Alcator C-Mod Run 1111130 Information

Back to runs

Miniproposals

Operators
Session leader(s):
Physics operator(s):Ian Hutchinson
Engineering operator(s):Bill Parkin,Andy Pfeiffer,Bill Byford

Engineering Operator Run Comment
FY12 Plasma Startup MP298a

Session Leader Plans

Physics Operators Plans

Session Leader Summaries

Physics Operator Summaries
Entered: Nov 30 2011 05:14:06:507PM
Author: Ian Hutchinson
Overview
--------

A successful startup and conditioning day leading to 10 successive
plasmas running full length. H/D is still around 1 as expected for the
second day of plasmas. Total plasma duration today: 31 seconds.


Physop Lessons Learned
----------------------

The breakdown appears to prefer B_R=-1mT and -3mT t=5ms as measured by mflux BR0 and BZ0.

The shot inherited had problems at the end caused by excessive
elongation and consequent vertical instability. Once that was fixed
and the duds avoided we settled into reasonable repeatability
The rampdown tweaks on the last shot were a bad thing. Use shot 35.

The PG3 early puff at -15ms was a bit too strong for good current ramp
and needed to be reduced (to levels of shots after shot ~20).


Scorecard:
---------

  Shot,Duration(s),Ipmax(MA),Result  Shot,Duration(s),Ipmax,Result
  |   01   1.395   0.717   Plasma  |   02   0.000   0.036   Fizzle  |
  |   03   0.000   0.035   Fizzle  |   04   1.766   0.712   Plasma  |
  |   05   0.000   0.004   Dud     |   06   1.832   0.712   Plasma  |
  |   07   0.000   0.033   Fizzle  |   08   0.000   0.032   Fizzle  |
  |   09   1.646   0.719   Plasma  |   10   0.000   0.033   Fizzle  |
  |   11   0.000   0.033   Fizzle  |   12   0.131   0.217   Plasma  |
  |   13   0.000   0.035   Fizzle  |   14   0.000   0.036   Fizzle  |
  |   15   0.133   0.387   Plasma  |   16   1.650   0.717   Plasma  |
  |   17   0.000   0.038   Fizzle  |   18   0.165   0.406   Plasma  |
  |   19   1.686   0.715   Plasma  |   20   0.000   0.038   Fizzle  |
  |   21   0.000   0.037   Dud     |   22   1.695   0.717   Plasma  |
  |   23   0.000   0.036   Dud     |   24   No Ip                   |
  |   25   0.000   0.039   Fizzle  |   26   0.000   0.039   Dud     |
  |   27   1.943   0.721   Plasma  |   28   1.935   0.717   Plasma  |
  |   29   1.940   0.715   Plasma  |   30   1.934   0.717   Plasma  |
  |   31   1.885   0.721   Plasma  |   32   1.920   0.720   Plasma  |
  |   33   1.895   0.717   Plasma  |   34   1.927   0.721   Plasma  |
  |   35   1.924   0.720   Plasma  |   36   1.796   0.721   Plasma  |
 
Date 1111130:  36 shots.  20 plasmas.  11 fizzles.   4 duds.   1 System Error.
        (Plasma = Ip gt 60.0 kA   Dud = H_alpha lt  0.10 V)
Total plasma duration: 31.20 s (exceeding  -71 kA)


Session Leader Comments

Physics Operator Comments
Nov 30 2011 08:46:43:913AMIan HutchinsonStarted from the last shot yesterday.
IC_EF4 at -1280A
Bz seems to be ramping rather quickly for early plasmas.
Fside pressure is .04. Early density is low.

No changes from the last shot of yesterday
Nov 30 2011 08:59:07:900AMIan HutchinsonRcur to .66 at .5s
Load.
Nov 30 2011 09:22:45:930AM1111130001Ian HutchinsonPlasma till 1.4s. Density continues to rise. Shape is crazy, but that might
be the fault of programming in this shot.
Zcur is programmed zero. Zxu has strange ramp. Zxl is near zero. Rxl is 0.012.
Rxu is -.017.

Changes:
Rxl to 0.002
Zcur to -.005
Nov 30 2011 09:31:58:477AM1111130002Ian HutchinsonFizzle.

EF3 V to 2600V at 5ms (from 2800V).
Load
Nov 30 2011 09:50:31:273AM1111130003Ian HutchinsonFizzle.


EF3 V to 2400 at 5ms, also to 2500V at -1ms.
Load.
Nov 30 2011 10:10:59:017AM1111130004Ian HutchinsonPlasma well into rampdown 1.76s. Unexpected density rise at 1.05s.
Nov 30 2011 10:17:13:920AM1111130005Ian HutchinsonTF only test


ICEF4 to -1275 from -1280A
Load.
Nov 30 2011 10:32:43:060AM1111130006Ian HutchinsonPlasma to 1.83s. Runaways. Appear caused by very low density till 30ms.
Strange density rise occurs later at 1.37s.

Extend PG3 puff to time 0s at 100 in segment 1.
Load
Nov 30 2011 10:47:02:307AM1111130007Ian HutchinsonFizzle.

RXL to 0.ZXL to 0. Zxu to +.03
Nov 30 2011 11:02:14:153AM1111130008Ian HutchinsonFizzle.

Return PG3 to 40 at 0s.
Load.
Nov 30 2011 11:13:07:880AM1111130009Ian HutchinsonPlasma to 1.64


RXL to -0.01. Load.
Nov 30 2011 11:23:50:180AM1111130010Ian HutchinsonFizzle.

Add PG3 40 point at -5ms.
Nov 30 2011 11:39:04:710AM1111130011Ian HutchinsonFizzle.

Br offset to 1mT from 0.5mT.Load.

Nov 30 2011 11:52:29:020AM1111130012Ian HutchinsonPlasma disrupts at .12s. Runaways. Weak current rise. Plasma far inside.

Br offset to 0mT. Load
Nov 30 2011 12:01:12:297PM1111130013Ian HutchinsonFizzle. Late breakdown. Br now seems to be too negative.

Br offset to 1mT. Load.
Nov 30 2011 12:21:53:283PM1111130014Ian HutchinsonFizzle. Still late breakdown 9ms.

IC_Ef4 to -1280A. Load.
Nov 30 2011 12:27:29:070PM1111130015Ian HutchinsonPlasma disrupts early. Slow current rise.

Import seg 1 from shot 1. Examine PG3 early puff. First 40 point was at -9ms.
Import seg 1 from shot 15. Set first 40 point to -9ms from -5ms. Load.
Nov 30 2011 12:44:19:240PM1111130016Ian HutchinsonPlasma into rampdown 1.64s.

PG3 early 40 point to -11ms. Load.
Nov 30 2011 12:57:49:380PM1111130017Ian HutchinsonFizzle.
Nov 30 2011 01:05:30:957PM1111130018Ian HutchinsonPlasma disrupts early. Slow Ip rise.

PG3 early 40 to -12ms. Load.
Nov 30 2011 01:20:32:617PM1111130019Ian HutchinsonPlasma into rampdown.

nl04 to 0.5 (from 0.6)
Seg 2 rcur moved out .5cm during ramp. And in seg1 after 50ms. Load.
Prepuff to 15ms. from 16ms. Load.
Nov 30 2011 01:34:49:913PM1111130020Ian HutchinsonFizzle.
Nov 30 2011 01:45:44:637PM1111130021Ian HutchinsonDud. Bz a bit higher?

IC_EF4 to -1285A. Load.
Nov 30 2011 02:01:04:863PM1111130022Ian HutchinsonPlasma to 1.7s.

Adjust shape in rampdown to try to improve stability.
Nov 30 2011 02:29:08:680PM1111130023Ian HutchinsonDud for no obvious reason.

IC_EF4 to -1290A. Load.
Nov 30 2011 02:29:27:847PM1111130024Ian HutchinsonData system hang. No power.
Nov 30 2011 02:43:15:173PM1111130025Ian HutchinsonFizzle. Halpha is increased by a factor of about 5 after this computer cycle
battle. Why?

No changes.
Nov 30 2011 02:58:07:227PM1111130026Ian HutchinsonDud.

IC_EF4 to -1300A. Load. Fill puff to 17ms. Load
Nov 30 2011 03:11:26:560PM1111130027Ian HutchinsonPlasma to rampdown.
Nov 30 2011 03:23:29:253PM1111130028Ian HutchinsonPlasma to rampdown.
Nov 30 2011 03:32:41:883PM1111130029Ian HutchinsonPlasma to rampdown. Only just made it through a bit injection at .32s.


nl04 to .6 in flattop. Load.
Nov 30 2011 03:51:21:420PM1111130030Ian HutchinsonPlasma to rampdown.

Make nl04 .6 earlier. Increase clearin earlier. Load.
Nov 30 2011 04:05:44:243PM1111130031Ian HutchinsonPlasma to rampdown.

Enable Ar puff. 30ms at 100.
Nov 30 2011 04:21:34:870PM1111130032Ian HutchinsonPlasma to rampdown. Some runaways induced by weak Ip ramp. V small Ar signal seen.

Increase clearin round about .3s. Move rcur out 2mm accordingly. Load.
Nov 30 2011 04:42:50:243PM1111130033Ian HutchinsonPlasma to rampdown.

Leave zcur below midplane during rampdown.
Nov 30 2011 04:51:04:080PM1111130034Ian HutchinsonPlasma to rampdown.


Maintain zcur at -.5cm throughout rampdown.
Nov 30 2011 05:03:16:787PM1111130035Ian HutchinsonPlasma to rampdown.

Ar puff to 35ms.
Zcur ramp to -1cm at 2s. Slower end ramp on clearin.
Terminate nl04 demand at 1.25s
Nov 30 2011 05:13:10:373PM1111130036Ian HutchinsonPlasma till 1.8s.
Rampdown imperfect. Start from 35 not this shot.

Engineering Operator Comments
ShotTimeTypeStatusComment
109:00:19:340AMPlasmaOk
209:19:53:430AMPlasmaOk
309:32:34:353AMPlasmaOk
409:46:30:437AMPlasmaOk
510:03:39:783AMTestOkTest TF only
610:16:12:067AMPlasmaOk
710:30:52:743AMPlasmaOk
810:45:11:583AMPlasmaOk
910:57:36:677AMPlasmaOk
1011:11:10:537AMPlasmaOk
1111:24:03:940AMPlasmaOk
1211:36:28:780AMPlasmaOk
1311:49:22:090AMPlasmaOk
1412:01:54:623PMPlasmaOk
1512:14:22:137PMPlasmaOk
1612:27:17:737PMPlasmaOk
1712:40:04:270PMPlasmaOk
1812:52:39:170PMPlasmaOk
1901:05:23:030PMPlasmaOk
2001:18:41:830PMPlasmaOk
2101:31:41:367PMPlasmaOk
2201:44:33:053PMPlasmaOk
2301:57:42:100PMPlasmaOk
2502:29:20:273PMPlasmaOk
2602:43:37:093PMPlasmaOk
2702:56:10:060PMPlasmaOk
2803:08:55:540PMPlasmaOk
2903:21:33:693PMPlasmaOk
3003:34:01:690PMPlasmaOk
3103:49:33:147PMPlasmaOk
3204:03:45:813PMPlasmaOk
3304:20:59:980PMPlasmaOk
3404:36:03:317PMPlasmaOk
3504:50:55:457PMPlasmaOk
3605:06:14:107PMPlasmaOk

System Availability
Nov 30 2011 08:59:59:217AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesUsing new preamps.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed but not hooked up yet, pending end of bake.Nov 10 2011 11:57AM (ypodpaly)John RiceHigh Resolution X-Rayince,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 4.5e-8 T. Reduced speed for initial operation.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 30 2011 10:15:57:537AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesUsing new preamps.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed and operating on the shot cycle. Requires final alignment prior to full-availability.Nov 30 2011 10:11AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 4.5e-8 T. Reduced speed for initial operation.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 30 2011 10:30:39:133AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesUsing new preamps.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed and operating on the shot cycle. Requires final alignment prior to full-availability.Nov 30 2011 10:11AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 4.5e-8 T. Reduced speed for initial operation.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 30 2011 10:44:56:700AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesUsing new preamps.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed and operating on the shot cycle. Requires final alignment prior to full-availability.Nov 30 2011 10:11AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 4.5e-8 T. Reduced speed for initial operation.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 30 2011 10:57:23:513AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesUsing new preamps.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed and operating on the shot cycle. Requires final alignment prior to full-availability.Nov 30 2011 10:11AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 4.5e-8 T. Reduced speed for initial operation.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 30 2011 11:10:56:520AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesUsing new preamps.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed and operating on the shot cycle. Requires final alignment prior to full-availability.Nov 30 2011 10:11AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 4.5e-8 T. Reduced speed for initial operation.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 30 2011 11:23:49:353AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesUsing new preamps.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed and operating on the shot cycle. Requires final alignment prior to full-availability.Nov 30 2011 10:11AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 4.5e-8 T. Reduced speed for initial operation.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 30 2011 11:36:15:640AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesUsing new preamps.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed and operating on the shot cycle. Requires final alignment prior to full-availability.Nov 30 2011 10:11AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 4.5e-8 T. Reduced speed for initial operation.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 30 2011 11:49:06:840AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesUsing new preamps.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed and operating on the shot cycle. Requires final alignment prior to full-availability.Nov 30 2011 10:11AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 4.5e-8 T. Reduced speed for initial operation.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 30 2011 12:01:40:047PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesUsing new preamps.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed and operating on the shot cycle. Requires final alignment prior to full-availability.Nov 30 2011 10:11AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 4.5e-8 T. Reduced speed for initial operation.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 30 2011 12:14:08:590PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesUsing new preamps.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed and operating on the shot cycle. Requires final alignment prior to full-availability.Nov 30 2011 10:11AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 4.5e-8 T. Reduced speed for initial operation.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 30 2011 12:27:04:200PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesUsing new preamps.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed and operating on the shot cycle. Requires final alignment prior to full-availability.Nov 30 2011 10:11AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 4.5e-8 T. Reduced speed for initial operation.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 30 2011 12:39:50:207PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesUsing new preamps.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed and operating on the shot cycle. Requires final alignment prior to full-availability.Nov 30 2011 10:11AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 4.5e-8 T. Reduced speed for initial operation.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCInoSecured for in-vessel workApr 14 2011 06:21PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 30 2011 12:52:24:210PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesUsing new preamps.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed and operating on the shot cycle. Requires final alignment prior to full-availability.Nov 30 2011 10:11AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 4.5e-8 T. Reduced speed for initial operation.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCIyesOperational.Nov 30 2011 12:45PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 30 2011 01:05:09:803PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesUsing new preamps.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed and operating on the shot cycle. Requires final alignment prior to full-availability.Nov 30 2011 10:11AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 4.5e-8 T. Reduced speed for initial operation.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCIyesOperational.Nov 30 2011 12:45PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 30 2011 01:18:28:320PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesUsing new preamps.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed and operating on the shot cycle. Requires final alignment prior to full-availability.Nov 30 2011 10:11AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 4.5e-8 T. Reduced speed for initial operation.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCIyesOperational.Nov 30 2011 12:45PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 30 2011 01:31:28:260PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesUsing new preamps.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed and operating on the shot cycle. Requires final alignment prior to full-availability.Nov 30 2011 10:11AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 4.5e-8 T. Reduced speed for initial operation.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCIyesOperational.Nov 30 2011 12:45PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 30 2011 01:44:19:820PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesUsing new preamps.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed and operating on the shot cycle. Requires final alignment prior to full-availability.Nov 30 2011 10:11AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 4.5e-8 T. Reduced speed for initial operation.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCIyesOperational.Nov 30 2011 12:45PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 30 2011 01:57:27:760PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesUsing new preamps.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed and operating on the shot cycle. Requires final alignment prior to full-availability.Nov 30 2011 10:11AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 4.5e-8 T. Reduced speed for initial operation.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCIyesOperational.Nov 30 2011 12:45PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 30 2011 02:29:00:877PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesUsing new preamps.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed and operating on the shot cycle. Requires final alignment prior to full-availability.Nov 30 2011 10:11AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 4.5e-8 T. Reduced speed for initial operation.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCIyesOperational.Nov 30 2011 12:45PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 30 2011 02:43:23:207PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesUsing new preamps.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed and operating on the shot cycle. Requires final alignment prior to full-availability.Nov 30 2011 10:11AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 4.5e-8 T. Reduced speed for initial operation.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCIyesOperational.Nov 30 2011 12:45PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 30 2011 02:55:56:143PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesUsing new preamps.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed and operating on the shot cycle. Requires final alignment prior to full-availability.Nov 30 2011 10:11AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 4.5e-8 T. Reduced speed for initial operation.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCIyesOperational.Nov 30 2011 12:45PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 30 2011 03:08:41:873PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesUsing new preamps.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed and operating on the shot cycle. Requires final alignment prior to full-availability.Nov 30 2011 10:11AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 4.5e-8 T. Reduced speed for initial operation.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCIyesOperational.Nov 30 2011 12:45PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 30 2011 03:21:19:737PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesUsing new preamps.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed and operating on the shot cycle. Requires final alignment prior to full-availability.Nov 30 2011 10:11AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 4.5e-8 T. Reduced speed for initial operation.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCIyesOperational.Nov 30 2011 12:45PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 30 2011 03:33:50:043PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesUsing new preamps.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed and operating on the shot cycle. Requires final alignment prior to full-availability.Nov 30 2011 10:11AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 4.5e-8 T. Reduced speed for initial operation.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCIyesOperational.Nov 30 2011 12:45PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 30 2011 03:49:18:587PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesUsing new preamps.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed and operating on the shot cycle. Requires final alignment prior to full-availability.Nov 30 2011 10:11AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 4.5e-8 T. Reduced speed for initial operation.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCIyesOperational.Nov 30 2011 12:45PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 30 2011 04:03:31:717PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesUsing new preamps.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed and operating on the shot cycle. Requires final alignment prior to full-availability.Nov 30 2011 10:11AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 4.5e-8 T. Reduced speed for initial operation.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCIyesOperational.Nov 30 2011 12:45PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 30 2011 04:20:45:670PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesUsing new preamps.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed and operating on the shot cycle. Requires final alignment prior to full-availability.Nov 30 2011 10:11AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 4.5e-8 T. Reduced speed for initial operation.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCIyesOperational.Nov 30 2011 12:45PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 30 2011 04:35:49:343PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesUsing new preamps.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed and operating on the shot cycle. Requires final alignment prior to full-availability.Nov 30 2011 10:11AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 4.5e-8 T. Reduced speed for initial operation.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCIyesOperational.Nov 30 2011 12:45PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 30 2011 04:50:41:953PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesUsing new preamps.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed and operating on the shot cycle. Requires final alignment prior to full-availability.Nov 30 2011 10:11AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 4.5e-8 T. Reduced speed for initial operation.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCIyesOperational.Nov 30 2011 12:45PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Nov 30 2011 05:06:00:310PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is secured for the shutdown, and poses no safety risk for in-vessel access; camera removed from k-portJun 02 2011 10:21AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoStill setting up the data acquisition system.Nov 20 2011 12:19AM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes. Views poloidal "slices" of plasma through a 50 micron pinholegolynyk
DNBnogate valve disabled on 2011/04/13Apr 13 2011 02:03PM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,gung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side RatiomaticnoPower supply OFF Gauge removedApr 14 2011 09:52AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesUsing new preamps.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesno safety risk for in-vessel access;Apr 14 2011 11:47AM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SrnoHiReX installed and operating on the shot cycle. Requires final alignment prior to full-availability.Nov 30 2011 10:11AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSnocamera control softward unavailable, but gate-valve control ready to be testedNov 21 2011 06:58PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
McPhersonnobroken turbo pump, McPherson unavailableNov 17 2011 02:42PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 4.5e-8 T. Reduced speed for initial operation.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSnoSecured for work. Power supplies are turned off.Apr 14 2011 11:37AM (labombard)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAnoSecured for vessel entry. Backfilled plenum to helium, disconnected feed line to capillary valves at C-bottom.Apr 14 2011 11:44AM (labombard)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCIyesOperational.Nov 30 2011 12:45PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesremote triggering of XEUS tested, all TORVAC faults cleared - ready for first plasmaNov 21 2011 06:57PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Bob GranetzX-Ray Tomographyfaustian,granetz,mlreinke