Alcator C-Mod Run 1110214 Information

Back to runs

Miniproposals
Miniproposal:298a
Date Filed: 5/20/2002
Title:C-Mod Plasma Startup
First Author:Jim Irby
Session Leader:Steve Wolfe (shots 1-18)

Operators
Session leader(s):Steve Wolfe
Physics operator(s):Steve Scott
Engineering operator(s):Bill Cochran

Engineering Operator Run Comment
Power tests for Reverse field startup

Session Leader Plans
Entered: Feb 11 2011 10:30:49:970AM
Author: Steve Wolfe
Session Leader plan for Monday, 2/14/2011

MP#298a (sort of): Reverse field startup
SL: wolfe
PO: Scott

ECDC in D2 (2e-4 Torr) requested over the weekend.

Run starts at 10:00AM (est) with power system tests
Plasma attempts should start around 13:00 
and end by 17:00 or preferably earlier.

The beginning of the day will be spent testing the power
systems and verifying the reconfiguration to reverse field/current
operation. SL will monitor magnetics signals and dpcs inputs
for consistency. Physop may be required to program waveforms
for some coils. Preferably EO will have reference shots from 2007 
for this purpose. We'll start tests with coils using TMX supplies,
proceed to PF coils using alternator, and end with TF tests under
PLC control. Assuming all tests are successful we will then proceed
to plasma tests.

The goal of the plasma tests is to develop 
a reasonably reliable startup in the reverse field 
configuration for the next couple of weeks of experiments.
The target shot should be suitable as a starting point for 
Tuesday's run on MP#654 "I-mode with LSN and unfavorable grad-B
topology". 

Engineering setup should be as for 1110128003 except 
A-coil setup should be -Dtop +Dbot +Jtop -Jbot (reverse the signs)

No cryopump. They will need it on Tuesday, but that's just a pg4 change
on the startup and not worth the time or expense of cooling it down
for a few shots. 

No RF is required. 

Physop should start with segment #1 from 1110128003 and make all 
changes required for reverse field (see email and/or logbook entry under
HYBRID for 1110208). Suggest starting with RCUR offset=-3500, BR_0=0.
Also, change PG4 puff from 50msec to 25msec, since we won't be using
cryopump. Change Seg1 title to something like "2011 reverse field non-cryopump 
startup".

For segment#2, Physop should import seg#2 from 1070726018 (+800kA, +5.4T),
as called for in tomorrow's MP. This is already
set for reversed field, but the magnetics predictors (wires 1-8 and 12) need
to be recalculated. Note that this was the run on which we lost f19; hopefully
that won't happen again!
Since 1070726018 already had B21_proj set for reverse field, it isn't 
necessary to recalculate this predictor, but there has been a minor change
in the error field correction algorithm since then, so it wouldn't hurt. 
Note that if this is being done ahead of time, setting the keyword arg
to ACOIL_CONF="-Dtop +Dbot +Jtop -Jbot" is required to force the correct
calculation to be done; after the CALL the text in the Alg.Version window
should indicate phi=18.67 degrees and the ACOIL setting as shown. 

Segments#3 and 4 should be zeroed, unless the physop wants to go 
through the flip and fold exercise for these for conversion to reverse
field as well. Since we won't be doing tests with these, it's probably 
better to zero them out than to leave untested, possibly incomplete, 
modifications lying around. 

The dpcs_fizzle (ASYNC_PROS) setup needs to have the SOURCE_SHOT changed
from 1090731017 to 1060517007 for reverse field. 

Shot plan:

1. Try for plasma using the setup specified above. (1 shot)
2. Tweak startup fields and offsets, and/or gas puffs, based on results. 
   Expect first field tweak to be RCUR offset or IC_EF4U current; 
   gas tweaks to PG4 or seg1 PG3 maintenance level. Aim is
   non-bouncy reliable startup without runaways, but we may settle
   for less if it's getting late. (0-5 shots)
3. Once successful startup is obtained, verify programming in seg#2 
   and try for full length plasma. (0-3 shots)
4. Declare success based on between 1 and 3 successful plasmas (sustained
   into rampdown) in a row. 


Physics Operators Plans
Entered: Feb 11 2011 03:04:04:823PM
Author: Steve Scott
-----------------
Engineering Setup
-----------------

*** REVERSE FIELD OPERATION ***

Run begins at 10:00 and ends at 17:00

Power systems as on:

Acoil: -Dtop +Dbot +Jtop -Jbot (for reverse field) Hybrid Enabled

Gas setup:

Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
fill NINJA with 10 psi D2 DISABLED

Enable gate-valves and shutters: ECE, VUV, HiREX Sr, Xeus
Leave z-bolo shutter as is (should be open)

Torvac gatevalve toggle (yes/no): no

Boronization(yes/no): no
Overnight ECDC (yes/no): yes
ICRF(yes/no): no
LH(yes/no): no
Cryopump (yes/no): no
DNB (yes/no): no

Vessel temperature: 35/35/35

------------------------------
ECDC Parameters (if requested)
------------------------------
gas and pressure: D2 at 2e-4 Torr over the weekend
sweep: 44/45/103 cm
scan: 20/120 s

Today's objective is to confirm that all power supplies and PCS configuration parameters are properly set for reverse-field operation, and to make at least one plasma suitable for the start of the I-mode experiment (MP654) scheduled for Tuesday.

We will start at 10 AM with power-tests of PF and TF coils. Presumably, these will be similar to the tests on 1070717001 thru 1070717013.

We will then move on to try to make a plasma. Probably the transition from power supply test shots to plasma attempts will occur at about 1 PM.

A PCS configuration has been prepared and saved according to the following prescription: segment 1 loaded from a recent shot = 1110128003 (which was a forward-field shot) and segment 2 was loaded from an old reverse-field shot 1070726018.

Then all necessary changes to make the control system ready for reverse-field operation were implemented, as per Steve Wolfe's emailed instructions a few days ago.

These changes include:

In segment #1, 'flip' IC_OH1, IC_OH2U, IC_EF1U, IC_EF1L, IC_EF2U, IC_EF2L, IC_EF4U and IP

In segment #1, 'flip' OH1_VOLT, CHOPPER, OH2U_VOLT, OH2L_VOLT, EF1U_VOLT, EF1L_VOLT, EF2U_VOLT, EF2L_VOLT, EF4_VOLT, EF3_VOLT, TF_CURRENT

In Segment #2, recalculated all of the predictors. When recalculating the predictor for B21_PROJ, the argument was set to ACOIL_CONFIG="-DTOP +DBOT +JTOP -JBOT". Verified that the field showed phi=18.67 degrees ...

changed the source shot for the fizzle detector to 1060517007.

verified that the dpcs_xjump threshold is set to 1.0e15.

verified that the dpcs_piezo_chopper OUTPUTS was "pulse_gas1", "pulse_gas3", "H-Bot"

Changed the offset for RCUR in segment 1 from +3500 to -3500.

verified that the offset for BR_0 in segment 1 is set to zero.

shortened the prepuff from 50 to 25 ms.

Session Leader Summaries
Entered: Feb 14 2011 03:52:22:813PM
Author: Steve Wolfe
Session Leader summary for Monday, Feb 14

Reverse field power tests and plasma startup (MP#298a)
SL: wolfe
PO: Scott
EO: Dekow, Cochran

Power testing began on schedule, around 10:00AM, with 
testing of the TMX supplies. These all checked out. 
There was a two and a half
hour delay before the alternator came up to speed, and we
resumed testing at 13:00 with the EF3. All the power tests
ran successfully and without incident. Commutation tests of
EF1 and OH's were performed because of a change in the 
CAMAC crate that drives the triggers. This was completed
at about 15:00. We took advantage of the last few power tests
to exercise the gas valve; B-main needed an extra pulse. 

First plasma attempt was #16, and it ran full length with a
good startup. It looks like reversing the sign on the RCUR
offset to -3500 is appropriate. 
The density was above the program as the walls
were loaded, but otherwise the shot was just like the reference
from Dennis' MP. A repeat for #17 had a small bounce in startup,
density came down, and the shot disrupted at 1.3sec with a possible
locked mode. For shot#18 we tweaked up the gas to fix the bounce,
and got a good startup again, but the disruption was still there, and 
I think this is a locked mode. The Acoil was on with B21_PROJ, reaching
1500A. Probably some tweaking on the density program will be needed 
tomorrow, but this should be done with the cryopump on and the RF 
pulse as requested. 



Physics Operator Summaries
Entered: Feb 14 2011 03:41:04:577PM
Author: Steve Scott
This was a highly successful startup in reversed field.

Shots 1 thru 15 were standard power-supply / coil tests. These proceeded nominally. The only hiccup was a ~2 hour delay for the alternator, which started from a cold-start this morning.

We achieved a full-length plasma on the first attempt, shot 16. Shot 17 had a little bump on the startup, and it disrupted at about 1.3 sec. On shot 18 we increased the prefill a little, and got a better startup. Shot 18 still disrupted, a little later than in shot 17.

Recommend starting with shot 18 as the reference shot for tomorrow, and adjust the gas as needed for use with cryopumping and RF.


Session Leader Comments
Feb 14 2011 10:01:07:247AM1110214001Steve Wolfe
Shot#1: EFC test
Got about 1kA, negative signal on efcl. 
BR_0 is negative. Timing is not consistent with 1070717001,
but the connection looks ok. 
It looks like the chopper is still getting the demand
from DPCS, which is still set for normal field. Should have
requested a positive chopper demand signal. 


Feb 14 2011 10:13:32:780AM1110214002Steve Wolfe
Shot#2: EF2U test under PLC control. 
positive current positive flux on inner wall, looks fine.
EF3 induced current same as old shot


Feb 14 2011 10:21:39:277AM1110214003Steve Wolfe
Shot#3: EF2L test under PLC control. 
Looks correct. 
We are not getting data from ha2bright or the CII signal.
Emailed Josh and JT. 

Feb 14 2011 10:34:08:640AM1110214004Steve Wolfe
Shot#4: Acoil test under Hybrid control
This is based on the shot from 1070717004 which was 
supposed to be hybrid but had actually been run as PLC control.

Looks correct, follows drawn waveform less about 600A,
polarity on LM loops matches old shot, flattop amplitude pretty close.

Feb 14 2011 01:12:10:617PM1110214005Steve Wolfe
Shot#5: EF3 test PLC control
Got Ha2bright this time.
EF3 negative pulse, negative flux, looks ok. 


Feb 14 2011 01:22:19:773PM1110214006Steve Wolfe
Shot#6: EF4 forward bridge only PLC test
1Ka positive current, positive flux, Bz0 is positive .05
EF3 current induced


Feb 14 2011 01:29:09:453PM1110214007Steve Wolfe
Shot#7: EF1U forward bridge only PLC control
Positive 2kA positive flux. OK 
Lab and cell access before next shot, which will be EF1L

Feb 14 2011 01:38:58:370PM1110214008Steve Wolfe
Shot#8:  EF1L forward bridge test, PLC control
Positive 2kA, positive flux, mflux looks normal
test ok


Feb 14 2011 01:51:55:107PM1110214009Steve Wolfe
Shot#9: OH1 PLC test (forward bridge)
Physop will load the plasma startup shot, so
we can start looking at the error signals. 
positive ~2.8kA, positive flux, good mflux

Initial RCUR offset before OH current is ~ -3000A-m,
so the offset may be close. 

Feb 14 2011 01:58:41:920PM1110214010Steve Wolfe
Shot#10: OH2U PLC test (forward bridge)
+2.8kA, positive flux, mflux ok.


Feb 14 2011 02:05:29:200PM1110214011Steve Wolfe
Shot#11: OH2l PLC test (forward bridge)
+2.7kA (no buzzer) positive flux, mflux ok for oh2l



Feb 14 2011 02:14:39:503PM1110214012Steve Wolfe
Shot#12:TF 50kA PLC test
+50kA, positive flux, mflux shows an outboard null
Bz0 around +1mT


Feb 14 2011 02:21:37:210PM1110214013Steve Wolfe
Shot#13:TF 100kA PLC test
Enable B-top and B-main gas valves for this shot
+100kA in TF ok
Got gas from B-top, nothing from B-main. It needs exercising.
Physop will program something more agressive for seg1 pg3 for next test

Feb 14 2011 02:42:30:343PM1110214014Steve Wolfe
Shot#14: EF1 commutation test, with gas
The fizzle detector is set for 0.5sec, so just run
segment 1 with a 100msec 90V pulse, seg 2 off so the
nl04 feedback doesn't flood the machine. 
EF1 Commutation looks ok, got gas from B-main ok. 

Next: Physop will put back the normal seg1 pg3 puff. 
Engineers will run an oh1 comm test


Feb 14 2011 02:50:20:620PM1110214015Steve Wolfe
Shot#15: OH (all three) commutation test, with gas
The fizzle detector is set for 0.5sec, so just run
seg1 with normal seg1 pg3 puff. 

10kA oh commutation looks ok. Gas looks ok
pressure (with no EF4) ~.06mTorr

Next: try for plasma. 

Feb 14 2011 03:11:38:330PM1110214016Steve Wolfe
Shot#16: try for plasma. 
plasma full length. 
A few injections early, and a marfe before 0.4sec,
but all in all, a good start. 
No gas puffing in segment 2, and the density is dropping down to
6e19, and the program calls for 6. 

Next: Just repeat, try for 2 in a row

Feb 14 2011 03:27:16:243PM1110214017Steve Wolfe
Shot#17: Just repeat, try for 2 in a row
see if the density comes down. 

plasma to 1.3sec, little bounce and some runaways early.
Looks like an injection, something coming in around 1.16sec
The density is down to 6e19, with some puffing. 
Could be a locked mode, the ECE looks ratty. A-coil is on. 

Next: do one more, with some startup tweaks

Feb 14 2011 03:36:59:447PM1110214018Steve Wolfe
Shot#18: do one more, with some startup tweaks
plasma to 1.35sec, no runaways, no bounce
still has a possible locked mode. 
Density is around 5e19, puffing gas. 

Startup seems robust enough, the shot will need to
be tweaked up with rf and the cryopump tomorrow. 

END OF REVERSE FIELD TESTs

Physics Operator Comments
Feb 14 2011 10:04:25:677AM1110214001Steve ScottSystem will be under PLC control. This will be a test of EFC.
Compared to 1070717001, this shot got more EFC current early (t<0.077) but
the EFC current waveform overlays 1070717001 exactly thereafter.

Important note: see SL comments. When testing EFC "under PLC control" it appears that the hybrid is not entirely ignored.

It also appears that we got a gas puff on this shot, which was missing from
the reference shot 1070717001.

Will turn off gas puff for next shot.
Feb 14 2011 10:16:54:783AM1110214002Steve ScottTest of EF2U under PLC control.

EF2U current waveform overlays reference shot (1070717002) exactly -- iscope11 is a real help in comparing power shots that should be identical! Also the pickup on EF3, EF4, and EFC is exactly the same.

The gas puff is gone, as requested.

The toroidal field is about 0.002 Tesla higher than on 1070717002.
Feb 14 2011 10:18:58:360AM1110214003Steve ScottSuccessful test of EF2L. Looks identical to 1070717003.
Feb 14 2011 10:32:15:290AM1110214004Steve ScottLoaded from 1070717004 with no changes. This should be a test of the A-coil.

Result: same sign as on reference shot 1070717004. Timing of the waveform is different, because the a-coil was put under PLC control for the reference shot (it was a flat-top waveform on 1070717004).
Feb 14 2011 01:11:03:783PM1110214005Steve ScottEF3 test shot. Result: looks good.
Feb 14 2011 01:21:29:630PM1110214006Steve ScottWe seem to have gotten about 2% more current in EF4 on this shot compared to the reference shot, 1070717006. othrewise looks OK.
Feb 14 2011 01:39:08:053PM1110214008Steve ScottLooks like a successful test of EF1-U
Feb 14 2011 01:49:14:130PM1110214009Steve ScottLoaded from shot /home/sscott/pcs_scratch: 1110215000

This shot is configured as described in the PO plan.

Not under DPCS control, so this should have no effect on the shot.

result: good OH1 forward bridge test. reference shot = 1070717009.
we got roughly 10% more current in OH1 than in the reference shot.
Feb 14 2011 02:12:54:420PM1110214012Steve ScottTF test @ 50 kA. perfect repeat of 1070717012
Feb 14 2011 02:16:21:983PM1110214013Steve Scottre-enable B-top and B-main gas valves. This will act as a check on their performance, prior to our first plasma attempt in a few shots.
Feb 14 2011 02:29:53:790PM1110214014Steve ScottIncrease open loop PG3 demand in segment 3 to about 90 for 0.1 seconds.
Also, turn off segment 2. So segment #1 will control for the entire shot.
Feb 14 2011 02:43:00:880PM1110214015Steve ScottReloaded shot 13 from today (in order to get the original, smaller gas puff) and then turned off segment 2.
Feb 14 2011 03:09:45:087PM1110214016Steve ScottAt request of SL, moved the prepuff from [-0.55, -0.525] to [-0.525,-0.500].
also, turned segment 2 back on. We should be ready for the first reverse-field shot of 2011.

Result: plasma on the first attempt (:)). Breakdown similar to reference shot 1070726018.
Feb 14 2011 03:11:56:470PM1110214017Steve ScottAttempt: exact repeat of previous shot. No PO changes. Look to see if the early density drops a little.
Feb 14 2011 03:31:57:837PM1110214017Steve Scottdisrupted at circa 1.3 seconds. a little bump on the startup.
Feb 14 2011 03:36:42:020PM1110214018Steve ScottIncreased prepuff by ~10% and increased PG3 puff from level 35 to 40.

disruption delayed a little until 1.346 sec. NeL achieved (~0.6e20) is close to demand value. Startup is OK.

recommend using this shot as the starting point for tomorrow's run.

Engineering Operator Comments
ShotTimeTypeStatusComment
109:49:45:397AMTestOkEFC
210:07:11:077AMTestOkEF2U Test
310:15:42:577AMTestOkEF2L Test
410:28:28:787AMTestOkA_Coil Test
501:08:29:120PMTestOkEF3 Test
601:16:37:200PMTestOkEF4 Test
701:25:00:317PMTestOkEF1U Test
801:35:58:603PMTestOkEF1L
901:45:23:987PMTestOkOH1 Test
1001:53:34:590PMTestOkOH2U Test
1102:01:14:830PMTestOkOH2L Test
1202:10:24:487PMTestOkTF 50kA Test
1302:17:47:807PMTestOkTF 100kA Test
1402:37:55:463PMTestOkEF1U&L Commutation Test
1502:45:44:313PMTestOkOH1,OH2U&L Comm. Test
1603:02:02:100PMPlasmaOkAll Power Sypplies Fired
1703:14:52:803PMPlasmaOk
1803:30:32:980PMPlasmaOk

System Availability
Feb 14 2011 09:49:24:317AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesBES system is onlineOct 21 2010 11:33AM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (D+F) working. All midplane and off-midplane diode arrays working except WB1AX. Midplane foils calibrated and PRAD_MAIN is being filled. Divertor/Ledge foils not yet ready.Jul 15 2010 08:27AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Nov 16 2010 02:36PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA availableOct 21 2010 07:11PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged.Apr 06 2010 10:51AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesWide-view CXRS system is onlineOct 21 2010 11:33AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned; new calibrations (relative brightness and position) not yet implementedJun 29 2010 10:27AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperationalJun 26 2010 09:28PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll channels working and calibrated.Oct 27 2010 03:41PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauges are operational.Jun 28 2010 08:02PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPlugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access.Apr 05 2010 11:18AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational. Oct 22 2010 11:46AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesoperating normallyJun 29 2010 10:26AM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Jun 26 2010 11:19PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesSystem installed and aligned. Inverted Profiles for Ti are available upon request. Vtor profiles still under revision.Dec 17 2010 09:25AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operationalOct 23 2010 01:41PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-Antennayessystem checked out ok on 11006728. Jun 28 2010 04:57PM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayessystem checked out ok on 1100628Jun 28 2010 04:57PM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayessystem checked out ok. conditioned to vacuum. Jun 28 2010 04:58PM (ylin)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-Offyesoperational and testedJul 20 2010 04:42PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridyesLH working. New directional couplers installed at input to each klystron.Oct 21 2010 11:42AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid Reflectometeryes50GHz: up-, 60 GHz up- and down-Oct 21 2010 11:31AM (sgbaek)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
Lower Hybrid SOL reflectometeryesprofiles and fluctuations both working. If requested, please request LH launcher to be moved in.Jan 18 2011 03:07PM (cornwall)Cornwall LauLower Hybrid SOL reflectometercornwall,wukitch,ylin
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoWB4LY and LLY working but not during ICRF. WB1LY not attached due to pickup problems. LYMID attached but have profile problems.Aug 24 2010 09:17AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesSpectra being collected and tree filled. Wavelength scan is broken so fixed on the Mo XXXI and XXXII lines.Jul 15 2010 08:28AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Oct 22 2010 11:46AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are operationalJun 28 2010 08:02PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesAll systems are on and functionalJun 29 2010 12:56PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03Jun 26 2010 09:21PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoCapillaries tested in-vessel.Jun 28 2010 08:08PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational. AM (2 * 39.51) MHz.Dec 13 2010 05:29PM (ntsujii)Miklos PorkolabPhase Contrast Imagingennever,ntsujii,porkolab
Penning GaugesnoHigh voltage power supplies are turned off, waiting for work at A-port horizontal to be finished.Jun 28 2010 08:07PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air Switchyes Jun 26 2010 11:19PM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Jun 26 2010 11:19PM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyes Jun 26 2010 11:19PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power Systemsyes Jun 26 2010 11:20PM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesOperational.Jun 28 2010 08:03PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperational.Jun 28 2010 08:03PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesF and J outer divertor probes are operational.Jun 28 2010 08:04PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperational, except probe#13Jun 28 2010 08:04PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesAs of 1101123, the 60, 88u, 88l, 140 and variable set at 115GHz are operational. The 50, 75 and 112 are nonoperational. On 1101123, the noise band at ~200kHz is again seen on the 88u and 88l channels.Nov 23 2010 09:30AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational. New Langmuir-Mach probe head installed.Jun 28 2010 08:05PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesOperational.Jun 28 2010 08:05PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesBoth A and K units are operational. Coil polarity needs to be checked.Jun 28 2010 08:06PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesHV supply on, cable run to sparker at k-horJun 23 2010 02:41PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationyesSSS installed and leak tested.Oct 21 2010 11:31AM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesNo new CO2 detector, so still missing edge channelsJun 23 2010 02:40PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CoreyesOperating with 2 lasersOct 22 2010 01:06PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgeyesOperationalJul 14 2010 11:54AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesRaw spectra stored but not line brightness time histories are going into the tree yet.Jan 20 2011 10:45AM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermlreinke
XTOMOyesCore system working. Edge system waiting for H-modes.Jul 01 2010 11:55AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke