| Miniproposals | ||||||||||
|
| Operators | |
| Session leader(s): | John Rice |
| Physics operator(s): | Earl Marmar |
| Engineering operator(s): | Bill Cochran,Sam Pierson,Gary Dekow |
| Engineering Operator Run Comment |
| MP632 - Rotation Reversal, PO: E. Marmar, SL: J. Rice |
| Session Leader Plans |
| Entered: Jan 24 2011 03:33:04:890PM |
| Author: John Rice |
| MP 632 continuation of 1110105 1 psi Ar B-side lower enabled need cryo at some point no ICRF no LH need Thomson, Hirex-Sr, PCI, CXRS/DNB first shot, locked mode. load 1110105018 |
| Physics Operators Plans |
| Entered: Jan 24 2011 03:42:48:560PM |
| Author: Earl Marmar |
| PO: E. Marmar, SL: J. Rice
MP632 - Rotation Reversal ------------------ Engineering Setup ----------------- Run begins at 09:00 and ends at 17:00 Power systems as on: 1110105018 (locked mode) Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled Gas setup: Fill B-Top with 6 psi D2 Hybrid enabled (PG4) fill B-side lower with 1 psi Ar Hybrid ENABLED (PG1) leave B-side upper as is Hybrid DISABLED (PG2) fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3) leave NINJA as is DISABLED Enable the following gate valves and shutters, assuming no vacuum problems: ECE, VUV, Z-bolo, HIREX-Sr, B-spectrometer GV Torvac gatevalve toggle (yes/no): no Boronization: no Overnight ECDC: yes ICRF: no LH: no Cryopump: yes DNB: yes overnight ECDC Gas Setup Gas: D2, 2.0e-4 Torr sweep: 44/45/103 cm scan: 20/120 s |
| Session Leader Summaries |
| Entered: Jan 25 2011 03:56:03:830PM |
| Author: John Rice |
| there were several good reversals, 004, 005, 006, 012, 020, 021 and 022. 023 was a strange one, but there was a data system problem and the run was aborted. reversals at 3 and 7 T were obtained. we weren't able to get to the PCI masking or the density hysteresis. good reflectometer data were obtained. |
| Physics Operator Summaries |
| Entered: Jan 28 2011 10:03:04:560AM |
| Author: Earl Marmar |
| The machine ran reasonably well today, with no fizzles, 3 early disruptions, and 1 power supply dud (EF1U early commutation). We had a short delay after shot 10 (OH2 fault after the shot).
Shot 13 was 7 tesla, 1.4 MA (the only shot of the day at this field). It disrupted during rampdown, after one of the OH supplies faulted. Around 3:00 pm, after shot 23, a server disk died, and the run ended early. After the server was repaired (shortly before 5:00 pm), two data system cycles were run to test the repairs (cycles 24 and 25). Scorecard: 22 plasmas 1 power supply dud 23 plasma attempts |
| Session Leader Comments | |||
| Jan 25 2011 09:09:38:543AM | 1110125001 | John Rice | disrupted early |
| Jan 25 2011 09:27:14:983AM | 1110125002 | John Rice | locked mode at 0.62 s |
| Jan 25 2011 09:38:46:387AM | 1110125003 | John Rice | locked mode |
| Jan 25 2011 09:58:30:460AM | 1110125004 | John Rice | good co- to counter reversal, .75 MA, 5.1 T |
| Jan 25 2011 10:07:44:903AM | 1110125005 | John Rice | good co- to counter reversal, .75 MA, 5.1 T |
| Jan 25 2011 10:21:59:730AM | 1110125006 | John Rice | good co- to counter reversal, .75 MA, 5.1 T |
| Jan 25 2011 10:31:08:937AM | 1110125007 | John Rice | 7 T attempt. early disruption |
| Jan 25 2011 10:46:19:800AM | 1110125008 | John Rice | 7 T disrupted |
| Jan 25 2011 11:04:35:097AM | 1110125009 | John Rice | 7 T reversal? |
| Jan 25 2011 11:18:56:277AM | 1110125010 | John Rice | 7 T no reversal? |
| Jan 25 2011 12:02:13:753PM | 1110125011 | John Rice | 7 T no reversal? too high density? |
| Jan 25 2011 12:31:02:140PM | 1110125012 | John Rice | 7.1 T 0.72 MA, reversal at 0.994 S, |
| Jan 25 2011 12:51:27:177PM | 1110125013 | John Rice | 7.1 T 1.4 MA, reversal? at 0.97 s, |
| Jan 25 2011 01:17:58:607PM | 1110125015 | John Rice | 3.2 T 0.48 MA disrupted too much Ar? reversal? |
| Jan 25 2011 01:34:19:983PM | 1110125016 | John Rice | 3.1 T 0.48 MA no reversal, too high ne? |
| Jan 25 2011 01:45:04:423PM | 1110125017 | John Rice | 3.1 T 0.48 MA no reversal, too low ne? |
| Jan 25 2011 02:08:21:547PM | 1110125018 | John Rice | 3.1 T 0.48 MA no plasma |
| Jan 25 2011 02:20:00:207PM | 1110125019 | John Rice | 3.1 T 0.48 MA late reversal, 1.51 s, |
| Jan 25 2011 02:26:39:597PM | 1110125020 | John Rice | 3.1 T 0.48 MA great reversal at 1.216 s, |
| Jan 25 2011 02:50:38:923PM | 1110125021 | John Rice | 5.1 T 0.75 MA reversal at 1.026 s, |
| Jan 25 2011 02:50:54:947PM | 1110125022 | John Rice | 5.1 T 0.75 MA reversal at 0.817 s, |
| Jan 25 2011 03:52:29:700PM | 1110125023 | John Rice | 5.1 T 0.75 MA reversal??? |
| Physics Operator Comments | |||
| Jan 25 2011 09:16:53:880AM | 1110125001 | Earl Marmar | load 1110105018, locked mode shot (segment 4)
import segment 1 from 1110121031 into segment 1 plasma startup looks ok disrupt at 0.24 s, preceded by large increase in Prad and density |
| Jan 25 2011 09:25:32:993AM | 1110125002 | Earl Marmar | no dpcs changes
plasma locked mode starting around 0.65 s disruption at 1.4 s |
| Jan 25 2011 09:40:00:530AM | 1110125003 | Earl Marmar | no dpcs changes
plasma locked mode from ~0.64 s disrupt in rampdown |
| Jan 25 2011 10:27:27:607AM | 1110125004 | Earl Marmar | load from 1110105020, upper null, 5 T (segment 3 is active)
import segment 1 from 1110125003 into segment 1 plasma, full length bounce on startup |
| Jan 25 2011 10:07:14:823AM | 1110125005 | Earl Marmar | EF4 current to -1290 A at t=0 (from -1303 A)
tweak early nl04 target plasma, full length startup bounce is smaller |
| Jan 25 2011 10:23:59:383AM | 1110125006 | Earl Marmar | increase argon puff, now 300 ms (from 200 ms) still starting at 0.3 s
plasma, full length |
| Jan 25 2011 10:33:47:240AM | 1110125007 | Earl Marmar | load from 1110105033, 7 Tesla (segment 3 is active)
import segment 1 from 1110125006 into segment 1 plasma, early disrupt deja vu all over again (a la shot 1) |
| Jan 25 2011 10:53:27:270AM | 1110125008 | Earl Marmar | no dpcs changes
plasma, early disrupt looks like 7 |
| Jan 25 2011 11:02:17:357AM | 1110125009 | Earl Marmar | delay argon puff by 100 ms (now from .4 to .6 s)
tweak early nl_04 target (up) plasma disrupt at 1.46 s (Mo LBO?) |
| Jan 25 2011 11:20:33:283AM | 1110125010 | Earl Marmar | reduce argon puff to 100 msec (from 200 msec), now starting at 0.5 s
plasma, full length funny density rise just after Mo LBO injection |
| Jan 25 2011 11:31:10:973AM | 1110125010 | Earl Marmar | OH2 fault after the shot
short delay while engineers investigate/reset they will also check TF fuses during the power room access |
| Jan 25 2011 12:01:35:153PM | 1110125011 | Earl Marmar | reduce nl04 ramp, programmed to reach 6.5e19 at 1.4 s (was 7.5e19)
plasma, full length still wonky after the Mo LBO |
| Jan 25 2011 12:01:02:123PM | 1110125012 | Earl Marmar | lower nl04 target (3.5e19 ramping to 5e19) |
| Jan 25 2011 12:57:15:790PM | 1110125013 | Earl Marmar | Ip to 1.4 MA
EF4 preprog to 4 kA (segment 3) nl04 target ramping to 1.0 e20 plasma, disrupt in rampdown (~1 MA) |
| Jan 25 2011 01:09:45:607PM | 1110125014 | Earl Marmar | locked mode shot
import segment 4 from 1110125003 into segment 4 turn off segment 3, turn on segment 4 plasma, disrupt 1.55 s locked mode starting ~0.65 s |
| Jan 25 2011 01:17:16:300PM | 1110125015 | Earl Marmar | import segment 3 from 1110125006 into segment 3
turn off segment 4 turn on segment 3 Ip to .48 MA reduce EF4 target in segment 3 TF current ramping down to 82 kA (3 tesla) plasma, disrupt 0.7 s |
| Jan 25 2011 01:40:02:107PM | 1110125016 | Earl Marmar | argon puff to 150 ms (from 300), now starting at 0.45 s
nl_04 target reduced 10% through entire ramp plasma, full length |
| Jan 25 2011 01:49:28:447PM | 1110125017 | Earl Marmar | nl_04 target reduced, ramping from 3.0e19 to 4.5e19
plasma, full length |
| Jan 25 2011 01:56:30:367PM | 1110125018 | Earl Marmar | nl_04 target ramping from 3.0e19 to 5.0e19
dud, EF1U early commutation |
| Jan 25 2011 02:11:42:137PM | 1110125019 | Earl Marmar | no additional dpcs changes
plasma, full length |
| Jan 25 2011 02:27:35:290PM | 1110125020 | Earl Marmar | nl_04 target ramping from 3.0e19 to 6.0e19
plasma, full length |
| Jan 25 2011 02:41:45:830PM | 1110125021 | Earl Marmar | import segment 3 from 1110125006 into segment 3 (5 T, SNU)
nl_04 target to 0 at 1.201 s plasma, full length |
| Jan 25 2011 02:53:02:237PM | 1110125022 | Earl Marmar | small increase in nl_4 target through 1.2 s
plasma, disrupts halfway through ramp-down early injection, Ip lurched down, then recovered |
| Jan 25 2011 03:14:00:700PM | 1110125023 | Earl Marmar | minor tweak to nl_04 programming
plasma, disrupt in rampdown |
| Jan 25 2011 03:55:54:450PM | 1110125023 | Earl Marmar | after this shot, encountered a problem with computer access to data
delay while Josh works on the problem Josh concludes he can't finish repairs before 5:00 pm, so the run is over |
| Engineering Operator Comments | ||||
| Shot | Time | Type | Status | Comment |
| 1 | 09:07:29:787AM | Plasma | Ok | |
| 2 | 09:20:13:723AM | Plasma | Ok | |
| 3 | 09:32:48:017AM | Plasma | Ok | |
| 4 | 09:47:30:187AM | Plasma | Ok | |
| 5 | 10:00:03:007AM | Plasma | Ok | |
| 6 | 10:15:25:780AM | Plasma | Ok | |
| 7 | 10:29:03:960AM | Plasma | Ok | |
| 8 | 10:41:32:160AM | Plasma | Ok | |
| 9 | 10:55:56:213AM | Plasma | Ok | |
| 10 | 11:13:09:963AM | Plasma | Ok | |
| 11 | 11:52:27:907AM | Plasma | Ok | |
| 12 | 12:15:41:740PM | Plasma | Ok | |
| 13 | 12:36:06:620PM | Plasma | Ok | |
| 14 | 12:59:51:503PM | Plasma | Ok | |
| 15 | 01:13:05:933PM | Plasma | Ok | |
| 16 | 01:27:35:247PM | Plasma | Ok | |
| 17 | 01:40:14:730PM | Plasma | Ok | |
| 18 | 01:52:59:477PM | Plasma | Ok | |
| 19 | 02:06:01:863PM | Plasma | Ok | |
| 20 | 02:18:39:553PM | Plasma | Ok | |
| 21 | 02:31:25:250PM | Plasma | Ok | |
| 22 | 02:44:12:333PM | Plasma | Ok | |
| 23 | 02:57:03:973PM | Plasma | Ok | |
| 24 | 05:07:18:550PM | Test | Ok | |
| 25 | 05:31:01:857PM | Test | Ok | |
| System Availability | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Jan 25 2011 09:07:09:677AM | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||