Alcator C-Mod Run 1110207 Information

Back to runs

Miniproposals
Miniproposal:641
Date Filed: 1/27/2011
Title:LHCD density limit in H and He discharges
First Author:Greg Wallace
Session Leader:Greg Wallace (shots 1-32)

Operators
Session leader(s):Greg Wallace
Physics operator(s):Robert Granetz
Engineering operator(s):Bill Cochran,Andy Pfeiffer,Ed Fitzgerald

Engineering Operator Run Comment
MP641 - LHCD density limit in H and He discharges

Session Leader Plans
Entered: Feb 4 2011 01:37:13:353PM
Author: Greg Wallace
SL plan for 1110207
MP641: LHCD density limit in H and He discharges
SL: G. Wallace
PO: R. Granetz

Required systems: TCI, TS, fixed divertor probes, reciprocating probes, HXR, non-thermal ECE, GPI,
SOL reflectometer, O-mode LH reflectometer, X-mode reflectometer, DNB, MSE, LH spectrum analyzer.


Over the weekend ECDC in He.

LH setup: 90 deg phasing, 80-160 kW/klystron, launcher 0.1 mm behind limiter (1269 counts), pulse
0.8-1.3 s.


Reference shot for physop: 1100901005

AM (He):
1. Establish upper null He discharge at 5.4 T, 800 kA. Take a few shots to establish
high He/low D plasma. Reference shot 1100901005 . (2-3 shots)
2. Upper null, �??normal�?? inner wall gap of 1.0-1.5 cm. Adjust from step 1 as
necessary. Scan density from 0.9-1.3x1020 m-3. (2-3 shots)
3. Repeat 2 in upper null, reduce CLEARIN to achieve inner wall gap of 0.3-0.4 cm.
Reference shot 1100901020. (2-3 shots)
4. Repeat 2 in double null by reducing ZCUR to achieve balance between upper and
lower null. Reference shot 1101201002. (2-3 shots)
5. Inner wall limited. Reduce CLEARIN to achieve inner wall limited discharge.
Reference shot 1100820003. (2-3 shots)

PM (H):
1. Establish upper null H discharge at 5.4 T, 800 kA. Take a few shots to establish
high H/low D plasma. (2-3 shots)
2. Upper null, nominal inner wall gap of 1.0-1.5 cm. Scan density from 0.9-1.3x1020
m-3. (2-3 shots)
3. Repeat 2 in upper null, reduce CLEARIN to achieve inner wall gap of 0.3-0.4 cm.
(2-3 shots)
4. Repeat 2 in double null by reducing ZCUR to achieve balance between upper and
lower null. (2-3 shots)
5. Inner wall limited. Reduce CLEARIN to achieve inner wall limited discharge. (2-
3 shots)

Physics Operators Plans
Entered: Feb 6 2011 10:24:15:687PM
Author: Robert Granetz

Engineering setup for Monday 2011/02/07

MP641 - LHCD density limit in H and He discharges

Session leaders: G. Wallace
Physics operator: R. Granetz

** ECDC in helium over the weekend!

** Run will start at 10:00 and end at 18:00

Power systems as on: 1100901005 (0.8 MA, 5.4 T, 0.6e20 m-2 target, USN)

A-coil configuration: +Dtop -Dbot -Jtop +Jbot; Hybrid enabled (standard
configuration)

Gas Setup:
   fill B-Top            with  6 psi He  Hybrid enabled  (PG4)
   fill B-side lower     with  1 psi Ar  Hybrid DISABLED (PG1)
  leave B-side upper     as is           Hybrid DISABLED (PG2)
   fill B-main (C-side)  with 40 psi He  Hybrid enabled  (PG3)
  leave NINJA            as is

Enable the following gate valves and shutters, assuming no vacuum problems:
  ECE, VUV, Z-bolo, HIREX-Sr, B-spectrometer GV

Torvac setup: keep gate valves open during pulse

Specific diagnostics: GPI, reflectometers (SOL, O-mode LH, X-mode), DNB,
   MSE, HXR array, LH probes, LH reflectometer, LH spectrum analyzer,
   non-thermal ECE, fixed and scanning divertor probes

------------------------------------------------------------------------------
Boronization: no
Impurity injector: no
ICRF: no
LH: yes, see SL plan for specifics
DNB: yes
Cryopump: possibly in afternoon (with hydrogen plasmas)
------------------------------------------------------------------------------

Run plan: See the session leader's detailed run plan in the logbook.  We
          will run helium plasmas in the morning, including breakdown in
          helium.  In the afternoon we will switch to hydrogen plasmas,
          including breakdown in hydrogen.  We will be varying density and
          plasma configuration (USN, DN, limited) during each half of the
          day.


Session Leader Summaries
Entered: Feb 9 2011 02:00:57:960PM
Author: Greg Wallace
Session leader summary for 1110207
MP641: LHCD density limit in He and H discharges
SL: G. Wallace
PO: R. Granetz

Today's run was to investigate the physics of the LHCD density limit in He and H discharges. Data from D discharges shows a sharp drop in non-thermal electrons at nebar=0.8-1.0e20. Today's run shows that the density limit may be slightly higher in H, although at the highest densities (nebar ~ 1.5e20) the H and D discharges show the same HXR emission. He discharges show increased HXR emission at all densities scanned above the density limit (nebar ~ 1e20). Differences between the ion species are most pronounced for upper null discharges with large (> 1 cm) inner wall gaps. Discharges with small gaps (<0.5 cm) and no gap (i.e. inner wall limited) show smaller and almost no difference between ion species, respectively.

The run was very successful with good data obtained in single null, single null w/ small inner gap, and limited configurations in both He and H. Unfortunately there was not enough time for the double null shots. Breakdown was achieved in He in the morning and H in the afternoon. According to Earl, H/(H+D) was measured to be ~2/3 during MARFEs in the H part of the discharge. No measurement of H fraction was available without when not MARFEing.

Summary of shots (all at 5.4 T, 800 kA except where noted):
3-11: Upper null, large gap, He
12-15: Upper null, small gap, He
16-19: Limited, He
22-25: Upper null, large gap, H
26-27: Upper null, small gap, H
28-31: Limited, H
32: Upper null, large gap, H, 6.5 T

List of good shots from 1110207:
All shots at n|| = 1.9, Ip = 800 kA, and Bt = 5.4 T unless otherwise noted
Helium shots:
3) 700 kW, nebar = 1.6-2.0e20, upper null, large gap, injection kills
HXR after 1.2 s
4) 700 kW, nebar = 0.9-1.1e20, upper null, large gap, runaways start
after injection at 1.0 s
5) 650 kW, nebar = 1.0-1.2e20, upper null, large gap
7) 600 kW, nebar = 1.0-1.55e20, upper null, large gap
8) 650 kW, nebar = 1.0-1.5e20, upper null, large gap
10) 600 kW, nebar = 1.2-1.55e20, upper null, large gap
11) 600 kW, nebar = 1.0-1.6e20, upper null, large gap
13) 600 kW, nebar = 1.0-1.6e20, upper null, smaller gap (0.7 cm)
14) 600 kW, nebar = 1.2-1.65e20, upper null, small gap (0.4-0.5 cm)
15) 650 kW, nebar = 0.95-1.45e20, upper null, small gap (0.4 cm)
16) 650 kW, nebar = 1.35-1.7e20, limited
19) 600 kW, nebar = 1.05-1.35e20, limited
Hydrogen shots:
22) 650 kW, nebar = 0.75-1.1e20, upper null, large gap
25) 600 kW, nebar = 0.89-1.3e20, upper null, large gap
26) 700 kW, nebar = 1.0e20, upper null, small gap (0.4 cm)
27) 650 kW, nebar = 0.85-1.35e20, upper null, small gap (0.4 cm)
28) 680 kW, nebar = 1.2-1.4e20, limited, good before 1.0 s
29) 700 kW, nebar = 1.3-1.4e20, limited, good before 0.95 s
30) 700 kW, nebar = 1.3-1.4e20, limited, several sporadic trips
31) 650 kW, nebar = 1.4-1.7e20, limited, clean LH pulse
32) 600 kW, nebar = 0.9-1.3e20, upper null, large gap, Bt = 6.5 T

Physics Operator Summaries
Entered: Feb 7 2011 06:04:01:367PM
Author: Robert Granetz

Run summary for Monday 2011/02/07

MP641 - LHCD density limit in H and He discharges

Session leader: G. Wallace
Physics operator: R. Granetz

Note: this run started at 10:00 and ended at 18:00.

The first 60% of today's LH run was done with helium plasmas, including
breakdown in helium.  These were the first helium breakdown shots since
1090821.  It only took a shot or two to obtain a reliable breakdown and
rampup.  The latter 40% of today's LH run was done with hydrogen plasmas,
including breakdown in hydrogen.  I don't know when we last did this.
Breakdown and rampup was obtained on the first try.

[For helium breakdown and fueling:
  B-top had 6 psi He
  B-main had 40 psi He
  PG4 set to 24 ms in seg 1
  PG3 programming in seg 1 was zero prior to t=0.
  PG3 programming and nl_04 feedback gains in seg 2 had to be played with
   to roughly obtain the desired waveform]

In both the helium and hydrogen plasmas we programmed a moderate density
ramp during the shot (which was only nominally controlled in helium), and
we ran a variety of magnetic configurations: upper single null with normal
inboard gap, upper single null with reduced inboard gap, and inner wall
limited.  The LH worked well all day, and a lot of useful information on
the so-called density limit was obtained.  The only real difficulties we
encountered were a number of early disruptions due to molybdenum
injections.

Scorecard: 29 plasmas
            1 dud
            1 fizzle
            0 power supply tests
            1 no-power MDS shot cycle
           --------------
   Total:  32 shot cycles

Session Leader Comments
Feb 7 2011 10:20:19:067AM1110207001Greg WallaceNo power shot.
Feb 7 2011 10:20:10:253AM1110207002Greg WallaceLooks like a dud.
Feb 7 2011 10:56:25:840AM1110207003Greg WallacePlasma! Breakdown in He. LH pulse is clean.

Density is too high on this shot (nebar=1.6-2e20). Miscommunication between PO and SL with respect to nebar vs nl_04. Next shot will decrease density to desired range (nebar=.9-1.3e20).
Feb 7 2011 11:06:34:123AM1110207004Greg WallacePlasma. Much lower density on this shot but no ramp. Injection at 1.0 s causes LH trip---might be caused by WASP?

Next shot will repeat with slightly less LH power (140 instead of 160 kW/klystron) and try to avoid disruption. Will also change control gains to get density ramp.
Feb 7 2011 11:20:42:967AM1110207005Greg WallaceClean LH pulse. Plasma disrupts just after LH turns off at 1.3 s. Density is still not ramping as desired. Density is steady around 1.05e20. 650 kW of LH yields steady loop voltage reduction from 1.1 to 0.8 V. Lots of non-thermal ECE.

Next shot will try again for density ramp.
Feb 7 2011 11:24:37:247AM1110207006Greg WallaceFizzle.
Feb 7 2011 11:56:09:440AM1110207007Greg WallaceClean LH pulse. Density starts low (nebar=1e20) then suddenly jumps up high (nebar=1.5e20) at 1.0 s.

Next shot will try again for better density control.
Feb 7 2011 12:01:29:660PM1110207008Greg WallaceClean LH pulse. Density controll is even worse now. Will try one last time for a density ramp with pre-programmed gas valve signals.
Feb 7 2011 01:05:17:190PM1110207009Greg WallaceDisruption at 0.54 s. Data system issues.
Feb 7 2011 12:43:01:427PM1110207010Greg WallaceClean LH pulse at 600 kW. Density is 1.5e20 throughout LH pulse. Will try one final time for a density ramp before moving on to step 3 of the run plan.
Feb 7 2011 12:53:26:143PM1110207011Greg WallaceAnother shot with step-function in density. A few LH trips at the very beginning of the pulse. Density is ramping up quickly during the faulting but nothing visible on LH camera. Density on LH probes goes up by an order of magnitude as nebar changes from .7e20 to 1.4e20.

At this point we are going to move on to step 3 of the run plan---small inner wall gap upper null.
Feb 7 2011 01:03:00:707PM1110207012Greg WallaceDisruption at .4 s.
Feb 7 2011 01:30:04:180PM1110207013Greg WallaceA few faults early in LH pulse when density is very low. Inner gap is ~0.7 cm, want ~0.35 cm. Early nebar=.5e20, late nebar=1.5e20.

Next shot will increase feedback control on density and also reduce inner gap again.
Feb 7 2011 01:37:12:177PM1110207014Greg WallaceSeveral trips again at beginning of LH pulse during the low density phase. Inner gap is 0.4-0.5 cm. Next shot will try to reduce inner gap by 0.1 cm.
Feb 7 2011 01:47:32:603PM1110207015Greg WallaceClean LH pulse with nice density ramp from .8-1.4e20. Injection at 0.75 s but still have good data during LH pulse.

Next shot will go on to inner wall limited discharges in He (step 5 of run plan). Skipping double nulls for now.
Feb 7 2011 02:05:00:003PM1110207016Greg WallaceMany trips early in LH then one trip later in pulse. Inner gap < 0.05 cm according to EFIT. Will try again for cleaner LH. Density at LH antenna is quite low before 1.0 s. Next shot will decrease outer gap by 5mm.
Feb 7 2011 02:13:54:427PM1110207017Greg WallaceDisruption at 0.6 s.
Feb 7 2011 02:29:22:640PM1110207018Greg WallaceDisruption at 0.6 s.
Feb 7 2011 02:42:33:643PM1110207019Greg WallaceSeveral trips late in LH pulse. Disruption at 1.4 s. Inner wall limited. Got some good data and now moving on to H part of the day.

Next shot will repeat 11 but in H instead of He.
Feb 7 2011 03:08:46:473PM1110207020Greg WallaceDisruption at 0.35 s. PF breaker pulled. First attempt at H plasma. Will try again for next shot.
Feb 7 2011 03:23:03:260PM1110207021Greg WallaceDisruption at .17 s. Runaway shutdown.
Feb 8 2011 10:33:10:523AM1110207022Greg WallaceOne early trip in LH pulse, otherwise good shot. Density ramp from nebar = 0.8-1.1e20 in H. Looks like maybe more non-thermals than in D or He??? Need to quantify that, of course. Upper null, large inner gap.

Next shot will try for a little higher density.
Feb 7 2011 03:46:57:670PM1110207023Greg WallaceDisruption at .25 s.
Feb 7 2011 04:19:41:893PM1110207024Greg WallaceLH did not fire on this shot. Data seems to be missing too. Will try again.
Feb 7 2011 04:25:30:133PM1110207025Greg WallaceClean LH pulse at 600 kW in H. Good density scan from nebar=.9-1.3e20. Good scanning probe data.

Still have clear non-thermal emission at 1.3e20, higher than what we're used to in D.

Next shot will go back to equilibrium from shot 15 (small inner gap) but keep the density programming from shot 25.
Feb 8 2011 10:35:00:967AM1110207026Greg WallaceLH ran clean until disruption. Small inner wall gap. Looks like probe scan might be responsible. Good non-thermal ECE before disruption. Next shot will repeat.
Feb 7 2011 04:53:11:650PM1110207027Greg WallaceClean LH pulse in H with small inner gap. Good shot for step 3 in H. Moving on to inner wall limited. Will reload RCUR and CLEARIN from shot 19.
Feb 7 2011 05:06:53:357PM1110207028Greg WallaceB row cols 10?-16 seem to be causing problems. Too much density at grill? Will increase outer gap by ~4 mm for next shot.
Feb 7 2011 05:28:40:547PM1110207029Greg WallaceMany trips in the LH pulse. Still having problems on B row columns 10-16. Density on LH probes is ~2e18. Will try increasing outer gap by another 4 mm (to ~2.3 cm) for next shot.
Feb 7 2011 05:44:49:420PM1110207030Greg WallaceBetter LH on this shot. Still some glowing on B row col 14-16 septa. Will increase the outer gap by an additional 3 mm to see if that helps. Will also add a bit of a density scan (above current level).
Feb 7 2011 05:56:42:627PM1110207031Greg WallaceClean LH and got density scan up to nebar=1.7e19. Good final shot for inner wall limited in H.

Next shot will reload shot 25 (USN, large gap) and increase to 6.5 T to investigate peak in non-thermal ECE on FRC. Ron wants to see if feature moves; he suspects it's instrumental and will not move.
Feb 7 2011 06:10:01:127PM1110207032Greg WallaceLast shot of the day. Repeat of shot 25 at higher field for Ron. 6.5 T. Inner gap of 1.4 cm.

Physics Operator Comments
Feb 7 2011 09:41:09:220AMRobert Granetz
Note: the last successful helium breakdown run was 1090821.  I chose seg 1 from shot 7 that
day to copy the pre-fill and PG3 programming.  The B-top and B-main plenum pressures were
6 psi and 40 psi of helium that day, and I've done the same setup for today.

Loaded seg 1 with seg 1 from 1110204031 (last Friday, 5.4 T), and adjusted pre-fill (PG4) and
PG3 as described above.

Loaded seg 2 with seg 2 from 1100901005 as per SL's plan, and programmed nl_04 to ramp
from 0.9e20 to 1.3e20 m-2.

Feb 7 2011 10:23:20:697AM1110207001Robert Granetz
Shot 01 -- No-power shot cycle because we got hung up in INIT

Next shot: try for plasma

Feb 7 2011 10:24:48:103AM1110207002Robert Granetz
Shot 02 -- Dud.  Pre-fill pressure reading was about the same as the last time we broke down in
           helium (see 1090821007).  Bz0 looks a bit high.

Next shot: add -20 A to IC_EF4 (to -1310 A); add 1 ms to pre-fill

Feb 7 2011 10:37:33:063AM1110207002Robert Granetz
Btor did not get all the way to 5.4 T by t=0.  This could also explain some of the Bz0 offset.
Therefore, I have changed the tweaks so that the total change to IC_EF4 is only -10 A (i.e.
not -20 A), and the pre-fill is now 4 ms longer than on shot 02.

Feb 7 2011 10:54:42:263AM1110207003Robert Granetz
Shot 03 -- Plasma, nearly full length.  Helium plasma with helium breakdown.  0.8 MA, 5.4 T,
           0.8-1.2e20 m-2, USN.  P_LH=0.7 MW, very clean.  Inner gap = 1.4 cm

Next shot: decrease nl_04 and change times of density ramp programming

Feb 7 2011 11:04:29:100AM1110207004Robert Granetz
Shot 04 -- Plasma, full length.  Helium, 0.8 MA, 5.4 T, 0.6e20 m-2, USN.  Inner gap = 1.2-1.3 cm.
           Density did not behave as programmed.

Next shot: increase proportional gain on nl_04 to 5.0 (from 2.5)

Feb 7 2011 11:17:43:397AM1110207005Robert Granetz
Shot 05 -- Plasma, disrupted at t=1.31 due to a big injection.  Helium, 0.8 MA, 5.4 T, 0.6e20 m-2,
           USN.  Inner gap = 1.3-1.4 cm.  Density is still not behaving.

Next shot: put some PG3 programming on in seg 2; also increase nl_04 gain to 9.

Feb 7 2011 11:33:55:183AM1110207006Robert Granetz
Shot 06 -- Fizzle, but it made it to 90 kA.  Breakdown looks okay; I think something came in
           at t=0.022 s and killed the plasma.

Next shot: reduce PG3 programming in seg 1 to be only 20 ms long (instead of 30 ms).

Feb 7 2011 11:50:47:113AM1110207007Robert Granetz
Shot 07 -- Plasma, full length.  Helium.  0.8 MA, 5.4 T, 0.6-0.85 m-2, USN.  Inner gap = 1.2-1.4 cm.
           P_LH=0.6 MW

Next shot: tweak PG3 voltage programming

Feb 7 2011 12:01:25:827PM1110207008Robert Granetz
Shot 08 -- Plasma, full length.  Helium.  Density is still no behaving.  We may have to go to
           mostly pre-programmed voltage, rather than nl_04 feedback.

Next shot: extend PG3 voltage programming; turn down PD gain on nl_04; also increase argon puff
           to 100 ms (from 70 ms)

Feb 7 2011 12:28:07:763PM1110207009Robert Granetz
Shot 09 -- Plasma, disrupted at t=0.54 s.  Data acquisition is having some problems.  Looks like
           OH2L crowbarred and caused this disruption

Next shot: try again; no changes

Feb 7 2011 12:42:38:107PM1110207010Robert Granetz
Shot 10 -- Plasma, full length.  Helium.  0.8 MA, 5.4 T, 0.35-0.86e20 m-2, USN.  Inner gap = 1.2-1.4 cm.
           P_LH=0.6 MW and very clean.

Next shot: more tweaking of PG3 voltage programming

Feb 7 2011 12:54:24:127PM1110207011Robert Granetz
Shot 11 -- Plasma, full length.  Helium.  0.8 MA, 5.4 T, 0.33-0.87e20 m-2, USN.  Inner gap = 13-14 mm
           P_LH=0.6 MW.

Next shot: decrease inner gap by 10 mm while keeping outer gap unchanged (delta RCUR = -5 mm)

Feb 7 2011 01:06:32:417PM1110207012Robert Granetz
Shot 12 -- Plasma, disrupted at t=0.40 s.  No obvious reason.

Next shot: repeat, no changes

Feb 7 2011 01:22:02:950PM1110207013Robert Granetz
Shot 13 -- Plasma, full length.  Helium.  0.8 MA, 5.4 T, 0.3-0.85e20 m-2, USN.  Inner gap = 7 mm.
           P_LH=0.6 MW.

Next shot: decrease CLEARIN another 3.5 mm; decrease RCUR by 1.75 mm to keep outer gap unchanged;
           increase nl_04 PD gains by factor of 2 (to 4)

Feb 7 2011 01:35:53:283PM1110207014Robert Granetz
Shot 14 -- Plasma, full length.  Helium.  0.8 MA, 5.4 T, 0.4-0.9e20 m-2, USN.  Inner gap = 4-5 mm.
           P_LH=0.6 MW.

Next shot: reduce CLEARIN another 1 mm

Feb 7 2011 01:46:34:413PM1110207015Robert Granetz
Shot 15 -- Plasma, full length.  Helium.  0.8 MA, 5.4 T, 0.4-0.9e20 m-2, USN.  Inner gap = 4-5 mm.
           Good density ramp.  P_LH=0.6+ MW.

Next shot: limited plasma --> set CLEARIN to -2 cm

Feb 7 2011 02:06:06:180PM1110207016Robert Granetz
Shot 16 -- Plasma, full length.  Helium.  Inner wall limited.  0.8 MA, 5.4 T, 0.55-0.9e20 m-2.

Next shot: reduce CLEARIN by 1 mm.  Repeat mostly for LH tuning.  Also decrease outer gap
           by 5 mm (increase RCUR by 2.5 mm)

Feb 7 2011 02:21:34:270PM1110207017Robert Granetz
Shot 17 -- Plasma, disrupted at t=0.60 s due to injection.  Helium.  0.8 MA, 5.4 T, 0.6e20 m-2.
           Inner wall limited.

Next shot: repeat, no changes

Feb 7 2011 02:30:03:007PM1110207018Robert Granetz
Shot 18 -- Plasma, disrupted at t=0.60 s.  Helium.  0.8 MA, 5.4 T, 0.6e20 m-2, inner wall limited.

Next shot: try again

Feb 7 2011 02:43:26:550PM1110207019Robert Granetz
Shot 19 -- Plasma, disrupted at t=1.39 s.  Helium.  0.8 MA, 5.4 T, 0.6-0.8e20 m-2, inner wall
           limited.  P_LH=0.6 MW

Next shot: switch over to hydrogen plasmas, with hydrogen breakdown; reload shot 11 (USN w/standard gap)

Feb 7 2011 02:53:02:540PM1110207019Robert Granetz
We're turning on the cryopump for these hydrogen plasmas, so I'm increasing the pre-fill pulse
to 55 ms.

Feb 7 2011 03:09:42:060PM1110207020Robert Granetz
Shot 20 -- Plasma, disrupted at t=0.35 s.  Hydrogen breakdown was successful.  Breaker pulled.

Next shot: turn off PG3 programming and rely on nl_04 feedback in H2 w/cryopump

Feb 7 2011 03:25:57:717PM1110207021Robert Granetz
Shot 21 -- Plasma, but shut down early due to hard x-rays.

Next shot: copy standard PG3 programming into segs 1 and 2.

Feb 7 2011 03:40:35:543PM1110207022Robert Granetz
Shot 22 -- Plasma, full length.  Hydrogen w/hydrogen breakdown.  0.8 MA, 5.4 T, 0.4-0.6e20 m-2, USN.
           Better density control than helium.

Next shot: increase nl_04

Feb 7 2011 03:58:41:447PM1110207023Robert Granetz
Shot 23 -- Plasma, short runaway shot, terminated at t=0.25 s.  A lobe of synchrotron
           emission showed up on the WIDE2 video camera image.

Next shot: increase pre-fill to 60 ms

Feb 7 2011 04:01:19:763PM1110207024Robert Granetz
Shot 24 -- Plasma, full length.  Hydrogen.  0.8 MA, 5.4 T, 0.4-0.7e20 m-2, USN.  No LH.

Next shot: repeat for LH

Feb 7 2011 04:28:38:317PM1110207025Robert Granetz
Shot 25 -- Plasma, full length.  Hydrogen.  0.8 MA, 5.4 T, 0.5-0.7e20 m-2, USN.  P_LH=0.6 MW.

Next shot: decrease inner gap by loading CLEARIN and RCUR from shot 15 today.

Feb 7 2011 04:36:52:190PM1110207026Robert Granetz
Shot 26 -- Plasma, disrupted at t=1.06 s, probably due to the FSP plunge.  Hydrogen.  0.8 MA, 5.4 T,
           0.6e20 m-2, USN with left gap = 3-4 mm.

Next shot: repeat, no changes

Feb 7 2011 04:53:38:740PM1110207027Robert Granetz
Shot 27 -- Plasma, full length.  Hydrogen.  0.8 MA, 5.4 T, 0.5-0.7e20 m-2, USN with inner gap = 3-4 mm.
           P_LH=0.6-0.7 MW.

Next shot: switch to inner wall limited by loading CLEARIN and RCUR from shot 19 today

Feb 7 2011 05:07:20:623PM1110207028Robert Granetz
Shot 28 -- Plasma, full length.  Hydrogen.  0.8 MA, 5.4 T, 0.7-0.8e20 m-2, inner wall limited.
           P_LH=0.6 MW.

Next shot: increase outboard gap by 4 mm (decrease RCUR by 2 mm)

Feb 7 2011 05:29:49:550PM1110207029Robert Granetz
Shot 29 -- Plasma, full length.  Hydrogen.  0.8 MA, 5.4 T, 0.7-0.8e20 m-2, inner wall limited.
           P_LH=0.7 MW, but still with faulting.  Outer gap increased by 4 mm (now at 2 cm).

Next shot: increase outer gap another 4 mm (move RCUR in another 2 mm)

Feb 7 2011 05:44:44:667PM1110207030Robert Granetz
Shot 30 -- Plasma, full length.  Hydrogen.  0.8 MA, 5.4 T, 0.7e20 m-2, inner wall limited.  Outer gap
           increased about 3 mm.  P_LH=0.7 MW, but still with some faulting.

Next shot: increase outer gap by another 3 mm (decrease RCUR by 1.5 mm); set density ramp
           to higher values

Feb 7 2011 06:02:44:690PM1110207031Robert Granetz
Shot 31 -- Plasma, full length.  Hydrogen.  0.8 MA, 5.4 T, 0.8-0.9e20 m-2, inner wall limited.
           P_LH=0.67 MW.

Next shot: reload seg 2 from shot 25 (USN, normal inboard gap), but increase Btor to 6.5 T (181 kA).

Feb 7 2011 06:09:33:747PM1110207032Robert Granetz
Shot 32 -- Plasma, full length.  Hydrogen.  0.8 MA, 6.5 T, 0.5-0.7e20 m-2, USN w/normal gap.
           P_LH=0.62 MW.

End of run 

Engineering Operator Comments
ShotTimeTypeStatusComment
110:03:09:473AMPlasmaBadShot cycle
210:16:08:853AMPlasmaOk
310:43:39:050AMPlasmaOk
410:56:34:910AMPlasmaOk
511:09:53:960AMPlasmaOk
611:22:19:623AMPlasmaOk
711:40:41:143AMPlasmaOk
811:53:22:993AMPlasmaOk
912:06:39:360PMPlasmaBadEF1 & OH2 Comm Flt
1012:32:41:233PMPlasmaOk
1112:45:11:540PMPlasmaOk
1212:59:28:850PMPlasmaOk
1301:12:13:083PMPlasmaOk
1401:25:55:900PMPlasmaOk
1501:40:26:913PMPlasmaOk
1601:56:35:260PMPlasmaOk
1702:11:51:290PMPlasmaOk
1802:24:45:267PMPlasmaOk
1902:36:59:500PMPlasmaOk
2003:05:49:193PMPlasmaBadOH1 self powered
2103:18:49:190PMPlasmaOk
2203:31:22:940PMPlasmaOk
2303:44:33:480PMPlasmaOk
2403:57:08:203PMPlasmaOk
2504:15:21:547PMPlasmaOk
2604:30:04:977PMPlasmaOk
2704:44:21:027PMPlasmaOk
2805:01:07:847PMPlasmaOk
2905:19:40:773PMPlasmaOk
3005:34:24:140PMPlasmaOk
3105:48:40:780PMPlasmaOk
3206:05:26:697PMPlasmaOk

System Availability
Feb 7 2011 10:02:53:853AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesBES system is onlineOct 21 2010 11:33AM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (D+F) working. All midplane and off-midplane diode arrays working except WB1AX. Midplane foils calibrated and PRAD_MAIN is being filled. Divertor/Ledge foils not yet ready.Jul 15 2010 08:27AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Nov 16 2010 02:36PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA availableOct 21 2010 07:11PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged.Apr 06 2010 10:51AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesWide-view CXRS system is onlineOct 21 2010 11:33AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned; new calibrations (relative brightness and position) not yet implementedJun 29 2010 10:27AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperationalJun 26 2010 09:28PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll channels working and calibrated.Oct 27 2010 03:41PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauges are operational.Jun 28 2010 08:02PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPlugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access.Apr 05 2010 11:18AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational. Oct 22 2010 11:46AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesoperating normallyJun 29 2010 10:26AM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Jun 26 2010 11:19PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesSystem installed and aligned. Inverted Profiles for Ti are available upon request. Vtor profiles still under revision.Dec 17 2010 09:25AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operationalOct 23 2010 01:41PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-Antennayessystem checked out ok on 11006728. Jun 28 2010 04:57PM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayessystem checked out ok on 1100628Jun 28 2010 04:57PM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayessystem checked out ok. conditioned to vacuum. Jun 28 2010 04:58PM (ylin)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-Offyesoperational and testedJul 20 2010 04:42PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridyesLH working. New directional couplers installed at input to each klystron.Oct 21 2010 11:42AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid Reflectometeryes50GHz: up-, 60 GHz up- and down-Oct 21 2010 11:31AM (sgbaek)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
Lower Hybrid SOL reflectometeryesprofiles and fluctuations both working. If requested, please request LH launcher to be moved in.Jan 18 2011 03:07PM (cornwall)Cornwall LauLower Hybrid SOL reflectometercornwall,wukitch,ylin
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoWB4LY and LLY working but not during ICRF. WB1LY not attached due to pickup problems. LYMID attached but have profile problems.Aug 24 2010 09:17AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesSpectra being collected and tree filled. Wavelength scan is broken so fixed on the Mo XXXI and XXXII lines.Jul 15 2010 08:28AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Oct 22 2010 11:46AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are operationalJun 28 2010 08:02PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesAll systems are on and functionalJun 29 2010 12:56PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03Jun 26 2010 09:21PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoCapillaries tested in-vessel.Jun 28 2010 08:08PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational. AM (2 * 39.51) MHz.Dec 13 2010 05:29PM (ntsujii)Miklos PorkolabPhase Contrast Imagingennever,ntsujii,porkolab
Penning GaugesnoHigh voltage power supplies are turned off, waiting for work at A-port horizontal to be finished.Jun 28 2010 08:07PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air Switchyes Jun 26 2010 11:19PM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Jun 26 2010 11:19PM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyes Jun 26 2010 11:19PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power Systemsyes Jun 26 2010 11:20PM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesOperational.Jun 28 2010 08:03PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperational.Jun 28 2010 08:03PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesF and J outer divertor probes are operational.Jun 28 2010 08:04PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperational, except probe#13Jun 28 2010 08:04PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesAs of 1101123, the 60, 88u, 88l, 140 and variable set at 115GHz are operational. The 50, 75 and 112 are nonoperational. On 1101123, the noise band at ~200kHz is again seen on the 88u and 88l channels.Nov 23 2010 09:30AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational. New Langmuir-Mach probe head installed.Jun 28 2010 08:05PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesOperational.Jun 28 2010 08:05PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesBoth A and K units are operational. Coil polarity needs to be checked.Jun 28 2010 08:06PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesHV supply on, cable run to sparker at k-horJun 23 2010 02:41PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationyesSSS installed and leak tested.Oct 21 2010 11:31AM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesNo new CO2 detector, so still missing edge channelsJun 23 2010 02:40PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CoreyesOperating with 2 lasersOct 22 2010 01:06PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgeyesOperationalJul 14 2010 11:54AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesRaw spectra stored but not line brightness time histories are going into the tree yet.Jan 20 2011 10:45AM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermlreinke
XTOMOyesCore system working. Edge system waiting for H-modes.Jul 01 2010 11:55AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke