Oct 21 2010 11:31AM (sgbaek) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | Lower Hybrid SOL reflectometer | yes | differential phase (profile) working since 8/27/2010. full phase (fluctuations + profile) is not. If put on a miniproposal, please request LH launcher to be moved in | Oct 05 2010 11:26AM (cornwall) | Cornwall Lau | Lower Hybrid SOL reflectometer | cornwall,wukitch,ylin | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | WB4LY and LLY working but not during ICRF. WB1LY not attached due to pickup problems. LYMID attached but have profile problems. | Aug 24 2010 09:17AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Spectra being collected and tree filled. Wavelength scan is broken so fixed on the Mo XXXI and XXXII lines. | Jul 15 2010 08:28AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Oct 22 2010 11:46AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are operational | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | All systems are on and functional | Jun 29 2010 12:56PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | PMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03 | Jun 26 2010 09:21PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Capillaries tested in-vessel. | Jun 28 2010 08:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. AM (2 * 39.51) MHz. | Jul 19 2010 05:54PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,ennever,ntsujii,porkolab | | Penning Gauges | no | High voltage power supplies are turned off, waiting for work at A-port horizontal to be finished. | Jun 28 2010 08:07PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | | Jun 26 2010 11:20PM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | F and J outer divertor probes are operational. | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Operational, except probe#13 | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | On 1101103011, the 75GHz and 112GHz channels failed. On 1101116, all channels except the variable frequency (set fixed at ~115GHz) and the 140GHz channels have been removed for repair. An amplifier is also being added to the 60GHz channel for LH operation. | Nov 18 2010 11:51AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Operational. New Langmuir-Mach probe head installed. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Operational. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | Both A and K units are operational. Coil polarity needs to be checked. | Jun 28 2010 08:06PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | HV supply on, cable run to sparker at k-hor | Jun 23 2010 02:41PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | yes | SSS installed and leak tested. | Oct 21 2010 11:31AM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | No new CO2 detector, so still missing edge channels | Jun 23 2010 02:40PM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | Operating with 2 lasers | Oct 22 2010 01:06PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | yes | Operational | Jul 14 2010 11:54AM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | Operational. Raw spectra stored but not line brightness time histories are going into the tree yet. | Aug 24 2010 09:17AM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | mlreinke | | XTOMO | yes | Core system working. Edge system waiting for H-modes. | Jul 01 2010 11:55AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Nov 18 2010 12:28:20:127PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | BES system is online | Oct 21 2010 11:33AM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (D+F) working. All midplane and off-midplane diode arrays working except WB1AX. Midplane foils calibrated and PRAD_MAIN is being filled. Divertor/Ledge foils not yet ready. | Jul 15 2010 08:27AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | | Nov 16 2010 02:36PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Multiple channel CNPA available | Oct 21 2010 07:11PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged. | Apr 06 2010 10:51AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | Wide-view CXRS system is online | Oct 21 2010 11:33AM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned; new calibrations (relative brightness and position) not yet implemented | Jun 29 2010 10:27AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational | Jun 26 2010 09:28PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | All channels working and calibrated. | Oct 27 2010 03:41PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauges are operational. | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Plugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access. | Apr 05 2010 11:18AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Oct 22 2010 11:46AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | operating normally | Jun 29 2010 10:26AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | System installed and aligned. Inverted profiles are still not available. | Jul 22 2010 08:41AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | 32 Channels operational | Oct 23 2010 01:41PM (parker) | Ron Parker | Hard X-Ray Array | faust,parker,schmidt | | ICRF D-Antenna | yes | system checked out ok on 11006728. | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | system checked out ok on 1100628 | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | system checked out ok. conditioned to vacuum. | Jun 28 2010 04:58PM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | operational and tested | Jul 20 2010 04:42PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | yes | LH working. New directional couplers installed at input to each klystron. | Oct 21 2010 11:42AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | yes | 50GHz: up-, 60 GHz up- and down- | Oct 21 2010 11:31AM (sgbaek) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | Lower Hybrid SOL reflectometer | yes | differential phase (profile) working since 8/27/2010. full phase (fluctuations + profile) is not. If put on a miniproposal, please request LH launcher to be moved in | Oct 05 2010 11:26AM (cornwall) | Cornwall Lau | Lower Hybrid SOL reflectometer | cornwall,wukitch,ylin | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | WB4LY and LLY working but not during ICRF. WB1LY not attached due to pickup problems. LYMID attached but have profile problems. | Aug 24 2010 09:17AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Spectra being collected and tree filled. Wavelength scan is broken so fixed on the Mo XXXI and XXXII lines. | Jul 15 2010 08:28AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Oct 22 2010 11:46AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are operational | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | All systems are on and functional | Jun 29 2010 12:56PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | PMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03 | Jun 26 2010 09:21PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Capillaries tested in-vessel. | Jun 28 2010 08:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. AM (2 * 39.51) MHz. | Jul 19 2010 05:54PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,ennever,ntsujii,porkolab | | Penning Gauges | no | High voltage power supplies are turned off, waiting for work at A-port horizontal to be finished. | Jun 28 2010 08:07PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | | Jun 26 2010 11:20PM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | F and J outer divertor probes are operational. | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Operational, except probe#13 | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | On 1101103011, the 75GHz and 112GHz channels failed. On 1101116, all channels except the variable frequency (set fixed at ~115GHz) and the 140GHz channels have been removed for repair. An amplifier is also being added to the 60GHz channel for LH operation. | Nov 18 2010 11:51AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Operational. New Langmuir-Mach probe head installed. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Operational. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | Both A and K units are operational. Coil polarity needs to be checked. | Jun 28 2010 08:06PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | HV supply on, cable run to sparker at k-hor | Jun 23 2010 02:41PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | yes | SSS installed and leak tested. | Oct 21 2010 11:31AM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | No new CO2 detector, so still missing edge channels | Jun 23 2010 02:40PM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | Operating with 2 lasers | Oct 22 2010 01:06PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | yes | Operational | Jul 14 2010 11:54AM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | Operational. Raw spectra stored but not line brightness time histories are going into the tree yet. | Aug 24 2010 09:17AM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | mlreinke | | XTOMO | yes | Core system working. Edge system waiting for H-modes. | Jul 01 2010 11:55AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Nov 18 2010 12:41:44:217PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | BES system is online | Oct 21 2010 11:33AM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (D+F) working. All midplane and off-midplane diode arrays working except WB1AX. Midplane foils calibrated and PRAD_MAIN is being filled. Divertor/Ledge foils not yet ready. | Jul 15 2010 08:27AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | | Nov 16 2010 02:36PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Multiple channel CNPA available | Oct 21 2010 07:11PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged. | Apr 06 2010 10:51AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | Wide-view CXRS system is online | Oct 21 2010 11:33AM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned; new calibrations (relative brightness and position) not yet implemented | Jun 29 2010 10:27AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational | Jun 26 2010 09:28PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | All channels working and calibrated. | Oct 27 2010 03:41PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauges are operational. | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Plugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access. | Apr 05 2010 11:18AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Oct 22 2010 11:46AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | operating normally | Jun 29 2010 10:26AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | System installed and aligned. Inverted profiles are still not available. | Jul 22 2010 08:41AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | 32 Channels operational | Oct 23 2010 01:41PM (parker) | Ron Parker | Hard X-Ray Array | faust,parker,schmidt | | ICRF D-Antenna | yes | system checked out ok on 11006728. | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | system checked out ok on 1100628 | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | system checked out ok. conditioned to vacuum. | Jun 28 2010 04:58PM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | operational and tested | Jul 20 2010 04:42PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | yes | LH working. New directional couplers installed at input to each klystron. | Oct 21 2010 11:42AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | yes | 50GHz: up-, 60 GHz up- and down- | Oct 21 2010 11:31AM (sgbaek) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | Lower Hybrid SOL reflectometer | yes | differential phase (profile) working since 8/27/2010. full phase (fluctuations + profile) is not. If put on a miniproposal, please request LH launcher to be moved in | Oct 05 2010 11:26AM (cornwall) | Cornwall Lau | Lower Hybrid SOL reflectometer | cornwall,wukitch,ylin | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | WB4LY and LLY working but not during ICRF. WB1LY not attached due to pickup problems. LYMID attached but have profile problems. | Aug 24 2010 09:17AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Spectra being collected and tree filled. Wavelength scan is broken so fixed on the Mo XXXI and XXXII lines. | Jul 15 2010 08:28AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Oct 22 2010 11:46AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are operational | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | All systems are on and functional | Jun 29 2010 12:56PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | PMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03 | Jun 26 2010 09:21PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Capillaries tested in-vessel. | Jun 28 2010 08:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. AM (2 * 39.51) MHz. | Jul 19 2010 05:54PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | arai,ennever,ntsujii,porkolab | | Penning Gauges | no | High voltage power supplies are turned off, waiting for work at A-port horizontal to be finished. | Jun 28 2010 08:07PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | | Jun 26 2010 11:20PM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | F and J outer divertor probes are operational. | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Operational, except probe#13 | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | On 1101103011, the 75GHz and 112GHz channels failed. On 1101116, all channels except the variable frequency (set fixed at ~115GHz) and the 140GHz channels have been removed for repair. An amplifier is also being added to the 60GHz channel for LH operation. | Nov 18 2010 11:51AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Operational. New Langmuir-Mach probe head installed. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Operational. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | Both A and K units are operational. Coil polarity needs to be checked. | Jun 28 2010 08:06PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | HV supply on, cable run to sparker at k-hor | Jun 23 2010 02:41PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | yes | SSS installed and leak tested. | Oct 21 2010 11:31AM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | No new CO2 detector, so still missing edge channels | Jun 23 2010 02:40PM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | Operating with 2 lasers | Oct 22 2010 01:06PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | yes | Operational | Jul 14 2010 11:54AM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | Operational. Raw spectra stored but not line brightness time histories are going into the tree yet. | Aug 24 2010 09:17AM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | mlreinke | | XTOMO | yes | Core system working. Edge system waiting for H-modes. | Jul 01 2010 11:55AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|