Alcator C-Mod Run 1111129 Information

Back to runs

Miniproposals

Operators
Session leader(s):
Physics operator(s):Bill Rowan
Engineering operator(s):Bill Cochran,Bill Byford,Ed Fitzgerald

Engineering Operator Run Comment
FY12 Plasma Startup (MP298a)

Session Leader Plans

Physics Operators Plans
Entered: Nov 27 2011 08:36:29:790PM
Author: Bill Rowan
Physop Plan for Tuesday, 29-Nov-2011, Run 1111129

FY12 Plasma Startup (MP298a)

PO: Rowan
SL: None

-----------------
Engineering Setup
-----------------

Run begins at 9:00 and ends at 17:00


Power systems as on: 1111123032

Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:
----------
Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
fill H-bot with 15psi D2 Hybrid DISABLED (PG5)
DO NOT fill B-div, Hybrid DISABLED (PG6)
DO NOT fill H-div, Hybrid DISABLED (PG7)
fill NINJA with 10 psi D2 DISABLED

Gate-valves and shutters: Enable ECE

Check with the physop before opening other diagnostic gate-valves or shutters.

Torvac gatevalve toggle (yes/no): no

Boronization(yes/no): no
Overnight ECDC (yes/no): YES
ICRF(yes/no): no
LH(yes/no): no
Cryopump (yes/no): no
DNB (yes/no): YES, 60/40

Vessel temperature: 35/35/35

------------------------------
ECDC Parameters
------------------------------
gas and pressure: D2 at 2e-4 Torr
sweep: 44/45/103 cm
scan: 20/120 s

====================================
Physics Operator Plan

The first shot will be a gas test, B-main and B-top

Start from 1111123032.
As required, continue to tune startup for current rise.
When successful, consider slowly increasing density and plasma current.

Continue to check magnetics for problems with BP16_JK, which had a problem on 1111118

Use between shot ECDC if impurity problems persist.

Session Leader Summaries

Physics Operator Summaries
Entered: Nov 30 2011 07:35:23:420AM
Author: Bill Rowan
The purpose of this run was to get long discharges. The longest was approximately 0.75 s

The run started with the weekly gas test. This was successful on the second attempt
due to a problem with two of the engineering computers.

For the plasma-related part of the run, shot 1111123032 was loaded. The first shot ran
0.5 s, the longest shot thus far in the campaign. Certainly longer than this setup
produced during run 1111123.
Then, returned to shot 1111122029. This was the starting point for run 1111123. The
intent was to determine whether progress had been made during 1111123.
Concluded that it had and reloaded 1111123032.

The changes made during the day were typical of fizzle repair. EF4 was increased a
couple of times. This seemed to help. Prefill changes during the early part of the run
did not have an effect. Late in the run, changes in the prefill had the expected
effect on breakdown time. Some control via prefill seems to be returning.

One attempt at between shots ECDC resulted in a series of improved shots. Suggests that
overnight ECDC will lead to a much better run on Thursday.

score card

12 plasma
01 gas test
15 fizzles
04 engineering shots or engineering failures
----------
32 total

Session Leader Comments

Physics Operator Comments
Nov 29 2011 08:09:29:263AMBill Rowanloaded 1111129032 as planned.
prefill remains at 20 ms.
ECDC over the weekend.

Nov 29 2011 08:52:30:010AM1111129001Bill Rowan001.
Gas test
B-top but no B-main
voltage on both


next shot
shot cycle hung but want to do another gas test when possible
enable gv for zeus
increased pg3 back porch from 0.01 s to 0.1 s

Nov 29 2011 09:37:15:540AM1111129002Bill Rowan002.
gas test successful.
tested b-top and b-main

next shot.
reload shot 001 only to remove the pg3 back porch
delay due to computer problems

Nov 29 2011 09:45:53:987AM1111129003Bill Rowan003.
no power shot for computer test
pg3 was still set to the test values

next shot.
change pg3 to the shorter setting as on shot 001
enable dnb -- testing pressure gauges as well

Nov 29 2011 10:12:45:547AM1111129004Bill Rowan004.
plasma
disruption at 0.5 s
so work done for 1111123 only lacked a cleaner plasma

next shot.
return to shot 1111122029 for a new starting point

Nov 29 2011 10:26:46:427AM1111129005Bill Rowan005.
fizzle
interpret as a post disruption fizzle
the prefill is 12 ms

next shot.
no pcs changes

Nov 29 2011 10:50:25:010AM1111129006Bill Rowan006.
fizzle

next shot
reduce prefill by 1 ms to 11 ms
Nov 29 2011 11:03:24:143AM1111129007Bill Rowan007.
fizzle

next shot
no pcs changes

Nov 29 2011 11:20:01:527AM1111129008Bill Rowan008.
fizzle

next shot
reduce prefill by 1 ms to 10 ms

Nov 29 2011 11:29:04:167AM1111129009Bill Rowan009.
plasma
disruption at 0.052 s

next shot
return to shot 004

Nov 29 2011 11:41:36:627AM1111129010Bill Rowan010.
fizzle

next shot.
reduce prefill by 2 ms to 18 ms

Nov 29 2011 11:56:12:510AM1111129011Bill Rowan011.
disruption at 0.12 s

next shot.
reduce prefill from 18 ms to 16 ms
Nov 29 2011 12:06:55:027PM1111129012Bill Rowan012.
fizzle

Next shot
no pcs changes
Nov 29 2011 12:26:05:267PM1111129013Bill Rowan013.
dud
ef1 fault

next shot.
no pcs changes

Nov 29 2011 12:31:35:533PM1111129014Bill Rowan014.
plasma
disruption at 0.15s

Next shot.
no pcs changes

Nov 29 2011 12:43:34:163PM1111129015Bill Rowan015.
fizzle


Next shot
increase IC_EF4 from -1300 to -1290

Nov 29 2011 01:09:49:557PM1111129017Bill Rowan017.
plasma
disruption at 150 ms

next shot
no pcs changes
Nov 29 2011 03:59:51:663PM1111129018Bill Rowan018.
plasma
disruption at 400 ms
commutation failure on the disruption

next shot
check fuses in the OH
blew a fuse in the OH cabinet
change the fuse and test
no pcs changes

Nov 29 2011 01:50:54:337PM1111129019Bill Rowan019.
fizzle

next shot
No pcs changes

Nov 29 2011 02:06:39:443PM1111129020Bill Rowan020.
fizzle

Next shot
no pcs changes

Nov 29 2011 02:52:33:053PM1111129021Bill Rowan021.
fizzle

next shot
15 minutes of ecdc
pump for about 10 minutes: 8.9e-07

Nov 29 2011 02:58:32:830PM1111129022Bill Rowan022.
plasma
disruption at 0.24 s

next shot
IC_ef4 = -1280

Nov 29 2011 03:15:30:497PM1111129023Bill Rowan023.
plasma
disruption at 0.56 s

next shot
increase innergap by approx 1 cm before 0.5 s

Nov 29 2011 03:19:05:307PM1111129024Bill Rowan024
fizzle

next shot
no pcs changes
Nov 29 2011 03:33:08:020PM1111129025Bill Rowan025
fizzle

next shot
reduce the prefill by 1 ms
Nov 29 2011 03:45:51:260PM1111129026Bill Rowan026.
plasma
disruption at 0.0938

next shot.
no pcs changes

Nov 29 2011 03:59:27:570PM1111129027Bill Rowan027.
plasma
disruption at 0.21

next shot
no pcs changes

Nov 29 2011 04:09:40:130PM1111129028Bill Rowan028.
plasma
disrup[tion at 0.2354 s

next shot
no pcs changes

Nov 29 2011 04:31:50:137PM1111129029Bill Rowan029.
plasma
disruption at 0.75 s

next shot.
dnb enabled

Nov 29 2011 04:37:12:433PM1111129030Bill Rowan030.
fizzle

next shot.
increase prefill by 2 ms to 16 ms

Nov 29 2011 04:51:22:077PM1111129031Bill Rowan031.
engineering failure
operational failure

next shot
no pcs changes

Nov 29 2011 05:00:41:247PM1111129032Bill Rowan032.
fizzle

last shot.

Engineering Operator Comments
ShotTimeTypeStatusComment
309:34:36:473AMTestOkCycle Test
410:03:23:330AMPlasmaOk
510:18:09:743AMPlasmaOk
610:45:36:440AMPlasmaOk
710:58:17:587AMPlasmaOk
811:10:45:767AMPlasmaOk
911:23:22:540AMPlasmaOk
1011:36:02:440AMPlasmaOk
1111:48:51:197AMPlasmaOk
1212:01:37:217PMPlasmaOk
1312:14:21:457PMPlasmaBadEF1-U&L Comm failure
1412:27:21:620PMPlasmaOk
1512:40:11:080PMPlasmaOk
1612:52:48:477PMPlasmaOk
1701:05:23:270PMPlasmaOk
1801:18:00:757PMPlasmaOk
1901:46:58:773PMPlasmaOk
2002:03:39:520PMPlasmaOk
2102:16:20:840PMPlasmaOk
2202:50:25:527PMPlasmaOk
2303:03:14:733PMPlasmaOk
2403:16:17:127PMPlasmaOk
2503:28:49:367PMPlasmaOk
2603:41:28:720PMPlasmaOk
2703:54:18:730PMPlasmaOk
2804:06:56:293PMPlasmaOk
2904:19:21:203PMPlasmaOk
3004:33:17:790PMPlasmaOk
3104:45:56:800PMPlasmaBadNo Permissive
3204:58:24:137PMPlasmaOk

System Availability
Nov 29 2011 08:28:46:957AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum -8 scale. Gate valve enabled. Will be using new preamps.Nov 18 2011 12:24PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
Lower Hybrid SOL reflectometernoplease notify if moving LH or reflectometer componentsApr 14 2011 08:57AM (wukitch)Cornwall LauLower Hybrid SOL reflectometercornwall,wukitch,ylin
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start.Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 29 2011 12:14:07:683PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum -8 scale. Gate valve enabled. Will be using new preamps.Nov 18 2011 12:24PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start.Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 29 2011 12:27:06:623PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum -8 scale. Gate valve enabled. Will be using new preamps.Nov 18 2011 12:24PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start.Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 29 2011 12:39:57:217PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum -8 scale. Gate valve enabled. Will be using new preamps.Nov 18 2011 12:24PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start.Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 29 2011 12:52:33:957PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum -8 scale. Gate valve enabled. Will be using new preamps.Nov 18 2011 12:24PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start.Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 29 2011 01:05:09:630PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum -8 scale. Gate valve enabled. Will be using new preamps.Nov 18 2011 12:24PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start.Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 29 2011 01:17:46:580PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum -8 scale. Gate valve enabled. Will be using new preamps.Nov 18 2011 12:24PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start.Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 29 2011 01:46:43:927PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum -8 scale. Gate valve enabled. Will be using new preamps.Nov 18 2011 12:24PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start.Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 29 2011 02:03:25:913PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum -8 scale. Gate valve enabled. Will be using new preamps.Nov 18 2011 12:24PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start.Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 29 2011 02:16:06:527PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum -8 scale. Gate valve enabled. Will be using new preamps.Nov 18 2011 12:24PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start.Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 29 2011 02:50:10:770PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum -8 scale. Gate valve enabled. Will be using new preamps.Nov 18 2011 12:24PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start.Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 29 2011 03:03:00:043PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum -8 scale. Gate valve enabled. Will be using new preamps.Nov 18 2011 12:24PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start.Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 29 2011 03:16:03:420PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum -8 scale. Gate valve enabled. Will be using new preamps.Nov 18 2011 12:24PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start.Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 29 2011 03:28:35:700PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum -8 scale. Gate valve enabled. Will be using new preamps.Nov 18 2011 12:24PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start.Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 29 2011 03:41:15:093PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum -8 scale. Gate valve enabled. Will be using new preamps.Nov 18 2011 12:24PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start.Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 29 2011 03:54:04:693PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum -8 scale. Gate valve enabled. Will be using new preamps.Nov 18 2011 12:24PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start.Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 29 2011 04:06:42:370PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum -8 scale. Gate valve enabled. Will be using new preamps.Nov 18 2011 12:24PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start.Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 29 2011 04:19:07:180PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum -8 scale. Gate valve enabled. Will be using new preamps.Nov 18 2011 12:24PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start.Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 29 2011 04:33:04:273PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum -8 scale. Gate valve enabled. Will be using new preamps.Nov 18 2011 12:24PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start.Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 29 2011 04:45:44:970PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum -8 scale. Gate valve enabled. Will be using new preamps.Nov 18 2011 12:24PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start.Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 29 2011 04:58:10:610PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesFront end under vacuum -8 scale. Gate valve enabled. Will be using new preamps.Nov 18 2011 12:24PM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start.Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke