Alcator C-Mod Run 1110118 Information

Back to runs

Miniproposals
Miniproposal:521a
Date Filed: 7/31/2009
Title:ITB formation - Ti and rotation profile effects
First Author:Catherine Fiore
Session Leader:Catherine Fiore (shots 1-13)

Operators
Session leader(s):Catherine Fiore
Physics operator(s):Jerry Hughes
Engineering operator(s):Andy Pfeiffer,Sam Pierson,Ed Fitzgerald

Engineering Operator Run Comment
automatically entered by signon - please replace with real comment

Session Leader Plans
Entered: Jan 14 2011 01:30:32:017PM
Author: Catherine Fiore
MP521A

Set up an EDA H-mode plasma at 5.5 T using 70 Mhz ICRF. Suggested target shot is 1100322007, but do not use the short pulse of 80 Mhz at 0.5 s. Use higher plasma current, 0.9 MA.

Start without an argon pulse. Ensure that all of the other required diagnostics are obtaining good data: CXRS, MSE, PCI.

Establish an ITB, then slowly add argon, 40 ms to begin. Increment until HIREX has adequate data.

Once an ITB is established, begin scanning the magnetic field down in 0.1 T increments, reducing the plasma current to maintain fixed q_95 if possible.

When ITB is lost, increase the magnetic field increment to 0.2 T until reaching
4.2 T

Decrease the magnetic field increment to 0.1 T and continue until 3.9 T

Once the field scan is completed, return to 5.4 T and add 80 Mhz central heating late in the pulse to hold the ITB in steady state.

Physics Operators Plans
Entered: Jan 14 2011 09:57:34:200PM
Author: Jerry Hughes
PO Plan for 18JAN2011
MP521a, "ITB formation - Ti and rotation profile effects"
PO: J. Hughes
SL: C. Fiore

-----------------
Engineering Setup
-----------------

Run begins at 09:00 and ends at 17:00

Power systems as on: 1100322007

Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:

Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
fill NINJA with 10 psi D2 DISABLED

Enable gate-valves and shutters: ECE, VUV, HiREX Sr, Xeus
Leave z-bolo shutter as is (should be open)

Torvac gatevalve toggle (yes/no): no

Boronization(yes/no): yes, overnight. Guidance below.
Overnight ECDC (yes/no): morning, following boronization
ICRF(yes/no): yes, for D(H) heating. J-port (70MHz) available for first shot.
D+E (80MHz) requested later in day.
LH(yes/no): no
Cryopump (yes/no): yes, starting with first shot
DNB (yes/no): yes

------------------------------
Boronization will be performed over weekend:
------------------------------

Use same recipe that was employed on 07JAN and 04JAN:

dP=120psi
pulser .7s on- .3s off
rmin/rdwell/rmax: 44/75/80 cm
tdwell/tsweep: 60/120 s
EF4 current: 0 A

Post boronization ECDC: 3hrs in He
sweep: 44/45/103cm
scan: 20/120 s

--------------------------

Shot plan:

1st shot. Load cryopump startup from 1110114006. Import Segment 2 from
1100322007. Make Ip 900kA. Incrase nl04 demand from 0.8 to 0.9e20. Adjust TF
to give Bt=5.5T.

First shots will consist of establishing ITB in this configuration with 70MHz
heating, and then finding appropriate level of Ar puffing for Hirex.

Next, proceed with SL's shot-by-shot changes to scan ICRF resonance from LFS
to HFS. TF values corresponding to particular fields obtained on 1110114 are:

Bt(T) TF(kA)
5.41 -150000
5.24 -144800
4.56 -125300
3.92 -105700

Based on a linear fit to these points, I build a table TF programs for each
desired current. Also, the Ip values required to keep q95 ~constant:

Bt(T) TF(kA) Ip(kA)
5.50 -152685 900
5.40 -149725 884
5.30 -146766 867
5.20 -143807 851
5.10 -140847 835
5.00 -137888 818
4.90 -134929 802
4.80 -131969 785
4.70 -129010 769
4.60 -126051 753
4.50 -123092 736
4.40 -120132 720
4.30 -117173 704
4.20 -114214 687
4.10 -111254 671
4.00 -108295 655
3.90 -105336 638

Session Leader Summaries
Entered: Jan 18 2011 05:18:50:173PM
Author: Catherine Fiore
MP521A

Set up an EDA H-mode plasma at 5.5 T using 70 Mhz ICRF. Suggested target shot is 1100322007, but do not use the short pulse of 80 Mhz at 0.5 s. Use higher plasma current, 0.9 MA.

Start without an argon pulse. Ensure that all of the other required diagnostics are obtaining good data: CXRS, MSE, PCI.

Establish an ITB, then slowly add argon, 40 ms to begin. Increment until HIREX has adequate data.

Once an ITB is established, begin scanning the magnetic field down in 0.1 T increments, reducing the plasma current to maintain fixed q_95 if possible.

When ITB is lost, increase the magnetic field increment to 0.2 T until reaching
4.2 T

Decrease the magnetic field increment to 0.1 T and continue until 3.9 T

Once the field scan is completed, return to 5.4 T and add 80 Mhz central heating late in the pulse to hold the ITB in steady state.

Run start delayed until 2:00 by alternator problems.

Best ITBs 1110118003, 004 (no argon, no rf), 007, 009

Shots 10,11,12 had some kind of injection and resulted in disruptions.
_____________________________
1110118001 Gas test.

1110118002 RF faulted, no H-mode.

1110118003 Late H-mode, good ITB. The ITB started while the ICRF was faulting. Very interesting.

1110118004 H-mode, back transition, H-mode, good ITB, forming after the ICRF terminated. Power threshhold appears to be zero. If this run plan called for Ohmic ITBs, we'd be in great shape.

1110118005 See shot 2. RF faulted, no H-mode. It's too soon to blame the 40 ms of Argon we asked for.

1110118006 RF was ramped. There was a short H-mode which was peaking up, but it had an untimely back transition. The rf group is going to lower the power a little. The HIREX had data during the ITB

1110118007 RF was perfect. An ITB was formed. HIREX got data. We will start reducing the magnetic field and plasma current to see if we can get at least half of our field scan done today.

1110118008 5.43 T. Very late H-mode with likely a short ITB. We're going to repeat this setting and see if we can get a longer H-mode and ITB.

1110118009 5.4 T. Multiple H-modes, but the last one has a good ITB. We are going to step down the field and current for the next shot.

1110118010 Early disruption.

1110118011 Disrupts at 0.8 s.

1110118012 H-mode, back transition, restrike and disruption, We'll tweak the magnetic field to move the resonance a little bit further in to see if it makes a difference.

1110118013 5.22 T. No steady H-mode. We'll resume from this point in the morning.

Physics Operator Summaries
Entered: Jan 18 2011 05:19:14:217PM
Author: Jerry Hughes

A faulty contactor prevented the alternator from making is last-stage
transfer this morning, which resulted in its being spun down and
examined. It was finally brought up to speed at around 14:00. In the
three hours we had available, we accomplished the following:

Shot 001 was a successful gas test.

Shots 002 through 009 ran fairly well, and we obtained a number of
ITBs at 5.5T and 5.4T with q95=4.2.

We continued the Bt/Ip scan at fixed q95 on shots 010 through
012. These were at 5.3T, and were all ended by early disruptions,
apparently induced by injections from the divertor.

The last shot, 013, pushed on to 5.2T, and was free of large
injections.

SL will pick up her run tomorrow morning, with D. Pace as PO.

Startups on the early shots today looked good, but by shot 5 I was
seeing a lot of early bounces and sometimes early hards. I tried to
tweak the startup with small changes to EF4 and the pre-fill, but
never really achieved a satisfying result. I also increased the PG3
demand at t=0 late in the day, and saw very little effect.

Scorecard:

Gas test: 1
Plasma into ramp-down: 9
Disruptions in flattop: 3
Fizzles: 0
Duds: 0


Session Leader Comments
Jan 18 2011 01:43:34:077PM1110118001Catherine FioreGas test
Jan 18 2011 02:13:13:843PM1110118002Catherine FioreRF faulted, no H-mode.
Jan 18 2011 02:27:43:020PM1110118003Catherine Fiore
Late H-mode, good ITB. The ITB started while the ICRF was faulting. Very interesting.
Jan 18 2011 02:41:31:967PM1110118004Catherine FioreH-mode, back transition, H-mode, good ITB, forming after the ICRF terminated. Power threshhold appears to be zero. If this run plan called for Ohmic ITBs, we'd be in great shape.
Jan 18 2011 02:54:41:700PM1110118005Catherine FioreSee shot 2. RF faulted, no H-mode. It's too soon to blame the 40 ms of Argon we asked for.
Jan 18 2011 03:14:19:287PM1110118006Catherine FioreRF was ramped. There was a short H-mode which was peaking up, but it had an untimely back transition. The rf group is going to lower the power a little. The HIREX had data during the ITB
Jan 18 2011 03:31:34:640PM1110118007Catherine FioreRF was perfect. An ITB was formed HIREX got data. We will start reducing the magnetic field and plasma current to see if we can get at least half of our field scan done today.
Jan 18 2011 03:42:59:207PM1110118008Catherine Fiore5.4 T. Very late H-mode with likely a short ITB. We're going to repeat this setting and see if we can get a longer H-mode and ITB.
Jan 18 2011 04:03:46:630PM1110118009Catherine Fiore5.4 T. Multiple H-modes, but the last one has a good ITB. We are going to step down the field and current for the next shot.
Jan 18 2011 04:13:24:280PM1110118010Catherine FioreEarly disruption.
Jan 18 2011 04:30:55:877PM1110118011Catherine FioreDisrupts at 0.8 s.
Jan 18 2011 04:48:28:220PM1110118012Catherine FioreH-mode, back transition, restrike and disruption, We'll tweak the magnetic field to move the resonance a little bit further in to see if it makes a difference.
Jan 18 2011 05:11:11:660PM1110118013Catherine FioreNo steady H-mode. We'll resume from this point in the morning.

Physics Operator Comments
Jan 14 2011 01:49:48:620PMJerry HughesPreparing a starting shot for 1110118.

Load from 1110114006 (5.4T shot with cryopump).
Import segment 2 from 1100322007.
Set PG1 to 100V from 0.30 to 0.34s. (But B-side lower will begin DISABLED)
Set IP demand in Seg 2 to -900000A in flattop.
Set nl04 demand in Seg 2 to 9e19. (Actual result may be lower.)

Note: TF demand is -150700A. This gave 5.49T on the target shot.

Saved as 1110118666 in /home/jwhughes/physop/pcs_scratch/




Jan 14 2011 10:06:27:420PMJerry HughesLooking more carefully at setup for Tuesday's run. Need to adjust the TF program
to get the correct field.

Load from 1110118666 in /home/jwhughes/physop/pcs_scratch/

Using table I generated in the PO_PLAN, setting TF in Segment 2 to -152685.

Saved as 1110118667 in /home/jwhughes/physop/pcs_scratch/
Jan 18 2011 01:36:39:473PM1110118001Jerry HughesShot 1.

Load from 1110118667 in /home/jwhughes/physop/pcs_scratch/
Target Bt=5.5T, Ip=900kA, nl04=9e19

Load at 18-Jan-2011 08:36:47.00
Open tree /home/jwhughes/physop/pcs_scratch -1
Open tree done

13:33: We may be able to run in another 1/2hour.

Setting up gas test shot. Change Segment 1 PG3 demand from t=0.009 to 0.099 from
35V to 90V.

Load at 18-Jan-2011 13:33:28.00
Open tree /home/jwhughes/physop/pcs_scratch -1
Open tree done

Jan 18 2011 01:43:51:200PM1110118001Jerry HughesShot 1.

Attempt: Gas test

Result: PG3 looks good. Plenty of gas.


Jan 18 2011 01:44:50:160PM1110118001Jerry HughesAlternator having trouble getting up to speed. 1st shot will likely be delayed.

8:53. Trying again for alternator transfer.
8:56. Looks like a fault. Alternator will spin down now for diagnosis.

Estimated time to get the alternator back up: no earlier than noon. More likely
13:30.

10:14. 282 RPM
10:47. 55 RPM
12:21. 157 RPM
12:49. 495 RPM

*** New estimated start time of 14:00.

13:10. 838 RPM
13:36. 1223 RPM
13:44. 1387 RPM

We seem to be out of the woods now. Should be able to get started shortly
after 2pm.

Jan 18 2011 02:15:42:250PM1110118002Jerry HughesShot 2.

Attempt: Make target shot from run plan: 5.5T, 900kA, cryopumped.
Return PG3 program in Segment 1 to 35V.

Load at 18-Jan-2011 13:45:55.00
Open tree /home/jwhughes/physop/pcs_scratch -1
Open tree done

Result: Plasma to 1.96s.
Startup mostly okay. Slow bounce after t=0.04s.
SL content with discharge, except RF.


Jan 18 2011 02:28:54:903PM1110118003Jerry HughesShot 3:

Attempt: Repeat, no PO changes.

Result: Plasma to 1.96s. H-mode. Density peaking evident.
Btor=5.53T
Ip=0.89MA

Startup looks okay.
Jan 18 2011 02:42:09:373PM1110118004Jerry HughesShot 4.

Attempt: Repeat, no PO changes.

Result: Plasma to 1.95s. Startup okay.
H-modes, 2nd one sustained Ohmically. Density is still peaking.


Jan 18 2011 02:54:32:947PM1110118005Jerry HughesShot 5.

Attempt: Enable the Ar (40ms at 0.3s) and retry.

Result: Plasma to 1.96s. Bounce at 0.012s.
No H-mode. No RF to speak of.
0.01 torr-L of Ar injected.



Jan 18 2011 03:10:53:150PM1110118006Jerry HughesShot 6:

Attempt: Repeat, no changes

Result: Plasma to 1.96s. Bounce at 0.1s.
H-mode.

Jan 18 2011 03:26:15:657PM1110118007Jerry HughesShot 7.

Attempt: Repeat, no PO changes.

Result: Plasma to 1.96s. Still bouncing.
H-mode, peaked. RF much steadier.
Jan 18 2011 03:48:21:600PM1110118008Jerry HughesShot 8.

Attempt: Begin Bt/Ip scan. -->5.4T
In Segment 2, change TF current to -149725. Change Ip demand to -884000.
Also, in Segment 1, change EF4 demand from -1300 to -1310.

Load at 18-Jan-2011 15:32:44.00
Open tree /home/jwhughes/physop/pcs_scratch -1
Open tree done

Result: Plasma to 1.96s. Bt=5.42T. q95=4.2
Good RF, late H-mode.
Still a small bounce at 0.01s.



Jan 18 2011 03:59:44:473PM1110118009Jerry HughesShot 9.

Attempt: Repeat, no PO changes.

Result: Plasma to 1.96s. Multiple H-modes, first few are transient and
radiative. Fifth one settles down into EDA. Peaking apparent.





Jan 18 2011 04:19:39:857PM1110118010Jerry HughesShot 10.

Attempt: Go to next Bt/Ip point.

In Segment 2, set TF demand to -146766. Set Ip demand to -867000.
In Segment 1, reduce PG4 pre-puff from 50ms to 48ms.

Load at 18-Jan-2011 16:05:33.00
Open tree /home/jwhughes/physop/pcs_scratch -1
Open tree done

Result: Disruption at 0.55s. 2pi diode shows radiation build up beginning at
0.525s. WIDE2 shows big spray from the G-side divertor.
My startup changes didn't have much of an effect.


Jan 18 2011 04:38:26:273PM1110118011Jerry HughesShot 11.

Attempt: Retry, no PO changes.

Result: Plasma lasted a little longer. Disrupts at 0.845s. Injections from the
divertor are evident again, though not at the same toroidal location.

Startup still has a bounce, some hards.
Jan 18 2011 04:48:54:033PM1110118012Jerry HughesShot 12.

Attempt: Retry, with a bit more PG3 at t=0.
In segment 2, raise PG3 from 35V to 40V.

Load at 18-Jan-2011 16:38:27.00
Open tree /home/jwhughes/physop/pcs_scratch -1
Open tree done

Result: Disruption at 0.96s. Still seems to be caused by impurity injections.
All this business started with the Bt/Ip tweak following shot 9.


Jan 18 2011 05:06:34:730PM1110118013Jerry HughesShot 13.

Attempt: Advance further through the Bt/Ip scan, and see whether the injections
continue.
In segment 2, set TF demand to -143807. Set Ip demand to -851000.

Load at 18-Jan-2011 16:53:08.00
Open tree /home/jwhughes/physop/pcs_scratch -1
Open tree done

Result: Hmm. That went full length with no major injections.
Plasma to 1.96s. Multiple H-modes.
It would be a little disturbing if the injections were tied to a particular
resonance location, but they all occurred at Bt=5.3T.

Engineering Operator Comments
ShotTimeTypeStatusComment
101:39:15:293PMTestOk
202:06:02:603PMPlasmaOk
302:19:44:133PMPlasmaOk
402:33:46:737PMPlasmaOk
502:48:36:727PMPlasmaOk
603:03:24:323PMPlasmaOk
703:19:39:703PMPlasmaOk
803:36:16:807PMPlasmaOk
903:52:38:550PMPlasmaOk
1004:08:51:740PMPlasmaOk
1104:26:11:840PMPlasmaOk
1204:40:38:903PMPlasmaOk
1304:54:39:703PMPlasmaOk

System Availability
Jan 18 2011 01:39:00:430PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesBES system is onlineOct 21 2010 11:33AM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (D+F) working. All midplane and off-midplane diode arrays working except WB1AX. Midplane foils calibrated and PRAD_MAIN is being filled. Divertor/Ledge foils not yet ready.Jul 15 2010 08:27AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Nov 16 2010 02:36PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA availableOct 21 2010 07:11PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged.Apr 06 2010 10:51AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesWide-view CXRS system is onlineOct 21 2010 11:33AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned; new calibrations (relative brightness and position) not yet implementedJun 29 2010 10:27AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperationalJun 26 2010 09:28PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll channels working and calibrated.Oct 27 2010 03:41PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauges are operational.Jun 28 2010 08:02PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPlugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access.Apr 05 2010 11:18AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational. Oct 22 2010 11:46AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesoperating normallyJun 29 2010 10:26AM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Jun 26 2010 11:19PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesSystem installed and aligned. Inverted Profiles for Ti are available upon request. Vtor profiles still under revision.Dec 17 2010 09:25AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operationalOct 23 2010 01:41PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-Antennayessystem checked out ok on 11006728. Jun 28 2010 04:57PM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayessystem checked out ok on 1100628Jun 28 2010 04:57PM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayessystem checked out ok. conditioned to vacuum. Jun 28 2010 04:58PM (ylin)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-Offyesoperational and testedJul 20 2010 04:42PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridyesLH working. New directional couplers installed at input to each klystron.Oct 21 2010 11:42AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid Reflectometeryes50GHz: up-, 60 GHz up- and down-Oct 21 2010 11:31AM (sgbaek)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
Lower Hybrid SOL reflectometeryesdifferential phase (profile) working since 8/27/2010. full phase (fluctuations + profile) is not. If put on a miniproposal, please request LH launcher to be moved inOct 05 2010 11:26AM (cornwall)Cornwall LauLower Hybrid SOL reflectometercornwall,wukitch,ylin
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoWB4LY and LLY working but not during ICRF. WB1LY not attached due to pickup problems. LYMID attached but have profile problems.Aug 24 2010 09:17AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesSpectra being collected and tree filled. Wavelength scan is broken so fixed on the Mo XXXI and XXXII lines.Jul 15 2010 08:28AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Oct 22 2010 11:46AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are operationalJun 28 2010 08:02PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesAll systems are on and functionalJun 29 2010 12:56PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03Jun 26 2010 09:21PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoCapillaries tested in-vessel.Jun 28 2010 08:08PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational. AM (2 * 39.51) MHz.Dec 13 2010 05:29PM (ntsujii)Miklos PorkolabPhase Contrast Imagingennever,ntsujii,porkolab
Penning GaugesnoHigh voltage power supplies are turned off, waiting for work at A-port horizontal to be finished.Jun 28 2010 08:07PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air Switchyes Jun 26 2010 11:19PM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Jun 26 2010 11:19PM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyes Jun 26 2010 11:19PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power Systemsyes Jun 26 2010 11:20PM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesOperational.Jun 28 2010 08:03PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperational.Jun 28 2010 08:03PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesF and J outer divertor probes are operational.Jun 28 2010 08:04PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperational, except probe#13Jun 28 2010 08:04PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesAs of 1101123, the 60, 88u, 88l, 140 and variable set at 115GHz are operational. The 50, 75 and 112 are nonoperational. On 1101123, the noise band at ~200kHz is again seen on the 88u and 88l channels.Nov 23 2010 09:30AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational. New Langmuir-Mach probe head installed.Jun 28 2010 08:05PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesOperational.Jun 28 2010 08:05PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesBoth A and K units are operational. Coil polarity needs to be checked.Jun 28 2010 08:06PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesHV supply on, cable run to sparker at k-horJun 23 2010 02:41PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationyesSSS installed and leak tested.Oct 21 2010 11:31AM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesNo new CO2 detector, so still missing edge channelsJun 23 2010 02:40PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CoreyesOperating with 2 lasersOct 22 2010 01:06PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgeyesOperationalJul 14 2010 11:54AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSno1/3/11 - turbo pump failure, offline until repaired. Raw spectra stored but not line brightness time histories are going into the tree yet.Jan 03 2011 12:52PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermlreinke
XTOMOyesCore system working. Edge system waiting for H-modes.Jul 01 2010 11:55AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Jan 18 2011 03:19:28:707PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesBES system is onlineOct 21 2010 11:33AM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (D+F) working. All midplane and off-midplane diode arrays working except WB1AX. Midplane foils calibrated and PRAD_MAIN is being filled. Divertor/Ledge foils not yet ready.Jul 15 2010 08:27AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Nov 16 2010 02:36PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA availableOct 21 2010 07:11PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged.Apr 06 2010 10:51AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesWide-view CXRS system is onlineOct 21 2010 11:33AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned; new calibrations (relative brightness and position) not yet implementedJun 29 2010 10:27AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperationalJun 26 2010 09:28PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll channels working and calibrated.Oct 27 2010 03:41PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauges are operational.Jun 28 2010 08:02PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPlugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access.Apr 05 2010 11:18AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational. Oct 22 2010 11:46AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesoperating normallyJun 29 2010 10:26AM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Jun 26 2010 11:19PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesSystem installed and aligned. Inverted Profiles for Ti are available upon request. Vtor profiles still under revision.Dec 17 2010 09:25AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operationalOct 23 2010 01:41PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-Antennayessystem checked out ok on 11006728. Jun 28 2010 04:57PM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayessystem checked out ok on 1100628Jun 28 2010 04:57PM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayessystem checked out ok. conditioned to vacuum. Jun 28 2010 04:58PM (ylin)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-Offyesoperational and testedJul 20 2010 04:42PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridyesLH working. New directional couplers installed at input to each klystron.Oct 21 2010 11:42AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid Reflectometeryes50GHz: up-, 60 GHz up- and down-Oct 21 2010 11:31AM (sgbaek)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
Lower Hybrid SOL reflectometeryesprofiles and fluctuations both working. If requested, please request LH launcher to be moved in.Jan 18 2011 03:07PM (cornwall)Cornwall LauLower Hybrid SOL reflectometercornwall,wukitch,ylin
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoWB4LY and LLY working but not during ICRF. WB1LY not attached due to pickup problems. LYMID attached but have profile problems.Aug 24 2010 09:17AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesSpectra being collected and tree filled. Wavelength scan is broken so fixed on the Mo XXXI and XXXII lines.Jul 15 2010 08:28AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Oct 22 2010 11:46AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are operationalJun 28 2010 08:02PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesAll systems are on and functionalJun 29 2010 12:56PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03Jun 26 2010 09:21PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoCapillaries tested in-vessel.Jun 28 2010 08:08PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational. AM (2 * 39.51) MHz.Dec 13 2010 05:29PM (ntsujii)Miklos PorkolabPhase Contrast Imagingennever,ntsujii,porkolab
Penning GaugesnoHigh voltage power supplies are turned off, waiting for work at A-port horizontal to be finished.Jun 28 2010 08:07PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air Switchyes Jun 26 2010 11:19PM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Jun 26 2010 11:19PM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyes Jun 26 2010 11:19PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power Systemsyes Jun 26 2010 11:20PM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesOperational.Jun 28 2010 08:03PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperational.Jun 28 2010 08:03PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesF and J outer divertor probes are operational.Jun 28 2010 08:04PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperational, except probe#13Jun 28 2010 08:04PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesAs of 1101123, the 60, 88u, 88l, 140 and variable set at 115GHz are operational. The 50, 75 and 112 are nonoperational. On 1101123, the noise band at ~200kHz is again seen on the 88u and 88l channels.Nov 23 2010 09:30AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational. New Langmuir-Mach probe head installed.Jun 28 2010 08:05PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesOperational.Jun 28 2010 08:05PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesBoth A and K units are operational. Coil polarity needs to be checked.Jun 28 2010 08:06PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesHV supply on, cable run to sparker at k-horJun 23 2010 02:41PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationyesSSS installed and leak tested.Oct 21 2010 11:31AM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesNo new CO2 detector, so still missing edge channelsJun 23 2010 02:40PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CoreyesOperating with 2 lasersOct 22 2010 01:06PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgeyesOperationalJul 14 2010 11:54AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSno1/3/11 - turbo pump failure, offline until repaired. Raw spectra stored but not line brightness time histories are going into the tree yet.Jan 03 2011 12:52PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermlreinke
XTOMOyesCore system working. Edge system waiting for H-modes.Jul 01 2010 11:55AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Jan 18 2011 03:36:07:827PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesBES system is onlineOct 21 2010 11:33AM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (D+F) working. All midplane and off-midplane diode arrays working except WB1AX. Midplane foils calibrated and PRAD_MAIN is being filled. Divertor/Ledge foils not yet ready.Jul 15 2010 08:27AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Nov 16 2010 02:36PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA availableOct 21 2010 07:11PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged.Apr 06 2010 10:51AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesWide-view CXRS system is onlineOct 21 2010 11:33AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned; new calibrations (relative brightness and position) not yet implementedJun 29 2010 10:27AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperationalJun 26 2010 09:28PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll channels working and calibrated.Oct 27 2010 03:41PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauges are operational.Jun 28 2010 08:02PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPlugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access.Apr 05 2010 11:18AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational. Oct 22 2010 11:46AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesoperating normallyJun 29 2010 10:26AM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Jun 26 2010 11:19PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesSystem installed and aligned. Inverted Profiles for Ti are available upon request. Vtor profiles still under revision.Dec 17 2010 09:25AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operationalOct 23 2010 01:41PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-Antennayessystem checked out ok on 11006728. Jun 28 2010 04:57PM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayessystem checked out ok on 1100628Jun 28 2010 04:57PM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayessystem checked out ok. conditioned to vacuum. Jun 28 2010 04:58PM (ylin)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-Offyesoperational and testedJul 20 2010 04:42PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridyesLH working. New directional couplers installed at input to each klystron.Oct 21 2010 11:42AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid Reflectometeryes50GHz: up-, 60 GHz up- and down-Oct 21 2010 11:31AM (sgbaek)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
Lower Hybrid SOL reflectometeryesprofiles and fluctuations both working. If requested, please request LH launcher to be moved in.Jan 18 2011 03:07PM (cornwall)Cornwall LauLower Hybrid SOL reflectometercornwall,wukitch,ylin
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoWB4LY and LLY working but not during ICRF. WB1LY not attached due to pickup problems. LYMID attached but have profile problems.Aug 24 2010 09:17AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesSpectra being collected and tree filled. Wavelength scan is broken so fixed on the Mo XXXI and XXXII lines.Jul 15 2010 08:28AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Oct 22 2010 11:46AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are operationalJun 28 2010 08:02PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesAll systems are on and functionalJun 29 2010 12:56PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03Jun 26 2010 09:21PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoCapillaries tested in-vessel.Jun 28 2010 08:08PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational. AM (2 * 39.51) MHz.Dec 13 2010 05:29PM (ntsujii)Miklos PorkolabPhase Contrast Imagingennever,ntsujii,porkolab
Penning GaugesnoHigh voltage power supplies are turned off, waiting for work at A-port horizontal to be finished.Jun 28 2010 08:07PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air Switchyes Jun 26 2010 11:19PM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Jun 26 2010 11:19PM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyes Jun 26 2010 11:19PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power Systemsyes Jun 26 2010 11:20PM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesOperational.Jun 28 2010 08:03PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperational.Jun 28 2010 08:03PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesF and J outer divertor probes are operational.Jun 28 2010 08:04PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperational, except probe#13Jun 28 2010 08:04PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesAs of 1101123, the 60, 88u, 88l, 140 and variable set at 115GHz are operational. The 50, 75 and 112 are nonoperational. On 1101123, the noise band at ~200kHz is again seen on the 88u and 88l channels.Nov 23 2010 09:30AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational. New Langmuir-Mach probe head installed.Jun 28 2010 08:05PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesOperational.Jun 28 2010 08:05PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesBoth A and K units are operational. Coil polarity needs to be checked.Jun 28 2010 08:06PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesHV supply on, cable run to sparker at k-horJun 23 2010 02:41PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationyesSSS installed and leak tested.Oct 21 2010 11:31AM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesNo new CO2 detector, so still missing edge channelsJun 23 2010 02:40PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CoreyesOperating with 2 lasersOct 22 2010 01:06PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgeyesOperationalJul 14 2010 11:54AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSno1/3/11 - turbo pump failure, offline until repaired. Raw spectra stored but not line brightness time histories are going into the tree yet.Jan 03 2011 12:52PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermlreinke
XTOMOyesCore system working. Edge system waiting for H-modes.Jul 01 2010 11:55AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Jan 18 2011 03:52:28:617PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesBES system is onlineOct 21 2010 11:33AM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (D+F) working. All midplane and off-midplane diode arrays working except WB1AX. Midplane foils calibrated and PRAD_MAIN is being filled. Divertor/Ledge foils not yet ready.Jul 15 2010 08:27AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Nov 16 2010 02:36PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA availableOct 21 2010 07:11PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged.Apr 06 2010 10:51AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesWide-view CXRS system is onlineOct 21 2010 11:33AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned; new calibrations (relative brightness and position) not yet implementedJun 29 2010 10:27AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperationalJun 26 2010 09:28PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll channels working and calibrated.Oct 27 2010 03:41PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauges are operational.Jun 28 2010 08:02PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPlugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access.Apr 05 2010 11:18AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational. Oct 22 2010 11:46AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesoperating normallyJun 29 2010 10:26AM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Jun 26 2010 11:19PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesSystem installed and aligned. Inverted Profiles for Ti are available upon request. Vtor profiles still under revision.Dec 17 2010 09:25AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operationalOct 23 2010 01:41PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-Antennayessystem checked out ok on 11006728. Jun 28 2010 04:57PM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayessystem checked out ok on 1100628Jun 28 2010 04:57PM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayessystem checked out ok. conditioned to vacuum. Jun 28 2010 04:58PM (ylin)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-Offyesoperational and testedJul 20 2010 04:42PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridyesLH working. New directional couplers installed at input to each klystron.Oct 21 2010 11:42AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid Reflectometeryes50GHz: up-, 60 GHz up- and down-Oct 21 2010 11:31AM (sgbaek)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
Lower Hybrid SOL reflectometeryesprofiles and fluctuations both working. If requested, please request LH launcher to be moved in.Jan 18 2011 03:07PM (cornwall)Cornwall LauLower Hybrid SOL reflectometercornwall,wukitch,ylin
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoWB4LY and LLY working but not during ICRF. WB1LY not attached due to pickup problems. LYMID attached but have profile problems.Aug 24 2010 09:17AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesSpectra being collected and tree filled. Wavelength scan is broken so fixed on the Mo XXXI and XXXII lines.Jul 15 2010 08:28AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Oct 22 2010 11:46AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are operationalJun 28 2010 08:02PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesAll systems are on and functionalJun 29 2010 12:56PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03Jun 26 2010 09:21PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoCapillaries tested in-vessel.Jun 28 2010 08:08PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational. AM (2 * 39.51) MHz.Dec 13 2010 05:29PM (ntsujii)Miklos PorkolabPhase Contrast Imagingennever,ntsujii,porkolab
Penning GaugesnoHigh voltage power supplies are turned off, waiting for work at A-port horizontal to be finished.Jun 28 2010 08:07PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air Switchyes Jun 26 2010 11:19PM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Jun 26 2010 11:19PM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyes Jun 26 2010 11:19PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power Systemsyes Jun 26 2010 11:20PM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesOperational.Jun 28 2010 08:03PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperational.Jun 28 2010 08:03PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesF and J outer divertor probes are operational.Jun 28 2010 08:04PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperational, except probe#13Jun 28 2010 08:04PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesAs of 1101123, the 60, 88u, 88l, 140 and variable set at 115GHz are operational. The 50, 75 and 112 are nonoperational. On 1101123, the noise band at ~200kHz is again seen on the 88u and 88l channels.Nov 23 2010 09:30AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational. New Langmuir-Mach probe head installed.Jun 28 2010 08:05PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesOperational.Jun 28 2010 08:05PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesBoth A and K units are operational. Coil polarity needs to be checked.Jun 28 2010 08:06PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesHV supply on, cable run to sparker at k-horJun 23 2010 02:41PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationyesSSS installed and leak tested.Oct 21 2010 11:31AM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesNo new CO2 detector, so still missing edge channelsJun 23 2010 02:40PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CoreyesOperating with 2 lasersOct 22 2010 01:06PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgeyesOperationalJul 14 2010 11:54AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSno1/3/11 - turbo pump failure, offline until repaired. Raw spectra stored but not line brightness time histories are going into the tree yet.Jan 03 2011 12:52PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermlreinke
XTOMOyesCore system working. Edge system waiting for H-modes.Jul 01 2010 11:55AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke