Alcator C-Mod Run 1111117 Information

Back to runs

Miniproposals

Operators
Session leader(s):
Physics operator(s):
Engineering operator(s):

Engineering Operator Run Comment
Data system test cycles

Session Leader Plans

Physics Operators Plans

Session Leader Summaries

Physics Operator Summaries

Session Leader Comments

Physics Operator Comments
Nov 18 2011 10:21:27:663AM1111117009Steve Wolfe
Shot#1: EFC test (low voltage). ZCUR3 normal seg1 program
B-top and B-Main enabled, standard seg1 programming
Do a load just for form, since it's the same as was there yesterday.
Load at 18-Nov-2011 10:11:16.00
Open tree /home/wolfe/pcs_scratch      -1
Open tree done

Waiting for Joe and Yuri to troubleshoot the ACCESS master reset problem.



Engineering Operator Comments
ShotTimeTypeStatusComment
101:38:49:297PMTestOk
202:31:27:200PMTestOk
302:58:02:973PMTestOk
403:20:26:570PMTestOk
503:42:31:463PMTestOk
604:11:32:967PMTestOk
704:28:57:580PMTestOk
804:39:55:973PMTestOk
904:47:21:113PMTestOk

System Availability
Nov 17 2011 01:38:28:927PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESnoBES system is offline, no safety risk for in-vessel accessApr 14 2011 01:20PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
BolometersnoWB3,WB4 and ledge box removed from vessel, WB1, WB2 and KLIM still installedMay 04 2011 08:39AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSnocore-CXRS system is offline, no safety risk for in-vessel accessApr 14 2011 01:20PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCnoMagnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum, baking. Gate valve enabled. Will be using new preamps, under test during power tests.Nov 15 2011 02:09PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Gate valve enabled. Will test during power tests.Nov 15 2011 02:09PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
Lower Hybrid SOL reflectometernoplease notify if moving LH or reflectometer componentsApr 14 2011 08:57AM (wukitch)Cornwall LauLower Hybrid SOL reflectometercornwall,wukitch,ylin
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoWB4 and LEDGE removed, WB1 and KLIM still in-vesselMay 04 2011 08:40AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnostill under vacuum, MCP high voltage is offApr 13 2011 11:53AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesFront end pumped down, baking. Gate valve enabled, dewar cold. Will pump instrument and test mechanics during power tests.Nov 15 2011 02:10PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsnoHigh voltage is turned off on all detectors.Apr 11 2011 10:27AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On.Nov 10 2011 11:45AM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkernoHV supply off and unplugged from 120VAC, HV cable disconnected at sparkerApr 11 2011 11:25AM (parkin)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSnoXEUS has been removed from the cellApr 13 2011 11:52AM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermlreinke
XTOMOnoARRAY1 and ARRAY3 Be filters removed for spatial calibrationsMay 04 2011 08:40AM (mlreinke)Bob GranetzX-Ray Tomographygranetz,mlreinke

Nov 17 2011 02:57:48:710PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESnoBES system is offline, no safety risk for in-vessel accessApr 14 2011 01:20PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSnocore-CXRS system is offline, no safety risk for in-vessel accessApr 14 2011 01:20PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCnoMagnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum, baking. Gate valve enabled. Will be using new preamps, under test during power tests.Nov 15 2011 02:09PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Gate valve enabled. Will test during power tests.Nov 15 2011 02:09PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
Lower Hybrid SOL reflectometernoplease notify if moving LH or reflectometer componentsApr 14 2011 08:57AM (wukitch)Cornwall LauLower Hybrid SOL reflectometercornwall,wukitch,ylin
LowEUSno Nov 17 2011 02:49PM Matthew L. Reinke  mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end pumped down, baking. Gate valve enabled, dewar cold. Will pump instrument and test mechanics during power tests.Nov 15 2011 02:10PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsnoHigh voltage is turned off on all detectors.Apr 11 2011 10:27AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On.Nov 10 2011 11:45AM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkernoHV supply off and unplugged from 120VAC, HV cable disconnected at sparkerApr 11 2011 11:25AM (parkin)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSnoXEUS is currently under vacuum, but gate-valve and camera control is not yet availableNov 17 2011 02:40PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 17 2011 03:20:09:687PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESnoBES system is offline, no safety risk for in-vessel accessApr 14 2011 01:20PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSnocore-CXRS system is offline, no safety risk for in-vessel accessApr 14 2011 01:20PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCnoMagnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum, baking. Gate valve enabled. Will be using new preamps, under test during power tests.Nov 15 2011 02:09PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Gate valve enabled. Will test during power tests.Nov 15 2011 02:09PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
Lower Hybrid SOL reflectometernoplease notify if moving LH or reflectometer componentsApr 14 2011 08:57AM (wukitch)Cornwall LauLower Hybrid SOL reflectometercornwall,wukitch,ylin
LowEUSno Nov 17 2011 02:49PM Matthew L. Reinke  mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end pumped down, baking. Gate valve enabled, dewar cold. Will pump instrument and test mechanics during power tests.Nov 15 2011 02:10PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsnoHigh voltage is turned off on all detectors.Apr 11 2011 10:27AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On.Nov 10 2011 11:45AM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkernoHV supply off and unplugged from 120VAC, HV cable disconnected at sparkerApr 11 2011 11:25AM (parkin)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSnoXEUS is currently under vacuum, but gate-valve and camera control is not yet availableNov 17 2011 02:40PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 17 2011 03:42:16:973PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESnoBES system is offline, no safety risk for in-vessel accessApr 14 2011 01:20PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSnocore-CXRS system is offline, no safety risk for in-vessel accessApr 14 2011 01:20PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCnoMagnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum, baking. Gate valve enabled. Will be using new preamps, under test during power tests.Nov 15 2011 02:09PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Gate valve enabled. Will test during power tests.Nov 15 2011 02:09PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
Lower Hybrid SOL reflectometernoplease notify if moving LH or reflectometer componentsApr 14 2011 08:57AM (wukitch)Cornwall LauLower Hybrid SOL reflectometercornwall,wukitch,ylin
LowEUSno Nov 17 2011 02:49PM Matthew L. Reinke  mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end pumped down, baking. Gate valve enabled, dewar cold. Will pump instrument and test mechanics during power tests.Nov 15 2011 02:10PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsnoHigh voltage is turned off on all detectors.Apr 11 2011 10:27AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On.Nov 10 2011 11:45AM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkernoHV supply off and unplugged from 120VAC, HV cable disconnected at sparkerApr 11 2011 11:25AM (parkin)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSnoXEUS is currently under vacuum, but gate-valve and camera control is not yet availableNov 17 2011 02:40PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 17 2011 04:11:18:460PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESnoBES system is offline, no safety risk for in-vessel accessApr 14 2011 01:20PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSnocore-CXRS system is offline, no safety risk for in-vessel accessApr 14 2011 01:20PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCnoMagnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum, baking. Gate valve enabled. Will be using new preamps, under test during power tests.Nov 15 2011 02:09PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Gate valve enabled. Will test during power tests.Nov 15 2011 02:09PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
Lower Hybrid SOL reflectometernoplease notify if moving LH or reflectometer componentsApr 14 2011 08:57AM (wukitch)Cornwall LauLower Hybrid SOL reflectometercornwall,wukitch,ylin
LowEUSno Nov 17 2011 02:49PM Matthew L. Reinke  mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end pumped down, baking. Gate valve enabled, dewar cold. Will pump instrument and test mechanics during power tests.Nov 15 2011 02:10PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsnoHigh voltage is turned off on all detectors.Apr 11 2011 10:27AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On.Nov 10 2011 11:45AM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkernoHV supply off and unplugged from 120VAC, HV cable disconnected at sparkerApr 11 2011 11:25AM (parkin)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSnoXEUS is currently under vacuum, but gate-valve and camera control is not yet availableNov 17 2011 02:40PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 17 2011 04:28:43:760PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESnoBES system is offline, no safety risk for in-vessel accessApr 14 2011 01:20PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSnocore-CXRS system is offline, no safety risk for in-vessel accessApr 14 2011 01:20PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCnoMagnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum, baking. Gate valve enabled. Will be using new preamps, under test during power tests.Nov 15 2011 02:09PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Gate valve enabled. Will test during power tests.Nov 15 2011 02:09PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
Lower Hybrid SOL reflectometernoplease notify if moving LH or reflectometer componentsApr 14 2011 08:57AM (wukitch)Cornwall LauLower Hybrid SOL reflectometercornwall,wukitch,ylin
LowEUSno Nov 17 2011 02:49PM Matthew L. Reinke  mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end pumped down, baking. Gate valve enabled, dewar cold. Will pump instrument and test mechanics during power tests.Nov 15 2011 02:10PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsnoHigh voltage is turned off on all detectors.Apr 11 2011 10:27AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On.Nov 10 2011 11:45AM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkernoHV supply off and unplugged from 120VAC, HV cable disconnected at sparkerApr 11 2011 11:25AM (parkin)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSnoXEUS is currently under vacuum, but gate-valve and camera control is not yet availableNov 17 2011 02:40PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 17 2011 04:39:42:113PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESnoBES system is offline, no safety risk for in-vessel accessApr 14 2011 01:20PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSnocore-CXRS system is offline, no safety risk for in-vessel accessApr 14 2011 01:20PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCnoMagnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum, baking. Gate valve enabled. Will be using new preamps, under test during power tests.Nov 15 2011 02:09PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Gate valve enabled. Will test during power tests.Nov 15 2011 02:09PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
Lower Hybrid SOL reflectometernoplease notify if moving LH or reflectometer componentsApr 14 2011 08:57AM (wukitch)Cornwall LauLower Hybrid SOL reflectometercornwall,wukitch,ylin
LowEUSno Nov 17 2011 02:49PM Matthew L. Reinke  mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end pumped down, baking. Gate valve enabled, dewar cold. Will pump instrument and test mechanics during power tests.Nov 15 2011 02:10PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsnoHigh voltage is turned off on all detectors.Apr 11 2011 10:27AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On.Nov 10 2011 11:45AM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkernoHV supply off and unplugged from 120VAC, HV cable disconnected at sparkerApr 11 2011 11:25AM (parkin)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSnoXEUS is currently under vacuum, but gate-valve and camera control is not yet availableNov 17 2011 02:40PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 17 2011 04:47:06:690PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESnoBES system is offline, no safety risk for in-vessel accessApr 14 2011 01:20PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSnocore-CXRS system is offline, no safety risk for in-vessel accessApr 14 2011 01:20PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCnoMagnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum, baking. Gate valve enabled. Will be using new preamps, under test during power tests.Nov 15 2011 02:09PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Gate valve enabled. Will test during power tests.Nov 15 2011 02:09PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
Lower Hybrid SOL reflectometernoplease notify if moving LH or reflectometer componentsApr 14 2011 08:57AM (wukitch)Cornwall LauLower Hybrid SOL reflectometercornwall,wukitch,ylin
LowEUSno Nov 17 2011 02:49PM Matthew L. Reinke  mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end pumped down, baking. Gate valve enabled, dewar cold. Will pump instrument and test mechanics during power tests.Nov 15 2011 02:10PM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsnoHigh voltage is turned off on all detectors.Apr 11 2011 10:27AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On.Nov 10 2011 11:45AM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkernoHV supply off and unplugged from 120VAC, HV cable disconnected at sparkerApr 11 2011 11:25AM (parkin)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSnoXEUS is currently under vacuum, but gate-valve and camera control is not yet availableNov 17 2011 02:40PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke