Alcator C-Mod Run 1111122 Information

Back to runs

Miniproposals

Operators
Session leader(s):
Physics operator(s):Earl Marmar
Engineering operator(s):Bill Cochran,Bill Parkin,Bill Byford

Engineering Operator Run Comment
FY12 Plasma Startup (MP298a)

Session Leader Plans

Physics Operators Plans
Entered: Nov 21 2011 05:48:20:830PM
Author: Earl Marmar
Physop Plan for Tuesday, 22-Nov-2011

FY12 Plasma Startup (MP298a)

PO: Marmar



-----------------
Engineering Setup
-----------------

Run begins at 9:00 and ends at 17:00


Power systems as on: 1111118032

Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:
----------
Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
fill H-bot with 15psi D2 Hybrid DISABLED (PG5)
DO NOT fill B-div, Hybrid DISABLED (PG6)
DO NOT fill H-div, Hybrid DISABLED (PG7)
fill NINJA with 10 psi D2 DISABLED

Gate-valves and shutters: Enable ECE

Check with the physop before opening other diagnostic gate-valves or shutters.

Torvac gatevalve toggle (yes/no): no

Boronization(yes/no): no
Overnight ECDC (yes/no): YES
ICRF(yes/no): no
LH(yes/no): no
Cryopump (yes/no): no
DNB (yes/no): no

Vessel temperature: 35/35/35

------------------------------
ECDC Parameters
------------------------------
gas and pressure: D2 at 2e-4 Torr
sweep: 44/45/103 cm
scan: 20/120 s

====================================
Physics Operator Plans:

Willy has made some changes to the H-bottom pulsed-gas control electronics, which should be tested, preferably before 9:00 am.

Start from Friday's plasma attempt (1111118032, 700 kA, nl_04=5e19). Tune the startup until we get current rise. If successful, consider slowly increasing density and plasma current.

We will want to keep an eye on the magnetics, including BP16_JK, which had a problem on Friday and was zapped prior to shot 32.

Depending on success and reproducibility, we may consider between-shot ECDC.

Session Leader Summaries

Physics Operator Summaries
Entered: Nov 22 2011 05:11:05:137PM
Author: Earl Marmar
Not a terrible day for first plasmas after a long break, especially considering we've had relatively little ECDC, and there was an up to argon late last week.

By the end of the day, startup was reliable (6 in row on the last 6 shots), but we never got past 100 ms and 200 kA. Current rise is slow, density rises too fast, and the plasmas go vertically unstable at the end.

Prefull puff was short to start, and we made it shorter. Most plasmas had bursts of hard x-rays.

RGA looks ok, mostly deuterium, hydrogen, hydrocarbons and masses 28, 40 and 44. It seemed to slowly improve during the day.

H/D at the disruptions is not extremely high (~25%).

Power systems were generally reliable; we lost one shot to EF1U early commutation. There was also a delay when pcdaqdpcs3 crashed.

Summary:

13 plasmas
18 fizzles
1 dud

32 shot cycles

Session Leader Comments

Physics Operator Comments
Nov 22 2011 08:48:51:817AM1111122001Earl Marmargas test, B-main, B-top and H-bottom
Nov 22 2011 09:36:28:410AM1111122002Earl MarmarBob changed the BP16_jk TF offset
recalculated all the wires that might use it (all 4 segments)

plasma attempt
fizzle, got a bit of density, perhaps a bit more current than 1111118032


Nov 22 2011 09:55:35:680AM1111122003Earl MarmarBR_0 offset to +0.0005 (from 0.00000)

plasma

got to about 180 kA
very dirty, resistive, dense

Nov 22 2011 10:02:59:110AM1111122004Earl Marmarprefill puff to 16 ms (from 17)

fizzle
Nov 22 2011 10:17:13:183AM1111122005Earl MarmarBR_0 offset to +0.001 (from +0.0005)

fizzle
Nov 22 2011 10:28:47:423AM1111122006Earl Marmarprefill puff to 15 ms (from 16)

fizzle
Nov 22 2011 10:51:04:450AM1111122006Earl Marmarfollowing shot 6, a pause in the action while the engineers check out EF1L
Nov 22 2011 11:20:41:550AM1111122007Earl Marmarno dpcs changes

fizzle
Nov 22 2011 11:40:05:477AM1111122008Earl Marmarno DPCS changes

fizzle
Nov 22 2011 11:49:09:630AM1111122009Earl MarmarBR_0 offset to 0.0000 from +0.001

prefill puff to 16 ms (from 15)

fizzle
Nov 22 2011 12:07:52:223PM1111122010Earl Marmarprefill puff to 13 ms
BR_0 offset to +0.0005 (from 0.0000)

plasma

short, radiative, ~150 kA, short burst of hards
Nov 22 2011 12:23:21:747PM1111122011Earl Marmarprefill puff to 12 ms

fizzle
Nov 22 2011 12:24:24:290PM1111122012Earl Marmarno DPCS changes

fizzle



Nov 22 2011 12:44:49:213PM1111122013Earl Marmarno DPCS changes

plasma, short, radiative, bursts of hards
150 kA, lose it vertically (goes up)
Nov 22 2011 01:00:01:703PM1111122014Earl Marmarno DPCS changes

fizzle
Nov 22 2011 01:22:27:840PM1111122015Earl Marmarno DPCS changes

fizzle
Nov 22 2011 01:22:46:400PM1111122016Earl Marmarno DPCS changes

plasma; see entry for 13
Nov 22 2011 01:31:41:180PM1111122017Earl Marmarno DPCS changes

power supply dud, EF1U early commutation
Nov 22 2011 01:46:50:167PM1111122018Earl Marmarno DPCS changes

fizzle
Nov 22 2011 02:00:16:177PM1111122019Earl Marmarno DPCS changes

fizzle
Nov 22 2011 02:28:14:637PM1111122019Earl Marmardelay after 19
pcdaqdpcs3 problem
Nov 22 2011 02:37:36:127PM1111122020Earl Marmarno dpcs changes

plasma, similar to 16
maybe fewer hards
Nov 22 2011 02:44:25:473PM1111122021Earl Marmarno dpcs changes

fizzle
Nov 22 2011 03:03:48:573PM1111122022Earl Marmarsegment 1 RCUR offset to 2000 (was 3500)

plasma, short, dirty, 130 kA
Nov 22 2011 03:10:08:900PM1111122023Earl Marmarno dpcs changes
fizzle
Nov 22 2011 03:33:02:840PM1111122024Earl Marmarchopper on a little earlier
tweaks to OH2 voltages at 50 ms

plasma, similar to all the previous
Nov 22 2011 03:37:39:037PM1111122025Earl Marmarraise EF1 voltages between 50 and 100 msec

fizzle
Nov 22 2011 03:51:48:070PM1111122026Earl Marmarno additional dpcs changes

fizzle
Nov 22 2011 04:36:10:953PM1111122027Earl Marmarno dpcs changes

plasma
still only 150 kA, but it lasts slightly longer
Nov 22 2011 04:14:58:220PM1111122028Earl Marmardecrease initial PG3 puff a bit
raise EF1 voltages a bit more between 80 and 100 ms

plasma
similar to 27
Nov 22 2011 04:35:16:483PM1111122029Earl Marmarno dpcs changes

plasma
3 in a row,
this one makes it to 100 msec and almost 200 kA
Nov 22 2011 04:46:00:133PM1111122030Earl Marmarmove segment 1 zcur target to -0.01 m (from essentially 0.000)

plasma,
similar to 29, about 10 msec shorter
Nov 22 2011 04:46:29:397PM1111122031Earl Marmarno dpcs changes

Nov 22 2011 05:11:31:710PM1111122032Earl Marmarsegment 1 ZCUR target to -.02 m (from -.01)

plasma
deja vu all over again

Engineering Operator Comments
ShotTimeTypeStatusComment
108:46:58:460AMTestOkGas Test
209:25:07:547AMPlasmaOk
309:40:39:230AMPlasmaOk
409:55:20:520AMPlasmaOk
510:08:10:730AMPlasmaOk
610:20:29:390AMPlasmaOk
711:14:55:580AMPlasmaOk
811:30:57:960AMPlasmaOk
911:43:40:297AMPlasmaOk
1011:56:11:753AMPlasmaOk
1112:09:50:010PMPlasmaOk
1212:22:35:383PMPlasmaOk
1312:35:07:447PMPlasmaOk
1412:47:46:150PMPlasmaOk
1501:00:33:697PMPlasmaOk
1601:13:11:253PMPlasmaOk
1701:25:45:720PMPlasmaBadEF1_U comm failure
1801:44:52:770PMPlasmaOk
1901:57:24:020PMPlasmaOk
2002:30:00:530PMPlasmaOk
2102:42:39:567PMPlasmaOk
2202:55:10:637PMPlasmaOk
2303:08:00:820PMPlasmaOk
2403:20:34:393PMPlasmaOk
2503:33:56:310PMPlasmaOk
2603:46:22:187PMPlasmaOk
2703:58:51:383PMPlasmaOk
2804:11:23:367PMPlasmaOk
2904:23:51:227PMPlasmaOk
3004:36:21:390PMPlasmaOk
3104:48:47:187PMPlasmaOk
3205:01:15:123PMPlasmaOk

System Availability
Nov 22 2011 08:46:41:240AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESnoBES system is offline, no safety risk for in-vessel accessApr 14 2011 01:20PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSnocore-CXRS system is offline, no safety risk for in-vessel accessApr 14 2011 01:20PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCnoMagnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum -8 scale. Gate valve enabled. Will be using new preamps.Nov 18 2011 12:24PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
Lower Hybrid SOL reflectometernoplease notify if moving LH or reflectometer componentsApr 14 2011 08:57AM (wukitch)Cornwall LauLower Hybrid SOL reflectometercornwall,wukitch,ylin
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start.Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On.Nov 10 2011 11:45AM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesNew Type II sparker installed Nov 18 2011 05:50PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 22 2011 01:12:57:303PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESnoBES system is offline, no safety risk for in-vessel accessApr 14 2011 01:20PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSnocore-CXRS system is offline, no safety risk for in-vessel accessApr 14 2011 01:20PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCnoMagnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum -8 scale. Gate valve enabled. Will be using new preamps.Nov 18 2011 12:24PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
Lower Hybrid SOL reflectometernoplease notify if moving LH or reflectometer componentsApr 14 2011 08:57AM (wukitch)Cornwall LauLower Hybrid SOL reflectometercornwall,wukitch,ylin
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start.Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesNew Type II sparker installed Nov 18 2011 05:50PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 22 2011 02:29:46:710PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCnoMagnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum -8 scale. Gate valve enabled. Will be using new preamps.Nov 18 2011 12:24PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
Lower Hybrid SOL reflectometernoplease notify if moving LH or reflectometer componentsApr 14 2011 08:57AM (wukitch)Cornwall LauLower Hybrid SOL reflectometercornwall,wukitch,ylin
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start.Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesNew Type II sparker installed Nov 18 2011 05:50PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 22 2011 02:42:25:903PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCnoMagnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum -8 scale. Gate valve enabled. Will be using new preamps.Nov 18 2011 12:24PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
Lower Hybrid SOL reflectometernoplease notify if moving LH or reflectometer componentsApr 14 2011 08:57AM (wukitch)Cornwall LauLower Hybrid SOL reflectometercornwall,wukitch,ylin
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start.Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesNew Type II sparker installed Nov 18 2011 05:50PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 22 2011 02:54:57:000PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCnoMagnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum -8 scale. Gate valve enabled. Will be using new preamps.Nov 18 2011 12:24PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
Lower Hybrid SOL reflectometernoplease notify if moving LH or reflectometer componentsApr 14 2011 08:57AM (wukitch)Cornwall LauLower Hybrid SOL reflectometercornwall,wukitch,ylin
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start.Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesNew Type II sparker installed Nov 18 2011 05:50PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 22 2011 03:07:47:793PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum -8 scale. Gate valve enabled. Will be using new preamps.Nov 18 2011 12:24PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
Lower Hybrid SOL reflectometernoplease notify if moving LH or reflectometer componentsApr 14 2011 08:57AM (wukitch)Cornwall LauLower Hybrid SOL reflectometercornwall,wukitch,ylin
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start.Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesNew Type II sparker installed replacing Type INov 22 2011 03:00PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 22 2011 03:20:20:460PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum -8 scale. Gate valve enabled. Will be using new preamps.Nov 18 2011 12:24PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
Lower Hybrid SOL reflectometernoplease notify if moving LH or reflectometer componentsApr 14 2011 08:57AM (wukitch)Cornwall LauLower Hybrid SOL reflectometercornwall,wukitch,ylin
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start.Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesNew Type II sparker installed replacing Type INov 22 2011 03:00PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 22 2011 03:33:42:617PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum -8 scale. Gate valve enabled. Will be using new preamps.Nov 18 2011 12:24PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
Lower Hybrid SOL reflectometernoplease notify if moving LH or reflectometer componentsApr 14 2011 08:57AM (wukitch)Cornwall LauLower Hybrid SOL reflectometercornwall,wukitch,ylin
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start.Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesNew Type II sparker installed replacing Type INov 22 2011 03:00PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 22 2011 03:46:08:490PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum -8 scale. Gate valve enabled. Will be using new preamps.Nov 18 2011 12:24PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
Lower Hybrid SOL reflectometernoplease notify if moving LH or reflectometer componentsApr 14 2011 08:57AM (wukitch)Cornwall LauLower Hybrid SOL reflectometercornwall,wukitch,ylin
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start.Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesNew Type II sparker installed replacing Type INov 22 2011 03:00PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 22 2011 03:58:38:263PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum -8 scale. Gate valve enabled. Will be using new preamps.Nov 18 2011 12:24PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
Lower Hybrid SOL reflectometernoplease notify if moving LH or reflectometer componentsApr 14 2011 08:57AM (wukitch)Cornwall LauLower Hybrid SOL reflectometercornwall,wukitch,ylin
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start.Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesNew Type II sparker installed replacing Type INov 22 2011 03:00PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 22 2011 04:11:10:037PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum -8 scale. Gate valve enabled. Will be using new preamps.Nov 18 2011 12:24PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
Lower Hybrid SOL reflectometernoplease notify if moving LH or reflectometer componentsApr 14 2011 08:57AM (wukitch)Cornwall LauLower Hybrid SOL reflectometercornwall,wukitch,ylin
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start.Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesNew Type II sparker installed replacing Type INov 22 2011 03:00PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 22 2011 04:23:37:390PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum -8 scale. Gate valve enabled. Will be using new preamps.Nov 18 2011 12:24PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
Lower Hybrid SOL reflectometernoplease notify if moving LH or reflectometer componentsApr 14 2011 08:57AM (wukitch)Cornwall LauLower Hybrid SOL reflectometercornwall,wukitch,ylin
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start.Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesNew Type II sparker installed replacing Type INov 22 2011 03:00PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 22 2011 04:36:07:270PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum -8 scale. Gate valve enabled. Will be using new preamps.Nov 18 2011 12:24PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
Lower Hybrid SOL reflectometernoplease notify if moving LH or reflectometer componentsApr 14 2011 08:57AM (wukitch)Cornwall LauLower Hybrid SOL reflectometercornwall,wukitch,ylin
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start.Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesNew Type II sparker installed replacing Type INov 22 2011 03:00PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 22 2011 04:48:35:563PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum -8 scale. Gate valve enabled. Will be using new preamps.Nov 18 2011 12:24PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
Lower Hybrid SOL reflectometernoplease notify if moving LH or reflectometer componentsApr 14 2011 08:57AM (wukitch)Cornwall LauLower Hybrid SOL reflectometercornwall,wukitch,ylin
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start.Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesNew Type II sparker installed replacing Type INov 22 2011 03:00PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 22 2011 05:01:01:497PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum -8 scale. Gate valve enabled. Will be using new preamps.Nov 18 2011 12:24PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
Lower Hybrid SOL reflectometernoplease notify if moving LH or reflectometer componentsApr 14 2011 08:57AM (wukitch)Cornwall LauLower Hybrid SOL reflectometercornwall,wukitch,ylin
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start.Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesNew Type II sparker installed replacing Type INov 22 2011 03:00PM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke