| Session Leader Comments |
| Dec 6 2011 09:01:46:220AM | 1111206001 | Yijun Lin | gas shot. no plasma.
|
| Dec 6 2011 09:11:45:023AM | 1111206002 | Yijun Lin | another gas test shot. no plasma.
Next: plasma
|
| Dec 6 2011 10:01:38:967AM | 1111206003 | Yijun Lin | D and E antenna, 1 MW each.
result: plasma.
RF faults.
(A little bit heating)
H/H+D = 16%
From PCI 22%
|
| Dec 6 2011 10:03:05:093AM | 1111206004 | Yijun Lin | D and E antenna, 1 MW each.
result: plasma.
RF faults.
H/H+D = 20%
from PCI 28%
Next: make rf power ramp
|
| Dec 6 2011 10:15:47:243AM | 1111206005 | Yijun Lin | plasma.
D/E ran.
H/(H+D) ~ 22%-28%
|
| Dec 6 2011 10:44:01:473AM | 1111206006 | Yijun Lin | plasma.
D/E ran.
H/(H+D) ~ 25%
|
| Dec 6 2011 10:49:56:267AM | 1111206007 | Yijun Lin | plasma.
D/E ran.
H/(H+D) ~ 25%
PCI 34%... and starting move away from the window...
|
| Dec 6 2011 10:58:42:640AM | 1111206008 | Yijun Lin | plasma. D/E ran.
Next: raise B field to 6.2 T for PCI to keep the MC in the window.
Also add power from the new J antenna at 0.2 MW from .9 to 1.0 sec.
H/(H+D) ~ 0.25
|
| Dec 6 2011 11:14:53:117AM | 1111206009 | Yijun Lin | plasma. D/E/J ran.
H/(H+D) ~ 33%
Next: repeat.
|
| Dec 6 2011 11:25:56:167AM | 1111206010 | Yijun Lin | plasma. D/E/J ran.
H/(H+D) ~ 33%
Next: repeat.
|
| Dec 6 2011 11:45:09:443AM | 1111206011 | Yijun Lin | plasma. D/E/J ran.
J-antenna ran at 0.25 MW (first real power from J to a plasma!)
H/(H+D) ~ 33%
Next: same plasma. Raise J power.
|
| Dec 6 2011 11:58:31:417AM | 1111206012 | Yijun Lin | plasma. D/E/J ran.
J-antenna ran up to 1 MW, Vmax to 25 kV...
(I need to lower power because the line is only filled with N2)..
H/(H+D) ~ 33%
Next: 5.4 Tesla...so we can condition up the antennas. H/D seems to be levelled off so there is no more information for H/D study.
|
| Dec 6 2011 12:17:07:250PM | 1111206013 | Yijun Lin | plasma. D/E/J ran.
Next: repeat. overlapping antennas.
|
| Dec 6 2011 12:31:28:800PM | 1111206014 | Yijun Lin | plasma. D/E/J ran.
Next: repeat. overlapping antennas.
|
| Dec 6 2011 12:39:20:343PM | 1111206015 | Yijun Lin | fizzle
|
| Dec 6 2011 01:03:26:717PM | 1111206016 | Yijun Lin | plasma. D/E/J ran.
Ted Golf. said the shoe-lace antenna digitizer was saturated during J pulse...
so there is indeed coupling between the J antenna and the shoe-lace antenna.
Next: repeat. separate antennas.
|
| Dec 6 2011 01:10:41:183PM | 1111206017 | Yijun Lin | plasma. D/E/J ran.
E and J ran without fault. D still has faults.
Next: repeat. raise E power.
|
| Dec 6 2011 01:35:16:197PM | 1111206018 | Yijun Lin | plasma. D/E/J ran. reasonably well.
Next: repeat. raise D/E/J power.
|
| Dec 6 2011 01:39:41:243PM | 1111206019 | Yijun Lin | plasma. D/E/J ran. reasonably well.
Next: repeat. raise D/E power.
|
| Dec 6 2011 01:46:39:420PM | 1111206019 | Yijun Lin | plasma. D/E/J ran. reasonably well.
Next: repeat. raise D/E power. Switch antenna orders.
|
| Dec 6 2011 01:52:45:367PM | 1111206020 | Yijun Lin | plasma. D/E/J ran. reasonably well.
(it appears J antenna has lower impurity??? from 2pi_diode...
Next: do a shot with 1 MW from each antenna for comparison.
|
| Dec 6 2011 02:04:20:337PM | 1111206021 | Yijun Lin | fizzle.
|
| Dec 6 2011 02:17:13:333PM | 1111206022 | Yijun Lin | plasma. D/E/J ran. reasonably well.
(it appears J antenna has lower impurity. Likely true.
Next: raise D/E antennas for more conditioning...
|
| Dec 6 2011 02:33:50:683PM | 1111206023 | Yijun Lin | dud
|
| Dec 6 2011 02:59:58:633PM | 1111206024 | Yijun Lin | plasma. J/E/D ran.
J mismatched.
Next: repeat.
|
| Dec 6 2011 03:20:31:113PM | 1111206025 | Yijun Lin | plasma. J/E/D ran.
J had some faults...(mismatched..)
Next: repeat.
|
| Dec 6 2011 03:27:21:293PM | 1111206026 | Yijun Lin | fizzle
|
| Dec 6 2011 03:36:03:310PM | 1111206027 | Yijun Lin | fizzle
|
| Dec 6 2011 03:48:00:510PM | 1111206028 | Yijun Lin | another fizzle.
|
| Dec 6 2011 04:05:05:850PM | 1111206029 | Yijun Lin | plasma. J/E/D ran at 1 MW each.
J3 mismatched in the beginning.
Next: repeat.
|
| Dec 6 2011 04:12:58:820PM | 1111206030 | Yijun Lin | fizzle
|
| Dec 6 2011 04:30:41:427PM | 1111206031 | Yijun Lin | plasma. J/E/D ran at 1 MW each.
Next: raise D/E power to condition them up.
|
| Dec 6 2011 04:40:31:897PM | 1111206032 | Yijun Lin | plasma. J/E/D ran
E and D had some faults at 1.4 MW level.
Next: repeat.
|
| Dec 6 2011 04:59:24:103PM | 1111206033 | Yijun Lin | plasma. J/E/D ran
J had 100 ms monopole phase (0.79-0.89 sec)...Ran ok. Matching somewhat different. No heating seen in dipole or monopole phases.
Voltages seem to be lower in the monopole phase (larger loading?).
Next: repeat.
|
| Dec 6 2011 05:06:41:810PM | 1111206034 | Yijun Lin | plasma. J/E/D ran
J had 200 ms monopole phase (0.7-0.89 sec)...Ran ok. Matching somewhat different. No heating seen in dipole or monopole phases.
(During the monopole phase, SXR and 2pi-diode dropped? due to pickup??)
end of run.
|
| Physics Operator Comments |
| Dec 6 2011 06:55:56:543AM | | Steve Wolfe |
Starting setup for 1111206
Web-based logbook and physop signin are not working; emailed Josh and Tom.
Entry_display interface seems to be working.
ECDC still running, Dave reports it ran well last night.
|
| Dec 6 2011 07:20:18:113AM | | Steve Wolfe |
Starting setup for 1111206
Starting PCS setup, get config mismatch warning on startup, as I should
since I changed the config_id yesterday
Load from 1111202030
Start recalculating Magnetics predictors in all segments
Seg 1: Rcur , reset offset=3500
Zcur2
Zcur3
Seg2: Rcur (3time)
Zcur2
Zxur3
CLEARIN
RXL
ZXL
RXU
ZXU
strkpsi
Seg3: RCUR (3time)
ZCUR2
ZCUR3
Clearin
RXL
ZXL
RXU
ZXU
Seg4: RCUR (3 time)
ZCUR2
ZCUR3
CLEARIN
RXL
ZXL
RXU
ZXU
strkpsi
Change title of segment 2
Remove strike polnt sweep on RXL, hold constant at -.01 from 0.5sec to end of shot
Verify nl04=0.8, Ip=800kA
Note seg2 has 50msec pg1 puff at 300msec (argon), no pg3 feedforward
nl04 gain is P=2, D=3, I=0; leave it for now
In segment #1
Change pg4 from 12msec to 17msec; pg3 puff is short 40V to 9msec, will probably need to extend but leave
it for now.
Load at 6-Dec-2011 07:20:03.00
Open tree /home/wolfe/pcs_scratch -1
Open tree done
|
| Dec 6 2011 07:32:44:493AM | | Steve Wolfe |
Continuing setup for 1111206
Almost forgot to change the TF
in seg2 TF_CURRENT from -152800 to -168500, tirle to indicate 6T
Load at 6-Dec-2011 07:32:27.00
Open tree /home/wolfe/pcs_scratch -1
Open tree done
|
| Dec 6 2011 08:45:36:720AM | 1111206001 | Steve Wolfe |
Shot#1: Gas and data cycle test
Expect B-main not to respond with short progammed pulse,
but we'll see.
Now making logbook entries in chrome.
Result: Btop responded, B-main did not.
Will program a longer high level and retest before run
RF will be turning on FMIT# 3 and 4 for vac testing
|
| Dec 6 2011 09:10:22:460AM | 1111206002 | Steve Wolfe |
Shot#2: Gas and data cycle test
Program pg3 to 100V from -.019 to +.004 to exercise valve
Load at 6-Dec-2011 08:48:59.00
Open tree /home/wolfe/pcs_scratch -1
Open tree done
Waiting for RF guys to finish with FMIT#3,4 setup.
Note that Sparker was working and arcing on the gas test shot#1,
but it looks like there was a loss of current between -0.5 and -0.25sec;
have to keep an eye on that. Voltage over 20kV
Result: Got gas that time
B-main responded fine. Sparker is below 0.06mA for an extended
period before t=0, just recovers at -0.07 sec; this could be trouble.
Next: Reprogram pg3 in seg1 and go for plasma, hope sparker cleans up.
|
| Dec 6 2011 10:44:56:260AM | 1111206004 | Steve Wolfe | Logbook is hosed again, can't make entries
Tried from chrome and from idl, error both times
Keep log in emacs until Tom fixes it:
Shot#4: repeat after long delay to track down issue with E-port;
seems to have been a bad point in the programmed waveform, but Yijun
is still not sure how it did what it did.
Result: plasma full length some early runaways
some hestitation in initial current rise, just over 200kA at 50msec
Sparker still faulting, maybe better than last time; cleaning up? Voltage
down to 18kV around t=0 this time.
D&E still ratty, no early pulse from E this time.
Some evidence of heating on Te trace during Eport faulting
Density feedback puff is putting in about 10Torr-l
H/D going from .22 to .3 this time
Next: No DPCS changes
|
| Dec 6 2011 10:43:42:420AM | 1111206005 | Steve Wolfe |
Shot#5: no dpcs changes
Plasma full length, xraus at 3e13 level,
current rise getting slower, starting to move in.
Next: Decrease PG4 from 17 to 16msec
Load at 6-Dec-2011 10:12:22.00
Open tree /home/wolfe/pcs_scratch -1
Open tree done
Logbook still not taking entries from me. Tom claims he
could enter a one-line, but I don't see it.
|
| Dec 6 2011 10:39:44:047AM | 1111206006 | Steve Wolfe |
Shot#6: Decrease PG4 from 17 to 16msec
Yijun managed to get a logbook entry after several tries for shot#5.
Result: Fizzle, big C signal, looks like it's moving in.
EF4 is already at -1310. Sparker was down at t=0 on this one,
but the breakdown time was normal. Complicating things is that
Wukie is pulsing J into vacuum between shots; no obvious junk on RGA.
Next: Reduce PG4 from 16 to 15msec
Load at 6-Dec-2011 10:28:49.00
Open tree /home/wolfe/pcs_scratch -1
Open tree done
|
| Dec 6 2011 10:42:48:073AM | 1111206007 | Steve Wolfe |
Shot#7: Logbook is sort of fixed, but didn't have a
shot record for shot#7.
Shot#7: Reduce PG4 from 16 to 15msec
Result: plasma full length, early CIII signal still large and spiky,
RCUR indicates early move in, then out, xrays down to 2e12
Sparker is down to 0.1mA until after t=0; I think it's dead or dying
D still faulting, E better.
Next: Repeat
|
| Dec 6 2011 10:54:17:890AM | 1111206008 | Steve Wolfe |
Shot#8: No dpcs changes, though I'm tempted to drop the RCUR offset
to 2500.
Result: plasma full length. current rise a little worse
logbook is not advancing shot number
Next: raise B to 6.2T
|
| Dec 6 2011 11:14:27:747AM | 1111206009 | Steve Wolfe |
Shot#9: raise B to 6.2T (174.1kA), current limit to 180
reduce rcur offset from 3500 to 2500 in seg1
Load at 6-Dec-2011 10:57:45.00
Open tree /home/wolfe/pcs_scratch -1
Open tree done
ALternator is reducing speed because they are close to alarm state on #2 bearing
IGT at INIT =1.9e-6
Result: plasma full length
Sparker came back up briefly before t=0, then back down. I don't know if it's
doing any good at the 120uA level or not.
Current rise still slow, small inward motion before 20msec
D and E cleaning up ??
J trying in between them, with not much success.
B=6.18T
Next: No dpcs changes
|
| Dec 6 2011 11:30:11:110AM | 1111206010 | Steve Wolfe |
Shot#10: No dpcs changes
Josh is still trying to get the logbook to notice the current shot change
IGT at INIT=2.3e-6
Result: plasma full length, a few early hards (3e13)
possible bounce(?) just after 10msec, but then moving in.
Logbook current shot advanced to 10
D&E looking better, J just looking
Sparker still at 0.11mA until t=0, except briefly at .21 around -1sec
Supply Voltage claims to have gone to 35kA after +17msec on fast trace!
I didn't think it was set that high??? Must be a subtraction error, that
trace is calculated in the scope
Next: No dpcs changes
|
| Dec 6 2011 11:48:30:260AM | 1111206011 | Steve Wolfe |
Shot#11: No dpcs changes
We're having slow cooling, I think I'll move the fd gate earlier
so we don't extend the tf pulse on full plasmas.
Coax resistances look fine.
Result: plasma full length
current rise a little faster, no runaways
H/D (marmar) around 0.5 after 1 sec
Jport ran together at .15MW each
D and E still hanging in around 1MW (separately)
Sparker still looks bad, less than 0.1mA before t=0.
Next: Asked EO to move fd off from 2.1 to 1.8sec
No DPCS changes
|
| Dec 6 2011 11:58:37:027AM | 1111206012 | Steve Wolfe |
Shot#12: No dpcs changes, fd off gate to 1.8sec
Did a load just to get a new title (6.2T) on seg2
IGT at INIT=2.2e-6
Result: plasma full length
current rise looks ok, no runaways
Sparker got to 0.2mA before t=0, then dropped back
E ran clean over 1MW, J looking pretty good up to 0.5MW
D still hashy
Next: back to 5.4T
|
| Dec 6 2011 12:13:51:093PM | 1111206013 | Steve Wolfe |
Shot#13: back to 5.4T (150kA) drop EO current limit to 165kA
Load at 6-Dec-2011 11:59:49.00
Open tree /home/wolfe/pcs_scratch -1
Open tree done
IGT at INIT=2.3e-6
Result: plasma full length
no runaways
sparker up to .22mA from -0.1sec through t=0; did it matter?
D just under 1MW, some faulting, then J at .35each, then E up to 1MW, then J again in rampdown
B=5.4T as requested
Next: repeat
|
| Dec 6 2011 12:31:37:090PM | 1111206014 | Steve Wolfe |
Shot#14: no DPCS changes
IGT at INIT=2.5e-6 (13min in recool)
Irby has indicated that the sparker may need to have its voltage raised,
but the low level could be ok (see logbook entry under Ops). I'll leave
it for now, since the plasmas seem ok with it.
Result: plasma full length, current rise slower, under 150kA at .05sec
Sparker is back up to 0.22mA for most of its pulse this time.
RF trying to stack, with mixed success, max power up to 2MW, no noticeable heating. 2pi foil is up to 1.5MW.
H/D was over 0.5
Next: No DPCS changes, RF continuing to bang away
|
| Dec 6 2011 12:41:21:190PM | 1111206015 | Steve Wolfe |
Shot#15: no DPCS changes
IGT in INIT=2.6e-6
Result: fizzle
looks like a bounce, or a couple of bounces.
Sparker back down to .8mA until just before t=0, then pops back up
Next: raise pg4
|
| Dec 6 2011 12:57:34:697PM | 1111206016 | Steve Wolfe |
Shot#16: raise pg4 from 15 to 17msec
Load at 6-Dec-2011 12:42:20.00
Open tree /home/wolfe/pcs_scratch -1
Open tree done
Result: plasma full length, some early runaways ~5e13
still a possible bounce around 11msec
close to 200kA at .05sec
D faults out early, E almost clean for length of flattop
J ok from 1 to 1.2sec, .7MW total, then faulting.
Sparker was back down to 70uA for most of pulse this time.
Next: rcur offset to 3000 in seg1
|
| Dec 6 2011 01:09:27:087PM | 1111206017 | Steve Wolfe |
Shot#17: rcur offset from 2500 to 3000 in seg1
Load at 6-Dec-2011 12:56:12.00
Open tree /home/wolfe/pcs_scratch -1
Open tree done
Note that the monitor has been reporting over 0.6% changes in ef2L the
last two shots. Not sure why. The ef2 scope shows no signal from the
D supply, but it's been like that
IGT at INIT=2.4e-6
Result: plasma full length, no runaways
No apparent bounce this time.
D still some faults, E pretty clean at 1.1MW, J clean at 0.6MW (total)
Next: repeat
|
| Dec 6 2011 01:26:50:803PM | 1111206018 | Steve Wolfe |
Shot#18: repeat, no DPCS changes
IGT at INIT=2.2e-6 (over 15 min in RECOOL due to cell access for DNB)
Result: plasma full length, current rise the same as 17, no runaways
RF looking cleaner on this shot, E up to 1.2MW almost clean
Next: repeat
|
| Dec 6 2011 01:44:55:120PM | 1111206019 | Steve Wolfe |
Shot#19: repeat, no DPCS changes
IGT at INIT=2.9e-6 may be pushing it, 2.5e-6 going to pulse
Result: plasma full length, about 150kA at .05sec, no runaways
inward motion a little further before 17msec, CIII signal up around 11msec
E is up to 1.3MW, one fault, D clean around 1MW, J a couple faults on the
rise to 1.1MW, then clean.
Next: No DPCS changes, Amanda is going to change the ECE grating for 5.4T
|
| Dec 6 2011 01:53:33:063PM | 1111206020 | Steve Wolfe |
Shot#20: repeat, no DPCS changes
IGT at INIT=3.0e-6
Result: plasma full length, no runaways, similar current rise
maybe a little further inside
C light back down
D up to 1.3MW, E to 1.5MW, J at 1.1MW in between
Next: repeat
|
| Dec 6 2011 02:04:27:490PM | 1111206021 | Steve Wolfe |
Shot#21: repeat, no DPCS changes
IGT at INIT=2.8e-6
Result: fizzle, oh well!
C light shows some spikes, might have bounced, but rcur seems to be moving in
Next: Drop pg4 by 1msec
|
| Dec 6 2011 02:18:22:670PM | 1111206022 | Steve Wolfe |
Shot#22: Drop pg4 by From 17 to 16msec, just to do something
Load at 6-Dec-2011 14:05:41.00
Open tree /home/wolfe/pcs_scratch -1
Open tree done
IGT at INIT=1.9e-6
Result: plasma full length, some early runaways,
looks like a bounce at 11msec. I'm going to leave it alone and see if
the increased gas load after a plasma calms it down.
All RF's ran clean, between 1 and 1.2MW, D-J-E.
Next: repeat
|
| Dec 6 2011 02:32:50:167PM | 1111206023 | Steve Wolfe |
Shot#23: repeat, no DPCS changes
Result: Dud - PF breaker pulled out near -0.6sec
OH2L crowbarred first, around -0.7sec, near switch close time.
OH coax warning seems to be bogus due to low currents
Next: Engineers checking power systems
|
| Dec 6 2011 02:59:53:620PM | 1111206024 | Steve Wolfe |
Shot#24: repeat, no DPCS changes
Result: plasma full length, no runaways
Got D and E, but J faulted out.
Next: repeat
|
| Dec 6 2011 03:14:23:033PM | 1111206025 | Steve Wolfe |
Shot#25: repeat, no DPCS changes
IGT=2.3e-6 at CHECK
Result: plasma disrupted at 1.34sec, during RF (Dport)
J ran, then had faults, E had a couple of faults at 1.1MW
That one evolved a lot of gas, MKS claims over 100Torr-l with 11 injected.
Next: reduce pg4 post-disruption
|
| Dec 6 2011 03:23:45:563PM | 1111206026 | Steve Wolfe |
Shot#26: reduce pg4 from 16 to 14msec
Load at 6-Dec-2011 15:15:23.00
Open tree /home/wolfe/pcs_scratch -1
Open tree done
IGT at INIT=3.3e-6, may as well just go for it
Result: fizzle. What a surprise!
Next: just repeat, recovery may take a while
|
| Dec 6 2011 03:38:08:317PM | 1111206027 | Steve Wolfe |
Shot#27: just repeat with pg4 at 14msec,
recovery may take a while
IGT at INIT=1.9e-6, maybe this will work
Result: Nope, another fizzle. C light a lot brighter this time,
maybe a hint of current, Z-meter still lumpy.
Next: drop pg4 by one more msec
|
| Dec 6 2011 03:51:41:460PM | 1111206028 | Steve Wolfe |
Shot#28: drop pg4 from 14 to 13msec
Load at 6-Dec-2011 15:39:02.00
Open tree /home/wolfe/pcs_scratch -1
Open tree done
Result: Fizzle again! Still lots of C light, hardly any current
I'd ecdc but we only have about an hour left anyway.
RGA is showing lots of 16 slowly coming down since the disruption,
28 is mostly back to pre-shot#25 levels. It ought to be ready to go.
Next: Drop Seg1 rcur offset back to 2500, pg4 a little bit more
|
| Dec 6 2011 04:06:01:230PM | 1111206029 | Steve Wolfe |
Shot#29: drop pg4 from 13 to 12msec
rcur offset from 3000 to 2500
Load at 6-Dec-2011 15:52:49.00
Open tree /home/wolfe/pcs_scratch -1
Open tree done
If it runs I'll need to start undoing some of that
If not, just keep banging away?
Result: plasma full length, finally. And no runaways
current rise is slow, about 120kA at .05sec and it still moved in, but made it.
The walls pumped a little bit on this one, 6Torr-l out with 16 T-l in.
C light only down a little, around 0.02
J ran with multiple faults, then steady for a short while
E and D ran clean, all around 1MW.
Next: leave short prepuff until it starts giving runaways
|
| Dec 6 2011 04:18:52:503PM | 1111206030 | Steve Wolfe |
Shot#30: no dpcs changes this time, see if it starts bouncing.
Result: fizzle, which way did it go?
rcur seems to be moving in, but there are tiny spikes on C and Halpha
around 15msec, can't tell anything from bounce scope.
Next: Rcur offset back to 3000 in seg1
|
| Dec 6 2011 04:37:26:257PM | 1111206031 | Steve Wolfe |
Shot#31: Rcur offset from 2500 to 3000 in seg1
PG4 from 12 to 13 msec
Load at 6-Dec-2011 16:20:06.00
Open tree /home/wolfe/pcs_scratch -1
Open tree done
Result: plasma full length, no runaways,
still moving in, slight hesitation between 10-18msec,
C light lumpy, Zmeter burns out, then rises a bit.
Startup looks iffy.
RF runs just over 1MW with a few faults: order J/E/D
Divertor energy didn't update on 31, had a reading on inner divertor
on 30 (which had no plasma); possible problem.
Next: repeat, cross fingers
|
| Dec 6 2011 04:40:10:107PM | 1111206032 | Steve Wolfe |
Shot#32: Changed my mind: Reduce EF3_VOLT point at .012 sec from 2800 to 2600
see if that's responsible for the inward motion after 10msec
Load at 6-Dec-2011 16:33:01.00
Open tree /home/wolfe/pcs_scratch -1
Open tree done
Result: plasma full length, some early runaways.
inward motion is worse, if anything, no obvious benefit to decreasing ef3,
so put it back next time.
RF ran in same order, stepped up power on D&E
Next: put back EF3_VOLT
|
| Dec 6 2011 04:55:56:183PM | 1111206033 | Steve Wolfe |
Shot#33: put back EF3_VOLT point at .012sec from 2600 to 2800
Load at 6-Dec-2011 16:41:14.00
Open tree /home/wolfe/pcs_scratch -1
Open tree done
RF is playing with the phasing on J this time
IGT=2.9e-6 at INIT
Result: plasma full length, no runaways, but it almost didn't
make it, hesitation and slight back-off in current at 13msec
J had a couple faults, maybe related to monopole phase?
E and D also had faults, E worse than D, both around 1.5MW
Next: Reduce pg3 at t=0 a little
|
| Dec 6 2011 05:10:49:890PM | 1111206034 | Steve Wolfe |
Shot#34: Reduce pg3 at t=-1msec and after from 40 to 30V; may not do much,
since this is on the software chopper.
Load at 6-Dec-2011 16:57:08.00
Open tree /home/wolfe/pcs_scratch -1
Open tree done
Result: plasma full length, smoother current rise, less inward motion;
I think maybe the lower pg3 puff helped, maybe
J stayed on with monopole phasing in the middle of the pulse. 2pi diode
drops like a stone during that period, I don't think it's believable, but
it notices. Foil goes berserk, bipolar. Probably rectifying?
D and E also clean at 1.4MW or so.
END OF RUN
|
| System Availability |
| Dec 6 2011 08:40:38:953AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | golfit | | BES | yes | BES system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked up | Nov 17 2011 02:45PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed. Magnetron Unplugged | Apr 11 2011 09:51AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Multiple channel CNPA available, no safety risk for in-vessel access | Apr 14 2011 12:01PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed | Apr 15 2011 10:55AM (dekow) | Brian LaBombard | Upper Divertor Cryopump | dekow,irby,labombard | | CXRS | yes | core-CXRS system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | CXRS edge | yes | Michael CHurchill has primary responsibility at the moment | Apr 19 2011 11:44AM (blip) | Bruce Lipshultz | Measurement of CXR light in the pedestal region at both the high- and low-field sides | blip,rmchurch | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | system is is installed and aligned, but not functional (appears to be a broken cable) | Dec 05 2011 02:41PM (marmar) | Earl Marmar | Visible Bremsstrahlung Imaging | marmar | | Disruption Mitigation | no | gas jet valve disabled on 2011/04/13 | Apr 13 2011 02:04PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DMBolo AXUV diodes | no | Diodes are taking data, but system is not fully operational yet. Post-acquisition data processing code is not yet functional. | Dec 02 2011 03:27PM (golynyk) | Geoff Olynyk | Set of six AXUV diodes in a toroidal array of midplane wall boxes. | golynyk,granetz,mlreinke,whyte | | DNB | yes | | Dec 01 2011 11:46AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,mochung | | ECDC | yes | Operational as of 11/19/11 | Nov 22 2011 03:01PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off to RF and IF sections- Power on to DA | Apr 11 2011 02:54PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | bespam,liao,phillips,rowan,whitea | | G-Side Ratiomatic | yes | | Dec 02 2011 12:24PM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Power supply unplugged and redtagged, HV cables removed | Apr 14 2011 08:03AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Using new preamps. | Nov 30 2011 07:51AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPC2 | yes | Dewar cold. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | system is functional and taking data | Dec 05 2011 02:42PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Breakers off and red tagged | Apr 14 2011 11:27AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | Installed and aligned. Will be available for Ti/Vr profiles after focusing tests and locked modes are taken. | Dec 06 2011 08:21AM (ypodpaly) | John Rice | High Resolution X-Ray | cgao,ldelgado,rice,ypodpaly | | HXR | yes | 32 Channels operational,, no safety risk for in-vessel access | Apr 14 2011 12:05PM (parker) | Ron Parker | Hard X-Ray Array | faust,parker,schmidt | | ICRF D-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | secured | Apr 14 2011 08:56AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Impurity Spectroscopy | yes | Being upgraded with better optics and new spectrographs. Dan Miller has primary responsibility. | Apr 19 2011 11:46AM (blip) | Bruce Lipshultz | Measurement of recycling light and impurity source rates at multiple surfaces around the tokamak | blip,miller | | Laser Blow-Off | no | Beamline disconnected | Apr 14 2011 11:53AM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | LH HV Breaker Opened and Tagged, TPS Upgrade Underway | Nov 10 2011 03:51PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | LoWEUS | yes | LoWEUS working with the shot cycle. Viewing Mo line-emission normally covered by McPherson. Raw data only in tree. | Dec 01 2011 02:54PM (mlreinke) | Matthew L. Reinke | Long Wavelength Extreme Ultraviolet Spectrometer | markchil,mlreinke | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Midplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up. | Nov 17 2011 02:42PM (mlreinke) | Matt Reinke | Lyman alpha cameras | faustian,labombard,mlreinke | | Magnetics | yes | | Dec 01 2011 11:51AM (g) | Robert Granetz | Bp coils and flux loops for equilibrium control | granetz,wolfe | | McPherson | no | broken turbo pump, McPherson unavailable | Nov 17 2011 02:42PM (mlreinke) | Jim Terry | VUV Spectrometer | markchil,mlreinke,terry | | Michelson | yes | Front end at 4.5e-8 T. Reduced speed for initial operation. | Nov 30 2011 07:51AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | | Dec 02 2011 12:27PM (toland) | Brian LaBombard | Baratron pressure gauges | labombard,toland | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | no safety risk for in-vessel access as of 4/14/2011 | Apr 14 2011 11:48AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | High voltage is on. We're ready for plasma. | Nov 21 2011 12:58PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | All detectors Powered On --- Waiting for neutrons for calibration | Nov 22 2011 01:05PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | yes | C-bottom and new F-bottom system ready. | Dec 02 2011 12:28PM (toland) | Brian LaBombard | NINJA gas puff | labombard,terry,toland | | PCI | yes | Operational. | Nov 30 2011 12:45PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | emd,ennever,ntsujii,porkolab | | Penning Gauges | no | Secured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rack | Apr 14 2011 09:56AM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | no | Red tagged off | Apr 12 2011 07:23AM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | no | Breaker opened and red tagged | Apr 11 2011 11:59AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | no | Breakers opened and red tagged | Apr 11 2011 12:00PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | no | All systems disabled for in-vessel entry | Apr 14 2011 11:29AM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:56AM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack. | Apr 14 2011 09:57AM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array (F and J) | labombard | | Probe Array - UDIV | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Secured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack. | Apr 14 2011 11:39AM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | SOL reflectometer | yes | c-port waveguides operational, h-port waveguides are not. | Nov 29 2011 12:04PM (cornwall) | Cornwall Lau | SOL reflectometer | cornwall,wukitch,ylin | | Sparker | yes | New Type II sparker replaced Type I on 11/17/2011 | Nov 23 2011 08:53AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | no | SSS is up to air, no safety issues | Apr 14 2011 12:06PM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | TCI Operational. Density feedback operational. | Nov 10 2011 11:47AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jrwalk,jwhughes,yma | | TS - Edge | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jrwalk,jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | XEUS working with the shot cycle. Viewing low-Z emission. | Dec 01 2011 02:55PM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | markchil,mlreinke | | XTOMO | yes | ARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checked | Nov 17 2011 02:44PM (mlreinke) | Robert Granetz | X-Ray Tomography | faustian,granetz,mlreinke |
|
| Dec 6 2011 12:23:27:680PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | golfit | | BES | yes | BES system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked up | Nov 17 2011 02:45PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed. Magnetron Unplugged | Apr 11 2011 09:51AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Multiple channel CNPA available, no safety risk for in-vessel access | Apr 14 2011 12:01PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed | Apr 15 2011 10:55AM (dekow) | Brian LaBombard | Upper Divertor Cryopump | dekow,irby,labombard | | CXRS | yes | core-CXRS system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | CXRS edge | yes | Michael CHurchill has primary responsibility at the moment | Apr 19 2011 11:44AM (blip) | Bruce Lipshultz | Measurement of CXR light in the pedestal region at both the high- and low-field sides | blip,rmchurch | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | system is is installed and aligned, but not functional (appears to be a broken cable) | Dec 05 2011 02:41PM (marmar) | Earl Marmar | Visible Bremsstrahlung Imaging | marmar | | Disruption Mitigation | no | gas jet valve disabled on 2011/04/13 | Apr 13 2011 02:04PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DMBolo AXUV diodes | no | Diodes are taking data, but system is not fully operational yet. Post-acquisition data processing code is not yet functional. | Dec 02 2011 03:27PM (golynyk) | Geoff Olynyk | Set of six AXUV diodes in a toroidal array of midplane wall boxes. | golynyk,granetz,mlreinke,whyte | | DNB | yes | | Dec 01 2011 11:46AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,mochung | | ECDC | yes | Operational as of 11/19/11 | Nov 22 2011 03:01PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off to RF and IF sections- Power on to DA | Apr 11 2011 02:54PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | bespam,liao,phillips,rowan,whitea | | G-Side Ratiomatic | yes | | Dec 02 2011 12:24PM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Power supply unplugged and redtagged, HV cables removed | Apr 14 2011 08:03AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Using new preamps. | Nov 30 2011 07:51AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPC2 | yes | Dewar cold. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | system is functional and taking data | Dec 05 2011 02:42PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Breakers off and red tagged | Apr 14 2011 11:27AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | Installed and aligned. Will be available for Ti/Vr profiles after focusing tests and locked modes are taken. | Dec 06 2011 08:21AM (ypodpaly) | John Rice | High Resolution X-Ray | cgao,ldelgado,rice,ypodpaly | | HXR | yes | 32 Channels operational,, no safety risk for in-vessel access | Apr 14 2011 12:05PM (parker) | Ron Parker | Hard X-Ray Array | faust,parker,schmidt | | ICRF D-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | secured | Apr 14 2011 08:56AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Impurity Spectroscopy | yes | Being upgraded with better optics and new spectrographs. Dan Miller has primary responsibility. | Apr 19 2011 11:46AM (blip) | Bruce Lipshultz | Measurement of recycling light and impurity source rates at multiple surfaces around the tokamak | blip,miller | | Laser Blow-Off | no | Beamline disconnected | Apr 14 2011 11:53AM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | LH HV Breaker Opened and Tagged, TPS Upgrade Underway | Nov 10 2011 03:51PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | LoWEUS | yes | LoWEUS working with the shot cycle. Viewing Mo line-emission normally covered by McPherson. Raw data only in tree. | Dec 01 2011 02:54PM (mlreinke) | Matthew L. Reinke | Long Wavelength Extreme Ultraviolet Spectrometer | markchil,mlreinke | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Midplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up. | Nov 17 2011 02:42PM (mlreinke) | Matt Reinke | Lyman alpha cameras | faustian,labombard,mlreinke | | Magnetics | yes | | Dec 01 2011 11:51AM (g) | Robert Granetz | Bp coils and flux loops for equilibrium control | granetz,wolfe | | McPherson | no | new turbo pump, installed, McP pumping down. Almost ready to open to machine. | Dec 06 2011 12:16PM (mlreinke) | Jim Terry | VUV Spectrometer | markchil,mlreinke,terry | | Michelson | yes | Front end at 4.5e-8 T. Reduced speed for initial operation. | Nov 30 2011 07:51AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | | Dec 02 2011 12:27PM (toland) | Brian LaBombard | Baratron pressure gauges | labombard,toland | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | no safety risk for in-vessel access as of 4/14/2011 | Apr 14 2011 11:48AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | High voltage is on. We're ready for plasma. | Nov 21 2011 12:58PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | All detectors Powered On --- Waiting for neutrons for calibration | Nov 22 2011 01:05PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | yes | C-bottom and new F-bottom system ready. | Dec 02 2011 12:28PM (toland) | Brian LaBombard | NINJA gas puff | labombard,terry,toland | | PCI | yes | Operational. | Nov 30 2011 12:45PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | emd,ennever,ntsujii,porkolab | | Penning Gauges | no | Secured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rack | Apr 14 2011 09:56AM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | no | Red tagged off | Apr 12 2011 07:23AM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | no | Breaker opened and red tagged | Apr 11 2011 11:59AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | no | Breakers opened and red tagged | Apr 11 2011 12:00PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | no | All systems disabled for in-vessel entry | Apr 14 2011 11:29AM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:56AM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack. | Apr 14 2011 09:57AM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array (F and J) | labombard | | Probe Array - UDIV | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Secured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack. | Apr 14 2011 11:39AM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | SOL reflectometer | yes | c-port waveguides operational, h-port waveguides are not. | Nov 29 2011 12:04PM (cornwall) | Cornwall Lau | SOL reflectometer | cornwall,wukitch,ylin | | Sparker | yes | New Type II sparker replaced Type I on 11/17/2011 | Nov 23 2011 08:53AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | no | SSS is up to air, no safety issues | Apr 14 2011 12:06PM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | TCI Operational. Density feedback operational. | Nov 10 2011 11:47AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jrwalk,jwhughes,yma | | TS - Edge | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jrwalk,jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | XEUS working with the shot cycle. Viewing low-Z emission. | Dec 01 2011 02:55PM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | markchil,mlreinke | | XTOMO | yes | ARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checked | Nov 17 2011 02:44PM (mlreinke) | Robert Granetz | X-Ray Tomography | faustian,granetz,mlreinke |
|
| Dec 6 2011 12:37:11:360PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | golfit | | BES | yes | BES system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked up | Nov 17 2011 02:45PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed. Magnetron Unplugged | Apr 11 2011 09:51AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Multiple channel CNPA available, no safety risk for in-vessel access | Apr 14 2011 12:01PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed | Apr 15 2011 10:55AM (dekow) | Brian LaBombard | Upper Divertor Cryopump | dekow,irby,labombard | | CXRS | yes | core-CXRS system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | CXRS edge | yes | Michael CHurchill has primary responsibility at the moment | Apr 19 2011 11:44AM (blip) | Bruce Lipshultz | Measurement of CXR light in the pedestal region at both the high- and low-field sides | blip,rmchurch | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | system is is installed and aligned, but not functional (appears to be a broken cable) | Dec 05 2011 02:41PM (marmar) | Earl Marmar | Visible Bremsstrahlung Imaging | marmar | | Disruption Mitigation | no | gas jet valve disabled on 2011/04/13 | Apr 13 2011 02:04PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DMBolo AXUV diodes | no | Diodes are taking data, but system is not fully operational yet. Post-acquisition data processing code is not yet functional. | Dec 02 2011 03:27PM (golynyk) | Geoff Olynyk | Set of six AXUV diodes in a toroidal array of midplane wall boxes. | golynyk,granetz,mlreinke,whyte | | DNB | yes | | Dec 01 2011 11:46AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,mochung | | ECDC | yes | Operational as of 11/19/11 | Nov 22 2011 03:01PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off to RF and IF sections- Power on to DA | Apr 11 2011 02:54PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | bespam,liao,phillips,rowan,whitea | | G-Side Ratiomatic | yes | | Dec 02 2011 12:24PM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Power supply unplugged and redtagged, HV cables removed | Apr 14 2011 08:03AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Using new preamps. | Nov 30 2011 07:51AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPC2 | yes | Dewar cold. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | system is functional and taking data | Dec 05 2011 02:42PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Breakers off and red tagged | Apr 14 2011 11:27AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | Installed and aligned. Will be available for Ti/Vr profiles after focusing tests and locked modes are taken. | Dec 06 2011 08:21AM (ypodpaly) | John Rice | High Resolution X-Ray | cgao,ldelgado,rice,ypodpaly | | HXR | yes | 32 Channels operational,, no safety risk for in-vessel access | Apr 14 2011 12:05PM (parker) | Ron Parker | Hard X-Ray Array | faust,parker,schmidt | | ICRF D-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | secured | Apr 14 2011 08:56AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Impurity Spectroscopy | yes | Being upgraded with better optics and new spectrographs. Dan Miller has primary responsibility. | Apr 19 2011 11:46AM (blip) | Bruce Lipshultz | Measurement of recycling light and impurity source rates at multiple surfaces around the tokamak | blip,miller | | Laser Blow-Off | no | Beamline disconnected | Apr 14 2011 11:53AM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | LH HV Breaker Opened and Tagged, TPS Upgrade Underway | Nov 10 2011 03:51PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | LoWEUS | yes | LoWEUS working with the shot cycle. Viewing Mo line-emission normally covered by McPherson. Raw data only in tree. | Dec 01 2011 02:54PM (mlreinke) | Matthew L. Reinke | Long Wavelength Extreme Ultraviolet Spectrometer | markchil,mlreinke | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Midplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up. | Nov 17 2011 02:42PM (mlreinke) | Matt Reinke | Lyman alpha cameras | faustian,labombard,mlreinke | | Magnetics | yes | | Dec 01 2011 11:51AM (g) | Robert Granetz | Bp coils and flux loops for equilibrium control | granetz,wolfe | | McPherson | no | new turbo pump, installed, McP pumping down. Almost ready to open to machine. | Dec 06 2011 12:16PM (mlreinke) | Jim Terry | VUV Spectrometer | markchil,mlreinke,terry | | Michelson | yes | Front end at 4.5e-8 T. Reduced speed for initial operation. | Nov 30 2011 07:51AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | | Dec 02 2011 12:27PM (toland) | Brian LaBombard | Baratron pressure gauges | labombard,toland | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | no safety risk for in-vessel access as of 4/14/2011 | Apr 14 2011 11:48AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | High voltage is on. We're ready for plasma. | Nov 21 2011 12:58PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | All detectors Powered On --- Waiting for neutrons for calibration | Nov 22 2011 01:05PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | yes | C-bottom and new F-bottom system ready. | Dec 02 2011 12:28PM (toland) | Brian LaBombard | NINJA gas puff | labombard,terry,toland | | PCI | yes | Operational. | Nov 30 2011 12:45PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | emd,ennever,ntsujii,porkolab | | Penning Gauges | no | Secured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rack | Apr 14 2011 09:56AM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | no | Red tagged off | Apr 12 2011 07:23AM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | no | Breaker opened and red tagged | Apr 11 2011 11:59AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | no | Breakers opened and red tagged | Apr 11 2011 12:00PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | no | All systems disabled for in-vessel entry | Apr 14 2011 11:29AM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:56AM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack. | Apr 14 2011 09:57AM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array (F and J) | labombard | | Probe Array - UDIV | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Secured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack. | Apr 14 2011 11:39AM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | SOL reflectometer | yes | c-port waveguides operational, h-port waveguides are not. | Nov 29 2011 12:04PM (cornwall) | Cornwall Lau | SOL reflectometer | cornwall,wukitch,ylin | | Sparker | yes | New Type II sparker replaced Type I on 11/17/2011 | Nov 23 2011 08:53AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | no | SSS is up to air, no safety issues | Apr 14 2011 12:06PM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | TCI Operational. Density feedback operational. | Nov 10 2011 11:47AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jrwalk,jwhughes,yma | | TS - Edge | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jrwalk,jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | XEUS working with the shot cycle. Viewing low-Z emission. | Dec 01 2011 02:55PM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | markchil,mlreinke | | XTOMO | yes | ARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checked | Nov 17 2011 02:44PM (mlreinke) | Robert Granetz | X-Ray Tomography | faustian,granetz,mlreinke |
|
| Dec 6 2011 12:49:59:547PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | secured - tagged out | Jun 02 2008 11:03AM (sears) | Joe Snipes | Active MHD Antenna | golfit | | BES | yes | BES system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Beam Emission Spectroscopy | bespam,liao,rowan | | Bolometers | yes | 2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked up | Nov 17 2011 02:45PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | Bottle Removed. Magnetron Unplugged | Apr 11 2011 09:51AM (dekow) | Jim Irby | Boronization | dekow,irby | | CNPA | yes | Multiple channel CNPA available, no safety risk for in-vessel access | Apr 14 2011 12:01PM (parker) | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | Shut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed | Apr 15 2011 10:55AM (dekow) | Brian LaBombard | Upper Divertor Cryopump | dekow,irby,labombard | | CXRS | yes | core-CXRS system is online | Nov 22 2011 02:21PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,liao,rachmcd,rowan | | CXRS edge | yes | Michael CHurchill has primary responsibility at the moment | Apr 19 2011 11:44AM (blip) | Bruce Lipshultz | Measurement of CXR light in the pedestal region at both the high- and low-field sides | blip,rmchurch | | D Alpha | yes | \ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not available | Jul 01 2009 09:45AM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | no | system is is installed and aligned, but not functional (appears to be a broken cable) | Dec 05 2011 02:41PM (marmar) | Earl Marmar | Visible Bremsstrahlung Imaging | marmar | | Disruption Mitigation | no | gas jet valve disabled on 2011/04/13 | Apr 13 2011 02:04PM (granetz) | Robert Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,terry | | DMBolo AXUV diodes | no | Diodes are taking data, but system is not fully operational yet. Post-acquisition data processing code is not yet functional. | Dec 02 2011 03:27PM (golynyk) | Geoff Olynyk | Set of six AXUV diodes in a toroidal array of midplane wall boxes. | golynyk,granetz,mlreinke,whyte | | DNB | yes | | Dec 01 2011 11:46AM (granetz) | Robert Granetz | Diagnostic Neutral Beam | dterry,granetz,mochung | | ECDC | yes | Operational as of 11/19/11 | Nov 22 2011 03:01PM (irby) | Jim Irby | 2.45 GHz, 3 kW, discharge cleaning system | dekow,irby,pfeiffer | | FRC-ECE | no | Power off to RF and IF sections- Power on to DA | Apr 11 2011 02:54PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | bespam,liao,phillips,rowan,whitea | | G-Side Ratiomatic | yes | | Dec 02 2011 12:24PM (toland) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | Glow Discharge | no | Power supply unplugged and redtagged, HV cables removed | Apr 14 2011 08:03AM (dekow) | Jim Irby | 1 kV, 5 A, glow discharge system | dekow,dterry,irby | | GPC | yes | Using new preamps. | Nov 30 2011 07:51AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPC2 | yes | Dewar cold. | Nov 21 2011 09:55AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard | | GPI | yes | The Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. | Jul 01 2009 09:45AM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | system is functional and taking data | Dec 05 2011 02:42PM (marmar) | Earl Marmar | H/D Ratio | marmar | | HEAT | no | Breakers off and red tagged | Apr 14 2011 11:27AM (dekow) | Gary Dekow | - Machine Heaters - | burke,dekow | | Hirex Jr | yes | Hirex-Jr has been installed | Jun 28 2010 03:36PM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | Installed and aligned. Will be available for Ti/Vr profiles after focusing tests and locked modes are taken. | Dec 06 2011 08:21AM (ypodpaly) | John Rice | High Resolution X-Ray | cgao,ldelgado,rice,ypodpaly | | HXR | yes | 32 Channels operational,, no safety risk for in-vessel access | Apr 14 2011 12:05PM (parker) | Ron Parker | Hard X-Ray Array | faust,parker,schmidt | | ICRF D-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | secured | Apr 14 2011 08:55AM (wukitch) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | secured | Apr 14 2011 08:56AM (wukitch) | Steve Wukitch | J-port antenna | wukitch,ylin | | Impurity Spectroscopy | yes | Being upgraded with better optics and new spectrographs. Dan Miller has primary responsibility. | Apr 19 2011 11:46AM (blip) | Bruce Lipshultz | Measurement of recycling light and impurity source rates at multiple surfaces around the tokamak | blip,miller | | Laser Blow-Off | no | Beamline disconnected | Apr 14 2011 11:53AM (g) | Martin Greenwald | Impurity Injection System | g,nthoward | | Lower Hybrid | no | LH HV Breaker Opened and Tagged, TPS Upgrade Underway | Nov 10 2011 03:51PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker,wallaceg | | Lower Hybrid Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Arturo Dominguez | Lower Hybrid Reflectometer | dominguez,marmar,parker,sgbaek | | LoWEUS | yes | LoWEUS working with the shot cycle. Viewing Mo line-emission normally covered by McPherson. Raw data only in tree. | Dec 01 2011 02:54PM (mlreinke) | Matthew L. Reinke | Long Wavelength Extreme Ultraviolet Spectrometer | markchil,mlreinke | | LPI | no | Beam line removed | May 30 2008 02:09PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Midplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up. | Nov 17 2011 02:42PM (mlreinke) | Matt Reinke | Lyman alpha cameras | faustian,labombard,mlreinke | | Magnetics | yes | | Dec 01 2011 11:51AM (g) | Robert Granetz | Bp coils and flux loops for equilibrium control | granetz,wolfe | | McPherson | no | new turbo pump, installed, McP pumping down. Almost ready to open to machine. | Dec 06 2011 12:16PM (mlreinke) | Jim Terry | VUV Spectrometer | markchil,mlreinke,terry | | Michelson | yes | Front end at 4.5e-8 T. Reduced speed for initial operation. | Nov 30 2011 07:51AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | | Dec 02 2011 12:27PM (toland) | Brian LaBombard | Baratron pressure gauges | labombard,toland | | MLP | no | System is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it. | Jul 14 2009 09:20PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | no safety risk for in-vessel access as of 4/14/2011 | Apr 14 2011 11:48AM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | High voltage is on. We're ready for plasma. | Nov 21 2011 12:58PM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | All detectors Powered On --- Waiting for neutrons for calibration | Nov 22 2011 01:05PM (irby) | Jim Irby | X-Ray/Neutron Detectors at K-Hor | irby | | NINJA | yes | C-bottom and new F-bottom system ready. | Dec 02 2011 12:28PM (toland) | Brian LaBombard | NINJA gas puff | labombard,terry,toland | | PCI | yes | Operational. | Nov 30 2011 12:45PM (ntsujii) | Miklos Porkolab | Phase Contrast Imaging | emd,ennever,ntsujii,porkolab | | Penning Gauges | no | Secured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rack | Apr 14 2011 09:56AM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational. | Jul 01 2009 09:46AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Safe for Machine Entry | Sep 14 2007 12:17PM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Power - Alternator Air Switch | no | Red tagged off | Apr 12 2011 07:23AM (dekow) | Gary Dekow | feeds all the other supplies | cochran,dekow,dterry,irby | | Power - PEI | no | Breaker opened and red tagged | Apr 11 2011 11:59AM (dekow) | Gary Dekow | PEI System | cochran,dekow,dterry,irby | | Power - TMX | no | Breakers opened and red tagged | Apr 11 2011 12:00PM (dekow) | Gary Dekow | Ef2s,. EFCs and A-Coils | byford,cochran,dekow,dterry,irby | | Power Systems | no | All systems disabled for in-vessel entry | Apr 14 2011 11:29AM (dekow) | Jim Irby | C-Mod Magnet Supplies | byford,cochran,dekow,dterry,irby | | Probe Array - ISD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:56AM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack. | Apr 14 2011 09:57AM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array (F and J) | labombard | | Probe Array - UDIV | no | Secured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack. | Apr 14 2011 09:58AM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | off | Apr 15 2011 08:24AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | no | Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack. | Apr 14 2011 09:59AM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | Secured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack. | Apr 14 2011 11:39AM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | SOL reflectometer | yes | c-port waveguides operational, h-port waveguides are not. | Nov 29 2011 12:04PM (cornwall) | Cornwall Lau | SOL reflectometer | cornwall,wukitch,ylin | | Sparker | yes | New Type II sparker replaced Type I on 11/17/2011 | Nov 23 2011 08:53AM (irby) | Jim Irby | Field Emission Preionization for C-Mod | dekow,irby,parkin | | Surface Science Station | no | SSS is up to air, no safety issues | Apr 14 2011 12:06PM (ochoukov) | Bruce Lipschultz | Radially scanning probe located on K-port | blip,ochoukov | | TCI | yes | TCI Operational. Density feedback operational. | Nov 10 2011 11:47AM (irby) | Jim Irby | Two-Color Interferometer | irby,murray | | TS - Core | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jrwalk,jwhughes,yma | | TS - Edge | no | All lasers are shut down and cannot be fired into cell. | Apr 11 2011 01:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jrwalk,jwhughes,yma | | Vispec | no | 350 and 670 nm, 4 spatial channels | Nov 28 2007 09:58AM (agraf) | Alex Graf | Visible Spectrometer | agraf | | XEUS | yes | XEUS working with the shot cycle. Viewing low-Z emission. | Dec 01 2011 02:55PM (mlreinke) | Matt Reinke | X-ray Extended Ultraviolet Spectrometer | markchil,mlreinke | | XTOMO | yes | ARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checked | Nov 17 2011 02:44PM (mlreinke) | Robert Granetz | X-Ray Tomography | faustian,granetz,mlreinke |
|