| Physics Operator Comments |
| Mar 29 2011 07:34:18:480AM | | Bill Rowan | Loaded 1110125003 this is a locked mode shot
segment 4 is on
dpcs fizzle source 1090731017
Loaded 1110323021 segment 1.
Increased prefill from 30 ms to 50 ms for cryo
|
| Mar 29 2011 08:05:05:937AM | 1110329001 | Bill Rowan | 001. gas test (first day of the week)
Next shot. enable b-side lower
enable cryo
before the next shot: entry for repair of cryo TC
|
| Mar 29 2011 08:20:56:507AM | 1110329002 | Bill Rowan | 002. full length
locked mode at 0.9 s as intended
next shot.
repeat locked mode shot
before next shot: cell access for diagnostics
|
| Mar 29 2011 08:41:06:020AM | 1110329003 | Bill Rowan | 003. plasma full length
disruption in ramp down
next shot.
load 1110125006, seg 3 is on
load segment 1 from 1110329002
before next shot: cell access for diagnostics
|
| Mar 29 2011 09:05:31:733AM | 1110329004 | Bill Rowan | 004.
plasma full length
upper null as requested
ip = 0.75 MA, nl_04 = 0.53e+20, BT=5T
Next shot.
load 1100317028
included h-bot and pulse_gas 1 and pulse_gas3 in dpcs_piezo_chopper
load segment 1 from 1110329004
added dpcs)xjump
|
| Mar 29 2011 09:19:05:643AM | 1110329005 | Bill Rowan | 005.
plasma full length
did not succeed in getting the changes into dpcs_piezo_chopper
the dpcs_xjump parameters were not set
next shot.
the dpcx_xjump parameters were loaded from default
again added h-bot and pulse_gas3 so that the result is
["pulse_gas1","pulse_gas3","h-bot "]
note square brackets
added 2 ms to prefill so that it is now 52 ms
increased pg3 backporch
|
| Mar 29 2011 09:31:20:013AM | 1110329006 | Bill Rowan | 006.
neuts_hards signal down: note two changes were made
plasma full length
next shot
increase prefill by 1 ms to 53 ms
small change in the density ramp
|
| Mar 29 2011 09:38:25:080AM | 1110329007 | Bill Rowan | 007
plasma full length
next shot
increase ic_ef4 from -1290 to -1280
before next shot: cell access
|
| Mar 29 2011 09:54:45:133AM | 1110329008 | Bill Rowan | 008.
runaway shutdown
breakdown looks okay
next shot.
No PCS changes
|
| Mar 29 2011 10:07:28:613AM | 1110329009 | Bill Rowan | 009.
plasma full length
next shot
loaded shot 1110329003 for a locked mode
loaded segment 1 from 1110329009
|
| Mar 30 2011 07:21:03:040AM | 1110329010 | Bill Rowan | 010.
plasma full length
disruption in ramp down
appears to have locked.
Last shot for MP 632
Next shot.
load 11001119007
load segment 1 from 1110329010
changed dpcs_piezo_chopper [pulse_gas1 to the
["pulse_gas3","H-bot ","pulse_gas1"]
verified that the pg1 pulse length (ar) is 50 ms
enabled b-side upper (He3) pg2
First shot for MP 640
|
| Mar 30 2011 07:22:11:963AM | 1110329011 | Bill Rowan | 011.
First shot for MP 640
plasma full length
runaways a bit high, I think
increase in he shows up on wide-view cxrs
next shot.
increased the argon puff from 50 ms to 75 ms (pg1)
added a ramp nl_04 after 0.3 s to attempt to keep it constant
|
| Mar 29 2011 10:55:43:880AM | 1110329012 | Bill Rowan | 012.
when lh comes on the density goes up.
the initial density is high
Next shot
Reduced the initial density and took out the ramp
|
| Mar 29 2011 11:00:09:060AM | 1110329012 | Bill Rowan | 012.
when lh comes on the density goes up.
the initial density is high
Next shot
Reduced the initial density and took out the ramp
increase the outer gap by 3 mm, rcur reduced by 1.5 mm
|
| Mar 29 2011 11:08:56:863AM | 1110329013 | Bill Rowan | 013.
plasma full length
nl_04 still too high
next shot
reduce the backporch on pg3 back to 40
|
| Mar 29 2011 11:31:43:230AM | 1110329014 | Bill Rowan | 014.
plasma full length
Next shot.
Disabled B-side lower (PG1) argon
increased outer gap by 5 mm by reducing rcurr by 2.5 mm
|
| Mar 29 2011 11:45:57:410AM | 1110329015 | Bill Rowan | 015.
plasma full length
nl_04 is lower and nearer the target
outer gap approx 5 mm larger to 22 mm
next shot
reduced BT from 5.4 T to 5 T
enable argon
|
| Mar 29 2011 11:54:33:943AM | 1110329016 | Bill Rowan | 016.
plasma full length
BT=5.0 T
Next shot
decrease the outer gap by 3 mm
increase Rcurr by 1.5 mm
|
| Mar 29 2011 12:09:20:243PM | 1110329017 | Bill Rowan | 017.
plasma full length
Next shot
nl_04 demand increased to 0.3e+20
decrease outer gap by 3 mm
increase rcurr by 1.5 mm
|
| Mar 29 2011 12:25:46:457PM | 1110329018 | Bill Rowan | 018.
plasma full length
next shot
increase he3 puff to 200 ms from 150 ms
|
| Mar 29 2011 12:39:40:013PM | 1110329019 | Bill Rowan | 019. plasma full length
next shot
increase he3 puff to 250 ms from 200 ms
|
| Mar 29 2011 12:51:34:100PM | 1110329020 | Bill Rowan | 020.
plasma full length
next shot
|
| Mar 29 2011 01:15:06:457PM | 1110329021 | Bill Rowan | 021.
plasma. disruption at 1.45 s
speculation is that something came in
next shot.
No pcs chganges
|
| Mar 29 2011 01:49:23:347PM | 1110329022 | Bill Rowan | 022
plasma full length. disruption at the beginning of ramp down.
severe problem at 1.2 s. Maybe an injection. Left gap dives to 0.
next shot
modify heating location by increase Bt to 5.1T
reduce the helium puff to 150 ms
|
| Mar 29 2011 01:49:01:967PM | 1110329023 | Bill Rowan | 023.
plasma full length
next shot
increase BT to 5.2T
|
| Mar 29 2011 01:58:41:433PM | 1110329024 | Bill Rowan | 024.
Plasma. Disruption at 0.84 s
BT = 5.2 T
injection
next shot
No PCS changes
|
| Mar 29 2011 02:17:05:197PM | 1110329025 | Bill Rowan | 025.
Plasma. Disruption at 0.85 s
Next shot.
Turn off J-port on the assumtion that it is the source of pick up in the magnetics
Decrease the prefill by 1 ms
|
| Mar 30 2011 07:33:42:940AM | 1110329026 | Bill Rowan | 026. Plasma
J-port antenna still on.
Next shot
decrease prefill by 1 ms
increase backporch on PG3 from 40 to 50
J-port off to test for pickup on the magnetics
|
| Mar 30 2011 07:35:04:493AM | 1110329027 | Bill Rowan | 027.
Plasma full length.
J-antenna seems to be picked up on magnetics.
Next shot.
BT=5.3T
increase nl_04 demand to 0.34e+20
|
| Mar 29 2011 02:58:36:113PM | 1110329028 | Bill Rowan | 028.
plasma full length
Next shot
BT=5.4T
IP=0.45 MA
Last shot for mp 640
|
| Mar 30 2011 07:28:11:817AM | 1110329029 | Bill Rowan | 029.
plasma full length
end of mp 640
next shot.
load 1110126026 segment 2 only
Drew the ramped waveform as described in the MP 647.
reloaded engineering waveform and reset TF limit to 210000
First shot for MP 647
|
| Mar 30 2011 07:28:45:103AM | 1110329030 | Bill Rowan | 030.
First shot for MP 647
Fizzle
Next shot.
Disabled b-side upper
Disabled b-side lower
IC_EF4 reduced from -1280 to -1290
|
| Mar 29 2011 03:39:22:270PM | 1110329031 | Bill Rowan | 031.
plasma. disrupted at 1.5 s (not long enough)
Next shot
revised the prefill to what I actually intended for shot 031
|
| Mar 29 2011 04:03:20:013PM | 1110329032 | Bill Rowan | 032.
Plasma full length
next shot.
nl_04 = 8.0e+19
new ramp.
|
| Mar 29 2011 04:26:16:673PM | 1110329034 | Bill Rowan | 034.
Fizzle
Next shot.
|
| Mar 29 2011 04:35:20:153PM | 1110329035 | Bill Rowan | 035.
plasma
next shot
no pcs changes
|
| Mar 29 2011 04:52:24:597PM | 1110329036 | Bill Rowan | 036.
plasma to 1.7 s
Next shot.
Reload 033
increase the prefill from 50 ms to 52 ms so that it matches the prefill on shot 035 and 034.
|
| Mar 29 2011 05:04:03:783PM | 1110329037 | Bill Rowan | 037.
fizzle
Next shot
increase the prefill from 52 ms to 54 ms
|
| System Availability |
| Mar 29 2011 07:57:14:347AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | BES system is online | Oct 21 2010 11:33AM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (D+F) working. All midplane and off-midplane diode arrays working except WB1AX. Midplane foils calibrated and PRAD_MAIN is being filled. Divertor/Ledge foils not yet ready. | Jul 15 2010 08:27AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | | Nov 16 2010 02:36PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Multiple channel CNPA available | Oct 21 2010 07:11PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged. | Apr 06 2010 10:51AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | Wide-view CXRS system is online | Oct 21 2010 11:33AM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned; new calibrations (relative brightness and position) not yet implemented | Jun 29 2010 10:27AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational | Jun 26 2010 09:28PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | All channels working and calibrated. | Oct 27 2010 03:41PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauges are operational. | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Plugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access. | Apr 05 2010 11:18AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Oct 22 2010 11:46AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | operating normally | Jun 29 2010 10:26AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | System installed and aligned. Inverted Profiles for Ti are available upon request. Vtor profiles still under revision. | Dec 17 2010 09:25AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | 32 Channels operational | Oct 23 2010 01:41PM (parker) | Ron Parker | Hard X-Ray Array | faust,parker,schmidt | | ICRF D-Antenna | yes | system checked out ok on 11006728. | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | system checked out ok on 1100628 | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | system checked out ok. conditioned to vacuum. | Jun 28 2010 04:58PM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | operational and tested | Jul 20 2010 04:42PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | yes | LH working. New directional couplers installed at input to each klystron. | Oct 21 2010 11:42AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | yes | 50GHz: up-, 60 GHz up- and down- | Oct 21 2010 11:31AM (sgbaek) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | Lower Hybrid SOL reflectometer | yes | profiles and fluctuations both working. If requested, please request LH launcher to be moved in. | Jan 18 2011 03:07PM (cornwall) | Cornwall Lau | Lower Hybrid SOL reflectometer | cornwall,wukitch,ylin | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | WB4LY and LLY working but not during ICRF. WB1LY not attached due to pickup problems. LYMID attached but have profile problems. | Aug 24 2010 09:17AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | vacuum problems fixed, still no wavelength scan - just used as a Mo/Cu/Ni/Fe/Ti monitor. | Mar 25 2011 08:25AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Oct 22 2010 11:46AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are operational | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | All systems are on and functional | Jun 29 2010 12:56PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | PMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03 | Jun 26 2010 09:21PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Capillaries tested in-vessel. | Jun 28 2010 08:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | Down due to chiller problem. | Mar 25 2011 08:37AM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | emd,ennever,ntsujii,porkolab | | Penning Gauges | no | High voltage power supplies are turned off, waiting for work at A-port horizontal to be finished. | Jun 28 2010 08:07PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | | Jun 26 2010 11:20PM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | F and J outer divertor probes are operational. | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Operational, except probe#13 | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | Starting 1110309xxx all channels were operational. On 1110323018 the 75 RCVR was lost. | Mar 25 2011 09:19AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Operational. New Langmuir-Mach probe head installed. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Operational. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | Both A and K units are operational. Coil polarity needs to be checked. | Jun 28 2010 08:06PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | HV supply on, cable run to sparker at k-hor | Jun 23 2010 02:41PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | yes | SSS installed and leak tested. | Oct 21 2010 11:31AM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | No new CO2 detector, so still missing edge channels | Jun 23 2010 02:40PM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | Operating with 2 lasers | Oct 22 2010 01:06PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | yes | Operational | Jul 14 2010 11:54AM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | Raw spectra stored but not line brightness time histories are going into the tree yet. | Jan 20 2011 10:45AM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | mlreinke | | XTOMO | yes | Core system working. Edge system waiting for H-modes. | Jul 01 2010 11:55AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Mar 29 2011 08:46:21:010AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | BES system is online | Oct 21 2010 11:33AM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (D+F) working. All midplane and off-midplane diode arrays working except WB1AX. Midplane foils calibrated and PRAD_MAIN is being filled. Divertor/Ledge foils not yet ready. | Jul 15 2010 08:27AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | | Nov 16 2010 02:36PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Multiple channel CNPA available | Oct 21 2010 07:11PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged. | Apr 06 2010 10:51AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | Wide-view CXRS system is online | Oct 21 2010 11:33AM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned; new calibrations (relative brightness and position) not yet implemented | Jun 29 2010 10:27AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational | Jun 26 2010 09:28PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | All channels working and calibrated. | Oct 27 2010 03:41PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauges are operational. | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Plugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access. | Apr 05 2010 11:18AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Oct 22 2010 11:46AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | operating normally | Jun 29 2010 10:26AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | System installed and aligned. Inverted Profiles for Ti are available upon request. Vtor profiles still under revision. | Dec 17 2010 09:25AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | 32 Channels operational | Oct 23 2010 01:41PM (parker) | Ron Parker | Hard X-Ray Array | faust,parker,schmidt | | ICRF D-Antenna | yes | system checked out ok on 11006728. | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | system checked out ok on 1100628 | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | system checked out ok. conditioned to vacuum. | Jun 28 2010 04:58PM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | operational and tested | Jul 20 2010 04:42PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | yes | LH working. New directional couplers installed at input to each klystron. | Oct 21 2010 11:42AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | yes | 50GHz: up-, 60 GHz up- and down- | Oct 21 2010 11:31AM (sgbaek) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | Lower Hybrid SOL reflectometer | yes | profiles and fluctuations both working. If requested, please request LH launcher to be moved in. | Jan 18 2011 03:07PM (cornwall) | Cornwall Lau | Lower Hybrid SOL reflectometer | cornwall,wukitch,ylin | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | WB4LY and LLY working but not during ICRF. WB1LY not attached due to pickup problems. LYMID attached but have profile problems. | Aug 24 2010 09:17AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | vacuum problems fixed, still no wavelength scan - just used as a Mo/Cu/Ni/Fe/Ti monitor. | Mar 25 2011 08:25AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Oct 22 2010 11:46AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are operational | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | All systems are on and functional | Jun 29 2010 12:56PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | PMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03 | Jun 26 2010 09:21PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Capillaries tested in-vessel. | Jun 28 2010 08:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. | Mar 29 2011 08:34AM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | emd,ennever,ntsujii,porkolab | | Penning Gauges | no | High voltage power supplies are turned off, waiting for work at A-port horizontal to be finished. | Jun 28 2010 08:07PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | | Jun 26 2010 11:20PM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | F and J outer divertor probes are operational. | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Operational, except probe#13 | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | Starting 1110309xxx all channels were operational. On 1110323018 the 75 RCVR was lost. | Mar 25 2011 09:19AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Operational. New Langmuir-Mach probe head installed. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Operational. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | Both A and K units are operational. Coil polarity needs to be checked. | Jun 28 2010 08:06PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | HV supply on, cable run to sparker at k-hor | Jun 23 2010 02:41PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | yes | SSS installed and leak tested. | Oct 21 2010 11:31AM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | No new CO2 detector, so still missing edge channels | Jun 23 2010 02:40PM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | Operating with 2 lasers | Oct 22 2010 01:06PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | yes | Operational | Jul 14 2010 11:54AM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | Raw spectra stored but not line brightness time histories are going into the tree yet. | Jan 20 2011 10:45AM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | mlreinke | | XTOMO | yes | Core system working. Edge system waiting for H-modes. | Jul 01 2010 11:55AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Mar 29 2011 09:06:09:723AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | BES system is online | Oct 21 2010 11:33AM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (D+F) working. All midplane and off-midplane diode arrays working except WB1AX. Midplane foils calibrated and PRAD_MAIN is being filled. Divertor/Ledge foils not yet ready. | Jul 15 2010 08:27AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | | Nov 16 2010 02:36PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Multiple channel CNPA available | Oct 21 2010 07:11PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged. | Apr 06 2010 10:51AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | Wide-view CXRS system is online | Oct 21 2010 11:33AM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned; new calibrations (relative brightness and position) not yet implemented | Jun 29 2010 10:27AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational | Jun 26 2010 09:28PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | All channels working and calibrated. | Oct 27 2010 03:41PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauges are operational. | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Plugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access. | Apr 05 2010 11:18AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Oct 22 2010 11:46AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | operating normally | Jun 29 2010 10:26AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | System installed and aligned. Inverted Profiles for Ti are available upon request. Vtor profiles still under revision. | Dec 17 2010 09:25AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | 32 Channels operational | Oct 23 2010 01:41PM (parker) | Ron Parker | Hard X-Ray Array | faust,parker,schmidt | | ICRF D-Antenna | yes | system checked out ok on 11006728. | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | system checked out ok on 1100628 | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | system checked out ok. conditioned to vacuum. | Jun 28 2010 04:58PM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | operational and tested | Jul 20 2010 04:42PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | yes | LH working. New directional couplers installed at input to each klystron. | Oct 21 2010 11:42AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | yes | 50GHz: up-, 60 GHz up- and down- | Oct 21 2010 11:31AM (sgbaek) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | Lower Hybrid SOL reflectometer | yes | profiles and fluctuations both working. If requested, please request LH launcher to be moved in. | Jan 18 2011 03:07PM (cornwall) | Cornwall Lau | Lower Hybrid SOL reflectometer | cornwall,wukitch,ylin | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | WB4LY and LLY working but not during ICRF. WB1LY not attached due to pickup problems. LYMID attached but have profile problems. | Aug 24 2010 09:17AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | vacuum problems fixed, still no wavelength scan - just used as a Mo/Cu/Ni/Fe/Ti monitor. | Mar 25 2011 08:25AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Oct 22 2010 11:46AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are operational | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | All systems are on and functional | Jun 29 2010 12:56PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | PMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03 | Jun 26 2010 09:21PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Capillaries tested in-vessel. | Jun 28 2010 08:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. | Mar 29 2011 08:34AM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | emd,ennever,ntsujii,porkolab | | Penning Gauges | no | High voltage power supplies are turned off, waiting for work at A-port horizontal to be finished. | Jun 28 2010 08:07PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | | Jun 26 2010 11:20PM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | F and J outer divertor probes are operational. | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Operational, except probe#13 | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | Starting 1110309xxx all channels were operational. On 1110323018 the 75 RCVR was lost. | Mar 25 2011 09:19AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Operational. New Langmuir-Mach probe head installed. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Operational. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | Both A and K units are operational. Coil polarity needs to be checked. | Jun 28 2010 08:06PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | HV supply on, cable run to sparker at k-hor | Jun 23 2010 02:41PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | yes | SSS installed and leak tested. | Oct 21 2010 11:31AM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | No new CO2 detector, so still missing edge channels | Jun 23 2010 02:40PM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | Operating with 2 lasers | Oct 22 2010 01:06PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | yes | Operational | Jul 14 2010 11:54AM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | Raw spectra stored but not line brightness time histories are going into the tree yet. | Jan 20 2011 10:45AM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | mlreinke | | XTOMO | yes | Core system working. Edge system waiting for H-modes. | Jul 01 2010 11:55AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Mar 29 2011 09:20:16:633AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | BES system is online | Oct 21 2010 11:33AM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (D+F) working. All midplane and off-midplane diode arrays working except WB1AX. Midplane foils calibrated and PRAD_MAIN is being filled. Divertor/Ledge foils not yet ready. | Jul 15 2010 08:27AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | | Nov 16 2010 02:36PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Multiple channel CNPA available | Oct 21 2010 07:11PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged. | Apr 06 2010 10:51AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | Wide-view CXRS system is online | Oct 21 2010 11:33AM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned; new calibrations (relative brightness and position) not yet implemented | Jun 29 2010 10:27AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational | Jun 26 2010 09:28PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | All channels working and calibrated. | Oct 27 2010 03:41PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauges are operational. | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Plugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access. | Apr 05 2010 11:18AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Oct 22 2010 11:46AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | operating normally | Jun 29 2010 10:26AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | System installed and aligned. Inverted Profiles for Ti are available upon request. Vtor profiles still under revision. | Dec 17 2010 09:25AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | 32 Channels operational | Oct 23 2010 01:41PM (parker) | Ron Parker | Hard X-Ray Array | faust,parker,schmidt | | ICRF D-Antenna | yes | system checked out ok on 11006728. | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | system checked out ok on 1100628 | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | system checked out ok. conditioned to vacuum. | Jun 28 2010 04:58PM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | operational and tested | Jul 20 2010 04:42PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | yes | LH working. New directional couplers installed at input to each klystron. | Oct 21 2010 11:42AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | yes | 50GHz: up-, 60 GHz up- and down- | Oct 21 2010 11:31AM (sgbaek) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | Lower Hybrid SOL reflectometer | yes | profiles and fluctuations both working. If requested, please request LH launcher to be moved in. | Jan 18 2011 03:07PM (cornwall) | Cornwall Lau | Lower Hybrid SOL reflectometer | cornwall,wukitch,ylin | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | WB4LY and LLY working but not during ICRF. WB1LY not attached due to pickup problems. LYMID attached but have profile problems. | Aug 24 2010 09:17AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | vacuum problems fixed, still no wavelength scan - just used as a Mo/Cu/Ni/Fe/Ti monitor. | Mar 25 2011 08:25AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Oct 22 2010 11:46AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are operational | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | All systems are on and functional | Jun 29 2010 12:56PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | PMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03 | Jun 26 2010 09:21PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Capillaries tested in-vessel. | Jun 28 2010 08:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. | Mar 29 2011 08:34AM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | emd,ennever,ntsujii,porkolab | | Penning Gauges | no | High voltage power supplies are turned off, waiting for work at A-port horizontal to be finished. | Jun 28 2010 08:07PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | | Jun 26 2010 11:20PM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | F and J outer divertor probes are operational. | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Operational, except probe#13 | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | Starting 1110309xxx all channels were operational. On 1110323018 the 75 RCVR was lost. | Mar 25 2011 09:19AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Operational. New Langmuir-Mach probe head installed. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Operational. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | Both A and K units are operational. Coil polarity needs to be checked. | Jun 28 2010 08:06PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | HV supply on, cable run to sparker at k-hor | Jun 23 2010 02:41PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | yes | SSS installed and leak tested. | Oct 21 2010 11:31AM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | No new CO2 detector, so still missing edge channels | Jun 23 2010 02:40PM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | Operating with 2 lasers | Oct 22 2010 01:06PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | yes | Operational | Jul 14 2010 11:54AM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | Raw spectra stored but not line brightness time histories are going into the tree yet. | Jan 20 2011 10:45AM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | mlreinke | | XTOMO | yes | Core system working. Edge system waiting for H-modes. | Jul 01 2010 11:55AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Mar 29 2011 09:33:26:847AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | BES system is online | Oct 21 2010 11:33AM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (D+F) working. All midplane and off-midplane diode arrays working except WB1AX. Midplane foils calibrated and PRAD_MAIN is being filled. Divertor/Ledge foils not yet ready. | Jul 15 2010 08:27AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | | Nov 16 2010 02:36PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Multiple channel CNPA available | Oct 21 2010 07:11PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged. | Apr 06 2010 10:51AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | Wide-view CXRS system is online | Oct 21 2010 11:33AM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned; new calibrations (relative brightness and position) not yet implemented | Jun 29 2010 10:27AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational | Jun 26 2010 09:28PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | All channels working and calibrated. | Oct 27 2010 03:41PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauges are operational. | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Plugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access. | Apr 05 2010 11:18AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Oct 22 2010 11:46AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | operating normally | Jun 29 2010 10:26AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | System installed and aligned. Inverted Profiles for Ti are available upon request. Vtor profiles still under revision. | Dec 17 2010 09:25AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | 32 Channels operational | Oct 23 2010 01:41PM (parker) | Ron Parker | Hard X-Ray Array | faust,parker,schmidt | | ICRF D-Antenna | yes | system checked out ok on 11006728. | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | system checked out ok on 1100628 | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | system checked out ok. conditioned to vacuum. | Jun 28 2010 04:58PM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | operational and tested | Jul 20 2010 04:42PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | yes | LH working. New directional couplers installed at input to each klystron. | Oct 21 2010 11:42AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | yes | 50GHz: up-, 60 GHz up- and down- | Oct 21 2010 11:31AM (sgbaek) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | Lower Hybrid SOL reflectometer | yes | profiles and fluctuations both working. If requested, please request LH launcher to be moved in. | Jan 18 2011 03:07PM (cornwall) | Cornwall Lau | Lower Hybrid SOL reflectometer | cornwall,wukitch,ylin | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | WB4LY and LLY working but not during ICRF. WB1LY not attached due to pickup problems. LYMID attached but have profile problems. | Aug 24 2010 09:17AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | vacuum problems fixed, still no wavelength scan - just used as a Mo/Cu/Ni/Fe/Ti monitor. | Mar 25 2011 08:25AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Oct 22 2010 11:46AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are operational | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | All systems are on and functional | Jun 29 2010 12:56PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | PMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03 | Jun 26 2010 09:21PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Capillaries tested in-vessel. | Jun 28 2010 08:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. | Mar 29 2011 08:34AM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | emd,ennever,ntsujii,porkolab | | Penning Gauges | no | High voltage power supplies are turned off, waiting for work at A-port horizontal to be finished. | Jun 28 2010 08:07PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | | Jun 26 2010 11:20PM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | F and J outer divertor probes are operational. | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Operational, except probe#13 | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | Starting 1110309xxx all channels were operational. On 1110323018 the 75 RCVR was lost. | Mar 25 2011 09:19AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Operational. New Langmuir-Mach probe head installed. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Operational. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | Both A and K units are operational. Coil polarity needs to be checked. | Jun 28 2010 08:06PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | HV supply on, cable run to sparker at k-hor | Jun 23 2010 02:41PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | yes | SSS installed and leak tested. | Oct 21 2010 11:31AM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | No new CO2 detector, so still missing edge channels | Jun 23 2010 02:40PM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | Operating with 2 lasers | Oct 22 2010 01:06PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | yes | Operational | Jul 14 2010 11:54AM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | Raw spectra stored but not line brightness time histories are going into the tree yet. | Jan 20 2011 10:45AM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | mlreinke | | XTOMO | yes | Core system working. Edge system waiting for H-modes. | Jul 01 2010 11:55AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Mar 29 2011 09:47:08:963AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | BES system is online | Oct 21 2010 11:33AM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (D+F) working. All midplane and off-midplane diode arrays working except WB1AX. Midplane foils calibrated and PRAD_MAIN is being filled. Divertor/Ledge foils not yet ready. | Jul 15 2010 08:27AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | | Nov 16 2010 02:36PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Multiple channel CNPA available | Oct 21 2010 07:11PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged. | Apr 06 2010 10:51AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | Wide-view CXRS system is online | Oct 21 2010 11:33AM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned; new calibrations (relative brightness and position) not yet implemented | Jun 29 2010 10:27AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational | Jun 26 2010 09:28PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | All channels working and calibrated. | Oct 27 2010 03:41PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauges are operational. | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Plugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access. | Apr 05 2010 11:18AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Oct 22 2010 11:46AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | operating normally | Jun 29 2010 10:26AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | System installed and aligned. Inverted Profiles for Ti are available upon request. Vtor profiles still under revision. | Dec 17 2010 09:25AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | 32 Channels operational | Oct 23 2010 01:41PM (parker) | Ron Parker | Hard X-Ray Array | faust,parker,schmidt | | ICRF D-Antenna | yes | system checked out ok on 11006728. | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | system checked out ok on 1100628 | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | system checked out ok. conditioned to vacuum. | Jun 28 2010 04:58PM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | operational and tested | Jul 20 2010 04:42PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | yes | LH working. New directional couplers installed at input to each klystron. | Oct 21 2010 11:42AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | yes | 50GHz: up-, 60 GHz up- and down- | Oct 21 2010 11:31AM (sgbaek) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | Lower Hybrid SOL reflectometer | yes | profiles and fluctuations both working. If requested, please request LH launcher to be moved in. | Jan 18 2011 03:07PM (cornwall) | Cornwall Lau | Lower Hybrid SOL reflectometer | cornwall,wukitch,ylin | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | WB4LY and LLY working but not during ICRF. WB1LY not attached due to pickup problems. LYMID attached but have profile problems. | Aug 24 2010 09:17AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | vacuum problems fixed, still no wavelength scan - just used as a Mo/Cu/Ni/Fe/Ti monitor. | Mar 25 2011 08:25AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Oct 22 2010 11:46AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are operational | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | All systems are on and functional | Jun 29 2010 12:56PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | PMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03 | Jun 26 2010 09:21PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Capillaries tested in-vessel. | Jun 28 2010 08:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. | Mar 29 2011 08:34AM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | emd,ennever,ntsujii,porkolab | | Penning Gauges | no | High voltage power supplies are turned off, waiting for work at A-port horizontal to be finished. | Jun 28 2010 08:07PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | | Jun 26 2010 11:20PM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | F and J outer divertor probes are operational. | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Operational, except probe#13 | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | Starting 1110309xxx all channels were operational. On 1110323018 the 75 RCVR was lost. | Mar 25 2011 09:19AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Operational. New Langmuir-Mach probe head installed. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Operational. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | Both A and K units are operational. Coil polarity needs to be checked. | Jun 28 2010 08:06PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | HV supply on, cable run to sparker at k-hor | Jun 23 2010 02:41PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | yes | SSS installed and leak tested. | Oct 21 2010 11:31AM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | No new CO2 detector, so still missing edge channels | Jun 23 2010 02:40PM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | Operating with 2 lasers | Oct 22 2010 01:06PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | yes | Operational | Jul 14 2010 11:54AM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | Raw spectra stored but not line brightness time histories are going into the tree yet. | Jan 20 2011 10:45AM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | mlreinke | | XTOMO | yes | Core system working. Edge system waiting for H-modes. | Jul 01 2010 11:55AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|
| Mar 29 2011 09:59:51:443AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | BES system is online | Oct 21 2010 11:33AM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi (D+F) working. All midplane and off-midplane diode arrays working except WB1AX. Midplane foils calibrated and PRAD_MAIN is being filled. Divertor/Ledge foils not yet ready. | Jul 15 2010 08:27AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | | Nov 16 2010 02:36PM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Multiple channel CNPA available | Oct 21 2010 07:11PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve and solenoid valves are closed and tagged. | Apr 06 2010 10:51AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | Wide-view CXRS system is online | Oct 21 2010 11:33AM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | system is aligned; new calibrations (relative brightness and position) not yet implemented | Jun 29 2010 10:27AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | yes | operational, but turned off | Nov 03 2009 04:59PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DNB | no | in test mode only | Nov 03 2009 05:01PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational | Jun 26 2010 09:28PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | yes | All channels working and calibrated. | Oct 27 2010 03:41PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | Gauges are operational. | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Plugs for Power Supply and Controls have been unplugged and red tagged making system safe for In-Vessel Access. | Apr 05 2010 11:18AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Operational. | Jul 28 2009 04:23PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most channels operational. | Oct 22 2010 11:46AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | operating normally | Jun 29 2010 10:26AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | System installed and aligned. Inverted Profiles for Ti are available upon request. Vtor profiles still under revision. | Dec 17 2010 09:25AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | 32 Channels operational | Oct 23 2010 01:41PM (parker) | Ron Parker | Hard X-Ray Array | faust,parker,schmidt | | ICRF D-Antenna | yes | system checked out ok on 11006728. | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | yes | system checked out ok on 1100628 | Jun 28 2010 04:57PM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | system checked out ok. conditioned to vacuum. | Jun 28 2010 04:58PM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Laser Blow-Off | yes | operational and tested | Jul 20 2010 04:42PM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | yes | LH working. New directional couplers installed at input to each klystron. | Oct 21 2010 11:42AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | yes | 50GHz: up-, 60 GHz up- and down- | Oct 21 2010 11:31AM (sgbaek) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | Lower Hybrid SOL reflectometer | yes | profiles and fluctuations both working. If requested, please request LH launcher to be moved in. | Jan 18 2011 03:07PM (cornwall) | Cornwall Lau | Lower Hybrid SOL reflectometer | cornwall,wukitch,ylin | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | WB4LY and LLY working but not during ICRF. WB1LY not attached due to pickup problems. LYMID attached but have profile problems. | Aug 24 2010 09:17AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | vacuum problems fixed, still no wavelength scan - just used as a Mo/Cu/Ni/Fe/Ti monitor. | Mar 25 2011 08:25AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Oct 22 2010 11:46AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | Gauges are operational | Jun 28 2010 08:02PM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | As of 6/10/09, MSE is calibrated & ready to go. Awaiting DNB. | Jun 10 2009 10:34AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | All systems are on and functional | Jun 29 2010 12:56PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | PMT Neuts_hards, ssd_x01, ssd_x02, ssd_x03 | Jun 26 2010 09:21PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Capillaries tested in-vessel. | Jun 28 2010 08:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | yes | Operational. | Mar 29 2011 08:34AM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | emd,ennever,ntsujii,porkolab | | Penning Gauges | no | High voltage power supplies are turned off, waiting for work at A-port horizontal to be finished. | Jun 28 2010 08:07PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | yes | | Jun 26 2010 11:19PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | yes | | Jun 26 2010 11:20PM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | Operational. | Jun 28 2010 08:03PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | F and J outer divertor probes are operational. | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | Operational, except probe#13 | Jun 28 2010 08:04PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | Starting 1110309xxx all channels were operational. On 1110323018 the 75 RCVR was lost. | Mar 25 2011 09:19AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Operational. New Langmuir-Mach probe head installed. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Operational. | Jun 28 2010 08:05PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | Both A and K units are operational. Coil polarity needs to be checked. | Jun 28 2010 08:06PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | HV supply on, cable run to sparker at k-hor | Jun 23 2010 02:41PM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | yes | SSS installed and leak tested. | Oct 21 2010 11:31AM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | No new CO2 detector, so still missing edge channels | Jun 23 2010 02:40PM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | yes | Operating with 2 lasers | Oct 22 2010 01:06PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes,yma | | TS - Edge | yes | Operational | Jul 14 2010 11:54AM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | Raw spectra stored but not line brightness time histories are going into the tree yet. | Jan 20 2011 10:45AM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | mlreinke | | XTOMO | yes | Core system working. Edge system waiting for H-modes. | Jul 01 2010 11:55AM (mlreinke) | Bob Granetz | X-Ray Tomography | granetz,mlreinke |
|