| System Availability |
| Nov 29 2011 08:28:46:957AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | golfit | | BES | yes | BES system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked up | Nov 17 2011 02:45PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed. Magnetron Unplugged | Apr 11 2011 09:51AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Multiple channel CNPA available, no safety risk for in-vessel access | Apr 14 2011 12:01PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed | Apr 15 2011 10:55AM (dekow) | Brian LaBombard | Upper Divertor Cryopump | dekow,irby,labombard | | CXRS | yes | core-CXRS system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | CXRS edge | yes | Michael CHurchill has primary responsibility at the moment | Apr 19 2011 11:44AM (blip) | Bruce Lipshultz | Measurement of CXR light in the pedestal region at both the high- and low-field sides | blip,rmchurch | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | system is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-port | Jun 02 2011 10:21AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | gas jet valve disabled on 2011/04/13 | Apr 13 2011 02:04PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DMBolo AXUV diodes | no | Still setting up the data acquisition system. | Nov 20 2011 12:19AM (golynyk) | Geoff Olynyk | Set of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinhole | golynyk | | DNB | no | gate valve disabled on 2011/04/13 | Apr 13 2011 02:03PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational as of 11/19/11 | Nov 22 2011 03:01PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off to RF and IF sections- Power on to DA | Apr 11 2011 02:54PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | bespam,liao,phillips,rowan,whitea | | G-Side Ratiomatic | no | Power supply OFF Gauge removed | Apr 14 2011 09:52AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Power supply unplugged and redtagged, HV cables removed | Apr 14 2011 08:03AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Front end under vacuum -8 scale. Gate valve enabled. Will be using new preamps. | Nov 18 2011 12:24PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPC2 | yes | Dewar cold. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | no safety risk for in-vessel access; | Apr 14 2011 11:47AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Breakers off and red tagged | Apr 14 2011 11:27AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | HiReX installed but not hooked up yet, pending end of bake. | Nov 10 2011 11:57AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | 32 Channels operational,, no safety risk for in-vessel access | Apr 14 2011 12:05PM (parker) | Ron Parker | Hard X-Ray Array | faust,parker,schmidt | | ICRF D-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | secured | Apr 14 2011 08:56AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Impurity Spectroscopy | yes | Being upgraded with better optics and new spectrographs. Dan Miller has primary responsibility. | Apr 19 2011 11:46AM (blip) | Bruce Lipshultz | Measurement of recycling light and impurity source rates at multiple surfaces around the tokamak | blip,miller | | Laser Blow-Off | no | Beamline disconnected | Apr 14 2011 11:53AM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | LH HV Breaker Opened and Tagged, TPS Upgrade Underway | Nov 10 2011 03:51PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | Lower Hybrid SOL reflectometer | no | please notify if moving LH or reflectometer components | Apr 14 2011 08:57AM (wukitch) | Cornwall Lau | Lower Hybrid SOL reflectometer | cornwall,wukitch,ylin | | LoWEUS | no | camera control softward unavailable, but gate-valve control ready to be tested | Nov 21 2011 06:58PM (mlreinke) | Matthew L. Reinke | Long Wavelength Extreme Ultraviolet Spectrometer | markchil,mlreinke | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Midplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up. | Nov 17 2011 02:42PM (mlreinke) | Matt Reinke | Lyman alpha cameras | faustian,labombard,mlreinke | | McPherson | no | broken turbo pump, McPherson unavailable | Nov 17 2011 02:42PM (mlreinke) | Jim Terry | VUV Spectrometer | markchil,mlreinke,terry | | Michelson | yes | Front end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | no | Secured for work. Power supplies are turned off. | Apr 14 2011 11:37AM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard,toland | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | no safety risk for in-vessel access as of 4/14/2011 | Apr 14 2011 11:48AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | High voltage is on. We're ready for plasma. | Nov 21 2011 12:58PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | All detectors Powered On --- Waiting for neutrons for calibration | Nov 22 2011 01:05PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Secured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom. | Apr 14 2011 11:44AM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry,toland | | PCI | no | Secured for in-vessel work | Apr 14 2011 06:21PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | emd,ennever,ntsujii,porkolab | | Penning Gauges | no | Secured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rack | Apr 14 2011 09:56AM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | no | Red tagged off | Apr 12 2011 07:23AM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | no | Breaker opened and red tagged | Apr 11 2011 11:59AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | no | Breakers opened and red tagged | Apr 11 2011 12:00PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | no | All systems disabled for in-vessel entry | Apr 14 2011 11:29AM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:56AM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack. | Apr 14 2011 09:57AM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array (F and J) | labombard | | Probe Array - UDIV | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Secured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack. | Apr 14 2011 11:39AM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | Sparker | yes | New Type II sparker replaced Type I on 11/17/2011 | Nov 23 2011 08:53AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | no | SSS is up to air, no safety issues | Apr 14 2011 12:06PM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | TCI Operational. Density feedback operational. | Nov 10 2011 11:47AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jrwalk,jwhughes,yma | | TS - Edge | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jrwalk,jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | remote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasma | Nov 21 2011 06:57PM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | markchil,mlreinke | | XTOMO | yes | ARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checked | Nov 17 2011 02:44PM (mlreinke) | Bob Granetz | X-Ray Tomography | faustian,granetz,mlreinke |
|
| Nov 29 2011 12:14:07:683PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | golfit | | BES | yes | BES system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked up | Nov 17 2011 02:45PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed. Magnetron Unplugged | Apr 11 2011 09:51AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Multiple channel CNPA available, no safety risk for in-vessel access | Apr 14 2011 12:01PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed | Apr 15 2011 10:55AM (dekow) | Brian LaBombard | Upper Divertor Cryopump | dekow,irby,labombard | | CXRS | yes | core-CXRS system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | CXRS edge | yes | Michael CHurchill has primary responsibility at the moment | Apr 19 2011 11:44AM (blip) | Bruce Lipshultz | Measurement of CXR light in the pedestal region at both the high- and low-field sides | blip,rmchurch | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | system is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-port | Jun 02 2011 10:21AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | gas jet valve disabled on 2011/04/13 | Apr 13 2011 02:04PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DMBolo AXUV diodes | no | Still setting up the data acquisition system. | Nov 20 2011 12:19AM (golynyk) | Geoff Olynyk | Set of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinhole | golynyk | | DNB | no | gate valve disabled on 2011/04/13 | Apr 13 2011 02:03PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational as of 11/19/11 | Nov 22 2011 03:01PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off to RF and IF sections- Power on to DA | Apr 11 2011 02:54PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | bespam,liao,phillips,rowan,whitea | | G-Side Ratiomatic | no | Power supply OFF Gauge removed | Apr 14 2011 09:52AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Power supply unplugged and redtagged, HV cables removed | Apr 14 2011 08:03AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Front end under vacuum -8 scale. Gate valve enabled. Will be using new preamps. | Nov 18 2011 12:24PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPC2 | yes | Dewar cold. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | no safety risk for in-vessel access; | Apr 14 2011 11:47AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Breakers off and red tagged | Apr 14 2011 11:27AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | HiReX installed but not hooked up yet, pending end of bake. | Nov 10 2011 11:57AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | 32 Channels operational,, no safety risk for in-vessel access | Apr 14 2011 12:05PM (parker) | Ron Parker | Hard X-Ray Array | faust,parker,schmidt | | ICRF D-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | secured | Apr 14 2011 08:56AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Impurity Spectroscopy | yes | Being upgraded with better optics and new spectrographs. Dan Miller has primary responsibility. | Apr 19 2011 11:46AM (blip) | Bruce Lipshultz | Measurement of recycling light and impurity source rates at multiple surfaces around the tokamak | blip,miller | | Laser Blow-Off | no | Beamline disconnected | Apr 14 2011 11:53AM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | LH HV Breaker Opened and Tagged, TPS Upgrade Underway | Nov 10 2011 03:51PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | LoWEUS | no | camera control softward unavailable, but gate-valve control ready to be tested | Nov 21 2011 06:58PM (mlreinke) | Matthew L. Reinke | Long Wavelength Extreme Ultraviolet Spectrometer | markchil,mlreinke | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Midplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up. | Nov 17 2011 02:42PM (mlreinke) | Matt Reinke | Lyman alpha cameras | faustian,labombard,mlreinke | | McPherson | no | broken turbo pump, McPherson unavailable | Nov 17 2011 02:42PM (mlreinke) | Jim Terry | VUV Spectrometer | markchil,mlreinke,terry | | Michelson | yes | Front end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | no | Secured for work. Power supplies are turned off. | Apr 14 2011 11:37AM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard,toland | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | no safety risk for in-vessel access as of 4/14/2011 | Apr 14 2011 11:48AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | High voltage is on. We're ready for plasma. | Nov 21 2011 12:58PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | All detectors Powered On --- Waiting for neutrons for calibration | Nov 22 2011 01:05PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Secured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom. | Apr 14 2011 11:44AM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry,toland | | PCI | no | Secured for in-vessel work | Apr 14 2011 06:21PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | emd,ennever,ntsujii,porkolab | | Penning Gauges | no | Secured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rack | Apr 14 2011 09:56AM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | no | Red tagged off | Apr 12 2011 07:23AM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | no | Breaker opened and red tagged | Apr 11 2011 11:59AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | no | Breakers opened and red tagged | Apr 11 2011 12:00PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | no | All systems disabled for in-vessel entry | Apr 14 2011 11:29AM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:56AM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack. | Apr 14 2011 09:57AM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array (F and J) | labombard | | Probe Array - UDIV | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Secured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack. | Apr 14 2011 11:39AM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | SOL reflectometer | yes | c-port waveguides operational, h-port waveguides are not. | Nov 29 2011 12:04PM (cornwall) | Cornwall Lau | SOL reflectometer | cornwall,wukitch,ylin | | Sparker | yes | New Type II sparker replaced Type I on 11/17/2011 | Nov 23 2011 08:53AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | no | SSS is up to air, no safety issues | Apr 14 2011 12:06PM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | TCI Operational. Density feedback operational. | Nov 10 2011 11:47AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jrwalk,jwhughes,yma | | TS - Edge | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jrwalk,jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | remote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasma | Nov 21 2011 06:57PM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | markchil,mlreinke | | XTOMO | yes | ARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checked | Nov 17 2011 02:44PM (mlreinke) | Bob Granetz | X-Ray Tomography | faustian,granetz,mlreinke |
|
| Nov 29 2011 12:27:06:623PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | golfit | | BES | yes | BES system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked up | Nov 17 2011 02:45PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed. Magnetron Unplugged | Apr 11 2011 09:51AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Multiple channel CNPA available, no safety risk for in-vessel access | Apr 14 2011 12:01PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed | Apr 15 2011 10:55AM (dekow) | Brian LaBombard | Upper Divertor Cryopump | dekow,irby,labombard | | CXRS | yes | core-CXRS system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | CXRS edge | yes | Michael CHurchill has primary responsibility at the moment | Apr 19 2011 11:44AM (blip) | Bruce Lipshultz | Measurement of CXR light in the pedestal region at both the high- and low-field sides | blip,rmchurch | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | system is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-port | Jun 02 2011 10:21AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | gas jet valve disabled on 2011/04/13 | Apr 13 2011 02:04PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DMBolo AXUV diodes | no | Still setting up the data acquisition system. | Nov 20 2011 12:19AM (golynyk) | Geoff Olynyk | Set of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinhole | golynyk | | DNB | no | gate valve disabled on 2011/04/13 | Apr 13 2011 02:03PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational as of 11/19/11 | Nov 22 2011 03:01PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off to RF and IF sections- Power on to DA | Apr 11 2011 02:54PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | bespam,liao,phillips,rowan,whitea | | G-Side Ratiomatic | no | Power supply OFF Gauge removed | Apr 14 2011 09:52AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Power supply unplugged and redtagged, HV cables removed | Apr 14 2011 08:03AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Front end under vacuum -8 scale. Gate valve enabled. Will be using new preamps. | Nov 18 2011 12:24PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPC2 | yes | Dewar cold. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | no safety risk for in-vessel access; | Apr 14 2011 11:47AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Breakers off and red tagged | Apr 14 2011 11:27AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | HiReX installed but not hooked up yet, pending end of bake. | Nov 10 2011 11:57AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | 32 Channels operational,, no safety risk for in-vessel access | Apr 14 2011 12:05PM (parker) | Ron Parker | Hard X-Ray Array | faust,parker,schmidt | | ICRF D-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | secured | Apr 14 2011 08:56AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Impurity Spectroscopy | yes | Being upgraded with better optics and new spectrographs. Dan Miller has primary responsibility. | Apr 19 2011 11:46AM (blip) | Bruce Lipshultz | Measurement of recycling light and impurity source rates at multiple surfaces around the tokamak | blip,miller | | Laser Blow-Off | no | Beamline disconnected | Apr 14 2011 11:53AM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | LH HV Breaker Opened and Tagged, TPS Upgrade Underway | Nov 10 2011 03:51PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | LoWEUS | no | camera control softward unavailable, but gate-valve control ready to be tested | Nov 21 2011 06:58PM (mlreinke) | Matthew L. Reinke | Long Wavelength Extreme Ultraviolet Spectrometer | markchil,mlreinke | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Midplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up. | Nov 17 2011 02:42PM (mlreinke) | Matt Reinke | Lyman alpha cameras | faustian,labombard,mlreinke | | McPherson | no | broken turbo pump, McPherson unavailable | Nov 17 2011 02:42PM (mlreinke) | Jim Terry | VUV Spectrometer | markchil,mlreinke,terry | | Michelson | yes | Front end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | no | Secured for work. Power supplies are turned off. | Apr 14 2011 11:37AM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard,toland | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | no safety risk for in-vessel access as of 4/14/2011 | Apr 14 2011 11:48AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | High voltage is on. We're ready for plasma. | Nov 21 2011 12:58PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | All detectors Powered On --- Waiting for neutrons for calibration | Nov 22 2011 01:05PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Secured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom. | Apr 14 2011 11:44AM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry,toland | | PCI | no | Secured for in-vessel work | Apr 14 2011 06:21PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | emd,ennever,ntsujii,porkolab | | Penning Gauges | no | Secured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rack | Apr 14 2011 09:56AM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | no | Red tagged off | Apr 12 2011 07:23AM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | no | Breaker opened and red tagged | Apr 11 2011 11:59AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | no | Breakers opened and red tagged | Apr 11 2011 12:00PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | no | All systems disabled for in-vessel entry | Apr 14 2011 11:29AM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:56AM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack. | Apr 14 2011 09:57AM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array (F and J) | labombard | | Probe Array - UDIV | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Secured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack. | Apr 14 2011 11:39AM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | SOL reflectometer | yes | c-port waveguides operational, h-port waveguides are not. | Nov 29 2011 12:04PM (cornwall) | Cornwall Lau | SOL reflectometer | cornwall,wukitch,ylin | | Sparker | yes | New Type II sparker replaced Type I on 11/17/2011 | Nov 23 2011 08:53AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | no | SSS is up to air, no safety issues | Apr 14 2011 12:06PM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | TCI Operational. Density feedback operational. | Nov 10 2011 11:47AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jrwalk,jwhughes,yma | | TS - Edge | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jrwalk,jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | remote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasma | Nov 21 2011 06:57PM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | markchil,mlreinke | | XTOMO | yes | ARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checked | Nov 17 2011 02:44PM (mlreinke) | Bob Granetz | X-Ray Tomography | faustian,granetz,mlreinke |
|
| Nov 29 2011 12:39:57:217PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | golfit | | BES | yes | BES system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked up | Nov 17 2011 02:45PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed. Magnetron Unplugged | Apr 11 2011 09:51AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Multiple channel CNPA available, no safety risk for in-vessel access | Apr 14 2011 12:01PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed | Apr 15 2011 10:55AM (dekow) | Brian LaBombard | Upper Divertor Cryopump | dekow,irby,labombard | | CXRS | yes | core-CXRS system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | CXRS edge | yes | Michael CHurchill has primary responsibility at the moment | Apr 19 2011 11:44AM (blip) | Bruce Lipshultz | Measurement of CXR light in the pedestal region at both the high- and low-field sides | blip,rmchurch | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | system is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-port | Jun 02 2011 10:21AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | gas jet valve disabled on 2011/04/13 | Apr 13 2011 02:04PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DMBolo AXUV diodes | no | Still setting up the data acquisition system. | Nov 20 2011 12:19AM (golynyk) | Geoff Olynyk | Set of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinhole | golynyk | | DNB | no | gate valve disabled on 2011/04/13 | Apr 13 2011 02:03PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational as of 11/19/11 | Nov 22 2011 03:01PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off to RF and IF sections- Power on to DA | Apr 11 2011 02:54PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | bespam,liao,phillips,rowan,whitea | | G-Side Ratiomatic | no | Power supply OFF Gauge removed | Apr 14 2011 09:52AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Power supply unplugged and redtagged, HV cables removed | Apr 14 2011 08:03AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Front end under vacuum -8 scale. Gate valve enabled. Will be using new preamps. | Nov 18 2011 12:24PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPC2 | yes | Dewar cold. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | no safety risk for in-vessel access; | Apr 14 2011 11:47AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Breakers off and red tagged | Apr 14 2011 11:27AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | HiReX installed but not hooked up yet, pending end of bake. | Nov 10 2011 11:57AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | 32 Channels operational,, no safety risk for in-vessel access | Apr 14 2011 12:05PM (parker) | Ron Parker | Hard X-Ray Array | faust,parker,schmidt | | ICRF D-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | secured | Apr 14 2011 08:56AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Impurity Spectroscopy | yes | Being upgraded with better optics and new spectrographs. Dan Miller has primary responsibility. | Apr 19 2011 11:46AM (blip) | Bruce Lipshultz | Measurement of recycling light and impurity source rates at multiple surfaces around the tokamak | blip,miller | | Laser Blow-Off | no | Beamline disconnected | Apr 14 2011 11:53AM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | LH HV Breaker Opened and Tagged, TPS Upgrade Underway | Nov 10 2011 03:51PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | LoWEUS | no | camera control softward unavailable, but gate-valve control ready to be tested | Nov 21 2011 06:58PM (mlreinke) | Matthew L. Reinke | Long Wavelength Extreme Ultraviolet Spectrometer | markchil,mlreinke | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Midplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up. | Nov 17 2011 02:42PM (mlreinke) | Matt Reinke | Lyman alpha cameras | faustian,labombard,mlreinke | | McPherson | no | broken turbo pump, McPherson unavailable | Nov 17 2011 02:42PM (mlreinke) | Jim Terry | VUV Spectrometer | markchil,mlreinke,terry | | Michelson | yes | Front end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | no | Secured for work. Power supplies are turned off. | Apr 14 2011 11:37AM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard,toland | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | no safety risk for in-vessel access as of 4/14/2011 | Apr 14 2011 11:48AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | High voltage is on. We're ready for plasma. | Nov 21 2011 12:58PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | All detectors Powered On --- Waiting for neutrons for calibration | Nov 22 2011 01:05PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Secured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom. | Apr 14 2011 11:44AM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry,toland | | PCI | no | Secured for in-vessel work | Apr 14 2011 06:21PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | emd,ennever,ntsujii,porkolab | | Penning Gauges | no | Secured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rack | Apr 14 2011 09:56AM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | no | Red tagged off | Apr 12 2011 07:23AM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | no | Breaker opened and red tagged | Apr 11 2011 11:59AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | no | Breakers opened and red tagged | Apr 11 2011 12:00PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | no | All systems disabled for in-vessel entry | Apr 14 2011 11:29AM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:56AM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack. | Apr 14 2011 09:57AM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array (F and J) | labombard | | Probe Array - UDIV | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Secured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack. | Apr 14 2011 11:39AM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | SOL reflectometer | yes | c-port waveguides operational, h-port waveguides are not. | Nov 29 2011 12:04PM (cornwall) | Cornwall Lau | SOL reflectometer | cornwall,wukitch,ylin | | Sparker | yes | New Type II sparker replaced Type I on 11/17/2011 | Nov 23 2011 08:53AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | no | SSS is up to air, no safety issues | Apr 14 2011 12:06PM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | TCI Operational. Density feedback operational. | Nov 10 2011 11:47AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jrwalk,jwhughes,yma | | TS - Edge | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jrwalk,jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | remote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasma | Nov 21 2011 06:57PM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | markchil,mlreinke | | XTOMO | yes | ARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checked | Nov 17 2011 02:44PM (mlreinke) | Bob Granetz | X-Ray Tomography | faustian,granetz,mlreinke |
|
| Nov 29 2011 12:52:33:957PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | golfit | | BES | yes | BES system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked up | Nov 17 2011 02:45PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed. Magnetron Unplugged | Apr 11 2011 09:51AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Multiple channel CNPA available, no safety risk for in-vessel access | Apr 14 2011 12:01PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed | Apr 15 2011 10:55AM (dekow) | Brian LaBombard | Upper Divertor Cryopump | dekow,irby,labombard | | CXRS | yes | core-CXRS system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | CXRS edge | yes | Michael CHurchill has primary responsibility at the moment | Apr 19 2011 11:44AM (blip) | Bruce Lipshultz | Measurement of CXR light in the pedestal region at both the high- and low-field sides | blip,rmchurch | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | system is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-port | Jun 02 2011 10:21AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | gas jet valve disabled on 2011/04/13 | Apr 13 2011 02:04PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DMBolo AXUV diodes | no | Still setting up the data acquisition system. | Nov 20 2011 12:19AM (golynyk) | Geoff Olynyk | Set of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinhole | golynyk | | DNB | no | gate valve disabled on 2011/04/13 | Apr 13 2011 02:03PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational as of 11/19/11 | Nov 22 2011 03:01PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off to RF and IF sections- Power on to DA | Apr 11 2011 02:54PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | bespam,liao,phillips,rowan,whitea | | G-Side Ratiomatic | no | Power supply OFF Gauge removed | Apr 14 2011 09:52AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Power supply unplugged and redtagged, HV cables removed | Apr 14 2011 08:03AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Front end under vacuum -8 scale. Gate valve enabled. Will be using new preamps. | Nov 18 2011 12:24PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPC2 | yes | Dewar cold. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | no safety risk for in-vessel access; | Apr 14 2011 11:47AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Breakers off and red tagged | Apr 14 2011 11:27AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | HiReX installed but not hooked up yet, pending end of bake. | Nov 10 2011 11:57AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | 32 Channels operational,, no safety risk for in-vessel access | Apr 14 2011 12:05PM (parker) | Ron Parker | Hard X-Ray Array | faust,parker,schmidt | | ICRF D-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | secured | Apr 14 2011 08:56AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Impurity Spectroscopy | yes | Being upgraded with better optics and new spectrographs. Dan Miller has primary responsibility. | Apr 19 2011 11:46AM (blip) | Bruce Lipshultz | Measurement of recycling light and impurity source rates at multiple surfaces around the tokamak | blip,miller | | Laser Blow-Off | no | Beamline disconnected | Apr 14 2011 11:53AM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | LH HV Breaker Opened and Tagged, TPS Upgrade Underway | Nov 10 2011 03:51PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | LoWEUS | no | camera control softward unavailable, but gate-valve control ready to be tested | Nov 21 2011 06:58PM (mlreinke) | Matthew L. Reinke | Long Wavelength Extreme Ultraviolet Spectrometer | markchil,mlreinke | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Midplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up. | Nov 17 2011 02:42PM (mlreinke) | Matt Reinke | Lyman alpha cameras | faustian,labombard,mlreinke | | McPherson | no | broken turbo pump, McPherson unavailable | Nov 17 2011 02:42PM (mlreinke) | Jim Terry | VUV Spectrometer | markchil,mlreinke,terry | | Michelson | yes | Front end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | no | Secured for work. Power supplies are turned off. | Apr 14 2011 11:37AM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard,toland | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | no safety risk for in-vessel access as of 4/14/2011 | Apr 14 2011 11:48AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | High voltage is on. We're ready for plasma. | Nov 21 2011 12:58PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | All detectors Powered On --- Waiting for neutrons for calibration | Nov 22 2011 01:05PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Secured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom. | Apr 14 2011 11:44AM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry,toland | | PCI | no | Secured for in-vessel work | Apr 14 2011 06:21PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | emd,ennever,ntsujii,porkolab | | Penning Gauges | no | Secured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rack | Apr 14 2011 09:56AM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | no | Red tagged off | Apr 12 2011 07:23AM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | no | Breaker opened and red tagged | Apr 11 2011 11:59AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | no | Breakers opened and red tagged | Apr 11 2011 12:00PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | no | All systems disabled for in-vessel entry | Apr 14 2011 11:29AM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:56AM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack. | Apr 14 2011 09:57AM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array (F and J) | labombard | | Probe Array - UDIV | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Secured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack. | Apr 14 2011 11:39AM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | SOL reflectometer | yes | c-port waveguides operational, h-port waveguides are not. | Nov 29 2011 12:04PM (cornwall) | Cornwall Lau | SOL reflectometer | cornwall,wukitch,ylin | | Sparker | yes | New Type II sparker replaced Type I on 11/17/2011 | Nov 23 2011 08:53AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | no | SSS is up to air, no safety issues | Apr 14 2011 12:06PM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | TCI Operational. Density feedback operational. | Nov 10 2011 11:47AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jrwalk,jwhughes,yma | | TS - Edge | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jrwalk,jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | remote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasma | Nov 21 2011 06:57PM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | markchil,mlreinke | | XTOMO | yes | ARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checked | Nov 17 2011 02:44PM (mlreinke) | Bob Granetz | X-Ray Tomography | faustian,granetz,mlreinke |
|
| Nov 29 2011 01:05:09:630PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | golfit | | BES | yes | BES system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked up | Nov 17 2011 02:45PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed. Magnetron Unplugged | Apr 11 2011 09:51AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Multiple channel CNPA available, no safety risk for in-vessel access | Apr 14 2011 12:01PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed | Apr 15 2011 10:55AM (dekow) | Brian LaBombard | Upper Divertor Cryopump | dekow,irby,labombard | | CXRS | yes | core-CXRS system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | CXRS edge | yes | Michael CHurchill has primary responsibility at the moment | Apr 19 2011 11:44AM (blip) | Bruce Lipshultz | Measurement of CXR light in the pedestal region at both the high- and low-field sides | blip,rmchurch | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | system is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-port | Jun 02 2011 10:21AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | gas jet valve disabled on 2011/04/13 | Apr 13 2011 02:04PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DMBolo AXUV diodes | no | Still setting up the data acquisition system. | Nov 20 2011 12:19AM (golynyk) | Geoff Olynyk | Set of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinhole | golynyk | | DNB | no | gate valve disabled on 2011/04/13 | Apr 13 2011 02:03PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational as of 11/19/11 | Nov 22 2011 03:01PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off to RF and IF sections- Power on to DA | Apr 11 2011 02:54PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | bespam,liao,phillips,rowan,whitea | | G-Side Ratiomatic | no | Power supply OFF Gauge removed | Apr 14 2011 09:52AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Power supply unplugged and redtagged, HV cables removed | Apr 14 2011 08:03AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Front end under vacuum -8 scale. Gate valve enabled. Will be using new preamps. | Nov 18 2011 12:24PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPC2 | yes | Dewar cold. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | no safety risk for in-vessel access; | Apr 14 2011 11:47AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Breakers off and red tagged | Apr 14 2011 11:27AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | HiReX installed but not hooked up yet, pending end of bake. | Nov 10 2011 11:57AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | 32 Channels operational,, no safety risk for in-vessel access | Apr 14 2011 12:05PM (parker) | Ron Parker | Hard X-Ray Array | faust,parker,schmidt | | ICRF D-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | secured | Apr 14 2011 08:56AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Impurity Spectroscopy | yes | Being upgraded with better optics and new spectrographs. Dan Miller has primary responsibility. | Apr 19 2011 11:46AM (blip) | Bruce Lipshultz | Measurement of recycling light and impurity source rates at multiple surfaces around the tokamak | blip,miller | | Laser Blow-Off | no | Beamline disconnected | Apr 14 2011 11:53AM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | LH HV Breaker Opened and Tagged, TPS Upgrade Underway | Nov 10 2011 03:51PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | LoWEUS | no | camera control softward unavailable, but gate-valve control ready to be tested | Nov 21 2011 06:58PM (mlreinke) | Matthew L. Reinke | Long Wavelength Extreme Ultraviolet Spectrometer | markchil,mlreinke | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Midplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up. | Nov 17 2011 02:42PM (mlreinke) | Matt Reinke | Lyman alpha cameras | faustian,labombard,mlreinke | | McPherson | no | broken turbo pump, McPherson unavailable | Nov 17 2011 02:42PM (mlreinke) | Jim Terry | VUV Spectrometer | markchil,mlreinke,terry | | Michelson | yes | Front end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | no | Secured for work. Power supplies are turned off. | Apr 14 2011 11:37AM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard,toland | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | no safety risk for in-vessel access as of 4/14/2011 | Apr 14 2011 11:48AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | High voltage is on. We're ready for plasma. | Nov 21 2011 12:58PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | All detectors Powered On --- Waiting for neutrons for calibration | Nov 22 2011 01:05PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Secured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom. | Apr 14 2011 11:44AM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry,toland | | PCI | no | Secured for in-vessel work | Apr 14 2011 06:21PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | emd,ennever,ntsujii,porkolab | | Penning Gauges | no | Secured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rack | Apr 14 2011 09:56AM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | no | Red tagged off | Apr 12 2011 07:23AM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | no | Breaker opened and red tagged | Apr 11 2011 11:59AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | no | Breakers opened and red tagged | Apr 11 2011 12:00PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | no | All systems disabled for in-vessel entry | Apr 14 2011 11:29AM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:56AM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack. | Apr 14 2011 09:57AM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array (F and J) | labombard | | Probe Array - UDIV | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Secured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack. | Apr 14 2011 11:39AM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | SOL reflectometer | yes | c-port waveguides operational, h-port waveguides are not. | Nov 29 2011 12:04PM (cornwall) | Cornwall Lau | SOL reflectometer | cornwall,wukitch,ylin | | Sparker | yes | New Type II sparker replaced Type I on 11/17/2011 | Nov 23 2011 08:53AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | no | SSS is up to air, no safety issues | Apr 14 2011 12:06PM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | TCI Operational. Density feedback operational. | Nov 10 2011 11:47AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jrwalk,jwhughes,yma | | TS - Edge | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jrwalk,jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | remote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasma | Nov 21 2011 06:57PM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | markchil,mlreinke | | XTOMO | yes | ARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checked | Nov 17 2011 02:44PM (mlreinke) | Bob Granetz | X-Ray Tomography | faustian,granetz,mlreinke |
|
| Nov 29 2011 01:17:46:580PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | golfit | | BES | yes | BES system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked up | Nov 17 2011 02:45PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed. Magnetron Unplugged | Apr 11 2011 09:51AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Multiple channel CNPA available, no safety risk for in-vessel access | Apr 14 2011 12:01PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed | Apr 15 2011 10:55AM (dekow) | Brian LaBombard | Upper Divertor Cryopump | dekow,irby,labombard | | CXRS | yes | core-CXRS system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | CXRS edge | yes | Michael CHurchill has primary responsibility at the moment | Apr 19 2011 11:44AM (blip) | Bruce Lipshultz | Measurement of CXR light in the pedestal region at both the high- and low-field sides | blip,rmchurch | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | system is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-port | Jun 02 2011 10:21AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | gas jet valve disabled on 2011/04/13 | Apr 13 2011 02:04PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DMBolo AXUV diodes | no | Still setting up the data acquisition system. | Nov 20 2011 12:19AM (golynyk) | Geoff Olynyk | Set of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinhole | golynyk | | DNB | no | gate valve disabled on 2011/04/13 | Apr 13 2011 02:03PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational as of 11/19/11 | Nov 22 2011 03:01PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off to RF and IF sections- Power on to DA | Apr 11 2011 02:54PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | bespam,liao,phillips,rowan,whitea | | G-Side Ratiomatic | no | Power supply OFF Gauge removed | Apr 14 2011 09:52AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Power supply unplugged and redtagged, HV cables removed | Apr 14 2011 08:03AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Front end under vacuum -8 scale. Gate valve enabled. Will be using new preamps. | Nov 18 2011 12:24PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPC2 | yes | Dewar cold. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | no safety risk for in-vessel access; | Apr 14 2011 11:47AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Breakers off and red tagged | Apr 14 2011 11:27AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | HiReX installed but not hooked up yet, pending end of bake. | Nov 10 2011 11:57AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | 32 Channels operational,, no safety risk for in-vessel access | Apr 14 2011 12:05PM (parker) | Ron Parker | Hard X-Ray Array | faust,parker,schmidt | | ICRF D-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | secured | Apr 14 2011 08:56AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Impurity Spectroscopy | yes | Being upgraded with better optics and new spectrographs. Dan Miller has primary responsibility. | Apr 19 2011 11:46AM (blip) | Bruce Lipshultz | Measurement of recycling light and impurity source rates at multiple surfaces around the tokamak | blip,miller | | Laser Blow-Off | no | Beamline disconnected | Apr 14 2011 11:53AM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | LH HV Breaker Opened and Tagged, TPS Upgrade Underway | Nov 10 2011 03:51PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | LoWEUS | no | camera control softward unavailable, but gate-valve control ready to be tested | Nov 21 2011 06:58PM (mlreinke) | Matthew L. Reinke | Long Wavelength Extreme Ultraviolet Spectrometer | markchil,mlreinke | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Midplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up. | Nov 17 2011 02:42PM (mlreinke) | Matt Reinke | Lyman alpha cameras | faustian,labombard,mlreinke | | McPherson | no | broken turbo pump, McPherson unavailable | Nov 17 2011 02:42PM (mlreinke) | Jim Terry | VUV Spectrometer | markchil,mlreinke,terry | | Michelson | yes | Front end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | no | Secured for work. Power supplies are turned off. | Apr 14 2011 11:37AM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard,toland | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | no safety risk for in-vessel access as of 4/14/2011 | Apr 14 2011 11:48AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | High voltage is on. We're ready for plasma. | Nov 21 2011 12:58PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | All detectors Powered On --- Waiting for neutrons for calibration | Nov 22 2011 01:05PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Secured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom. | Apr 14 2011 11:44AM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry,toland | | PCI | no | Secured for in-vessel work | Apr 14 2011 06:21PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | emd,ennever,ntsujii,porkolab | | Penning Gauges | no | Secured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rack | Apr 14 2011 09:56AM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | no | Red tagged off | Apr 12 2011 07:23AM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | no | Breaker opened and red tagged | Apr 11 2011 11:59AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | no | Breakers opened and red tagged | Apr 11 2011 12:00PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | no | All systems disabled for in-vessel entry | Apr 14 2011 11:29AM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:56AM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack. | Apr 14 2011 09:57AM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array (F and J) | labombard | | Probe Array - UDIV | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Secured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack. | Apr 14 2011 11:39AM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | SOL reflectometer | yes | c-port waveguides operational, h-port waveguides are not. | Nov 29 2011 12:04PM (cornwall) | Cornwall Lau | SOL reflectometer | cornwall,wukitch,ylin | | Sparker | yes | New Type II sparker replaced Type I on 11/17/2011 | Nov 23 2011 08:53AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | no | SSS is up to air, no safety issues | Apr 14 2011 12:06PM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | TCI Operational. Density feedback operational. | Nov 10 2011 11:47AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jrwalk,jwhughes,yma | | TS - Edge | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jrwalk,jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | remote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasma | Nov 21 2011 06:57PM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | markchil,mlreinke | | XTOMO | yes | ARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checked | Nov 17 2011 02:44PM (mlreinke) | Bob Granetz | X-Ray Tomography | faustian,granetz,mlreinke |
|
| Nov 29 2011 01:46:43:927PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | golfit | | BES | yes | BES system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked up | Nov 17 2011 02:45PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed. Magnetron Unplugged | Apr 11 2011 09:51AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Multiple channel CNPA available, no safety risk for in-vessel access | Apr 14 2011 12:01PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed | Apr 15 2011 10:55AM (dekow) | Brian LaBombard | Upper Divertor Cryopump | dekow,irby,labombard | | CXRS | yes | core-CXRS system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | CXRS edge | yes | Michael CHurchill has primary responsibility at the moment | Apr 19 2011 11:44AM (blip) | Bruce Lipshultz | Measurement of CXR light in the pedestal region at both the high- and low-field sides | blip,rmchurch | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | system is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-port | Jun 02 2011 10:21AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | gas jet valve disabled on 2011/04/13 | Apr 13 2011 02:04PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DMBolo AXUV diodes | no | Still setting up the data acquisition system. | Nov 20 2011 12:19AM (golynyk) | Geoff Olynyk | Set of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinhole | golynyk | | DNB | no | gate valve disabled on 2011/04/13 | Apr 13 2011 02:03PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational as of 11/19/11 | Nov 22 2011 03:01PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off to RF and IF sections- Power on to DA | Apr 11 2011 02:54PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | bespam,liao,phillips,rowan,whitea | | G-Side Ratiomatic | no | Power supply OFF Gauge removed | Apr 14 2011 09:52AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Power supply unplugged and redtagged, HV cables removed | Apr 14 2011 08:03AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Front end under vacuum -8 scale. Gate valve enabled. Will be using new preamps. | Nov 18 2011 12:24PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPC2 | yes | Dewar cold. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | no safety risk for in-vessel access; | Apr 14 2011 11:47AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Breakers off and red tagged | Apr 14 2011 11:27AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | HiReX installed but not hooked up yet, pending end of bake. | Nov 10 2011 11:57AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | 32 Channels operational,, no safety risk for in-vessel access | Apr 14 2011 12:05PM (parker) | Ron Parker | Hard X-Ray Array | faust,parker,schmidt | | ICRF D-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | secured | Apr 14 2011 08:56AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Impurity Spectroscopy | yes | Being upgraded with better optics and new spectrographs. Dan Miller has primary responsibility. | Apr 19 2011 11:46AM (blip) | Bruce Lipshultz | Measurement of recycling light and impurity source rates at multiple surfaces around the tokamak | blip,miller | | Laser Blow-Off | no | Beamline disconnected | Apr 14 2011 11:53AM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | LH HV Breaker Opened and Tagged, TPS Upgrade Underway | Nov 10 2011 03:51PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | LoWEUS | no | camera control softward unavailable, but gate-valve control ready to be tested | Nov 21 2011 06:58PM (mlreinke) | Matthew L. Reinke | Long Wavelength Extreme Ultraviolet Spectrometer | markchil,mlreinke | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Midplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up. | Nov 17 2011 02:42PM (mlreinke) | Matt Reinke | Lyman alpha cameras | faustian,labombard,mlreinke | | McPherson | no | broken turbo pump, McPherson unavailable | Nov 17 2011 02:42PM (mlreinke) | Jim Terry | VUV Spectrometer | markchil,mlreinke,terry | | Michelson | yes | Front end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | no | Secured for work. Power supplies are turned off. | Apr 14 2011 11:37AM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard,toland | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | no safety risk for in-vessel access as of 4/14/2011 | Apr 14 2011 11:48AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | High voltage is on. We're ready for plasma. | Nov 21 2011 12:58PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | All detectors Powered On --- Waiting for neutrons for calibration | Nov 22 2011 01:05PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Secured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom. | Apr 14 2011 11:44AM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry,toland | | PCI | no | Secured for in-vessel work | Apr 14 2011 06:21PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | emd,ennever,ntsujii,porkolab | | Penning Gauges | no | Secured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rack | Apr 14 2011 09:56AM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | no | Red tagged off | Apr 12 2011 07:23AM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | no | Breaker opened and red tagged | Apr 11 2011 11:59AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | no | Breakers opened and red tagged | Apr 11 2011 12:00PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | no | All systems disabled for in-vessel entry | Apr 14 2011 11:29AM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:56AM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack. | Apr 14 2011 09:57AM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array (F and J) | labombard | | Probe Array - UDIV | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Secured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack. | Apr 14 2011 11:39AM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | SOL reflectometer | yes | c-port waveguides operational, h-port waveguides are not. | Nov 29 2011 12:04PM (cornwall) | Cornwall Lau | SOL reflectometer | cornwall,wukitch,ylin | | Sparker | yes | New Type II sparker replaced Type I on 11/17/2011 | Nov 23 2011 08:53AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | no | SSS is up to air, no safety issues | Apr 14 2011 12:06PM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | TCI Operational. Density feedback operational. | Nov 10 2011 11:47AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jrwalk,jwhughes,yma | | TS - Edge | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jrwalk,jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | remote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasma | Nov 21 2011 06:57PM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | markchil,mlreinke | | XTOMO | yes | ARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checked | Nov 17 2011 02:44PM (mlreinke) | Bob Granetz | X-Ray Tomography | faustian,granetz,mlreinke |
|
| Nov 29 2011 02:03:25:913PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | golfit | | BES | yes | BES system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked up | Nov 17 2011 02:45PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed. Magnetron Unplugged | Apr 11 2011 09:51AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Multiple channel CNPA available, no safety risk for in-vessel access | Apr 14 2011 12:01PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed | Apr 15 2011 10:55AM (dekow) | Brian LaBombard | Upper Divertor Cryopump | dekow,irby,labombard | | CXRS | yes | core-CXRS system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | CXRS edge | yes | Michael CHurchill has primary responsibility at the moment | Apr 19 2011 11:44AM (blip) | Bruce Lipshultz | Measurement of CXR light in the pedestal region at both the high- and low-field sides | blip,rmchurch | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | system is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-port | Jun 02 2011 10:21AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | gas jet valve disabled on 2011/04/13 | Apr 13 2011 02:04PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DMBolo AXUV diodes | no | Still setting up the data acquisition system. | Nov 20 2011 12:19AM (golynyk) | Geoff Olynyk | Set of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinhole | golynyk | | DNB | no | gate valve disabled on 2011/04/13 | Apr 13 2011 02:03PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational as of 11/19/11 | Nov 22 2011 03:01PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off to RF and IF sections- Power on to DA | Apr 11 2011 02:54PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | bespam,liao,phillips,rowan,whitea | | G-Side Ratiomatic | no | Power supply OFF Gauge removed | Apr 14 2011 09:52AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Power supply unplugged and redtagged, HV cables removed | Apr 14 2011 08:03AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Front end under vacuum -8 scale. Gate valve enabled. Will be using new preamps. | Nov 18 2011 12:24PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPC2 | yes | Dewar cold. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | no safety risk for in-vessel access; | Apr 14 2011 11:47AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Breakers off and red tagged | Apr 14 2011 11:27AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | HiReX installed but not hooked up yet, pending end of bake. | Nov 10 2011 11:57AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | 32 Channels operational,, no safety risk for in-vessel access | Apr 14 2011 12:05PM (parker) | Ron Parker | Hard X-Ray Array | faust,parker,schmidt | | ICRF D-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | secured | Apr 14 2011 08:56AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Impurity Spectroscopy | yes | Being upgraded with better optics and new spectrographs. Dan Miller has primary responsibility. | Apr 19 2011 11:46AM (blip) | Bruce Lipshultz | Measurement of recycling light and impurity source rates at multiple surfaces around the tokamak | blip,miller | | Laser Blow-Off | no | Beamline disconnected | Apr 14 2011 11:53AM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | LH HV Breaker Opened and Tagged, TPS Upgrade Underway | Nov 10 2011 03:51PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | LoWEUS | no | camera control softward unavailable, but gate-valve control ready to be tested | Nov 21 2011 06:58PM (mlreinke) | Matthew L. Reinke | Long Wavelength Extreme Ultraviolet Spectrometer | markchil,mlreinke | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Midplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up. | Nov 17 2011 02:42PM (mlreinke) | Matt Reinke | Lyman alpha cameras | faustian,labombard,mlreinke | | McPherson | no | broken turbo pump, McPherson unavailable | Nov 17 2011 02:42PM (mlreinke) | Jim Terry | VUV Spectrometer | markchil,mlreinke,terry | | Michelson | yes | Front end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | no | Secured for work. Power supplies are turned off. | Apr 14 2011 11:37AM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard,toland | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | no safety risk for in-vessel access as of 4/14/2011 | Apr 14 2011 11:48AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | High voltage is on. We're ready for plasma. | Nov 21 2011 12:58PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | All detectors Powered On --- Waiting for neutrons for calibration | Nov 22 2011 01:05PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Secured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom. | Apr 14 2011 11:44AM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry,toland | | PCI | no | Secured for in-vessel work | Apr 14 2011 06:21PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | emd,ennever,ntsujii,porkolab | | Penning Gauges | no | Secured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rack | Apr 14 2011 09:56AM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | no | Red tagged off | Apr 12 2011 07:23AM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | no | Breaker opened and red tagged | Apr 11 2011 11:59AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | no | Breakers opened and red tagged | Apr 11 2011 12:00PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | no | All systems disabled for in-vessel entry | Apr 14 2011 11:29AM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:56AM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack. | Apr 14 2011 09:57AM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array (F and J) | labombard | | Probe Array - UDIV | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Secured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack. | Apr 14 2011 11:39AM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | SOL reflectometer | yes | c-port waveguides operational, h-port waveguides are not. | Nov 29 2011 12:04PM (cornwall) | Cornwall Lau | SOL reflectometer | cornwall,wukitch,ylin | | Sparker | yes | New Type II sparker replaced Type I on 11/17/2011 | Nov 23 2011 08:53AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | no | SSS is up to air, no safety issues | Apr 14 2011 12:06PM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | TCI Operational. Density feedback operational. | Nov 10 2011 11:47AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jrwalk,jwhughes,yma | | TS - Edge | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jrwalk,jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | remote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasma | Nov 21 2011 06:57PM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | markchil,mlreinke | | XTOMO | yes | ARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checked | Nov 17 2011 02:44PM (mlreinke) | Bob Granetz | X-Ray Tomography | faustian,granetz,mlreinke |
|
| Nov 29 2011 02:16:06:527PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | golfit | | BES | yes | BES system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked up | Nov 17 2011 02:45PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed. Magnetron Unplugged | Apr 11 2011 09:51AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Multiple channel CNPA available, no safety risk for in-vessel access | Apr 14 2011 12:01PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed | Apr 15 2011 10:55AM (dekow) | Brian LaBombard | Upper Divertor Cryopump | dekow,irby,labombard | | CXRS | yes | core-CXRS system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | CXRS edge | yes | Michael CHurchill has primary responsibility at the moment | Apr 19 2011 11:44AM (blip) | Bruce Lipshultz | Measurement of CXR light in the pedestal region at both the high- and low-field sides | blip,rmchurch | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | system is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-port | Jun 02 2011 10:21AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | gas jet valve disabled on 2011/04/13 | Apr 13 2011 02:04PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DMBolo AXUV diodes | no | Still setting up the data acquisition system. | Nov 20 2011 12:19AM (golynyk) | Geoff Olynyk | Set of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinhole | golynyk | | DNB | no | gate valve disabled on 2011/04/13 | Apr 13 2011 02:03PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational as of 11/19/11 | Nov 22 2011 03:01PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off to RF and IF sections- Power on to DA | Apr 11 2011 02:54PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | bespam,liao,phillips,rowan,whitea | | G-Side Ratiomatic | no | Power supply OFF Gauge removed | Apr 14 2011 09:52AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Power supply unplugged and redtagged, HV cables removed | Apr 14 2011 08:03AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Front end under vacuum -8 scale. Gate valve enabled. Will be using new preamps. | Nov 18 2011 12:24PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPC2 | yes | Dewar cold. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | no safety risk for in-vessel access; | Apr 14 2011 11:47AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Breakers off and red tagged | Apr 14 2011 11:27AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | HiReX installed but not hooked up yet, pending end of bake. | Nov 10 2011 11:57AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | 32 Channels operational,, no safety risk for in-vessel access | Apr 14 2011 12:05PM (parker) | Ron Parker | Hard X-Ray Array | faust,parker,schmidt | | ICRF D-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | secured | Apr 14 2011 08:56AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Impurity Spectroscopy | yes | Being upgraded with better optics and new spectrographs. Dan Miller has primary responsibility. | Apr 19 2011 11:46AM (blip) | Bruce Lipshultz | Measurement of recycling light and impurity source rates at multiple surfaces around the tokamak | blip,miller | | Laser Blow-Off | no | Beamline disconnected | Apr 14 2011 11:53AM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | LH HV Breaker Opened and Tagged, TPS Upgrade Underway | Nov 10 2011 03:51PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | LoWEUS | no | camera control softward unavailable, but gate-valve control ready to be tested | Nov 21 2011 06:58PM (mlreinke) | Matthew L. Reinke | Long Wavelength Extreme Ultraviolet Spectrometer | markchil,mlreinke | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Midplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up. | Nov 17 2011 02:42PM (mlreinke) | Matt Reinke | Lyman alpha cameras | faustian,labombard,mlreinke | | McPherson | no | broken turbo pump, McPherson unavailable | Nov 17 2011 02:42PM (mlreinke) | Jim Terry | VUV Spectrometer | markchil,mlreinke,terry | | Michelson | yes | Front end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | no | Secured for work. Power supplies are turned off. | Apr 14 2011 11:37AM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard,toland | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | no safety risk for in-vessel access as of 4/14/2011 | Apr 14 2011 11:48AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | High voltage is on. We're ready for plasma. | Nov 21 2011 12:58PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | All detectors Powered On --- Waiting for neutrons for calibration | Nov 22 2011 01:05PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Secured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom. | Apr 14 2011 11:44AM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry,toland | | PCI | no | Secured for in-vessel work | Apr 14 2011 06:21PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | emd,ennever,ntsujii,porkolab | | Penning Gauges | no | Secured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rack | Apr 14 2011 09:56AM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | no | Red tagged off | Apr 12 2011 07:23AM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | no | Breaker opened and red tagged | Apr 11 2011 11:59AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | no | Breakers opened and red tagged | Apr 11 2011 12:00PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | no | All systems disabled for in-vessel entry | Apr 14 2011 11:29AM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:56AM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack. | Apr 14 2011 09:57AM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array (F and J) | labombard | | Probe Array - UDIV | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Secured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack. | Apr 14 2011 11:39AM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | SOL reflectometer | yes | c-port waveguides operational, h-port waveguides are not. | Nov 29 2011 12:04PM (cornwall) | Cornwall Lau | SOL reflectometer | cornwall,wukitch,ylin | | Sparker | yes | New Type II sparker replaced Type I on 11/17/2011 | Nov 23 2011 08:53AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | no | SSS is up to air, no safety issues | Apr 14 2011 12:06PM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | TCI Operational. Density feedback operational. | Nov 10 2011 11:47AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jrwalk,jwhughes,yma | | TS - Edge | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jrwalk,jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | remote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasma | Nov 21 2011 06:57PM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | markchil,mlreinke | | XTOMO | yes | ARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checked | Nov 17 2011 02:44PM (mlreinke) | Bob Granetz | X-Ray Tomography | faustian,granetz,mlreinke |
|
| Nov 29 2011 02:50:10:770PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | golfit | | BES | yes | BES system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked up | Nov 17 2011 02:45PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed. Magnetron Unplugged | Apr 11 2011 09:51AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Multiple channel CNPA available, no safety risk for in-vessel access | Apr 14 2011 12:01PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed | Apr 15 2011 10:55AM (dekow) | Brian LaBombard | Upper Divertor Cryopump | dekow,irby,labombard | | CXRS | yes | core-CXRS system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | CXRS edge | yes | Michael CHurchill has primary responsibility at the moment | Apr 19 2011 11:44AM (blip) | Bruce Lipshultz | Measurement of CXR light in the pedestal region at both the high- and low-field sides | blip,rmchurch | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | system is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-port | Jun 02 2011 10:21AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | gas jet valve disabled on 2011/04/13 | Apr 13 2011 02:04PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DMBolo AXUV diodes | no | Still setting up the data acquisition system. | Nov 20 2011 12:19AM (golynyk) | Geoff Olynyk | Set of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinhole | golynyk | | DNB | no | gate valve disabled on 2011/04/13 | Apr 13 2011 02:03PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational as of 11/19/11 | Nov 22 2011 03:01PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off to RF and IF sections- Power on to DA | Apr 11 2011 02:54PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | bespam,liao,phillips,rowan,whitea | | G-Side Ratiomatic | no | Power supply OFF Gauge removed | Apr 14 2011 09:52AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Power supply unplugged and redtagged, HV cables removed | Apr 14 2011 08:03AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Front end under vacuum -8 scale. Gate valve enabled. Will be using new preamps. | Nov 18 2011 12:24PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPC2 | yes | Dewar cold. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | no safety risk for in-vessel access; | Apr 14 2011 11:47AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Breakers off and red tagged | Apr 14 2011 11:27AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | HiReX installed but not hooked up yet, pending end of bake. | Nov 10 2011 11:57AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | 32 Channels operational,, no safety risk for in-vessel access | Apr 14 2011 12:05PM (parker) | Ron Parker | Hard X-Ray Array | faust,parker,schmidt | | ICRF D-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | secured | Apr 14 2011 08:56AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Impurity Spectroscopy | yes | Being upgraded with better optics and new spectrographs. Dan Miller has primary responsibility. | Apr 19 2011 11:46AM (blip) | Bruce Lipshultz | Measurement of recycling light and impurity source rates at multiple surfaces around the tokamak | blip,miller | | Laser Blow-Off | no | Beamline disconnected | Apr 14 2011 11:53AM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | LH HV Breaker Opened and Tagged, TPS Upgrade Underway | Nov 10 2011 03:51PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | LoWEUS | no | camera control softward unavailable, but gate-valve control ready to be tested | Nov 21 2011 06:58PM (mlreinke) | Matthew L. Reinke | Long Wavelength Extreme Ultraviolet Spectrometer | markchil,mlreinke | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Midplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up. | Nov 17 2011 02:42PM (mlreinke) | Matt Reinke | Lyman alpha cameras | faustian,labombard,mlreinke | | McPherson | no | broken turbo pump, McPherson unavailable | Nov 17 2011 02:42PM (mlreinke) | Jim Terry | VUV Spectrometer | markchil,mlreinke,terry | | Michelson | yes | Front end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | no | Secured for work. Power supplies are turned off. | Apr 14 2011 11:37AM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard,toland | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | no safety risk for in-vessel access as of 4/14/2011 | Apr 14 2011 11:48AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | High voltage is on. We're ready for plasma. | Nov 21 2011 12:58PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | All detectors Powered On --- Waiting for neutrons for calibration | Nov 22 2011 01:05PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Secured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom. | Apr 14 2011 11:44AM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry,toland | | PCI | no | Secured for in-vessel work | Apr 14 2011 06:21PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | emd,ennever,ntsujii,porkolab | | Penning Gauges | no | Secured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rack | Apr 14 2011 09:56AM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | no | Red tagged off | Apr 12 2011 07:23AM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | no | Breaker opened and red tagged | Apr 11 2011 11:59AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | no | Breakers opened and red tagged | Apr 11 2011 12:00PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | no | All systems disabled for in-vessel entry | Apr 14 2011 11:29AM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:56AM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack. | Apr 14 2011 09:57AM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array (F and J) | labombard | | Probe Array - UDIV | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Secured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack. | Apr 14 2011 11:39AM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | SOL reflectometer | yes | c-port waveguides operational, h-port waveguides are not. | Nov 29 2011 12:04PM (cornwall) | Cornwall Lau | SOL reflectometer | cornwall,wukitch,ylin | | Sparker | yes | New Type II sparker replaced Type I on 11/17/2011 | Nov 23 2011 08:53AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | no | SSS is up to air, no safety issues | Apr 14 2011 12:06PM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | TCI Operational. Density feedback operational. | Nov 10 2011 11:47AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jrwalk,jwhughes,yma | | TS - Edge | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jrwalk,jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | remote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasma | Nov 21 2011 06:57PM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | markchil,mlreinke | | XTOMO | yes | ARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checked | Nov 17 2011 02:44PM (mlreinke) | Bob Granetz | X-Ray Tomography | faustian,granetz,mlreinke |
|
| Nov 29 2011 03:03:00:043PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | golfit | | BES | yes | BES system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked up | Nov 17 2011 02:45PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed. Magnetron Unplugged | Apr 11 2011 09:51AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Multiple channel CNPA available, no safety risk for in-vessel access | Apr 14 2011 12:01PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed | Apr 15 2011 10:55AM (dekow) | Brian LaBombard | Upper Divertor Cryopump | dekow,irby,labombard | | CXRS | yes | core-CXRS system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | CXRS edge | yes | Michael CHurchill has primary responsibility at the moment | Apr 19 2011 11:44AM (blip) | Bruce Lipshultz | Measurement of CXR light in the pedestal region at both the high- and low-field sides | blip,rmchurch | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | system is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-port | Jun 02 2011 10:21AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | gas jet valve disabled on 2011/04/13 | Apr 13 2011 02:04PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DMBolo AXUV diodes | no | Still setting up the data acquisition system. | Nov 20 2011 12:19AM (golynyk) | Geoff Olynyk | Set of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinhole | golynyk | | DNB | no | gate valve disabled on 2011/04/13 | Apr 13 2011 02:03PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational as of 11/19/11 | Nov 22 2011 03:01PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off to RF and IF sections- Power on to DA | Apr 11 2011 02:54PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | bespam,liao,phillips,rowan,whitea | | G-Side Ratiomatic | no | Power supply OFF Gauge removed | Apr 14 2011 09:52AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Power supply unplugged and redtagged, HV cables removed | Apr 14 2011 08:03AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Front end under vacuum -8 scale. Gate valve enabled. Will be using new preamps. | Nov 18 2011 12:24PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPC2 | yes | Dewar cold. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | no safety risk for in-vessel access; | Apr 14 2011 11:47AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Breakers off and red tagged | Apr 14 2011 11:27AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | HiReX installed but not hooked up yet, pending end of bake. | Nov 10 2011 11:57AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | 32 Channels operational,, no safety risk for in-vessel access | Apr 14 2011 12:05PM (parker) | Ron Parker | Hard X-Ray Array | faust,parker,schmidt | | ICRF D-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | secured | Apr 14 2011 08:56AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Impurity Spectroscopy | yes | Being upgraded with better optics and new spectrographs. Dan Miller has primary responsibility. | Apr 19 2011 11:46AM (blip) | Bruce Lipshultz | Measurement of recycling light and impurity source rates at multiple surfaces around the tokamak | blip,miller | | Laser Blow-Off | no | Beamline disconnected | Apr 14 2011 11:53AM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | LH HV Breaker Opened and Tagged, TPS Upgrade Underway | Nov 10 2011 03:51PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | LoWEUS | no | camera control softward unavailable, but gate-valve control ready to be tested | Nov 21 2011 06:58PM (mlreinke) | Matthew L. Reinke | Long Wavelength Extreme Ultraviolet Spectrometer | markchil,mlreinke | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Midplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up. | Nov 17 2011 02:42PM (mlreinke) | Matt Reinke | Lyman alpha cameras | faustian,labombard,mlreinke | | McPherson | no | broken turbo pump, McPherson unavailable | Nov 17 2011 02:42PM (mlreinke) | Jim Terry | VUV Spectrometer | markchil,mlreinke,terry | | Michelson | yes | Front end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | no | Secured for work. Power supplies are turned off. | Apr 14 2011 11:37AM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard,toland | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | no safety risk for in-vessel access as of 4/14/2011 | Apr 14 2011 11:48AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | High voltage is on. We're ready for plasma. | Nov 21 2011 12:58PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | All detectors Powered On --- Waiting for neutrons for calibration | Nov 22 2011 01:05PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Secured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom. | Apr 14 2011 11:44AM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry,toland | | PCI | no | Secured for in-vessel work | Apr 14 2011 06:21PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | emd,ennever,ntsujii,porkolab | | Penning Gauges | no | Secured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rack | Apr 14 2011 09:56AM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | no | Red tagged off | Apr 12 2011 07:23AM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | no | Breaker opened and red tagged | Apr 11 2011 11:59AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | no | Breakers opened and red tagged | Apr 11 2011 12:00PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | no | All systems disabled for in-vessel entry | Apr 14 2011 11:29AM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:56AM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack. | Apr 14 2011 09:57AM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array (F and J) | labombard | | Probe Array - UDIV | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Secured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack. | Apr 14 2011 11:39AM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | SOL reflectometer | yes | c-port waveguides operational, h-port waveguides are not. | Nov 29 2011 12:04PM (cornwall) | Cornwall Lau | SOL reflectometer | cornwall,wukitch,ylin | | Sparker | yes | New Type II sparker replaced Type I on 11/17/2011 | Nov 23 2011 08:53AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | no | SSS is up to air, no safety issues | Apr 14 2011 12:06PM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | TCI Operational. Density feedback operational. | Nov 10 2011 11:47AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jrwalk,jwhughes,yma | | TS - Edge | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jrwalk,jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | remote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasma | Nov 21 2011 06:57PM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | markchil,mlreinke | | XTOMO | yes | ARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checked | Nov 17 2011 02:44PM (mlreinke) | Bob Granetz | X-Ray Tomography | faustian,granetz,mlreinke |
|
| Nov 29 2011 03:16:03:420PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | golfit | | BES | yes | BES system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked up | Nov 17 2011 02:45PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed. Magnetron Unplugged | Apr 11 2011 09:51AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Multiple channel CNPA available, no safety risk for in-vessel access | Apr 14 2011 12:01PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed | Apr 15 2011 10:55AM (dekow) | Brian LaBombard | Upper Divertor Cryopump | dekow,irby,labombard | | CXRS | yes | core-CXRS system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | CXRS edge | yes | Michael CHurchill has primary responsibility at the moment | Apr 19 2011 11:44AM (blip) | Bruce Lipshultz | Measurement of CXR light in the pedestal region at both the high- and low-field sides | blip,rmchurch | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | system is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-port | Jun 02 2011 10:21AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | gas jet valve disabled on 2011/04/13 | Apr 13 2011 02:04PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DMBolo AXUV diodes | no | Still setting up the data acquisition system. | Nov 20 2011 12:19AM (golynyk) | Geoff Olynyk | Set of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinhole | golynyk | | DNB | no | gate valve disabled on 2011/04/13 | Apr 13 2011 02:03PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational as of 11/19/11 | Nov 22 2011 03:01PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off to RF and IF sections- Power on to DA | Apr 11 2011 02:54PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | bespam,liao,phillips,rowan,whitea | | G-Side Ratiomatic | no | Power supply OFF Gauge removed | Apr 14 2011 09:52AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Power supply unplugged and redtagged, HV cables removed | Apr 14 2011 08:03AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Front end under vacuum -8 scale. Gate valve enabled. Will be using new preamps. | Nov 18 2011 12:24PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPC2 | yes | Dewar cold. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | no safety risk for in-vessel access; | Apr 14 2011 11:47AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Breakers off and red tagged | Apr 14 2011 11:27AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | HiReX installed but not hooked up yet, pending end of bake. | Nov 10 2011 11:57AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | 32 Channels operational,, no safety risk for in-vessel access | Apr 14 2011 12:05PM (parker) | Ron Parker | Hard X-Ray Array | faust,parker,schmidt | | ICRF D-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | secured | Apr 14 2011 08:56AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Impurity Spectroscopy | yes | Being upgraded with better optics and new spectrographs. Dan Miller has primary responsibility. | Apr 19 2011 11:46AM (blip) | Bruce Lipshultz | Measurement of recycling light and impurity source rates at multiple surfaces around the tokamak | blip,miller | | Laser Blow-Off | no | Beamline disconnected | Apr 14 2011 11:53AM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | LH HV Breaker Opened and Tagged, TPS Upgrade Underway | Nov 10 2011 03:51PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | LoWEUS | no | camera control softward unavailable, but gate-valve control ready to be tested | Nov 21 2011 06:58PM (mlreinke) | Matthew L. Reinke | Long Wavelength Extreme Ultraviolet Spectrometer | markchil,mlreinke | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Midplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up. | Nov 17 2011 02:42PM (mlreinke) | Matt Reinke | Lyman alpha cameras | faustian,labombard,mlreinke | | McPherson | no | broken turbo pump, McPherson unavailable | Nov 17 2011 02:42PM (mlreinke) | Jim Terry | VUV Spectrometer | markchil,mlreinke,terry | | Michelson | yes | Front end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | no | Secured for work. Power supplies are turned off. | Apr 14 2011 11:37AM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard,toland | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | no safety risk for in-vessel access as of 4/14/2011 | Apr 14 2011 11:48AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | High voltage is on. We're ready for plasma. | Nov 21 2011 12:58PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | All detectors Powered On --- Waiting for neutrons for calibration | Nov 22 2011 01:05PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Secured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom. | Apr 14 2011 11:44AM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry,toland | | PCI | no | Secured for in-vessel work | Apr 14 2011 06:21PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | emd,ennever,ntsujii,porkolab | | Penning Gauges | no | Secured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rack | Apr 14 2011 09:56AM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | no | Red tagged off | Apr 12 2011 07:23AM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | no | Breaker opened and red tagged | Apr 11 2011 11:59AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | no | Breakers opened and red tagged | Apr 11 2011 12:00PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | no | All systems disabled for in-vessel entry | Apr 14 2011 11:29AM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:56AM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack. | Apr 14 2011 09:57AM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array (F and J) | labombard | | Probe Array - UDIV | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Secured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack. | Apr 14 2011 11:39AM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | SOL reflectometer | yes | c-port waveguides operational, h-port waveguides are not. | Nov 29 2011 12:04PM (cornwall) | Cornwall Lau | SOL reflectometer | cornwall,wukitch,ylin | | Sparker | yes | New Type II sparker replaced Type I on 11/17/2011 | Nov 23 2011 08:53AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | no | SSS is up to air, no safety issues | Apr 14 2011 12:06PM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | TCI Operational. Density feedback operational. | Nov 10 2011 11:47AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jrwalk,jwhughes,yma | | TS - Edge | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jrwalk,jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | remote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasma | Nov 21 2011 06:57PM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | markchil,mlreinke | | XTOMO | yes | ARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checked | Nov 17 2011 02:44PM (mlreinke) | Bob Granetz | X-Ray Tomography | faustian,granetz,mlreinke |
|
| Nov 29 2011 03:28:35:700PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | golfit | | BES | yes | BES system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked up | Nov 17 2011 02:45PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed. Magnetron Unplugged | Apr 11 2011 09:51AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Multiple channel CNPA available, no safety risk for in-vessel access | Apr 14 2011 12:01PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed | Apr 15 2011 10:55AM (dekow) | Brian LaBombard | Upper Divertor Cryopump | dekow,irby,labombard | | CXRS | yes | core-CXRS system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | CXRS edge | yes | Michael CHurchill has primary responsibility at the moment | Apr 19 2011 11:44AM (blip) | Bruce Lipshultz | Measurement of CXR light in the pedestal region at both the high- and low-field sides | blip,rmchurch | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | system is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-port | Jun 02 2011 10:21AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | gas jet valve disabled on 2011/04/13 | Apr 13 2011 02:04PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DMBolo AXUV diodes | no | Still setting up the data acquisition system. | Nov 20 2011 12:19AM (golynyk) | Geoff Olynyk | Set of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinhole | golynyk | | DNB | no | gate valve disabled on 2011/04/13 | Apr 13 2011 02:03PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational as of 11/19/11 | Nov 22 2011 03:01PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off to RF and IF sections- Power on to DA | Apr 11 2011 02:54PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | bespam,liao,phillips,rowan,whitea | | G-Side Ratiomatic | no | Power supply OFF Gauge removed | Apr 14 2011 09:52AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Power supply unplugged and redtagged, HV cables removed | Apr 14 2011 08:03AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Front end under vacuum -8 scale. Gate valve enabled. Will be using new preamps. | Nov 18 2011 12:24PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPC2 | yes | Dewar cold. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | no safety risk for in-vessel access; | Apr 14 2011 11:47AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Breakers off and red tagged | Apr 14 2011 11:27AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | HiReX installed but not hooked up yet, pending end of bake. | Nov 10 2011 11:57AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | 32 Channels operational,, no safety risk for in-vessel access | Apr 14 2011 12:05PM (parker) | Ron Parker | Hard X-Ray Array | faust,parker,schmidt | | ICRF D-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | secured | Apr 14 2011 08:56AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Impurity Spectroscopy | yes | Being upgraded with better optics and new spectrographs. Dan Miller has primary responsibility. | Apr 19 2011 11:46AM (blip) | Bruce Lipshultz | Measurement of recycling light and impurity source rates at multiple surfaces around the tokamak | blip,miller | | Laser Blow-Off | no | Beamline disconnected | Apr 14 2011 11:53AM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | LH HV Breaker Opened and Tagged, TPS Upgrade Underway | Nov 10 2011 03:51PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | LoWEUS | no | camera control softward unavailable, but gate-valve control ready to be tested | Nov 21 2011 06:58PM (mlreinke) | Matthew L. Reinke | Long Wavelength Extreme Ultraviolet Spectrometer | markchil,mlreinke | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Midplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up. | Nov 17 2011 02:42PM (mlreinke) | Matt Reinke | Lyman alpha cameras | faustian,labombard,mlreinke | | McPherson | no | broken turbo pump, McPherson unavailable | Nov 17 2011 02:42PM (mlreinke) | Jim Terry | VUV Spectrometer | markchil,mlreinke,terry | | Michelson | yes | Front end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | no | Secured for work. Power supplies are turned off. | Apr 14 2011 11:37AM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard,toland | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | no safety risk for in-vessel access as of 4/14/2011 | Apr 14 2011 11:48AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | High voltage is on. We're ready for plasma. | Nov 21 2011 12:58PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | All detectors Powered On --- Waiting for neutrons for calibration | Nov 22 2011 01:05PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Secured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom. | Apr 14 2011 11:44AM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry,toland | | PCI | no | Secured for in-vessel work | Apr 14 2011 06:21PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | emd,ennever,ntsujii,porkolab | | Penning Gauges | no | Secured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rack | Apr 14 2011 09:56AM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | no | Red tagged off | Apr 12 2011 07:23AM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | no | Breaker opened and red tagged | Apr 11 2011 11:59AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | no | Breakers opened and red tagged | Apr 11 2011 12:00PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | no | All systems disabled for in-vessel entry | Apr 14 2011 11:29AM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:56AM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack. | Apr 14 2011 09:57AM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array (F and J) | labombard | | Probe Array - UDIV | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Secured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack. | Apr 14 2011 11:39AM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | SOL reflectometer | yes | c-port waveguides operational, h-port waveguides are not. | Nov 29 2011 12:04PM (cornwall) | Cornwall Lau | SOL reflectometer | cornwall,wukitch,ylin | | Sparker | yes | New Type II sparker replaced Type I on 11/17/2011 | Nov 23 2011 08:53AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | no | SSS is up to air, no safety issues | Apr 14 2011 12:06PM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | TCI Operational. Density feedback operational. | Nov 10 2011 11:47AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jrwalk,jwhughes,yma | | TS - Edge | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jrwalk,jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | remote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasma | Nov 21 2011 06:57PM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | markchil,mlreinke | | XTOMO | yes | ARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checked | Nov 17 2011 02:44PM (mlreinke) | Bob Granetz | X-Ray Tomography | faustian,granetz,mlreinke |
|
| Nov 29 2011 03:41:15:093PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | golfit | | BES | yes | BES system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked up | Nov 17 2011 02:45PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed. Magnetron Unplugged | Apr 11 2011 09:51AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Multiple channel CNPA available, no safety risk for in-vessel access | Apr 14 2011 12:01PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed | Apr 15 2011 10:55AM (dekow) | Brian LaBombard | Upper Divertor Cryopump | dekow,irby,labombard | | CXRS | yes | core-CXRS system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | CXRS edge | yes | Michael CHurchill has primary responsibility at the moment | Apr 19 2011 11:44AM (blip) | Bruce Lipshultz | Measurement of CXR light in the pedestal region at both the high- and low-field sides | blip,rmchurch | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | system is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-port | Jun 02 2011 10:21AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | gas jet valve disabled on 2011/04/13 | Apr 13 2011 02:04PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DMBolo AXUV diodes | no | Still setting up the data acquisition system. | Nov 20 2011 12:19AM (golynyk) | Geoff Olynyk | Set of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinhole | golynyk | | DNB | no | gate valve disabled on 2011/04/13 | Apr 13 2011 02:03PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational as of 11/19/11 | Nov 22 2011 03:01PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off to RF and IF sections- Power on to DA | Apr 11 2011 02:54PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | bespam,liao,phillips,rowan,whitea | | G-Side Ratiomatic | no | Power supply OFF Gauge removed | Apr 14 2011 09:52AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Power supply unplugged and redtagged, HV cables removed | Apr 14 2011 08:03AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Front end under vacuum -8 scale. Gate valve enabled. Will be using new preamps. | Nov 18 2011 12:24PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPC2 | yes | Dewar cold. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | no safety risk for in-vessel access; | Apr 14 2011 11:47AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Breakers off and red tagged | Apr 14 2011 11:27AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | HiReX installed but not hooked up yet, pending end of bake. | Nov 10 2011 11:57AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | 32 Channels operational,, no safety risk for in-vessel access | Apr 14 2011 12:05PM (parker) | Ron Parker | Hard X-Ray Array | faust,parker,schmidt | | ICRF D-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | secured | Apr 14 2011 08:56AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Impurity Spectroscopy | yes | Being upgraded with better optics and new spectrographs. Dan Miller has primary responsibility. | Apr 19 2011 11:46AM (blip) | Bruce Lipshultz | Measurement of recycling light and impurity source rates at multiple surfaces around the tokamak | blip,miller | | Laser Blow-Off | no | Beamline disconnected | Apr 14 2011 11:53AM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | LH HV Breaker Opened and Tagged, TPS Upgrade Underway | Nov 10 2011 03:51PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | LoWEUS | no | camera control softward unavailable, but gate-valve control ready to be tested | Nov 21 2011 06:58PM (mlreinke) | Matthew L. Reinke | Long Wavelength Extreme Ultraviolet Spectrometer | markchil,mlreinke | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Midplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up. | Nov 17 2011 02:42PM (mlreinke) | Matt Reinke | Lyman alpha cameras | faustian,labombard,mlreinke | | McPherson | no | broken turbo pump, McPherson unavailable | Nov 17 2011 02:42PM (mlreinke) | Jim Terry | VUV Spectrometer | markchil,mlreinke,terry | | Michelson | yes | Front end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | no | Secured for work. Power supplies are turned off. | Apr 14 2011 11:37AM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard,toland | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | no safety risk for in-vessel access as of 4/14/2011 | Apr 14 2011 11:48AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | High voltage is on. We're ready for plasma. | Nov 21 2011 12:58PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | All detectors Powered On --- Waiting for neutrons for calibration | Nov 22 2011 01:05PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Secured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom. | Apr 14 2011 11:44AM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry,toland | | PCI | no | Secured for in-vessel work | Apr 14 2011 06:21PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | emd,ennever,ntsujii,porkolab | | Penning Gauges | no | Secured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rack | Apr 14 2011 09:56AM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | no | Red tagged off | Apr 12 2011 07:23AM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | no | Breaker opened and red tagged | Apr 11 2011 11:59AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | no | Breakers opened and red tagged | Apr 11 2011 12:00PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | no | All systems disabled for in-vessel entry | Apr 14 2011 11:29AM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:56AM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack. | Apr 14 2011 09:57AM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array (F and J) | labombard | | Probe Array - UDIV | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Secured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack. | Apr 14 2011 11:39AM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | SOL reflectometer | yes | c-port waveguides operational, h-port waveguides are not. | Nov 29 2011 12:04PM (cornwall) | Cornwall Lau | SOL reflectometer | cornwall,wukitch,ylin | | Sparker | yes | New Type II sparker replaced Type I on 11/17/2011 | Nov 23 2011 08:53AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | no | SSS is up to air, no safety issues | Apr 14 2011 12:06PM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | TCI Operational. Density feedback operational. | Nov 10 2011 11:47AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jrwalk,jwhughes,yma | | TS - Edge | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jrwalk,jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | remote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasma | Nov 21 2011 06:57PM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | markchil,mlreinke | | XTOMO | yes | ARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checked | Nov 17 2011 02:44PM (mlreinke) | Bob Granetz | X-Ray Tomography | faustian,granetz,mlreinke |
|
| Nov 29 2011 03:54:04:693PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | golfit | | BES | yes | BES system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked up | Nov 17 2011 02:45PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed. Magnetron Unplugged | Apr 11 2011 09:51AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Multiple channel CNPA available, no safety risk for in-vessel access | Apr 14 2011 12:01PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed | Apr 15 2011 10:55AM (dekow) | Brian LaBombard | Upper Divertor Cryopump | dekow,irby,labombard | | CXRS | yes | core-CXRS system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | CXRS edge | yes | Michael CHurchill has primary responsibility at the moment | Apr 19 2011 11:44AM (blip) | Bruce Lipshultz | Measurement of CXR light in the pedestal region at both the high- and low-field sides | blip,rmchurch | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | system is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-port | Jun 02 2011 10:21AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | gas jet valve disabled on 2011/04/13 | Apr 13 2011 02:04PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DMBolo AXUV diodes | no | Still setting up the data acquisition system. | Nov 20 2011 12:19AM (golynyk) | Geoff Olynyk | Set of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinhole | golynyk | | DNB | no | gate valve disabled on 2011/04/13 | Apr 13 2011 02:03PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational as of 11/19/11 | Nov 22 2011 03:01PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off to RF and IF sections- Power on to DA | Apr 11 2011 02:54PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | bespam,liao,phillips,rowan,whitea | | G-Side Ratiomatic | no | Power supply OFF Gauge removed | Apr 14 2011 09:52AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Power supply unplugged and redtagged, HV cables removed | Apr 14 2011 08:03AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Front end under vacuum -8 scale. Gate valve enabled. Will be using new preamps. | Nov 18 2011 12:24PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPC2 | yes | Dewar cold. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | no safety risk for in-vessel access; | Apr 14 2011 11:47AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Breakers off and red tagged | Apr 14 2011 11:27AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | HiReX installed but not hooked up yet, pending end of bake. | Nov 10 2011 11:57AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | 32 Channels operational,, no safety risk for in-vessel access | Apr 14 2011 12:05PM (parker) | Ron Parker | Hard X-Ray Array | faust,parker,schmidt | | ICRF D-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | secured | Apr 14 2011 08:56AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Impurity Spectroscopy | yes | Being upgraded with better optics and new spectrographs. Dan Miller has primary responsibility. | Apr 19 2011 11:46AM (blip) | Bruce Lipshultz | Measurement of recycling light and impurity source rates at multiple surfaces around the tokamak | blip,miller | | Laser Blow-Off | no | Beamline disconnected | Apr 14 2011 11:53AM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | LH HV Breaker Opened and Tagged, TPS Upgrade Underway | Nov 10 2011 03:51PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | LoWEUS | no | camera control softward unavailable, but gate-valve control ready to be tested | Nov 21 2011 06:58PM (mlreinke) | Matthew L. Reinke | Long Wavelength Extreme Ultraviolet Spectrometer | markchil,mlreinke | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Midplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up. | Nov 17 2011 02:42PM (mlreinke) | Matt Reinke | Lyman alpha cameras | faustian,labombard,mlreinke | | McPherson | no | broken turbo pump, McPherson unavailable | Nov 17 2011 02:42PM (mlreinke) | Jim Terry | VUV Spectrometer | markchil,mlreinke,terry | | Michelson | yes | Front end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | no | Secured for work. Power supplies are turned off. | Apr 14 2011 11:37AM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard,toland | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | no safety risk for in-vessel access as of 4/14/2011 | Apr 14 2011 11:48AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | High voltage is on. We're ready for plasma. | Nov 21 2011 12:58PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | All detectors Powered On --- Waiting for neutrons for calibration | Nov 22 2011 01:05PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Secured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom. | Apr 14 2011 11:44AM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry,toland | | PCI | no | Secured for in-vessel work | Apr 14 2011 06:21PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | emd,ennever,ntsujii,porkolab | | Penning Gauges | no | Secured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rack | Apr 14 2011 09:56AM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | no | Red tagged off | Apr 12 2011 07:23AM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | no | Breaker opened and red tagged | Apr 11 2011 11:59AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | no | Breakers opened and red tagged | Apr 11 2011 12:00PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | no | All systems disabled for in-vessel entry | Apr 14 2011 11:29AM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:56AM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack. | Apr 14 2011 09:57AM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array (F and J) | labombard | | Probe Array - UDIV | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Secured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack. | Apr 14 2011 11:39AM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | SOL reflectometer | yes | c-port waveguides operational, h-port waveguides are not. | Nov 29 2011 12:04PM (cornwall) | Cornwall Lau | SOL reflectometer | cornwall,wukitch,ylin | | Sparker | yes | New Type II sparker replaced Type I on 11/17/2011 | Nov 23 2011 08:53AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | no | SSS is up to air, no safety issues | Apr 14 2011 12:06PM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | TCI Operational. Density feedback operational. | Nov 10 2011 11:47AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jrwalk,jwhughes,yma | | TS - Edge | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jrwalk,jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | remote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasma | Nov 21 2011 06:57PM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | markchil,mlreinke | | XTOMO | yes | ARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checked | Nov 17 2011 02:44PM (mlreinke) | Bob Granetz | X-Ray Tomography | faustian,granetz,mlreinke |
|
| Nov 29 2011 04:06:42:370PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | golfit | | BES | yes | BES system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked up | Nov 17 2011 02:45PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed. Magnetron Unplugged | Apr 11 2011 09:51AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Multiple channel CNPA available, no safety risk for in-vessel access | Apr 14 2011 12:01PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed | Apr 15 2011 10:55AM (dekow) | Brian LaBombard | Upper Divertor Cryopump | dekow,irby,labombard | | CXRS | yes | core-CXRS system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | CXRS edge | yes | Michael CHurchill has primary responsibility at the moment | Apr 19 2011 11:44AM (blip) | Bruce Lipshultz | Measurement of CXR light in the pedestal region at both the high- and low-field sides | blip,rmchurch | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | system is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-port | Jun 02 2011 10:21AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | gas jet valve disabled on 2011/04/13 | Apr 13 2011 02:04PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DMBolo AXUV diodes | no | Still setting up the data acquisition system. | Nov 20 2011 12:19AM (golynyk) | Geoff Olynyk | Set of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinhole | golynyk | | DNB | no | gate valve disabled on 2011/04/13 | Apr 13 2011 02:03PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational as of 11/19/11 | Nov 22 2011 03:01PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off to RF and IF sections- Power on to DA | Apr 11 2011 02:54PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | bespam,liao,phillips,rowan,whitea | | G-Side Ratiomatic | no | Power supply OFF Gauge removed | Apr 14 2011 09:52AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Power supply unplugged and redtagged, HV cables removed | Apr 14 2011 08:03AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Front end under vacuum -8 scale. Gate valve enabled. Will be using new preamps. | Nov 18 2011 12:24PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPC2 | yes | Dewar cold. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | no safety risk for in-vessel access; | Apr 14 2011 11:47AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Breakers off and red tagged | Apr 14 2011 11:27AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | HiReX installed but not hooked up yet, pending end of bake. | Nov 10 2011 11:57AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | 32 Channels operational,, no safety risk for in-vessel access | Apr 14 2011 12:05PM (parker) | Ron Parker | Hard X-Ray Array | faust,parker,schmidt | | ICRF D-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | secured | Apr 14 2011 08:56AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Impurity Spectroscopy | yes | Being upgraded with better optics and new spectrographs. Dan Miller has primary responsibility. | Apr 19 2011 11:46AM (blip) | Bruce Lipshultz | Measurement of recycling light and impurity source rates at multiple surfaces around the tokamak | blip,miller | | Laser Blow-Off | no | Beamline disconnected | Apr 14 2011 11:53AM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | LH HV Breaker Opened and Tagged, TPS Upgrade Underway | Nov 10 2011 03:51PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | LoWEUS | no | camera control softward unavailable, but gate-valve control ready to be tested | Nov 21 2011 06:58PM (mlreinke) | Matthew L. Reinke | Long Wavelength Extreme Ultraviolet Spectrometer | markchil,mlreinke | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Midplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up. | Nov 17 2011 02:42PM (mlreinke) | Matt Reinke | Lyman alpha cameras | faustian,labombard,mlreinke | | McPherson | no | broken turbo pump, McPherson unavailable | Nov 17 2011 02:42PM (mlreinke) | Jim Terry | VUV Spectrometer | markchil,mlreinke,terry | | Michelson | yes | Front end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | no | Secured for work. Power supplies are turned off. | Apr 14 2011 11:37AM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard,toland | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | no safety risk for in-vessel access as of 4/14/2011 | Apr 14 2011 11:48AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | High voltage is on. We're ready for plasma. | Nov 21 2011 12:58PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | All detectors Powered On --- Waiting for neutrons for calibration | Nov 22 2011 01:05PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Secured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom. | Apr 14 2011 11:44AM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry,toland | | PCI | no | Secured for in-vessel work | Apr 14 2011 06:21PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | emd,ennever,ntsujii,porkolab | | Penning Gauges | no | Secured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rack | Apr 14 2011 09:56AM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | no | Red tagged off | Apr 12 2011 07:23AM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | no | Breaker opened and red tagged | Apr 11 2011 11:59AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | no | Breakers opened and red tagged | Apr 11 2011 12:00PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | no | All systems disabled for in-vessel entry | Apr 14 2011 11:29AM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:56AM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack. | Apr 14 2011 09:57AM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array (F and J) | labombard | | Probe Array - UDIV | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Secured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack. | Apr 14 2011 11:39AM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | SOL reflectometer | yes | c-port waveguides operational, h-port waveguides are not. | Nov 29 2011 12:04PM (cornwall) | Cornwall Lau | SOL reflectometer | cornwall,wukitch,ylin | | Sparker | yes | New Type II sparker replaced Type I on 11/17/2011 | Nov 23 2011 08:53AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | no | SSS is up to air, no safety issues | Apr 14 2011 12:06PM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | TCI Operational. Density feedback operational. | Nov 10 2011 11:47AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jrwalk,jwhughes,yma | | TS - Edge | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jrwalk,jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | remote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasma | Nov 21 2011 06:57PM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | markchil,mlreinke | | XTOMO | yes | ARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checked | Nov 17 2011 02:44PM (mlreinke) | Bob Granetz | X-Ray Tomography | faustian,granetz,mlreinke |
|
| Nov 29 2011 04:19:07:180PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | golfit | | BES | yes | BES system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked up | Nov 17 2011 02:45PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed. Magnetron Unplugged | Apr 11 2011 09:51AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Multiple channel CNPA available, no safety risk for in-vessel access | Apr 14 2011 12:01PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed | Apr 15 2011 10:55AM (dekow) | Brian LaBombard | Upper Divertor Cryopump | dekow,irby,labombard | | CXRS | yes | core-CXRS system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | CXRS edge | yes | Michael CHurchill has primary responsibility at the moment | Apr 19 2011 11:44AM (blip) | Bruce Lipshultz | Measurement of CXR light in the pedestal region at both the high- and low-field sides | blip,rmchurch | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | system is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-port | Jun 02 2011 10:21AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | gas jet valve disabled on 2011/04/13 | Apr 13 2011 02:04PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DMBolo AXUV diodes | no | Still setting up the data acquisition system. | Nov 20 2011 12:19AM (golynyk) | Geoff Olynyk | Set of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinhole | golynyk | | DNB | no | gate valve disabled on 2011/04/13 | Apr 13 2011 02:03PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational as of 11/19/11 | Nov 22 2011 03:01PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off to RF and IF sections- Power on to DA | Apr 11 2011 02:54PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | bespam,liao,phillips,rowan,whitea | | G-Side Ratiomatic | no | Power supply OFF Gauge removed | Apr 14 2011 09:52AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Power supply unplugged and redtagged, HV cables removed | Apr 14 2011 08:03AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Front end under vacuum -8 scale. Gate valve enabled. Will be using new preamps. | Nov 18 2011 12:24PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPC2 | yes | Dewar cold. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | no safety risk for in-vessel access; | Apr 14 2011 11:47AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Breakers off and red tagged | Apr 14 2011 11:27AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | HiReX installed but not hooked up yet, pending end of bake. | Nov 10 2011 11:57AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | 32 Channels operational,, no safety risk for in-vessel access | Apr 14 2011 12:05PM (parker) | Ron Parker | Hard X-Ray Array | faust,parker,schmidt | | ICRF D-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | secured | Apr 14 2011 08:56AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Impurity Spectroscopy | yes | Being upgraded with better optics and new spectrographs. Dan Miller has primary responsibility. | Apr 19 2011 11:46AM (blip) | Bruce Lipshultz | Measurement of recycling light and impurity source rates at multiple surfaces around the tokamak | blip,miller | | Laser Blow-Off | no | Beamline disconnected | Apr 14 2011 11:53AM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | LH HV Breaker Opened and Tagged, TPS Upgrade Underway | Nov 10 2011 03:51PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | LoWEUS | no | camera control softward unavailable, but gate-valve control ready to be tested | Nov 21 2011 06:58PM (mlreinke) | Matthew L. Reinke | Long Wavelength Extreme Ultraviolet Spectrometer | markchil,mlreinke | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Midplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up. | Nov 17 2011 02:42PM (mlreinke) | Matt Reinke | Lyman alpha cameras | faustian,labombard,mlreinke | | McPherson | no | broken turbo pump, McPherson unavailable | Nov 17 2011 02:42PM (mlreinke) | Jim Terry | VUV Spectrometer | markchil,mlreinke,terry | | Michelson | yes | Front end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | no | Secured for work. Power supplies are turned off. | Apr 14 2011 11:37AM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard,toland | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | no safety risk for in-vessel access as of 4/14/2011 | Apr 14 2011 11:48AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | High voltage is on. We're ready for plasma. | Nov 21 2011 12:58PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | All detectors Powered On --- Waiting for neutrons for calibration | Nov 22 2011 01:05PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Secured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom. | Apr 14 2011 11:44AM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry,toland | | PCI | no | Secured for in-vessel work | Apr 14 2011 06:21PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | emd,ennever,ntsujii,porkolab | | Penning Gauges | no | Secured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rack | Apr 14 2011 09:56AM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | no | Red tagged off | Apr 12 2011 07:23AM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | no | Breaker opened and red tagged | Apr 11 2011 11:59AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | no | Breakers opened and red tagged | Apr 11 2011 12:00PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | no | All systems disabled for in-vessel entry | Apr 14 2011 11:29AM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:56AM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack. | Apr 14 2011 09:57AM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array (F and J) | labombard | | Probe Array - UDIV | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Secured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack. | Apr 14 2011 11:39AM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | SOL reflectometer | yes | c-port waveguides operational, h-port waveguides are not. | Nov 29 2011 12:04PM (cornwall) | Cornwall Lau | SOL reflectometer | cornwall,wukitch,ylin | | Sparker | yes | New Type II sparker replaced Type I on 11/17/2011 | Nov 23 2011 08:53AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | no | SSS is up to air, no safety issues | Apr 14 2011 12:06PM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | TCI Operational. Density feedback operational. | Nov 10 2011 11:47AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jrwalk,jwhughes,yma | | TS - Edge | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jrwalk,jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | remote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasma | Nov 21 2011 06:57PM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | markchil,mlreinke | | XTOMO | yes | ARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checked | Nov 17 2011 02:44PM (mlreinke) | Bob Granetz | X-Ray Tomography | faustian,granetz,mlreinke |
|
| Nov 29 2011 04:33:04:273PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | golfit | | BES | yes | BES system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked up | Nov 17 2011 02:45PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed. Magnetron Unplugged | Apr 11 2011 09:51AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Multiple channel CNPA available, no safety risk for in-vessel access | Apr 14 2011 12:01PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed | Apr 15 2011 10:55AM (dekow) | Brian LaBombard | Upper Divertor Cryopump | dekow,irby,labombard | | CXRS | yes | core-CXRS system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | CXRS edge | yes | Michael CHurchill has primary responsibility at the moment | Apr 19 2011 11:44AM (blip) | Bruce Lipshultz | Measurement of CXR light in the pedestal region at both the high- and low-field sides | blip,rmchurch | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | system is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-port | Jun 02 2011 10:21AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | gas jet valve disabled on 2011/04/13 | Apr 13 2011 02:04PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DMBolo AXUV diodes | no | Still setting up the data acquisition system. | Nov 20 2011 12:19AM (golynyk) | Geoff Olynyk | Set of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinhole | golynyk | | DNB | no | gate valve disabled on 2011/04/13 | Apr 13 2011 02:03PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational as of 11/19/11 | Nov 22 2011 03:01PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off to RF and IF sections- Power on to DA | Apr 11 2011 02:54PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | bespam,liao,phillips,rowan,whitea | | G-Side Ratiomatic | no | Power supply OFF Gauge removed | Apr 14 2011 09:52AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Power supply unplugged and redtagged, HV cables removed | Apr 14 2011 08:03AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Front end under vacuum -8 scale. Gate valve enabled. Will be using new preamps. | Nov 18 2011 12:24PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPC2 | yes | Dewar cold. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | no safety risk for in-vessel access; | Apr 14 2011 11:47AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Breakers off and red tagged | Apr 14 2011 11:27AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | HiReX installed but not hooked up yet, pending end of bake. | Nov 10 2011 11:57AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | 32 Channels operational,, no safety risk for in-vessel access | Apr 14 2011 12:05PM (parker) | Ron Parker | Hard X-Ray Array | faust,parker,schmidt | | ICRF D-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | secured | Apr 14 2011 08:56AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Impurity Spectroscopy | yes | Being upgraded with better optics and new spectrographs. Dan Miller has primary responsibility. | Apr 19 2011 11:46AM (blip) | Bruce Lipshultz | Measurement of recycling light and impurity source rates at multiple surfaces around the tokamak | blip,miller | | Laser Blow-Off | no | Beamline disconnected | Apr 14 2011 11:53AM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | LH HV Breaker Opened and Tagged, TPS Upgrade Underway | Nov 10 2011 03:51PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | LoWEUS | no | camera control softward unavailable, but gate-valve control ready to be tested | Nov 21 2011 06:58PM (mlreinke) | Matthew L. Reinke | Long Wavelength Extreme Ultraviolet Spectrometer | markchil,mlreinke | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Midplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up. | Nov 17 2011 02:42PM (mlreinke) | Matt Reinke | Lyman alpha cameras | faustian,labombard,mlreinke | | McPherson | no | broken turbo pump, McPherson unavailable | Nov 17 2011 02:42PM (mlreinke) | Jim Terry | VUV Spectrometer | markchil,mlreinke,terry | | Michelson | yes | Front end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | no | Secured for work. Power supplies are turned off. | Apr 14 2011 11:37AM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard,toland | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | no safety risk for in-vessel access as of 4/14/2011 | Apr 14 2011 11:48AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | High voltage is on. We're ready for plasma. | Nov 21 2011 12:58PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | All detectors Powered On --- Waiting for neutrons for calibration | Nov 22 2011 01:05PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Secured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom. | Apr 14 2011 11:44AM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry,toland | | PCI | no | Secured for in-vessel work | Apr 14 2011 06:21PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | emd,ennever,ntsujii,porkolab | | Penning Gauges | no | Secured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rack | Apr 14 2011 09:56AM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | no | Red tagged off | Apr 12 2011 07:23AM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | no | Breaker opened and red tagged | Apr 11 2011 11:59AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | no | Breakers opened and red tagged | Apr 11 2011 12:00PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | no | All systems disabled for in-vessel entry | Apr 14 2011 11:29AM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:56AM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack. | Apr 14 2011 09:57AM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array (F and J) | labombard | | Probe Array - UDIV | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Secured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack. | Apr 14 2011 11:39AM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | SOL reflectometer | yes | c-port waveguides operational, h-port waveguides are not. | Nov 29 2011 12:04PM (cornwall) | Cornwall Lau | SOL reflectometer | cornwall,wukitch,ylin | | Sparker | yes | New Type II sparker replaced Type I on 11/17/2011 | Nov 23 2011 08:53AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | no | SSS is up to air, no safety issues | Apr 14 2011 12:06PM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | TCI Operational. Density feedback operational. | Nov 10 2011 11:47AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jrwalk,jwhughes,yma | | TS - Edge | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jrwalk,jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | remote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasma | Nov 21 2011 06:57PM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | markchil,mlreinke | | XTOMO | yes | ARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checked | Nov 17 2011 02:44PM (mlreinke) | Bob Granetz | X-Ray Tomography | faustian,granetz,mlreinke |
|
| Nov 29 2011 04:45:44:970PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | golfit | | BES | yes | BES system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked up | Nov 17 2011 02:45PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed. Magnetron Unplugged | Apr 11 2011 09:51AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Multiple channel CNPA available, no safety risk for in-vessel access | Apr 14 2011 12:01PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed | Apr 15 2011 10:55AM (dekow) | Brian LaBombard | Upper Divertor Cryopump | dekow,irby,labombard | | CXRS | yes | core-CXRS system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | CXRS edge | yes | Michael CHurchill has primary responsibility at the moment | Apr 19 2011 11:44AM (blip) | Bruce Lipshultz | Measurement of CXR light in the pedestal region at both the high- and low-field sides | blip,rmchurch | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | system is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-port | Jun 02 2011 10:21AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | gas jet valve disabled on 2011/04/13 | Apr 13 2011 02:04PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DMBolo AXUV diodes | no | Still setting up the data acquisition system. | Nov 20 2011 12:19AM (golynyk) | Geoff Olynyk | Set of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinhole | golynyk | | DNB | no | gate valve disabled on 2011/04/13 | Apr 13 2011 02:03PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational as of 11/19/11 | Nov 22 2011 03:01PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off to RF and IF sections- Power on to DA | Apr 11 2011 02:54PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | bespam,liao,phillips,rowan,whitea | | G-Side Ratiomatic | no | Power supply OFF Gauge removed | Apr 14 2011 09:52AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Power supply unplugged and redtagged, HV cables removed | Apr 14 2011 08:03AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Front end under vacuum -8 scale. Gate valve enabled. Will be using new preamps. | Nov 18 2011 12:24PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPC2 | yes | Dewar cold. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | no safety risk for in-vessel access; | Apr 14 2011 11:47AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Breakers off and red tagged | Apr 14 2011 11:27AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | HiReX installed but not hooked up yet, pending end of bake. | Nov 10 2011 11:57AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | 32 Channels operational,, no safety risk for in-vessel access | Apr 14 2011 12:05PM (parker) | Ron Parker | Hard X-Ray Array | faust,parker,schmidt | | ICRF D-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | secured | Apr 14 2011 08:56AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Impurity Spectroscopy | yes | Being upgraded with better optics and new spectrographs. Dan Miller has primary responsibility. | Apr 19 2011 11:46AM (blip) | Bruce Lipshultz | Measurement of recycling light and impurity source rates at multiple surfaces around the tokamak | blip,miller | | Laser Blow-Off | no | Beamline disconnected | Apr 14 2011 11:53AM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | LH HV Breaker Opened and Tagged, TPS Upgrade Underway | Nov 10 2011 03:51PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | LoWEUS | no | camera control softward unavailable, but gate-valve control ready to be tested | Nov 21 2011 06:58PM (mlreinke) | Matthew L. Reinke | Long Wavelength Extreme Ultraviolet Spectrometer | markchil,mlreinke | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Midplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up. | Nov 17 2011 02:42PM (mlreinke) | Matt Reinke | Lyman alpha cameras | faustian,labombard,mlreinke | | McPherson | no | broken turbo pump, McPherson unavailable | Nov 17 2011 02:42PM (mlreinke) | Jim Terry | VUV Spectrometer | markchil,mlreinke,terry | | Michelson | yes | Front end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | no | Secured for work. Power supplies are turned off. | Apr 14 2011 11:37AM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard,toland | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | no safety risk for in-vessel access as of 4/14/2011 | Apr 14 2011 11:48AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | High voltage is on. We're ready for plasma. | Nov 21 2011 12:58PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | All detectors Powered On --- Waiting for neutrons for calibration | Nov 22 2011 01:05PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Secured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom. | Apr 14 2011 11:44AM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry,toland | | PCI | no | Secured for in-vessel work | Apr 14 2011 06:21PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | emd,ennever,ntsujii,porkolab | | Penning Gauges | no | Secured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rack | Apr 14 2011 09:56AM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | no | Red tagged off | Apr 12 2011 07:23AM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | no | Breaker opened and red tagged | Apr 11 2011 11:59AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | no | Breakers opened and red tagged | Apr 11 2011 12:00PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | no | All systems disabled for in-vessel entry | Apr 14 2011 11:29AM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:56AM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack. | Apr 14 2011 09:57AM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array (F and J) | labombard | | Probe Array - UDIV | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Secured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack. | Apr 14 2011 11:39AM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | SOL reflectometer | yes | c-port waveguides operational, h-port waveguides are not. | Nov 29 2011 12:04PM (cornwall) | Cornwall Lau | SOL reflectometer | cornwall,wukitch,ylin | | Sparker | yes | New Type II sparker replaced Type I on 11/17/2011 | Nov 23 2011 08:53AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | no | SSS is up to air, no safety issues | Apr 14 2011 12:06PM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | TCI Operational. Density feedback operational. | Nov 10 2011 11:47AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jrwalk,jwhughes,yma | | TS - Edge | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jrwalk,jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | remote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasma | Nov 21 2011 06:57PM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | markchil,mlreinke | | XTOMO | yes | ARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checked | Nov 17 2011 02:44PM (mlreinke) | Bob Granetz | X-Ray Tomography | faustian,granetz,mlreinke |
|
| Nov 29 2011 04:58:10:610PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | golfit | | BES | yes | BES system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked up | Nov 17 2011 02:45PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed. Magnetron Unplugged | Apr 11 2011 09:51AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Multiple channel CNPA available, no safety risk for in-vessel access | Apr 14 2011 12:01PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed | Apr 15 2011 10:55AM (dekow) | Brian LaBombard | Upper Divertor Cryopump | dekow,irby,labombard | | CXRS | yes | core-CXRS system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | CXRS edge | yes | Michael CHurchill has primary responsibility at the moment | Apr 19 2011 11:44AM (blip) | Bruce Lipshultz | Measurement of CXR light in the pedestal region at both the high- and low-field sides | blip,rmchurch | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | system is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-port | Jun 02 2011 10:21AM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | gas jet valve disabled on 2011/04/13 | Apr 13 2011 02:04PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DMBolo AXUV diodes | no | Still setting up the data acquisition system. | Nov 20 2011 12:19AM (golynyk) | Geoff Olynyk | Set of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinhole | golynyk | | DNB | no | gate valve disabled on 2011/04/13 | Apr 13 2011 02:03PM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,gung | | ECDC | yes | Operational as of 11/19/11 | Nov 22 2011 03:01PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off to RF and IF sections- Power on to DA | Apr 11 2011 02:54PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | bespam,liao,phillips,rowan,whitea | | G-Side Ratiomatic | no | Power supply OFF Gauge removed | Apr 14 2011 09:52AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Power supply unplugged and redtagged, HV cables removed | Apr 14 2011 08:03AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Front end under vacuum -8 scale. Gate valve enabled. Will be using new preamps. | Nov 18 2011 12:24PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPC2 | yes | Dewar cold. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | no safety risk for in-vessel access; | Apr 14 2011 11:47AM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Breakers off and red tagged | Apr 14 2011 11:27AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | no | HiReX installed but not hooked up yet, pending end of bake. | Nov 10 2011 11:57AM (ypodpaly) | John Rice | High Resolution X-Ray | ince,rice,ypodpaly | | HXR | yes | 32 Channels operational,, no safety risk for in-vessel access | Apr 14 2011 12:05PM (parker) | Ron Parker | Hard X-Ray Array | faust,parker,schmidt | | ICRF D-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | secured | Apr 14 2011 08:56AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Impurity Spectroscopy | yes | Being upgraded with better optics and new spectrographs. Dan Miller has primary responsibility. | Apr 19 2011 11:46AM (blip) | Bruce Lipshultz | Measurement of recycling light and impurity source rates at multiple surfaces around the tokamak | blip,miller | | Laser Blow-Off | no | Beamline disconnected | Apr 14 2011 11:53AM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | LH HV Breaker Opened and Tagged, TPS Upgrade Underway | Nov 10 2011 03:51PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | LoWEUS | no | camera control softward unavailable, but gate-valve control ready to be tested | Nov 21 2011 06:58PM (mlreinke) | Matthew L. Reinke | Long Wavelength Extreme Ultraviolet Spectrometer | markchil,mlreinke | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Midplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up. | Nov 17 2011 02:42PM (mlreinke) | Matt Reinke | Lyman alpha cameras | faustian,labombard,mlreinke | | McPherson | no | broken turbo pump, McPherson unavailable | Nov 17 2011 02:42PM (mlreinke) | Jim Terry | VUV Spectrometer | markchil,mlreinke,terry | | Michelson | yes | Front end at 5e-8 T. Gate valve enabled, dewar cold. Low speed to start. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | no | Secured for work. Power supplies are turned off. | Apr 14 2011 11:37AM (labombard) | Brian LaBombard | Baratron pressure gauges | labombard,toland | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | no safety risk for in-vessel access as of 4/14/2011 | Apr 14 2011 11:48AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | High voltage is on. We're ready for plasma. | Nov 21 2011 12:58PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | All detectors Powered On --- Waiting for neutrons for calibration | Nov 22 2011 01:05PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | no | Secured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom. | Apr 14 2011 11:44AM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry,toland | | PCI | no | Secured for in-vessel work | Apr 14 2011 06:21PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | emd,ennever,ntsujii,porkolab | | Penning Gauges | no | Secured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rack | Apr 14 2011 09:56AM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | no | Red tagged off | Apr 12 2011 07:23AM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | no | Breaker opened and red tagged | Apr 11 2011 11:59AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | no | Breakers opened and red tagged | Apr 11 2011 12:00PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | no | All systems disabled for in-vessel entry | Apr 14 2011 11:29AM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:56AM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack. | Apr 14 2011 09:57AM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array (F and J) | labombard | | Probe Array - UDIV | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Secured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack. | Apr 14 2011 11:39AM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | SOL reflectometer | yes | c-port waveguides operational, h-port waveguides are not. | Nov 29 2011 12:04PM (cornwall) | Cornwall Lau | SOL reflectometer | cornwall,wukitch,ylin | | Sparker | yes | New Type II sparker replaced Type I on 11/17/2011 | Nov 23 2011 08:53AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | no | SSS is up to air, no safety issues | Apr 14 2011 12:06PM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | TCI Operational. Density feedback operational. | Nov 10 2011 11:47AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jrwalk,jwhughes,yma | | TS - Edge | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jrwalk,jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | remote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasma | Nov 21 2011 06:57PM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | markchil,mlreinke | | XTOMO | yes | ARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checked | Nov 17 2011 02:44PM (mlreinke) | Bob Granetz | X-Ray Tomography | faustian,granetz,mlreinke |
|