Alcator C-Mod Run 1110120 Information

Back to runs

Miniproposals
Miniproposal:602
Date Filed: 2/26/2010
Title:Core Fluctuations and Transport in Two -Frequency ICRF Heated ITB Plasmas with Jogs and Modulated IC
First Author:Darin Ernst
Session Leader:Darin Ernst (shots 1-30)

Operators
Session leader(s):Darin Ernst
Physics operator(s):Greg Wallace
Engineering operator(s):Bill Cochran,Bill Parkin,Gary Dekow

Engineering Operator Run Comment
automatically entered by signon - please replace with real comment

Session Leader Plans
Entered: Jan 20 2011 09:38:23:933AM
Author: Darin Ernst
Yesterday we had a half-day run with some great ITB's, but only two
successfully controlled with on-axis heating (and they weren't great).
The main problem was the H-Mode back transition that occurred frequently
as the ITB developed (which was rather quick relative to previous runs).
We cranked up J-port off-axis power to 2.4 MW finally, and this helped
us stay in H-Mode. However, we still had D&E preheat on, which prevented
an ITB from forming. We fooled around with Bt, Ip, ne_tgt quite a bit,
with some statistically invalid conclusions.

Today we will adjust Bt, Ip, ne_tgt to favor ITB formation, disregarding
Pth scaling for EDA H-mode (the ITB limits the parameter space well within
EDA). We need to develop a good ITB, then hit it with on-axis power to
control Zeff and Prad so we can stay in H-Mode. Yet we want a very peaked
density before we hit it with on-axis heating.

If we are successful, we may get to do some vertical jogs (Jerry Hughes
suggests downward, since we are close to DN, so upward may be vertically
unstable).

NEXT: Following RF conditioning, repeat shot 1110119033 but with
J-port power 2.4 MW, same as 32. No D&E yet: want to check ITB
development . 40 ms argon. Keep ne_tgt=1.1. Going back to
5.4 T, 0.8 MA.

See how quickly ITB develops and apply on-axis heating accordingly,
in efforts to both control ITB, and keep Prad from blowing
up the H-Mode.

Physics Operators Plans
Entered: Jan 19 2011 05:29:30:327PM
Author: Greg Wallace
-----------------
Engineering Setup
-----------------

Run begins at 09:00 and ends at 17:00

Power systems as on: 1110119033

Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:

Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
fill NINJA with 10 psi D2 DISABLED

Enable gate-valves and shutters: ECE, VUV, HiREX Sr, Xeus
Leave z-bolo shutter as is (should be open)

Torvac gatevalve toggle (yes/no): no

Boronization(yes/no): YES, overnight (see below)
Overnight ECDC (yes/no): morning, following boronization
ICRF(yes/no): yes
LH(yes/no): no
Cryopump (yes/no): yes, starting with first shot
DNB (yes/no): yes


------------------------------
Boronization and ECDC parameters:
------------------------------

Use same recipe that was employed on 17JAN, 07JAN, and 04JAN:

dP=120psi
pulser .7s on- .3s off
rmin/rdwell/rmax: 44/75/80 cm
tdwell/tsweep: 60/120 s
EF4 current: 0 A

Post boronization ECDC: 3hrs in He
sweep: 44/45/103cm
scan: 20/120 s


------------------------------
Experimental Plan
------------------------------

1. Will begin with continuation of Ernst's run on 1110119. Starting shot will be based on last shot from Wednesday (1110119033). Will make changes as determined by session leader in the morning.

Session Leader Summaries
Entered: Jan 20 2011 09:03:17:550AM
Author: Darin Ernst
Some RF conditioning shots...following boronization.
Entered: Jan 20 2011 09:20:03:820AM
Author: Darin Ernst
Some RF conditioning shots...following boronization.

NEXT: Following RF conditioning, repeat shot 1110119033 but with
J-port power 2.4 MW, same as 32. No D&E yet: want to check ITB
development . 40 ms argon. Keep ne_tgt=1.1. Going back to
5.4 T, 0.8 MA.

See how quickly ITB develops and apply on-axis heating accordingly,
in efforts to both control ITB, and keep Prad from blowing
up the H-Mode.



Physics Operator Summaries

Session Leader Comments
Jan 20 2011 10:03:27:930AM1110120005Darin ErnstSteve Wukitch suggests lowering target density from 1.1 to 1.0:
neutral pressure is too high at J port. Typical following boronization.

Luis and Nathan injecting Ca at 1.5 sec. to see if they can observe
Te perturbation (any immediate core response -- nonlocal effect?)

Jan 20 2011 01:23:45:447PM1110120015Darin ErnstJ-port coming back, still a little glitchy, but got three H-Modes with moderate
ITB's, with ITB on 1st reaching ne0 ~ 4. Back transitions are consistent with
GPC Te8 dropping below 0.216 keV.


Jan 20 2011 01:40:48:657PM1110120016Darin ErnstJ still faulting, but 1st H-Mode terminated by an injection at 1.00 sec.
Moderate ITB ne0~3.7. Nathan Howard, looking at spectrograms, thinks
it may have been Ni early, then Mb. Movie shows antenna lighting up in
a couple of spots, so could be piece of the Ni Faraday screen. Also see
Ti along with it.


Jan 20 2011 01:53:30:613PM1110120017Darin Ernstne0~3.5, GPC Te8 drops starting 0.92s, may have been terminated by J port trip.
Jan 20 2011 02:07:32:140PM1110120018Darin Ernstpretty nice ITB at 1.236, ne0~4.3, ne_ped~2.7, injections at 1.05, 1.2 s hammer it down. Looks like J faulted at 1.243 before the back-transition. Getting over 2.5 MW on J.

Nathan: Getting some Cu, Mb, Ni, Fe, not really sudden injections, more of a source.
Jan 20 2011 02:15:34:467PM1110120018Darin ErnstRF improving. Got ITB with ne0~4, jump in Prad at 1.38s (not from ITB).
ne_ped ~ 2.5. Clear ITB foot. Saturates by 1.1 sec without any interference
(wolfe).

Jan 20 2011 02:34:25:887PM1110120018Darin ErnstNice clean H-Mode, no back transitions! A few minor J port RF faults.
ITB was steady by about 1.1 sec again, reaching ne0 ~ 4.

Next: Lower J-port power from 2.5 to 2.4 MW to reduce faulting.
Immediate Goal: Increase ITB central density, then apply on-axis pulses.
Going to 5.5 T, since best ITB's yesterday were there.


Jan 20 2011 02:47:14:047PM1110120021Darin ErnstNo RF faults. Nice. Lose sawteeth at 1.17 s, then Te0 starts falling,
but ne0 jumps up to 5.0, and holds. Probably impurity accumulation in ITB.

NEXT: add on-axis power starting 1.2 sec, 1 MW, 40ms on, 60ms off, repeat.


Jan 20 2011 03:03:04:637PM1110120022Darin ErnstLate H-Mode.

NEXT: Try raising J power slightly.

DNB will be starting 0.7 sec. with 100 ms period.
D&E ports will start 1.2, 0.8MW, 60ms on, 40 ms off.
DNB is on 40ms, so this will leave 20ms for background frame at end
of each RF pulse.


Jan 20 2011 03:32:45:893PM1110120024Darin ErnstGreat. Successful control of ITB. However, overdid the on-axis power
a little, so flattened the ITB.

NEXT: cut on-axis power by 50%.


Jan 20 2011 03:42:19:590PM1110120025Darin ErnstLate H-Mode 1.15 sec.


Jan 20 2011 03:46:30:323PM1110120025Darin Ernst**** We are running again tomorrow ****
**** Will break for C-Mod tour at about 1:30 pm, then resume ****



Jan 20 2011 04:05:43:450PM1110120026Darin ErnstGreat ne0 > 5 at 1.15 sec., but starts to die just before on-axis RF.
Seems that a couple of injections at 0.5, 1.0 sec contributed to radiative
collapse starting at 1.0 sec. The second injection dropped Te0 suddenly.

NEXT: repeat.
Jan 20 2011 04:44:34:693PM1110120027Darin ErnstHey Jerry -- we got ELMs starting 1.1 sec, slightly before 1st RF trip,
continuously to end. This seems to degrade the ITB. Also, did not
have a very strong ITB. Zeff < 2 entire shot. No sudden increases in Prad.
ne0 hit 4 before beginning to fall.

NEXT: repeat.

Jan 20 2011 04:39:48:890PM1110120028Darin ErnstClean RF, what dreams are made of. ITB: none to speak of: ne0~3.5 and steady.
Late H-Mode delayed ITB.

NEXT: remove first E-port pulse.

Jan 20 2011 04:55:04:467PM1110120029Darin ErnstClean RF, but delayed H-Mode, ITB similar to last time, with ne0 ~ 3.5,
ne_ped ~ 2.5.

Clear ITB foot around 80 cm. Density fairly steady during on-axis heating.
Decreased slightly during on-axis heating. Getting delta-Te0 from on-axis
heating of 0.75 keV on top of 1.75 keV (40% P-P).

So far not seeing strong bursts on PCI during on-axis heating. Probably
need to get the density gradient up so that ne0 > 5.

NEXT: add D preheat 1 MW from 0.6-0.7 sec. and repeat, hoping to get H-mode on time.

Physics Operator Comments
Jan 20 2011 10:31:03:460AM1110120001Greg WallaceChanges: Load shot 1110119033. Increase toroidal field to 5.4 T (150 kA TF bus current).

Result: Plasma to rampdown. RF having trouble after boronization.

Next shot: Add 40 ms Ar puff. Continue RF conditioning.
Jan 20 2011 10:31:11:980AM1110120002Greg WallaceChanges: Add 40 ms Ar puff. Continue RF conditioning.

Result: RF a little better on this shot. Disruption in rampdown at 500 kA. Gas scopes look funny---B-top puff at -.5 s shows up on B-main scope trace???

Next shot: Decrease Ip to 800 kA. Continue RF conditioning.
Jan 20 2011 10:31:23:183AM1110120003Greg WallaceChanges: Decrease Ip to 800 kA. Continue RF conditioning.

Result: Plasma. Disruption in rampdown at 400 kA. RF still having issues with boronization recovery. Gas scopes look normal again.

Next shot: Repeat. Continue RF conditioning.
Jan 20 2011 10:31:32:113AM1110120004Greg WallaceChanges: Repeat. Continue RF conditioning.

Result: Fizzle. Plasma bounced. Pressure and fields look same as shot 3. Will try again before tweaking gas or fields.

Next shot: Repeat, without the fizzle this time.
Jan 20 2011 10:31:42:027AM1110120005Greg WallaceChanges: Repeat, without the fizzle this time.

Result: Plasma. Disruption in rampdown at 500 kA. Still a little bounce. Will keep watching it.

Next shot: Reduce programmed nl_04 from 1.1e20 to 1.0e20 to avoid J-port neutral pressure limit.
Jan 20 2011 10:31:51:507AM1110120006Greg WallaceChanges: Reduce programmed nl_04 from 1.1e20 to 1.0e20 to avoid J-port neutral pressure limit.

Result: Plasma. Another bounce. Time to change something in seg 1.

Next shot: Increase PG4 puff by 4 ms (now set to 57 ms).
Jan 20 2011 10:30:31:357AM1110120007Greg WallaceChanges: Increase PG4 puff by 4 ms (now set to 57 ms).

Result: Plasma. Bounce in startup again. Pressure is slightly higher but didn't help. Looks like it's time to play with the fields.

Next shot: Increase IC_EF4U by 10 A (from -1300 to -1290) for t < 0.
Jan 20 2011 10:49:28:903AM1110120008Greg WallaceChanges: Increase IC_EF4U by 10 A (from -1300 to -1290) for t < 0.

Result: Plasma. Disruption in rampdown at 500 kA. Early bounce (at 15 ms) went away with change in IC_EF4U programming, but now something funny happens at 40 ms. J-port still having issues with boronization recovery.

Next shot: Continue RF conditioning.
Jan 20 2011 11:11:38:920AM1110120009Greg WallaceChanges: Continue RF conditioning.

Result: Plasma. Disruption in rampdown at 500 kA. Funny behavior again at 30 ms.

Next shot: Continue RF conditioning. Increase Ar puff from 40 to 45 ms.
Jan 20 2011 11:57:08:200AM1110120010Greg WallaceChanges: Continue RF conditioning. Increase Ar puff from 40 to 45 ms.

Result: Plasma. Still having RF problems. Power room access to investigate RF transmitters.

Next shot: Increase Ar puff from 45 ms to 50 ms.
Jan 20 2011 12:23:33:570PM1110120011Greg WallaceChanges: Increase Ar puff from 45 ms to 50 ms.

Result: Plasma. Disruption in rampdown at 600 kA. Still having problems with J-port. Another power room access to investigate.

Next shot: Decrease Ar puff from 50 ms to 35 ms.
Jan 20 2011 12:42:52:533PM1110120012Greg WallaceChanges: Decrease Ar puff from 50 ms to 35 ms.

Result: Later bounce at 40 ms. Plasma shut down due to runaways. No ratiomatic on this shot so can't see what happened to the pressure with long delay between shots.

Next shot: Try again. See what happens.
Jan 20 2011 12:56:00:097PM1110120013Greg WallaceChanges: Try again. See what happens.

Result: Fizzle. Pressure looks OK, Bz0 is OK or even a tad above what worked on previous shots (i.e. 11). Unknown cause. Try again.

Next shot: Try, try again.
Jan 20 2011 01:06:24:347PM1110120014Greg WallaceChanges: Try, try again.

Result: Plasma. Still some problems with J-port.

Next shot: Repeat. Continue RF conditioning.
Jan 20 2011 01:15:29:297PM1110120015Greg WallaceChanges: Repeat. Continue RF conditioning.

Result: Startup looks good. Three H-modes.

Next shot: Increase Ar puff from 35 ms to 40 ms. Continue RF conditioning.
Jan 20 2011 01:30:57:317PM1110120016Greg WallaceChanges: No changes. Continue RF conditioning.

Result: Plasma. Two or three H-modes? J-port is starting to look better.

Next shot: Repeat. Continue RF conditioning.
Jan 20 2011 01:43:36:010PM1110120017Greg WallaceChanges: Repeat. Continue RF conditioning.

Result: Plasma. Disruption in rampdown at 500 kA. Two H-modes? J-port starts off well then begins tripping around .9 s.

Next shot: Repeat. Continue RF conditioning.
Jan 20 2011 01:59:45:920PM1110120018Greg WallaceChanges: Repeat. Continue RF conditioning.

Result: Plasma. Sustained H-mode until RF trip at 1.25 s.

Next shot: Repeat. Continue RF conditioning.
Jan 20 2011 02:14:46:420PM1110120019Greg WallaceChanges: Repeat. Continue RF conditioning.

Result: Plasma. Steady H-mode until 1.4 s. RF is looking better.

Next shot: Repeat. Continue RF conditioning.
Jan 20 2011 02:35:55:047PM1110120020Greg WallaceChanges: Repeat. Continue RF conditioning.

Result: Plasma. RF looking much better.

Next shot: Increase TF from 5.4 to 5.5 T (TF current from 150 to 152.7 kA).
Jan 20 2011 02:44:59:610PM1110120021Greg WallaceChanges: Increase TF from 5.4 to 5.5 T (TF current from 150 to 152.7 kA).

Result: Plasma. Clean RF trace. Drop in stored energy and Te after sawteeth stabilize at 1.2 s. Breakdown was a little late on shot 20 but moved back to more normal time on this shot. TF was slightly higher than anticipated (5.53 T).

Next shot: No DPCS changes. Will start RF modulation on D&E at 1.2 s. J will hopefully remain steady.
Jan 20 2011 03:05:44:023PM1110120022Greg WallaceChanges: No DPCS changes. Will start RF modulation on D&E at 1.2 s. J will hopefully remain steady.

Result: Plasma. A couple RF trips but pretty good.

Next shot: Repeat. Change RF timing slightly.
Jan 20 2011 03:40:16:387PM1110120023Greg WallaceChanges: Repeat. Change RF timing slightly.

Result: Dud. EF1 commutation fault.

Next shot: Repeat.
Jan 20 2011 03:44:13:967PM1110120024Greg WallaceChanges: Repeat.

Result: Plasma. H-mode starts late.

Next shot: Repeat.
Jan 20 2011 04:06:01:023PM1110120026Greg WallaceChanges: Repeat.

Result: Plasma.

Next shot: Repeat.
Jan 20 2011 04:22:02:210PM1110120027Greg WallaceChanges: Repeat.

Result: Plasma. Breakdown is creeping later (7-8 ms). Also current rise slows after 30 ms but not sure why.

Next shot: Decrease IC_EF4U from -1290 to -1293 A for t < 0 to address later breakdown.
Jan 20 2011 04:49:27:547PM1110120028Greg WallaceChanges: Decrease IC_EF4U from -1290 to -1293 A for t < 0 to address later breakdown.

Result: Plasma. Breakdown slightly earlier. Current ramp looks good. Clean ICRF and good H-mode.

Next shot: Repeat.
Jan 20 2011 05:00:16:390PM1110120029Greg WallaceChanges: Repeat.

Result: Plasma. H-mode starts a little late. Clean RF.

Next shot: Repeat.
Jan 20 2011 05:03:04:920PM1110120030Greg WallaceChanges: Repeat.

Result: Plasma. Got the H-mode.

Last shot of the day.

Engineering Operator Comments
ShotTimeTypeStatusComment
109:00:36:513AMPlasmaOk
209:13:14:517AMPlasmaOk
309:28:14:280AMPlasmaOk
409:41:56:390AMPlasmaOk
509:54:30:330AMPlasmaOk
610:08:42:440AMPlasmaOk
710:23:30:790AMPlasmaOk
810:40:05:443AMPlasmaOk
910:54:38:467AMPlasmaOk
1011:12:01:050AMPlasmaOk
1111:57:34:257AMPlasmaOk
1212:27:39:423PMPlasmaOk
1312:42:21:227PMPlasmaOk
1412:55:57:923PMPlasmaOk
1501:08:28:750PMPlasmaOk
1601:21:43:043PMPlasmaOk
1701:34:53:453PMPlasmaOk
1801:49:36:983PMPlasmaOk
1902:05:14:060PMPlasmaOk
2002:21:05:850PMPlasmaOk
2102:36:31:557PMPlasmaOk
2202:52:30:333PMPlasmaOk
2303:08:30:890PMPlasmaBadEF1U Early Commutation
2403:21:48:197PMPlasmaOk
2503:37:23:683PMPlasmaOk
2603:53:45:610PMPlasmaOk
2704:09:35:677PMPlasmaOk
2804:25:54:000PMPlasmaOk
2904:43:01:067PMPlasmaOk
3004:59:29:050PMPlasmaOk

System Availability
Jan 20 2011 09:00:20:860AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesBES system is onlineOct 21 2010 11:33AM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (D+F) working. All midplane and off-midplane diode arrays working except WB1AX. Midplane foils calibrated and PRAD_MAIN is being filled. Divertor/Ledge foils not yet ready.Jul 15 2010 08:27AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Nov 16 2010 02:36PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA availableOct 21 2010 07:11PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged.Apr 06 2010 10:51AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesWide-view CXRS system is onlineOct 21 2010 11:33AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned; new calibrations (relative brightness and position) not yet implementedJun 29 2010 10:27AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperationalJun 26 2010 09:28PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll channels working and calibrated.Oct 27 2010 03:41PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauges are operational.Jun 28 2010 08:02PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPlugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access.Apr 05 2010 11:18AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational. Oct 22 2010 11:46AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesoperating normallyJun 29 2010 10:26AM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Jun 26 2010 11:19PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesSystem installed and aligned. Inverted Profiles for Ti are available upon request. Vtor profiles still under revision.Dec 17 2010 09:25AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operationalOct 23 2010 01:41PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-Antennayessystem checked out ok on 11006728. Jun 28 2010 04:57PM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayessystem checked out ok on 1100628Jun 28 2010 04:57PM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayessystem checked out ok. conditioned to vacuum. Jun 28 2010 04:58PM (ylin)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-Offyesoperational and testedJul 20 2010 04:42PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridyesLH working. New directional couplers installed at input to each klystron.Oct 21 2010 11:42AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid Reflectometeryes50GHz: up-, 60 GHz up- and down-Oct 21 2010 11:31AM (sgbaek)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
Lower Hybrid SOL reflectometeryesprofiles and fluctuations both working. If requested, please request LH launcher to be moved in.Jan 18 2011 03:07PM (cornwall)Cornwall LauLower Hybrid SOL reflectometercornwall,wukitch,ylin
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoWB4LY and LLY working but not during ICRF. WB1LY not attached due to pickup problems. LYMID attached but have profile problems.Aug 24 2010 09:17AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesSpectra being collected and tree filled. Wavelength scan is broken so fixed on the Mo XXXI and XXXII lines.Jul 15 2010 08:28AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Oct 22 2010 11:46AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are operationalJun 28 2010 08:02PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesAll systems are on and functionalJun 29 2010 12:56PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03Jun 26 2010 09:21PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoCapillaries tested in-vessel.Jun 28 2010 08:08PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational. AM (2 * 39.51) MHz.Dec 13 2010 05:29PM (ntsujii)Miklos PorkolabPhase Contrast Imagingennever,ntsujii,porkolab
Penning GaugesnoHigh voltage power supplies are turned off, waiting for work at A-port horizontal to be finished.Jun 28 2010 08:07PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air Switchyes Jun 26 2010 11:19PM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Jun 26 2010 11:19PM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyes Jun 26 2010 11:19PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power Systemsyes Jun 26 2010 11:20PM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesOperational.Jun 28 2010 08:03PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperational.Jun 28 2010 08:03PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesF and J outer divertor probes are operational.Jun 28 2010 08:04PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperational, except probe#13Jun 28 2010 08:04PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesAs of 1101123, the 60, 88u, 88l, 140 and variable set at 115GHz are operational. The 50, 75 and 112 are nonoperational. On 1101123, the noise band at ~200kHz is again seen on the 88u and 88l channels.Nov 23 2010 09:30AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational. New Langmuir-Mach probe head installed.Jun 28 2010 08:05PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesOperational.Jun 28 2010 08:05PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesBoth A and K units are operational. Coil polarity needs to be checked.Jun 28 2010 08:06PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesHV supply on, cable run to sparker at k-horJun 23 2010 02:41PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationyesSSS installed and leak tested.Oct 21 2010 11:31AM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesNo new CO2 detector, so still missing edge channelsJun 23 2010 02:40PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CoreyesOperating with 2 lasersOct 22 2010 01:06PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgeyesOperationalJul 14 2010 11:54AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSno1/3/11 - turbo pump failure, offline until repaired. Raw spectra stored but not line brightness time histories are going into the tree yet.Jan 03 2011 12:52PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermlreinke
XTOMOyesCore system working. Edge system waiting for H-modes.Jul 01 2010 11:55AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Jan 20 2011 10:54:27:553AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesBES system is onlineOct 21 2010 11:33AM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (D+F) working. All midplane and off-midplane diode arrays working except WB1AX. Midplane foils calibrated and PRAD_MAIN is being filled. Divertor/Ledge foils not yet ready.Jul 15 2010 08:27AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Nov 16 2010 02:36PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA availableOct 21 2010 07:11PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged.Apr 06 2010 10:51AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesWide-view CXRS system is onlineOct 21 2010 11:33AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned; new calibrations (relative brightness and position) not yet implementedJun 29 2010 10:27AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperationalJun 26 2010 09:28PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll channels working and calibrated.Oct 27 2010 03:41PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauges are operational.Jun 28 2010 08:02PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPlugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access.Apr 05 2010 11:18AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational. Oct 22 2010 11:46AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesoperating normallyJun 29 2010 10:26AM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Jun 26 2010 11:19PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesSystem installed and aligned. Inverted Profiles for Ti are available upon request. Vtor profiles still under revision.Dec 17 2010 09:25AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operationalOct 23 2010 01:41PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-Antennayessystem checked out ok on 11006728. Jun 28 2010 04:57PM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayessystem checked out ok on 1100628Jun 28 2010 04:57PM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayessystem checked out ok. conditioned to vacuum. Jun 28 2010 04:58PM (ylin)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-Offyesoperational and testedJul 20 2010 04:42PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridyesLH working. New directional couplers installed at input to each klystron.Oct 21 2010 11:42AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid Reflectometeryes50GHz: up-, 60 GHz up- and down-Oct 21 2010 11:31AM (sgbaek)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
Lower Hybrid SOL reflectometeryesprofiles and fluctuations both working. If requested, please request LH launcher to be moved in.Jan 18 2011 03:07PM (cornwall)Cornwall LauLower Hybrid SOL reflectometercornwall,wukitch,ylin
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoWB4LY and LLY working but not during ICRF. WB1LY not attached due to pickup problems. LYMID attached but have profile problems.Aug 24 2010 09:17AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesSpectra being collected and tree filled. Wavelength scan is broken so fixed on the Mo XXXI and XXXII lines.Jul 15 2010 08:28AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Oct 22 2010 11:46AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are operationalJun 28 2010 08:02PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesAll systems are on and functionalJun 29 2010 12:56PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03Jun 26 2010 09:21PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoCapillaries tested in-vessel.Jun 28 2010 08:08PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational. AM (2 * 39.51) MHz.Dec 13 2010 05:29PM (ntsujii)Miklos PorkolabPhase Contrast Imagingennever,ntsujii,porkolab
Penning GaugesnoHigh voltage power supplies are turned off, waiting for work at A-port horizontal to be finished.Jun 28 2010 08:07PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air Switchyes Jun 26 2010 11:19PM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Jun 26 2010 11:19PM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyes Jun 26 2010 11:19PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power Systemsyes Jun 26 2010 11:20PM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesOperational.Jun 28 2010 08:03PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperational.Jun 28 2010 08:03PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesF and J outer divertor probes are operational.Jun 28 2010 08:04PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperational, except probe#13Jun 28 2010 08:04PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesAs of 1101123, the 60, 88u, 88l, 140 and variable set at 115GHz are operational. The 50, 75 and 112 are nonoperational. On 1101123, the noise band at ~200kHz is again seen on the 88u and 88l channels.Nov 23 2010 09:30AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational. New Langmuir-Mach probe head installed.Jun 28 2010 08:05PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesOperational.Jun 28 2010 08:05PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesBoth A and K units are operational. Coil polarity needs to be checked.Jun 28 2010 08:06PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesHV supply on, cable run to sparker at k-horJun 23 2010 02:41PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationyesSSS installed and leak tested.Oct 21 2010 11:31AM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesNo new CO2 detector, so still missing edge channelsJun 23 2010 02:40PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CoreyesOperating with 2 lasersOct 22 2010 01:06PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgeyesOperationalJul 14 2010 11:54AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesRaw spectra stored but not line brightness time histories are going into the tree yet.Jan 20 2011 10:45AM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermlreinke
XTOMOyesCore system working. Edge system waiting for H-modes.Jul 01 2010 11:55AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke