Alcator C-Mod Run 1101210 Information

Back to runs

Miniproposals
Miniproposal:575
Date Filed: 8/28/2009
Title:ITER-like Discharge Rampdown Studies
First Author:Chuck Kessel
Session Leader:Chuck Kessel (shots 1-31)

Operators
Session leader(s):Chuck Kessel
Physics operator(s):Ian Hutchinson
Engineering operator(s):Sam Pierson,Gary Dekow,Bill Byford

Engineering Operator Run Comment
Alcator C-Mod Run 1101210

Session Leader Plans
Entered: Dec 10 2010 07:59:29:133AM
Author: Chuck Kessel
4.1 Machine and Plasma Parameters

Give values or range for:

Toroidal Field: 5.4 T
Plasma Current: 1.35 MA
Working Gas Species: D
Density: flattop H-mode density range 2.5 x 1020 m-2, variable (cryopump not precluded).

4.2 Auxiliary Systems

ICRF Power, pulse length, phasing: up to 4 MW, 2 s duration
LHCD Power, pulse length, phasing: no
Pellet Injection (species): no
Impurity blow-off injection: no
Diagnostic Neutral Beam: Highly desirable
Special gas puffing: NINJA (with D2) should be available.
Non-axisymmetric Coils (Connections, Current); Yes; optimized to reduce locked modes.
Other: boronization required


4.3 Diagnostics
List required diagnostics, and any special setup or configuration, e.g. non-standard digitization rate.

Essential: Thomson, Magnetics, Hard x-rays, ECE, TCI.
Desirable: MSE, CXRS, Hirex, SOL probes.


RUN PLAN: (we are not doing the strike point control!)
Recover discharge 1091006002, all were 750 ms rampdown times (500 ms Ip rampup t=0-500 ms, 700 ms flattop t=500-1200 ms, 750 ms rampdown t=1200-1950 ms)
This includes midplane coupling (vertically centered in front of ICRF launcher) with kappa reduction.
The plasma must begin the rampdown from an H-mode flattop state with EDA H-mode, rampdown times of 0.5 and 1.25 s.
--�?? ICRF power will be varied to access EDA H-mode
---> we are trying to establish rampdown discharges with different H-L transition times, for 2 Ip rampdown rates

· establish ohmic discharge with 0.5 s rampdown time
· establish H-mode in flattop with 0.5 s rampdown time, inject ICRF power 2-3 MW at 0.7 s
· 0.5 s rampdown, all power off at end of flattop
· 0.5 s rampdown, 1 MW ICRF heating fixed
· 0.5 s rampdown, 2 MW ICRF heating fixed to half way down then go to 1 MW

· establish ohmic discharge with 1.25 s rampdown time
· establish H-mode in flattop with 1.25 s rampdown time, inject ICRF power 2-3 MW at 0.7 s
· 1.25 s rampdown, all power off at end of flattop
· 1.25 s rampdown, 1 MW ICRF heating fixed
· 1.25 s rampdown, 2 MW ICRF heating fixed to half way down then go to 1 MW

Physics Operators Plans
Entered: Dec 9 2010 01:52:32:120PM
Author: Ian Hutchinson
********************************************************************************
Overnight boronization. Procedure as Per SMW
------------------------------
Boronization Parameters as for 1101130
------------------------------
dP=120 psi
** optimized sweep parameters **
rmin/rdwell/rmax: 44/75/80 cm
tdwell/tsweep: 60/120 s
Zero EF4 current
Pulser 0.7 on 0.3 off
----------------------------------
Post-boronization ECDC parameters:
----------------------------------
* Note: using He only *
----------------------
1st Gas Setup
Gas: He
sweep: 44/45/103 cm
scan: 20/120 s
Pressure: 5e-5 Torr
Duration: 3 hrs
*********************************************************
Note: If there are problems with helium ecdc staying on
with these parameters, I suggest the following steps:
1) Try either purging and refilling the B-top plenum with Helium
or running directly off the Helium bottle
2) Try raising the pressure set point to 1e-4 Torr
3) Try changing sweep to avoid going out on inner wall,
such as 45/46/103 cm, or to avoid going out at outer limit,
such as changing max value from 103 to 100cm
*********************************************************

Engineering Setup as per shot 1091006002.
Note: this is an early diversion shot with an early (but slow) ramp-down.

Session Leader Summaries
Entered: Dec 10 2010 11:04:54:423AM
Author: Amanda Hubbard
Strong cutoff, right into central GPC channel, in H-modes.
Entered: Dec 10 2010 05:13:15:490PM
Author: Chuck Kessel
MP575 ITER-like rampdown studies

Super run day, lots of good shots, long EDA H-modes into rampdown
2 Ip rampdown times (from 1.35 MA) 0.5s and 1.25 (actual 1.0 s)
ICRF powers in flattop to get EDA was 1.25 MW
higher power made ELM-free, injections, and higher prad in flattop
various powers in the rampdown from 0 to 0.75 to 1.5-0.75 MW

stored energies dropping faster than Ip
densities drop with Ip

faster Ip ramps make these drops faster, and visa versa

q95 between 3 and 3.25

nl04's up to 2.8e20 in EDA H-mode

do we need ICRF in the rampdown for the best behavior, seems like it

tried Ar to time H to L transition, but no luck

008-016 are 500 ms rampdown time
017-031 are 1000 ms rampdown time

lots of feedback control/discharge setup work, thanks Ian and Steve

Physics Operator Summaries
Entered: Dec 10 2010 05:08:14:010PM
Author: Ian Hutchinson
Physop Summary.
---------------

Using the controlled ramp-up (early crowbar, early diversion)
programming, it took 4 shots to fix the vertical instability in the
vicinity of .1s. This was mostly caused by the plasma being too far
in, and was fixed by programming the rcur further out. Thereafter
various clean-up adjustments to this scenario were added.

The required rampdowns in 0.5 and 1.2(5)s were obtained fairly
straightforwardly. At the end of the long-rampdown shots the plasma
shape is very bad because of current limits in EF1 (mostly). But it
proved possible to avoid OH2 current limits by accelerating the ramp
down in the last one third, which naturally reduces total flux
consumption. Nevertheless the shape control does not work well in the
long rampdowns and I don't completely understand why. Even so it
proved possible to attain final currents of about 100kA at which we
are well over the Greenwald limit.

There is another vertical excursion at .2s that we don't understand,
but it never caused a disruption.

We had 25 1.3MA plasmas only one of which disrupted at current higher
than 0.5MA (in ramp up or down).

Sustained H-modes in ramp-down were achieved remarkably well.

Score-Card
----------
  Shot,Duration(s),Ipmax(MA),Result  Shot,Duration(s),Ipmax,Result
  |   01   0.089   0.326   Plasma  |   02   0.113   0.403   Plasma  |
  |   03   0.110   0.396   Plasma  |   04   0.098   0.350   Plasma  |
  |   05   1.927   1.284   Plasma  |   06   1.273   1.284   Plasma  |
  |   07   1.927   1.290   Plasma  |   08   1.736   1.289   Plasma  |
  |   09   1.736   1.287   Plasma  |   10   1.738   1.288   Plasma  |
  |   11   1.737   1.284   Plasma  |   12   0.049   0.147   Plasma  |
  |   13   1.747   1.288   Plasma  |   14   1.740   1.286   Plasma  |
  |   15   1.728   1.286   Plasma  |   16   1.605   1.287   Plasma  |
  |   17   2.220   1.283   Plasma  |   18   2.191   1.286   Plasma  |
  |   19   2.070   1.285   Plasma  |   20   0.000   0.029   Dud     |
  |   21   2.060   1.286   Plasma  |   22   2.080   1.286   Plasma  |
  |   23   2.130   1.288   Plasma  |   24   2.150   1.286   Plasma  |
  |   25   2.170   1.286   Plasma  |   26   2.169   1.282   Plasma  |
  |   27   2.154   1.292   Plasma  |   28   2.165   1.289   Plasma  |
  |   29   2.160   1.287   Plasma  |   30   2.178   1.290   Plasma  |
  |   31   2.175   1.284   Plasma 
Date 1101210:  31 shots.  30 plasmas.   0 fizzles.   1 duds.   0 System Error.
        (Plasma = Ip gt 60.0 kA   Dud = H_alpha lt  0.40 V)
Total plasma duration: 49.43 s (exceeding  -32 kA)


Session Leader Comments
Dec 10 2010 10:55:26:473AM1101210007Chuck Kesselshot all the way thru, H-mode near start of rampdown, ICRF at 1.5 MW in flattop - off at beginning of rampdown, q95 good, kappa reduced somewhat to help with vertical stab
750 ms rampdown, switching to 500 ms rampdown
Dec 10 2010 11:35:47:200AM1101210010Chuck Kesselnew faster rampdown 500 ms, EDA onset in flattop with PICRF=1.25 MW, lasting into rampdown, great discharges q95 is 3-3.2
Dec 10 2010 11:48:43:763AM1101210011Chuck Kesselnew faster rampdown 500 ms, trying ICRF power in rampdown 0.75 MW, stepped down from flattop power 1.25 MW, late H-mode, but otherwise a long EDA H-mode in rampdown
Dec 10 2010 12:50:17:470PM1101210014Chuck Kessel500 ms rampdown, ICRF stays at 1.25 MW into rampdown partway, then drop to 0.75MW, good long EDA H-mode in rampdown shot
Dec 10 2010 12:51:31:180PM1101210015Chuck Kessel500 ms rampdown, trying to get H-L transition at beginning of rampdown, using Argon and ICRF shutoff, didn't quite work.....try little earlier ICRF shutoff nd higher Ar
Dec 10 2010 01:38:49:403PM1101210018Chuck Kessel1250 ms rampdown, Ip down to 250 kA, ohmic case (017) and ICRF (018), get H-mode in flattop, and 2nd one in rampdown, trying to get several systems setup with longer rampdown timing

Dec 10 2010 03:12:43:500PM1101210022Chuck Kessel1250 ms rampdown, Ip down to 400 kA, ending at 2.1 s, ICRF from 1.25 MW in flattop to 0.75 MW in rampdown, good long H-modes in rampdown

Dec 10 2010 03:15:09:510PM1101210024Chuck Kessel1250 ms rampdown, Ip down to 150 kA, ending at 2.15 s, slightly faster Ip ramp at end is working well, ICRF from 1.25 MW in flattop to 0 at end of flattop, late H-mode and early H-L
Dec 10 2010 04:30:59:783PM1101210027Chuck Kessel1250 ms rampdown, Ip down to 150 kA, ending at 2.15 s, raise ICRF power in flattop to 1.5 MW, got earier H-mode
Dec 10 2010 04:32:32:183PM1101210028Chuck Kesselsame as 027, stepdown ICRF from 1.5 MW in flattop to 0.75 MW in rampdown, very long H-mode to 1.95 s

Physics Operator Comments
Dec 10 2010 08:56:22:747AMIan HutchinsonLoad from 1091006002. No messages came up.
Bring up All-Vs for seg 1 and seg 2.
At the segment switch, add a point in seg 2 (80ms) with value equal to that
of seg 1 at the same time:
OH1: 250V
OH2U/L +10V
EF1U/L -110V
EF2U/L 95V (Also copy U->L since they seem to be different.
EF3 1330V

The fill gas puff is 20ms. Leave.
Load
Add point in zcur at 80ms -.0017 seg 2 to avoid discontinuity.
Load
Dec 10 2010 09:25:28:820AM1101210001Ian HutchinsonPlasma loses vertical control at segment switch. OH2U current ramps up quickly.
The plasma moves up.

Set seg 1 fast zcur gain to 3P, 3D at 60ms.
Dec 10 2010 09:37:14:537AM1101210002Ian HutchinsonPlasma to .1s got through the seg switch, but still unstable.
Click in dpcs_xjump and piezo_chopper.

Set clearin to +0.005 instead of .015 in seg 2.
Load.
Dec 10 2010 09:53:30:150AM1101210003Ian HutchinsonSame.

Reduce Ip gain in seg 2 to 2 from 4 at 80ms.
Load

Dec 10 2010 10:08:06:560AM1101210004Ian HutchinsonSlightly worse.

Rcur to .67 at 80ms seg 1. To .67 (from .662) in seg 2.
Load.
Dec 10 2010 10:23:01:900AM1101210005Ian HutchinsonPlasma to rampdown.

OH2 voltages to 8V at 70ms from 5V, back off on elongation a bit.
Rcur to .675 at 80ms. (from .67)
Increase fill puff to 23ms.
Add ICRF.
Dec 10 2010 10:39:51:663AM1101210006Ian HutchinsonPlasma to 1.3s

Clearin to .004 from .007 at >1s
Dec 10 2010 10:56:12:167AM1101210007Ian HutchinsonPlasma. In H-mode during rampdown.

Change to .5s rampdown.
Ip
ZXL
RXU
ZXU keep a bit higher to avoid upper null.
Load.
Dec 10 2010 11:09:19:617AM1101210008Ian HutchinsonPlasma to rampdown.

Program zcur to ramp to -.01 at end to control late upward motion.
Load.
Dec 10 2010 11:24:01:877AM1101210009Ian HutchinsonPlasma to rampdown.

Install a multistep Ip gain ramp at segment switch.
Dec 10 2010 11:48:05:387AM1101210010Ian HutchinsonPlasma to rampdown. H-mode in rampdown as required.

Make the Ip drawn identical for seg 1 and seg2 at points .04 and .1s.
Dec 10 2010 11:50:21:103AM1101210011Ian HutchinsonPlasma to rampdown. Enters H-mode at start of rampdown.
Dec 10 2010 12:10:15:780PM1101210012Ian HutchinsonTerminates at 40ms due to big radiative event, that appears to be associated
with the plasma being rather far inside (c.f. other shots). Perhaps the current
rise is a bit slower. There are a couple of early bounces.

Match Rcur derivative gain across gain switch.
Set ICEF4 to -1300 from -1310A.
Load.
Dec 10 2010 12:18:48:393PM1101210013Ian HutchinsonPlasma to rampdown.

Add point at zero to the Br gain trace at the end.
Delay zcur integral gain turn on to .095s, was ~.07
Dec 10 2010 12:43:24:627PM1101210014Ian HutchinsonPlasma to rampdown. Moving the integral gain did not do much.

Add seg 1 fast zcur gain point at 60ms 3.5. Note the seg 2 gain is 5 (D3.5). So this gain switch might be significant.

Fill Ar in B-side bottom. In addition to 30m at .3s, 50ms at 1s.
Load
Draw the zcur lower still in the end of rampdown.
Dec 10 2010 12:53:58:343PM1101210015Ian HutchinsonPlasma to rampdown.
The change to the fast zcur gain in seg1 has substantially reduced the excursion
induced by the seg switch. Therefore we can identify the zcur excursion as the
change in the _fast_ zcur gain at the seg switch. As a point of principle.
Draw the gains so that they are equal at seg switch, and put the gain changes
elsewhere.

Draw late zcur even lower.
Increase Ar puffs to 50ms, 100ms.
Match fast zcur gains at 4 across the seg switch.
Load
Dec 10 2010 01:25:33:767PM1101210016Ian HutchinsonPlasma to rampdown. Disrupts in rampdown at about 400kA probably because of the
Ar.

Turn off second Ar puff. Make first 40ms.

Make Ip ramp till 2.5s
Make integrators till 2.5s
Go through all the wires and extend gains to 2.5s
Dec 10 2010 01:36:09:083PM1101210017Ian HutchinsonPlasma disrupts at 2.25s. Pretty good.

Lower ICEF4 gain to 1 from 2 at end.
Dec 10 2010 01:57:20:897PM1101210018Ian HutchinsonPlasma. Same. Ef2s still turn off and then disruption.

Draw EF4 to -3000.
Draw Ip ramp faster after 2s.
Dec 10 2010 02:08:08:237PM1101210019Ian HutchinsonPlasma disrupts slightly earlier in ramp down.

Disable Ar.
Draw Rcur to .45 at .01s instead of .5 to try to increase the initial Bzramp.
Dec 10 2010 02:25:36:993PM1101210020Ian HutchinsonPS Dud. EF1U commutated early (charging through the resistor.) OH2s also imbalanced.
Dec 10 2010 02:37:13:753PM1101210021Ian HutchinsonPlasma with H-mode

Drop clearin to zero at 2.2s
Draw rcur rising toward shot end to compensate drift.
Dec 10 2010 02:53:00:103PM1101210022Ian HutchinsonPlasma to rampdown.

Draw out the OH1V trace to 2.5V it was terminating subtantially earlier and
that might be a cause of our rcur problem.
Dec 10 2010 03:10:46:570PM1101210023Ian HutchinsonPlasma.

Increase ICEF4 gain back to 2. It is now drawn more negative.
Dec 10 2010 03:22:08:453PM1101210024Ian HutchinsonPlasma.

Draw TF flat top out to 2.25s
Drop RXU/L to 0 and reduce their gains to 1 at 2s.
Dec 10 2010 03:43:42:270PM1101210025Ian HutchinsonPlasma till 2.16s.

Hold OH1V up till 2.5s
Load.
Dec 10 2010 03:57:32:790PM1101210026Ian HutchinsonPlasma. Same.

Rcur drawn to .55 at 10ms.
Dec 10 2010 04:21:26:543PM1101210027Ian HutchinsonPlasma.

Rcur drawn to 4 at 10ms.
Dec 10 2010 04:33:43:990PM1101210028Ian HutchinsonPlasma.
Dec 10 2010 04:43:13:647PM1101210029Ian HutchinsonPlasma.
Dec 10 2010 05:07:39:370PM1101210030Ian HutchinsonPlasma.
Dec 10 2010 05:07:49:540PM1101210031Ian HutchinsonPlasma.

Engineering Operator Comments
ShotTimeTypeStatusComment
108:58:28:757AMPlasmaOk
209:20:17:243AMPlasmaOk
309:35:35:303AMPlasmaOk
409:51:19:300AMPlasmaOk
510:06:07:267AMPlasmaOk
610:20:59:997AMPlasmaOk
710:37:25:370AMPlasmaOk
810:54:12:270AMPlasmaOk
911:07:25:873AMPlasmaOk
1011:21:49:050AMPlasmaOk
1111:35:56:393AMPlasmaOk
1211:49:16:447AMPlasmaOk
1312:02:08:370PMPlasmaOk
1412:16:52:230PMPlasmaOk
1512:38:00:313PMPlasmaOk
1612:52:06:200PMPlasmaOk
1701:14:21:273PMPlasmaOk
1801:30:20:500PMPlasmaOk
1901:48:48:623PMPlasmaOk
2002:05:08:360PMPlasmaBadEF1U Commutated Early
2102:17:32:103PMPlasmaOk
2202:31:23:667PMPlasmaOk
2302:50:05:053PMPlasmaOk
2403:04:16:937PMPlasmaOk
2503:20:16:767PMPlasmaOk
2603:37:17:937PMPlasmaOk
2703:55:22:697PMPlasmaOk
2804:12:17:383PMPlasmaOk
2904:30:57:520PMPlasmaOk
3004:46:23:100PMPlasmaOk
3105:02:35:677PMPlasmaOk

System Availability
Dec 10 2010 08:58:10:390AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesBES system is onlineOct 21 2010 11:33AM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (D+F) working. All midplane and off-midplane diode arrays working except WB1AX. Midplane foils calibrated and PRAD_MAIN is being filled. Divertor/Ledge foils not yet ready.Jul 15 2010 08:27AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Nov 16 2010 02:36PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA availableOct 21 2010 07:11PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged.Apr 06 2010 10:51AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesWide-view CXRS system is onlineOct 21 2010 11:33AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned; new calibrations (relative brightness and position) not yet implementedJun 29 2010 10:27AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperationalJun 26 2010 09:28PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll channels working and calibrated.Oct 27 2010 03:41PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauges are operational.Jun 28 2010 08:02PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPlugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access.Apr 05 2010 11:18AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational. Oct 22 2010 11:46AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesoperating normallyJun 29 2010 10:26AM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Jun 26 2010 11:19PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesSystem installed and aligned. Inverted profiles are still not available.Jul 22 2010 08:41AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operationalOct 23 2010 01:41PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-Antennayessystem checked out ok on 11006728. Jun 28 2010 04:57PM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayessystem checked out ok on 1100628Jun 28 2010 04:57PM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayessystem checked out ok. conditioned to vacuum. Jun 28 2010 04:58PM (ylin)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-Offyesoperational and testedJul 20 2010 04:42PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridyesLH working. New directional couplers installed at input to each klystron.Oct 21 2010 11:42AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid Reflectometeryes50GHz: up-, 60 GHz up- and down-Oct 21 2010 11:31AM (sgbaek)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
Lower Hybrid SOL reflectometeryesdifferential phase (profile) working since 8/27/2010. full phase (fluctuations + profile) is not. If put on a miniproposal, please request LH launcher to be moved inOct 05 2010 11:26AM (cornwall)Cornwall LauLower Hybrid SOL reflectometercornwall,wukitch,ylin
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoWB4LY and LLY working but not during ICRF. WB1LY not attached due to pickup problems. LYMID attached but have profile problems.Aug 24 2010 09:17AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesSpectra being collected and tree filled. Wavelength scan is broken so fixed on the Mo XXXI and XXXII lines.Jul 15 2010 08:28AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Oct 22 2010 11:46AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are operationalJun 28 2010 08:02PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesAll systems are on and functionalJun 29 2010 12:56PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03Jun 26 2010 09:21PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoCapillaries tested in-vessel.Jun 28 2010 08:08PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCInoDown due to broken laser shutter.Nov 22 2010 10:44AM (ntsujii)Miklos PorkolabPhase Contrast Imagingarai,ennever,ntsujii,porkolab
Penning GaugesnoHigh voltage power supplies are turned off, waiting for work at A-port horizontal to be finished.Jun 28 2010 08:07PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air Switchyes Jun 26 2010 11:19PM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Jun 26 2010 11:19PM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyes Jun 26 2010 11:19PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power Systemsyes Jun 26 2010 11:20PM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesOperational.Jun 28 2010 08:03PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperational.Jun 28 2010 08:03PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesF and J outer divertor probes are operational.Jun 28 2010 08:04PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperational, except probe#13Jun 28 2010 08:04PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesAs of 1101123, the 60, 88u, 88l, 140 and variable set at 115GHz are operational. The 50, 75 and 112 are nonoperational. On 1101123, the noise band at ~200kHz is again seen on the 88u and 88l channels.Nov 23 2010 09:30AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational. New Langmuir-Mach probe head installed.Jun 28 2010 08:05PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesOperational.Jun 28 2010 08:05PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesBoth A and K units are operational. Coil polarity needs to be checked.Jun 28 2010 08:06PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesHV supply on, cable run to sparker at k-horJun 23 2010 02:41PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationyesSSS installed and leak tested.Oct 21 2010 11:31AM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesNo new CO2 detector, so still missing edge channelsJun 23 2010 02:40PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CoreyesOperating with 2 lasersOct 22 2010 01:06PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgeyesOperationalJul 14 2010 11:54AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesOperational. Raw spectra stored but not line brightness time histories are going into the tree yet.Aug 24 2010 09:17AM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermlreinke
XTOMOyesCore system working. Edge system waiting for H-modes.Jul 01 2010 11:55AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke