Alcator C-Mod Run 1110318 Information

Back to runs

Miniproposals

Operators
Session leader(s):
Physics operator(s):Steve Scott
Engineering operator(s):

Engineering Operator Run Comment
BEAM-INTO-GAS ONLY

Session Leader Plans
Entered: Mar 21 2011 08:22:03:947AM
Author: Bill Rowan

MP: CXRS calibration via beam into helium gas. Verify performance of MSE filters.
SL: Rowan, Liao
PO: Scott

Initial setup
Reference shot 1100901031.
Load helium into B-Top at a pressure of 6 psi. Use at least three fill and purge cycles to remove remnant of previous fill gas. Control the gas using the wave form for PG4 in segment 1. Turn off all power supplies as no fields will be used in this run. Set the fizzle detector past 2.0 s. Set the gate valve to close during the shot.

Set the beam for 100 ms on 100 ms off. Note the temporal variation of beam current and voltage and assure that integration time for detector is sufficiently short that times of non-constant beam parameters are acquired but may be left out of the averaging.

For the first shot, the pressure will be set in the 10e-5 Torr range (50 ms) as it would be for helium fueling of a plasma shot. This will be a shorter setting for PG4 than is initially loaded. The pressure will be scanned up in coarse increments until 4713 He I line is observable with at least 1000 counts above the detector background. The increments will be determined on the fly during the run. 5 shots.

Adjust beam timing and detector synchronization to optimize signal. 1 shot.

Repeat for statistics. 3 shots.

Scan the helium pressure up by approximately a factor of 5 to document any beam attenuation. Check the scaling of the signal level with pressure. Repeat with different pressures in the event of anomalies. 5-10 shots.

Reset the helium pressure in the torus to approximately 2 mT (gas control set to approx 1 s). 3 shots

With the pressure in the torus set to approximately 2 mT, measure MSE signal level in spatial channel #2 as a function of filter. Changing the filter is expected to require 5-10 minutes. 10 shots.

With the pressure in the torus set to approximately 2 mT, measure the MSE signal level in spatial channel #2 as a function of filter temperature for a single filter. 5 shots

Physics Operators Plans
Entered: Mar 18 2011 08:46:33:237AM
Author: Steve Scott
-----------------
Engineering Setup
-----------------

Run begins at 09:00 and ends at 12:30

Power systems as on: 1100901031

*** NO POWER TODAY. NO FIELDS. BEAM-INTO-GAS ONLY

Acoil: +Dtop -Dbot -Jtop +Jbot (OFF)

Gas setup:

Fill B-Top with 6 psi He Hybrid enabled (PG4)


DISABLE gate-valves and shutters: ECE, VUV, HiREX Sr, Xeus
z-bolo shutter CLOSED

Torvac gatevalve toggle (yes/no): YES

Boronization(yes/no): no
Overnight ECDC (yes/no): no
ICRF(yes/no): no
LH(yes/no): no
Cryopump (yes/no): no
DNB (yes/no): YES

Vessel temperature: 35/35/35

------------------------------
ECDC Parameters (if requested)
------------------------------
gas and pressure: D2 at 2e-4 Torr
sweep: 44/45/103 cm
scan: 20/120 s

Load helium into B-Top at 6 PSI. use at least three fill and purge cycles to remove remnant of previous gas fill.

Control gas using waveform for PG4 in segment 1.

Set fizzle detector past 2.0 sec.

Set gate value to close during the shot.

We will start with a very small gas puff, sufficient to get roughly 10^-5 torr. Fire DNB, 100 ms on, 100 ms off.

On successive shots, raise torus pressure until CXRS observes about 1000 counts above background.

Then raise pressure another factor of 5, to document beam attenuation.

Then proceed to 15 shots for MSE, at approximately 1-2 mTorr. There will be about 10 minutes between shots to allow MSE to swap optical filters.

Session Leader Summaries
Entered: Mar 18 2011 06:53:15:440PM
Author: Ken Liao
The purpose of the experiment is to intensity calibrate the CXRS diagnostic for helium impurity measurements, helium fast ion measurments, or helium plasma measurements by observing the emission from the interaction between the beam and helium gas.

For these experiments, the beam was fired into a helium filled vacuum vessel. The pressure was varied from approximately 0.1 mT to 6 mT. Useful data was acquired for all channels over at least a subset of the pressure scan range; that is, the most sensitive channels acquired data at all pressures. The least sensitive channels did acquire useful signals for the higher pressures.

A channel to channel relative intensity calibration of the channels will result from this experiment.

Physics Operator Summaries

Session Leader Comments
Mar 18 2011 09:45:39:963AM1110318004Ken LiaoShot with 375ms puff shows about 1/2 the intensity of previous, in core channel B11. No obvious beam attenuation.

Next shot, got to 1500ms puff
Mar 18 2011 09:52:58:853AM1110318005Ken Liaoabout 800 counts on B11 (brightest), 70-80 counts on B13 (darkest)

Next shot, go to 3000ms puff.
Mar 18 2011 10:08:02:633AM1110318006Ken LiaoBeam on wall signal is visibly weaker in wide2.
Signal levels on core B11 are about 1400 counts. This is clearly attenuated.
Near edge channel B13 peak around 100 counts, also clearly attenuated.

Next shot 2s
Mar 18 2011 10:12:42:253AM1110318007Ken Liao2s puff

3s puff signal is about 16% higher than 2s puff signal in B11.

next shot 1s He puff.
Mar 18 2011 10:13:22:000AM1110318008Ken Liao1s puff

next shot 800ms puff.
Mar 18 2011 10:19:07:660AM1110318009Ken Liao800ms puff

next shot 600ms
Mar 18 2011 10:27:02:910AM1110318010Ken Liao600ms shot, last shot for CXRS calibration

Physics Operator Comments
Mar 18 2011 09:08:13:623AM1110318001Steve Scott.
Mar 18 2011 09:19:59:343AM1110318001Steve ScottGas puff = 50 ms.
0.47 Torr-liter injected.
ratiomatic was off (and not calibrated for He).
Mar 18 2011 09:32:46:030AM1110318002Steve ScottNext: repeat. Want measurement of pressure with ratiomatic.
0.5 Torr-liter. ratiomatic = 0.04 mTorr.
maximum g_side_mks = 0.22
Mar 18 2011 09:40:53:157AM1110318003Steve ScottDNB: 100 ms on, 100 ms off
gas puff: 750 ms (operator error. 75 ms was requested)
maximum g_side_mks = 1.6 mTorr.
Mar 18 2011 09:43:33:427AM1110318004Steve ScottThis shot will be 375 ms gas puff. Operator error on last shot.
maximum g_side_mks = 0.8 mTorr

Mar 18 2011 09:53:02:837AM1110318005Steve Scott1.5 sec. got to 3.0 mTorr on the g_side_mks.

dnb reports that we are increasing the dnb tank pressure with this much gas
Mar 18 2011 10:01:42:360AM1110318006Steve Scottgas puff to 3.0 sec (!)
got to 5.5 mTorr on g_side_mks
Mar 18 2011 10:10:45:480AM1110318007Steve Scottgas puff = 2.0 sec
got to 4.0 mTorr
Mar 18 2011 10:20:05:633AM1110318008Steve ScottGas puff = 1.0 sec
got to 2.1 mTorr
Mar 18 2011 10:27:09:137AM1110318009Steve Scottgas puff = 0.80 sec.

1.7 mTorr maximum on g_side_mks
Mar 18 2011 10:34:50:230AM1110318010Steve Scottgas puff = 0.600 sec
1.25 mTorr.
Mar 18 2011 11:01:33:940AM1110318011Steve ScottStart shots for MSE filter calibration.
All shots will have the same gas puff = 0.800 sec starting this shot.

short delay due to data system problem

got 1.7 mTorr. good DNB. exact repeat of shot 9
Mar 18 2011 11:14:29:030AM1110318012Steve ScottNo physOp changes from shot 11.
result: good shot. same torus pressure
Mar 18 2011 11:22:57:577AM1110318013Steve ScottNo PhysOp changes.
result: good shot. same torus pressure.
Mar 18 2011 11:30:54:470AM1110318014Steve Scottno physOp changes.
result: good shot. pressure has drifted down a few percent.
Mar 18 2011 11:31:32:980AM1110318015Steve ScottNo physOp changes.
Mar 18 2011 11:52:37:833AM1110318016Steve Scottincrease duration of gas puff from 0.800 to 0.807 sec

result: no dnb.
Mar 18 2011 12:55:10:020PM1110318017Steve Scottincrease puff to 0.820 sec

no DNB. The DNB breaker has opened. DNB team is investigating. there will be a delay of unknown duration.

Probably no operation until at least 2 PM.

Engineering Operator Comments
ShotTimeTypeStatusComment
109:11:43:460AMTestOk
209:21:43:623AMTestOk
309:30:20:770AMTestOk
409:38:50:657AMTestOk
509:46:46:203AMTestOk
609:59:08:310AMTestOk
710:08:09:550AMTestOk
810:16:17:447AMTestOk
910:24:20:897AMTestOk
1010:32:18:237AMTestOk
1110:57:27:357AMTestOk
1211:08:31:387AMTestOk
1311:19:54:190AMTestOk
1411:27:45:403AMTestOk
1511:37:18:797AMTestOk
1611:50:18:560AMTestOk
1712:00:16:180PMTestOk
1802:25:48:403PMTestOk
1902:33:51:920PMTestOk
2002:43:23:353PMTestOk
2102:51:15:947PMTestOk
2202:58:13:797PMTestOk
2303:10:14:123PMTestOk
2403:18:19:110PMTestOk
2503:24:09:343PMTestOk
2603:30:21:063PMTestOk
2703:44:55:100PMTestOk
2804:05:36:737PMTestOk
2904:13:59:750PMTestOk

System Availability
Mar 18 2011 09:11:29:443AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesBES system is onlineOct 21 2010 11:33AM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi (D+F) working. All midplane and off-midplane diode arrays working except WB1AX. Midplane foils calibrated and PRAD_MAIN is being filled. Divertor/Ledge foils not yet ready.Jul 15 2010 08:27AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Nov 16 2010 02:36PM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA availableOct 21 2010 07:11PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged.Apr 06 2010 10:51AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesWide-view CXRS system is onlineOct 21 2010 11:33AM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayessystem is aligned; new calibrations (relative brightness and position) not yet implementedJun 29 2010 10:27AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationyesoperational, but turned offNov 03 2009 04:59PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnoin test mode onlyNov 03 2009 05:01PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperationalJun 26 2010 09:28PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesAll channels working and calibrated.Oct 27 2010 03:41PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesGauges are operational.Jun 28 2010 08:02PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPlugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access.Apr 05 2010 11:18AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperational.Jul 28 2009 04:23PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels operational. Oct 22 2010 11:46AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesoperating normallyJun 29 2010 10:26AM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Jun 26 2010 11:19PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesSystem installed and aligned. Inverted Profiles for Ti are available upon request. Vtor profiles still under revision.Dec 17 2010 09:25AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operationalOct 23 2010 01:41PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-Antennayessystem checked out ok on 11006728. Jun 28 2010 04:57PM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayessystem checked out ok on 1100628Jun 28 2010 04:57PM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayessystem checked out ok. conditioned to vacuum. Jun 28 2010 04:58PM (ylin)Steve WukitchJ-port antennawukitch,ylin
Laser Blow-Offyesoperational and testedJul 20 2010 04:42PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridyesLH working. New directional couplers installed at input to each klystron.Oct 21 2010 11:42AM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid Reflectometeryes50GHz: up-, 60 GHz up- and down-Oct 21 2010 11:31AM (sgbaek)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
Lower Hybrid SOL reflectometeryesprofiles and fluctuations both working. If requested, please request LH launcher to be moved in.Jan 18 2011 03:07PM (cornwall)Cornwall LauLower Hybrid SOL reflectometercornwall,wukitch,ylin
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoWB4LY and LLY working but not during ICRF. WB1LY not attached due to pickup problems. LYMID attached but have profile problems.Aug 24 2010 09:17AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesSpectra being collected and tree filled. Wavelength scan is broken so fixed on the Mo XXXI and XXXII lines.Jul 15 2010 08:28AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Oct 22 2010 11:46AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesGauges are operationalJun 28 2010 08:02PM (labombard)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnoAs of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB.Jun 10 2009 10:34AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesAll systems are on and functionalJun 29 2010 12:56PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesPMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03Jun 26 2010 09:21PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoCapillaries tested in-vessel.Jun 28 2010 08:08PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIyesOperational. AM 47.92 MHz.Mar 16 2011 08:24AM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoHigh voltage power supplies are turned off, waiting for work at A-port horizontal to be finished.Jun 28 2010 08:07PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air Switchyes Jun 26 2010 11:19PM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Jun 26 2010 11:19PM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyes Jun 26 2010 11:19PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power Systemsyes Jun 26 2010 11:20PM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesOperational.Jun 28 2010 08:03PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperational.Jun 28 2010 08:03PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesF and J outer divertor probes are operational.Jun 28 2010 08:04PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyesOperational, except probe#13Jun 28 2010 08:04PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
Reflectometerno1110216000 all waveguides disconnected to protect mixersFeb 16 2011 08:21AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational. New Langmuir-Mach probe head installed.Jun 28 2010 08:05PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesOperational.Jun 28 2010 08:05PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesBoth A and K units are operational. Coil polarity needs to be checked.Jun 28 2010 08:06PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesHV supply on, cable run to sparker at k-horJun 23 2010 02:41PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationyesSSS installed and leak tested.Oct 21 2010 11:31AM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesNo new CO2 detector, so still missing edge channelsJun 23 2010 02:40PM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CoreyesOperating with 2 lasersOct 22 2010 01:06PM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes,yma
TS - EdgeyesOperationalJul 14 2010 11:54AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesRaw spectra stored but not line brightness time histories are going into the tree yet.Jan 20 2011 10:45AM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermlreinke
XTOMOyesCore system working. Edge system waiting for H-modes.Jul 01 2010 11:55AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke