Alcator C-Mod Run 1110126 Information

Back to runs

Miniproposals
Miniproposal:614
Date Filed: 7/23/2010
Title:Pedestal modifications with lower hybrid in EDA H-mode
First Author:Jerry Hughes
Session Leader:Jerry Hughes (shots 1-31)

Operators
Session leader(s):Jerry Hughes
Physics operator(s):Syunichi Shiraiwa
Engineering operator(s):Bill Parkin,Bill Byford,Gary Dekow

Engineering Operator Run Comment
MP 614. Pedestal modifications with lower hybrid in EDA H-mode

Session Leader Plans
Entered: Jan 25 2011 04:47:46:720PM
Author: Jerry Hughes
Run plan for 1110126
MP 614. Pedestal modifications with lower hybrid in EDA H-mode

Overnight boronization requested, followed by He ECDC. Use recipe from latest
boronization.

Special gas request:
Fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
Fill H-bottom with 2 psi Ne Hybrid DISABLED (PG5)
Fill NINJA with 8 psi He.

ICRF: all transmitters available
LH: make available, but not on first shot, set up as on 1101202:
>>50kV
>>90 Degree phasing
>>start at 0.9 sec
>>stop at 1.4 sec
>>launcher at 0.1 mm or 1270

Cryopump: yes, available on first shot.
DNB: yes

Requested diagnostics: TS, ECE, TCI, HXR camera, div probes, bolos, Ly-a,
reflectometry, fast magnetics, Edge CXRS, SOL reflectomery, PCI.
Special request for LH group: spectrum analyzer connected to probe on LH grill

Starting shot:

Load from 1101202030. 5.4T, 600kA, target nl04=6x1019m-2. SSEP=-0.8cm.
Cryopump ON. Pulse PG1 from 0.30 to 0.35s for diagnostic Ar, but leave
B-side lower disabled for first shot. Set H-bottom to chop and program a 70V
PG5 pulse from 0.35 to 0.45s.

Shot plan:

(1) Begin boronization recovery. Allow ICRF to exercise antennas from 0.6 to
1.5s in each shot until >2MW is cleanly obtained from some combination of
J+E. Exercise D also. Lower Ne pulse steadily shot to shot and confirm
steady EDA H-mode can be maintained. Attempt to proceed with zero Ne puffing,
although if heat loading or injections begin to look problematic, seed some more. Allow NINJA puff after 1.1s for GPI shake-down.
NO LOWER HYBRID YET!
(3--5 shots)

(2) Turn off NINJA. Program flat Prf=2MW. Inject LH power at n_||=1.9,
ramping Plh from 100kW to 600kW from 0.9 to 1.4s. Use this ramp for the first
guess for threshold power, P0, for the density pump-out effect. Put NINJA
back on and repeat shot with flat LH power program at levels of P0, P0-100kW,
and P0+100kW. If the NINJA puffs are detrimental, reduce them or turn them off.
If the NINJA puffs seem non-perturbative, run a case with GPI and zero LH power.
(5--6 shots)

(3) Launch LH power from only the central sets of columns, at maximum
level feasible, using the same n_||. This configuration should allow
phase change on demand. Take comparison shot with counter-Ip phasing,
and then one with heating phasing.
(4--5 shots)

(4) Taking a suitable case from above, increase Ip by 0.1MA shot
by shot until either pedestal modification is no longer observed, or we
can no longer get steady H-modes. If plasmas go ELM-free, try putting in
LH before ICRF, or attempt to ramp Ip up during an already established
H-mode.
(5--7 shots)

(5) ICRF power scan. Take a well-established case from earlier steps and
increase power. At 1.1s, step ICRF power up by 0.5MW, and at 1.25s, step up
again by 0.5MW (or to max available). It is okay to try D-port out.
Next, run a case in which ICRF is stepped down by 0.5MW at 1.1s,
and then again at 1.25s. Then, to establish a control, rerun these shots
with Plh=0.
(4--6 shots)


Physics Operators Plans
Entered: Jan 25 2011 05:36:30:960PM
Author: Syunichi Shiraiwa
Run plan for 1110126
MP 614. Pedestal modifications with lower hybrid in EDA H-mode

Session leaders: J. Hughes
Physics operator: S. Shiraiwa

Run will start at 09:00 and end at 17:00

Overnight boronization requested, followed by He ECDC. Use recipe from latest
boronization.

Power systems as on: 1101202030. (LSN, 5.4T, 600kA, target nl04=6x1019m-2, Cryopump on)

A-coil configuration: +Dtop -Dbot -Jtop +Jbot; Hybrid enabled (standard
configuration)

Gas Setup:
fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED(PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi He Hybrid enabled (PG3)
fill NINJA with 8 psi He DISABLED
Fill H-bottom with 2 psi Ne Hybrid DISABLED (PG5)

Requested diagnostics: See SL plan

Session Leader Summaries
Entered: Jan 26 2011 05:28:50:143PM
Author: Jerry Hughes
SL summary for 1110126
MP614.

The goal of today's run was to further explore and understand the
pedestal modifications that are observed in some EDA H-modes upon
application of lower hybrid power. We began the run by reproducing a
suitable target shot, 1101202030. This is a 600kA, 5.4T shot with SSEP
of of -8mm. With 500kW of LH power, this target shot exhibited a clear
density reduction and temperature boost. We spent much of today's run
trying to emulate this result. Somewhat complicating the
interpretation of today's result was the fact that the main fueling
was set up with He, rather than D2, by mistake. This was suspected and
reported by C. Fiore, based on low neutron rates, by mid-afternoon. It
was in fact found to be the case by S. Wolfe around 4:30 after a
series of duds led us to look carefully at the discharge setup. I will
have to examine the data to try to determine what, if any data, have
enough D fraction to be useful. But it seems unlikely at this stage
that we can study these alongside the D plasmas of previous runs.

Nonetheless, there are some things to report:

On several shots we were successful inobtaining steady EDA H-modes
with reduced density and enhanced Te,ped. However the effect was not
as strong as had been previously observed in D plasmas, and the
evolution following LH turn-on or turn-off seemed to happen on slower
time scales.

We had fairly clean H-modes early (002, 003, 007, 008, 009), but the
Mo started to hit us hard after a few shots, and we had a distressing
series of shots in which the rate of rise of radiation in the H-modes
was increasing shot to shot. Ultimately we ameliorated this with an
increase in target density, although after that we never got the
H-mode density back down to the levels of earlier in the day.

I decided not to try the piece of the plan that involved a phasing
scan from the central columns of the LH launcher, at reduced
power. This looked unlikely to pay off, since we were having trouble
seeing much effect on the plasma at the 200-300kW level, and
G. Wallace estimated it could take several shots even to condition the
central columns to that level of power.

As Mo radiation had risen anyway, it made sense to move forward with
the ICRF power scan. Shots 024, 026 and 027 coupled between 3.8 and 4.9MW of
ICRF concurrent with LH being injected into EDA H-modes. Notably, LH
tolerated up to 1MW from D-port, which conventional wisdom says is not
feasible, at least in D discharges.


Physics Operator Summaries
Entered: Jan 27 2011 11:23:23:600AM
Author: Syunichi Shiraiwa
PO mistake day.

B-main (C-side) was requested to be He instead of D, in PO plan.

During a run, there were couple of Indications of this mistake
1) very small neutron rate (as suggested by C. Fiore)
2) low Ha signal compared to the reference
However, it was not determined until we had two dud in shot 25 and 26 and S. Wolfe, J. Irby,
and SL checked the all setup.

Besides the mistake, C-Mod itself run well. 23 plasmas continued until the ramp-down phase.
We had three dud in late afternoon and 5 Xray shutdown in the morning. X-ray shutdown also might have been the indication of He.




Session Leader Comments
Jan 26 2011 09:02:41:577AM1110126001Jerry HughesShot 1:

We are delayed waiting for ICRF to get through test shots.


Jan 26 2011 09:38:51:447AM1110126001Jerry HughesShot 1.

Attempt: Boronization recovery.

Result: Plasma, L-mode. Got some RF from J and D.
Ne puffing seems to have worked, although it was incorrectly programmed
to be 50ms instead of 100ms. PO is correcting for next shot.
Thomson data look pretty clean.
Shape looks decent.
PCI, magnetics, reflectometry are taking data.





Jan 26 2011 09:48:53:830AM1110126002Jerry HughesShot 2:

Attempt: More boronization recovery.

Result: Plasma, with RF from D and J. H-mode. ne,ped~1.8e20
Looks like we got the Ne in that we wanted.

FFT on E-port still not working. Rick will try to get 2MW out of J-port on next
shot.



Jan 26 2011 10:04:27:030AM1110126003Jerry HughesShot 3.

Attempt: Continue bringing up J, try for some E-port.

Result: Plasma. Steady H-mode.
Not bad. 2MW from J-port. E-port fired without FFT.
D-port working well at 1MW level.

Next shot. Put in some LH on next shot.


Jan 26 2011 10:19:10:697AM1110126004Jerry HughesShot 4.

Attempt: Move on to first piece of actual run plan. Put in a LH ramp.

Result: Early disruption


Jan 26 2011 10:33:43:537AM1110126005Jerry HughesShot 5.

Attempt: Retry

Result: Another early disruption. Impurities are coming in, starting at 0.26s.
I can't find anything obviously wrong with the discharge/startup. Injections
are reported from the D-port area. Fe/Mo. Thanks, Matt.




Jan 26 2011 10:44:54:810AM1110126006Jerry HughesShot 6.

Attempt: Retry

Result: Plasma. Brief H-mode. J-port faults and the plasma drops back into
L-mode before the LH comes on. The LH looks good, and seems to make some
non-thermals. However, the LH program is actually not what was
requested. Put in ramp for next shot. Also, we will add some power from
E-port.



Jan 26 2011 11:03:40:740AM1110126007Jerry HughesShot 7.


Result: Good H-mode, steady RF from J+E.
Clean LH too, although the ramp doesn't seem to have much of an effect
on the plasma. Confinement steadily degrades.

May be over dense with neutrals, post-boronization. Radiation seems to be
pretty small, and constant, so that doesn't seem to be the problem.
Take another shot with 600kW flat LH power. See what happens.


Jan 26 2011 11:18:48:087AM1110126008Jerry HughesShot 8.

Result: Long, steady H-mode with steady ne drop and Prad drop.
Some hash on the Dalpha during the LH pulse.
When LH turns off at 1.4s, nebar comes back up.



Jan 26 2011 11:31:36:893AM1110126009Jerry HughesShot 9.

Attempt. Repeat shot 8 with reduced Ne. PG5 from 70V to 40V.

Result: Pretty clean H-mode. Desnity drop and Te rise is a little more
evident when LH comes on.
Matt informs me I may have the optimimum level of Ne, based on the Mo
time trace when RF comes on.

Next. Have PO raise ZCUR while LH is on, and see if that has an impact on
density. Will probably stay LSN.
Jan 26 2011 11:48:21:190AM1110126010Jerry HughesShot 10.

Very early disruption.

Jan 26 2011 12:00:56:030PM1110126011Jerry HughesShot 11.

Attempt: Retry 9, with ZCUR ramp from 1.0 to 1.4s.

Result: H-modes, 2nd one steady. Density reduction begins around 1.23s. SSEP
is ~-5mm.

Next: Keep ZCUR flat at a somewhat higher value, giving SSEP~-5mm.
Also, NINJA will puff He at 1.3s



Jan 26 2011 12:07:28:483PM1110126012Jerry HughesShot 12.

Result: DPCS shut down discharge early due to early hards.


Jan 26 2011 12:25:42:317PM1110126013Jerry Hughes
Shot 13.

Result: Got the plasma back. ZCUR is up early, and may be making it harder to
access H-mode. Dithers from 0.7s to 0.9s, then H-mode. LH power may have
been the thing that kicked it in.
With LH on, H-mode nebar is 1.8e20. neped is 1.3e20.
Density rises after LH turn-off.

GPI has plenty of signal from the He puff at 1.3s.

Next: More RF power.


Jan 26 2011 12:35:16:630PM1110126014Jerry HughesShot 14.

Attempt: Retry 13 with more ICRF power.

Result: H-mode, back to L at 0.896s due to radiation. Bad Mo rising.
2nd H-mode has reduced density, Prad.

Next: up the Ne. PG5 to 60V.



Jan 26 2011 12:56:05:870PM1110126015Jerry HughesShot 15.

Attempt: Retry 14 with more Ne.

Result: EDA H-mode interuptted by an injection at 1.3s.
Early H-mode pretty radiative. This seems to be fixed by the LH turn
on.
GPI getting good time series data before and after LH turn-off at 1.4s.

Next: Let's advance the entire LH pulse by 0.1s.


Jan 26 2011 01:08:54:820PM1110126016Jerry HughesShot 16:

Attempt: Shot 15 with early LH onset.

Result: Another drop in radiation as the H-mode evolves. It is delayed until
well after LH turn-on. Density re-rises after LH turn-off.

The previously observed pedestal effects are pretty weak today, although
we are getting a lot of new data from the GPI and SOL reflectometer.

Before going to the co vs. counter scan, we need to see whether 300kW
is enough to have a measurable effect on the plasma. That will be the next
shot.

Jan 26 2011 01:33:12:643PM1110126017Jerry HughesShot 17:

Attempt: Repeat with reduced LH power

Result: Multiple H-modes, relatively high Prad.
LH never fired. So, we have a control shot.

No TS.


Jan 26 2011 01:42:45:880PM1110126018Jerry HughesShot 18.

Attempt: Repeat 16 with 300kW LH power.

Result: Similar traces all around, except a faster Prad rise and a H-L
transition at 0.85s.
Discharge conditions at 1.3s are very similar to shot 016, except higher Prad,
lower Tped.


Jan 26 2011 01:59:26:607PM1110126019Jerry Hughes
Shot 19.

Attempt: Ne pulse delayed 50ms (MLR's suggestion).
Also reduce LH power to 200kW, see whether any effect remains.

Result: Not so pretty.
1st H-mode evolves the same way, radiating to a H-L. 2nd H-mode is not much
better. Disrupts at 1.25s.


Jan 26 2011 02:13:28:510PM1110126020Jerry Hughes
Shot 20.

Greg says 300kW is possible from the center columns, but it would take a few
shots to work up to it. Based on the 200kW and 300kW results so far,
I would not expect a strong payoff, assuming we accomplished this.

So, for this shot, we will raise the LH power to the level it was at on shot 15.

Result: More transient, radiative H-modes.
LH is not so well behaved anymore. It only successfully injects power
when we are in L-mode.



Jan 26 2011 02:35:03:127PM1110126021Jerry Hughes
Shot 21

Attempt: Change things up a little bit. Put in LH starting at 0.55s, pre-ICRF.

Result: Not much better in terms of initial H-mode quality.

Next: Ohmic-phase density has come down between shot 15 and now. Maybe it's
time to push it up and see if we can't steady out the initial H-mode.




Jan 26 2011 02:42:20:990PM1110126022Jerry HughesShot 22.

Result: Shut down early due to runaways.


Jan 26 2011 03:05:16:050PM1110126023Jerry HughesShot 23

Result: Multiple H-modes. Edge Te is pretty low, Prad high.
Looking marginal to sustaining the H-mode at this level of Pnet.

Next request more ICRF.




Jan 26 2011 03:22:55:790PM1110126024Jerry HughesShot 24.

Attempt: Repeat with more ICRF

Result: That's better. After some initial transient H-modes, we have a
steady EDA period with a density reduction, then a density rebuild after
LH turns off.


Jan 26 2011 03:31:52:273PM1110126025Jerry HughesShot 25:

Attempt: Repeat shot 24, but put in some D-port power at 1.2s.

Result: Dud
Jan 26 2011 03:51:06:857PM1110126026Jerry HughesShot 26.

Attempt: Repeat shot 24, but put in some D-port power at 1.2s.

Result: Continuous H-mode from 0.68s to 1.5s!
Almost 4MW of RF until 1.2s, then D-port injects 0.5MW.
LH stays on during D-port pulse.
Interestingly, the density starts to rise, when D-port turns on.


Jan 26 2011 04:06:14:727PM1110126027Jerry HughesShot 27

Attempt: More RF from D

Result: And LH doesn't mind! Density creeps up with D on still. Perhaps
just outgassing?

This makes things a little ambiguous, so turn off D for next shot.
Next: Repeat shot 024 with Ip increased to 700kA.



Jan 26 2011 04:14:32:717PM1110126028Jerry HughesShot 28:

Attempt: Ip=700kA

Result: Short H-mode (J-port faults and doesn't recover.)

Next Yijun will try to keep J on. PO will put in a slight increase to the nl04
target.




Jan 26 2011 04:22:56:143PM1110126029Jerry HughesShot 29.

Result: Dud. 2nd one today.


Jan 26 2011 04:35:58:550PM1110126030Jerry HughesShot 30.

Result: Dud III
Jan 26 2011 05:28:03:560PM1110126031Jerry HughesShot 31.

Result: Shot ran.

It has been discovered that the main fueling puff was He all day today, and not
D2.


Physics Operator Comments
Jan 26 2011 09:33:13:367AM1110126001Syunichi ShiraiwaLoad 1101202030, PG1 and PG5 program modified.
PG5 (H-buttom) Enabled

Looks ok. PG5 was 0.05s instead of 0.1 s.

Next : correct pg5 pulse length
Jan 26 2011 09:55:59:450AM1110126002Syunichi ShiraiwaLooks Okey

Next : fix GPC2 Te0
Jan 26 2011 10:08:06:947AM1110126003Syunichi ShiraiwaLooks Okey

Next : No change in PCS
Jan 26 2011 10:26:00:653AM1110126004Syunichi ShiraiwaSomething dropped from the top...?

Jan 26 2011 10:26:46:937AM1110126005Syunichi ShiraiwaAppears to be same but plasma continued a little longer
Something dropped from the top...?

Jan 26 2011 11:00:44:800AM1110126007Syunichi ShiraiwaFull length. Clean H-mode
Jan 26 2011 11:05:44:680AM1110126008Syunichi ShiraiwaFull length. Clean H-mode
Jan 26 2011 11:11:41:503AM1110126008Syunichi ShiraiwaGood H-mod

Next: PG5 voltage will be reduced from 70 to 40 V
Jan 26 2011 11:31:28:110AM1110126009Syunichi ShiraiwaGood shot

Next : move ZCUR upward by 1cm from 1.0s to 1.4s
Jan 26 2011 11:50:58:263AM1110126010Syunichi ShiraiwaDisrupted during a ramp-up

Next: retry
Jan 26 2011 11:59:47:733AM1110126011Syunichi ShiraiwaFull length

Next : Add Ninja puff and adjust ZCUR so that it stays the position at 1.25 s of shot 10.
(ZCUR = -0.002)
Jan 26 2011 12:08:35:503PM1110126012Syunichi ShiraiwaSoft ramp-down due to X-ray.

Next : retry. ZCUR was made to be the same as shot 10 until 0.45s
Jan 26 2011 12:26:15:367PM1110126013Syunichi ShiraiwaFull length.
Entered the steady H-mode after LH.

Next : Repeat with more ICRF
Jan 26 2011 12:34:56:400PM1110126014Syunichi ShiraiwaFull length.

Next : Raise Ne puff from 40V to 60V
Jan 26 2011 12:51:54:340PM1110126015Syunichi ShiraiwaFull length
Injection at 1.35s

Next:
Jan 26 2011 12:54:03:943PM1110126015Syunichi ShiraiwaFull length
Injection at 1.35s

Next: No change in PCS
Jan 26 2011 01:22:04:577PM1110126017Syunichi ShiraiwaFull length, No LH
Jan 26 2011 01:47:00:743PM1110126018Syunichi ShiraiwaLH ok this time.

Next: Move PG5 by 50 ms later (from 0.4 to 0.5s)
Jan 26 2011 01:58:57:970PM1110126019Syunichi ShiraiwaDisrupted at 1.25s

Next:
Jan 26 2011 02:58:23:430PM1110126022Syunichi ShiraiwaShut down due to early disruption
Jan 26 2011 02:58:07:220PM1110126023Syunichi ShiraiwaFull length
Jan 26 2011 03:58:48:440PM1110126026Syunichi ShiraiwaFull length

Next: No change in PCS
Jan 26 2011 04:03:16:077PM1110126027Syunichi ShiraiwaOk

Next: Increase Ip to 700kA from 600kA
Jan 26 2011 04:14:36:703PM1110126028Syunichi ShiraiwaLH/ICRF many trips.

Next: Increase target density to 8e19, hoping H-mode improves the LH coupling too.
Jan 26 2011 04:26:47:047PM1110126029Syunichi ShiraiwaDud

Next: Repeat

Engineering Operator Comments
ShotTimeTypeStatusComment
109:22:27:547AMPlasmaOk
209:38:06:617AMPlasmaOk
309:54:58:470AMPlasmaOk
410:09:45:487AMPlasmaOk
510:22:24:003AMPlasmaOk
610:34:54:323AMPlasmaOk
710:48:18:770AMPlasmaOk
811:02:30:623AMPlasmaOk
911:16:31:333AMPlasmaOk
1011:31:10:480AMPlasmaOk
1111:45:00:373AMPlasmaOk
1211:59:05:653AMPlasmaOk
1312:11:53:727PMPlasmaOk
1412:25:55:377PMPlasmaOk
1512:39:40:343PMPlasmaOk
1612:59:39:663PMPlasmaOk
1701:14:27:180PMPlasmaOk
1801:33:11:940PMPlasmaOk
1901:51:49:367PMPlasmaOk
2002:07:35:590PMPlasmaOk
2102:23:20:417PMPlasmaOk
2202:38:24:260PMPlasmaOk
2302:53:56:397PMPlasmaOk
2403:08:38:147PMPlasmaOk
2503:23:16:383PMPlasmaOk
2603:36:29:160PMPlasmaOk
2703:50:03:097PMPlasmaOk
2804:04:43:267PMPlasmaOk
2904:18:32:647PMPlasmaOk
3004:32:04:283PMPlasmaOk
3104:50:51:220PMPlasmaOk

System Availability
Jan 26 2011 09:20:20:860AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesBES system is onlineOct 21 2010 11:33AM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (D+F) working. All midplane and off-midplane diode arrays working except WB1AX. Midplane foils calibrated and PRAD_MAIN is being filled. Divertor/Ledge foils not yet ready.Jul 15 2010 08:27AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Nov 16 2010 02:36PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA availableOct 21 2010 07:11PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged.Apr 06 2010 10:51AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesWide-view CXRS system is onlineOct 21 2010 11:33AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned; new calibrations (relative brightness and position) not yet implementedJun 29 2010 10:27AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperationalJun 26 2010 09:28PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll channels working and calibrated.Oct 27 2010 03:41PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauges are operational.Jun 28 2010 08:02PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPlugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access.Apr 05 2010 11:18AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational. Oct 22 2010 11:46AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesoperating normallyJun 29 2010 10:26AM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Jun 26 2010 11:19PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesSystem installed and aligned. Inverted Profiles for Ti are available upon request. Vtor profiles still under revision.Dec 17 2010 09:25AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operationalOct 23 2010 01:41PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-Antennayessystem checked out ok on 11006728. Jun 28 2010 04:57PM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayessystem checked out ok on 1100628Jun 28 2010 04:57PM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayessystem checked out ok. conditioned to vacuum. Jun 28 2010 04:58PM (ylin)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-Offyesoperational and testedJul 20 2010 04:42PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridyesLH working. New directional couplers installed at input to each klystron.Oct 21 2010 11:42AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid Reflectometeryes50GHz: up-, 60 GHz up- and down-Oct 21 2010 11:31AM (sgbaek)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
Lower Hybrid SOL reflectometeryesprofiles and fluctuations both working. If requested, please request LH launcher to be moved in.Jan 18 2011 03:07PM (cornwall)Cornwall LauLower Hybrid SOL reflectometercornwall,wukitch,ylin
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoWB4LY and LLY working but not during ICRF. WB1LY not attached due to pickup problems. LYMID attached but have profile problems.Aug 24 2010 09:17AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesSpectra being collected and tree filled. Wavelength scan is broken so fixed on the Mo XXXI and XXXII lines.Jul 15 2010 08:28AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Oct 22 2010 11:46AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are operationalJun 28 2010 08:02PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesAll systems are on and functionalJun 29 2010 12:56PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03Jun 26 2010 09:21PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoCapillaries tested in-vessel.Jun 28 2010 08:08PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational. AM (2 * 39.51) MHz.Dec 13 2010 05:29PM (ntsujii)Miklos PorkolabPhase Contrast Imagingennever,ntsujii,porkolab
Penning GaugesnoHigh voltage power supplies are turned off, waiting for work at A-port horizontal to be finished.Jun 28 2010 08:07PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air Switchyes Jun 26 2010 11:19PM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Jun 26 2010 11:19PM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyes Jun 26 2010 11:19PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power Systemsyes Jun 26 2010 11:20PM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesOperational.Jun 28 2010 08:03PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperational.Jun 28 2010 08:03PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesF and J outer divertor probes are operational.Jun 28 2010 08:04PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperational, except probe#13Jun 28 2010 08:04PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesAs of 1101123, the 60, 88u, 88l, 140 and variable set at 115GHz are operational. The 50, 75 and 112 are nonoperational. On 1101123, the noise band at ~200kHz is again seen on the 88u and 88l channels.Nov 23 2010 09:30AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational. New Langmuir-Mach probe head installed.Jun 28 2010 08:05PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesOperational.Jun 28 2010 08:05PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesBoth A and K units are operational. Coil polarity needs to be checked.Jun 28 2010 08:06PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesHV supply on, cable run to sparker at k-horJun 23 2010 02:41PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationyesSSS installed and leak tested.Oct 21 2010 11:31AM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesNo new CO2 detector, so still missing edge channelsJun 23 2010 02:40PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CoreyesOperating with 2 lasersOct 22 2010 01:06PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgeyesOperationalJul 14 2010 11:54AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesRaw spectra stored but not line brightness time histories are going into the tree yet.Jan 20 2011 10:45AM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermlreinke
XTOMOyesCore system working. Edge system waiting for H-modes.Jul 01 2010 11:55AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke