Miniproposal:670
Date Filed:10/25/2011
Title:Statistical properties of scrape-off layer plasma fluctuations
First Author:Odd Erik Garcia
Session Leader:Odd Erik Garcia (shots 1-34)

Operators
Session leader(s):Odd Erik Garcia
Physics operator(s):Yijun Lin
Engineering operator(s):Gary Dekow,Andy Pfeiffer,Ed Fitzgerald

Engineering Operator Run Comment
MP670 - Statistical properties of scrape-off layer plasma fluctuations S

Session Leader Plans

Physics Operators Plans
Entered: Dec 7 2011 11:48:04:763AM
Author: Yijun Lin
-------------------------
1111208:

Engineering setup for Thursday 12/08/2011
-------
MP670 - Statistical properties of scrape-off layer plasma fluctuations

Session leaders: O.E. Garcia
Physics operator: Y. Lin

-----------------
Overnight ECDC in D2:
ECDC Parameters:
------------------------------
gas and pressure: D2 at 2e-4 Torr
sweep: 44/45/103 cm
scan: 20/120 s
Vessel Temp for ECDC 60/60/60
---------------------------------------

Run begins at 9:00 am and ends at 5:00 pm

Power systems as on: 1100716016 (0.55 MA, 5.4 T, 0.35e20 m-2 target, LSN)

A-coil configuration: +Dtop -Dbot -Jtop +Jbot; Hybrid enabled (standard
configuration)

Gas Setup:
-------
fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
***fill NINJA with 10 psi helium, DISABLED

Enable gate-valves and shutters: ECE, HiREX Sr, Xeus, LoWEUS
Z-bolo shutter should be closed unless requested by physop

------
Specific diagnostics: Divertor probes, ASP/FSP/WASP, GPI, and edge Thomson

------------------------------------------------------------------------------
Torvac gatevalve toggle (yes/no): no
Boronization: no
Overnight ECDC: Yes. in D2
Impurity injection: no.
ICRF: no.
LH: no.
DNB: no.
Cryopump: no.
------------------------------

Vessel temperature: 35/35/35

Run plan:

Load segment 2 from 1111202026, use the shape/strike-points etc of t = 0.85 sec of this shot, and make flat-top from 0.5 to 1.0 sec.

Density and current scan, see SL-plan.-

Session Leader Summaries
Entered: Dec 12 2011 11:13:48:497AM
Author:
The primary goal of the MP was to record long data records (~1s) of fluctuations in the boundary plasma (midplane and divertor probes and GPI) for a variety of densities and currents. As planned, a three-point density scan was performed at Ip=0.55MA. At Ip=0.8MA we got an Ohmic H-Mode and lost two pins on the ASP probe. The program continued without the possibility to estimate the turbulence driven particle flux. Fluctuation data were subsequently obtained from a three-point density scan at 0.8MA and for two densities at 1.1MA. Selected discharges were repeated with GPI diagnostics. Overall, the experiments were successful and produced many high-quality data time series.

Physics Operator Summaries
Entered: Dec 8 2011 05:08:53:020PM
Author: Yijun Lin
PO_summary: 1111208

Machine ran ok. First several shots were used to obtain fixed strike-point in the flat-top. ZXL was programmed to compensate the strike motion as seen from the probes.

Got some post-disruption fizzles.

We got two 1.1 MA plasma in a row (33 and 34). pcdaqdpcs3 crashed after shot 32, but Josh fixed, then we just went for plasma shot.
----------
score cards:
plasma attempts: 34
plasmas: 27 (2 disruptions in flat-top. several 1.1 MA plasmas disruption during ramp-down)
fizzles: 7
duds: 0

Entered: Dec 8 2011 05:09:06:443PM
Author: Yijun Lin
PO_summary: 1111208

Machine ran ok. Got some fizzles post-disruption and post 1.1 MA shots.
pcdaqdpcs3 crashed before shot 33. Josh fixed it, and got two 1.1 MA plasma in a row.

score cards:
plasma attempts: 34
plasmas: 27 (2 disruptions in flat-top. several 1.1 MA plasmas disruption during ramp-down)
fizzles: 7
duds: 0

Session Leader Comments
Dec 7 2011 10:15:57:780PMBrian LabombardMP#670 - Statistical properties of scrape-off layer plasma fluctuations

The primary goal of the MP is to record long data records (~1s) of plasma fluctuations (Isat, Vf, fluxes) in the boundary plasma, both
at the outer midplane and at the outer divertor surface, for a variety
of densities and currents.

Diagnostic setup:

- Horizontal probe (ASP) operated in a dwell mode at two radial locations: 3mm and 8mm from LCFS.
Electrodes NE and SE in ion saturation mode, NW and SW in floating mode. 5MHz sampling rate.
High heat-flux handling Langmuir-Mach probe head must be installed on A-port drive system.

- Divertor probes: all ramped probes operating in continuous ion saturation mode, flush probes in
floating mode. 0.5MHz sampling rate.

- FSP and WASP Langmuir-Mach scanning probes operated in spatial scan mode. Target probes to
reach to the separatrix (3 plunges) such that the phase velocity shear layer is recorded. Operate in
standard I-V sweep mode (2 kHz) with 5MHz sampling.

Overnight ECDC in D2, standard parameters.

Shot Plan
Reload from shot#1111202026. This was a 0.8 MA, 5.5 tesla shots with NL04 ~ 0.5e20. Change plasma current to 0.55 MA. Change density program to 0.3e20. Remove strike point sweep. Set strike point to be constant, corresponding to the time of 0.85 s in this shot (1111202026). Make sure cross-over patch is employed to stabilize plasma position.

No ICRF. No cryopump. No NINJA. No DNB

0.55 MA
Shot #1 - 3 NL04~0.3 Optimize gaps and probe targeting
Start with ASP scanning to find LCFS location.
Then change to NE and SE in ion saturation mode, NW and SW in floating mode.
Shot #4 - 5 Dwell-scan ASP at 8mm and then 3mm
Shot #6 - 7 NL04~0.5 ASP at 8mm and 3mm
Shot #8 - 9 NL04~0.65 ASP at 8mm and 3mm
0.8 MA
Shot #10 - 11 NL04~0.45 Optimize gaps and probe targeting
Shot #12 - 13 ASP at 8mm and 3mm
Shot #14 repeat
Shot #15 - 16 NL04~0.7 Dwell-scan ASP at 8mm and then 3mm
Shot #17 - 18 NL04~0.95 Dwell-scan ASP at 8mm and then 3mm
Shot #19
1.1 MA
Shot #20 - 22 NL04~0.6 Optimize gaps and probe targeting
Shot #23 - 24 ASP at 8mm and 3mm
Shot #25 - 26 NL04~1.0 ASP at 8mm and 3mm
Dec 8 2011 09:17:33:277AM1111208001 NL04~0.3 Optimize gaps and probe targeting
ASP scanning to find LCFS location
Constant outer gap from 0.5 to 1.5s
Slight upward drift of outer strike point
Dec 8 2011 09:30:53:740AM1111208002 NL04~0.3 Optimize gaps and probe targeting
ASP scanning to find LCFS location
Constant outer gap from 0.5 to 1.5s
Slight upward drift of outer strike point
Dec 8 2011 09:54:40:577AM1111208003 NL04~0.3 Optimize gaps and probe targeting
ASP scanning to find LCFS
Constant LN04 and outer gap from 0.5 to 1.5s
Slight movement of outer strike point
No gas puff
Dec 8 2011 10:00:17:463AM1111208004 NL04~0.3 Optimize gaps and probe targeting
ASP scanning to find LCFS
Constant LN04 and outer gap from 0.5 to 1.5s
Divertor probe data overlap ASP at 3 and 8mm
Dec 8 2011 10:23:48:147AM1111208005 NL04~0.3 ASP dwell close to rho=8mm (uncertain)
NE and SE in ion saturation mode
NW and SW in floating mode
Constant outer gap from 0.5 to 1.5s
Small perturbation on LN04 at about t=1.2s

Dec 8 2011 10:34:56:450AM1111208006 NL04~0.3 ASP dwell 3mm further in
NE and SE in ion saturation mode
NW and SW in floating mode
Constant outer gap from 0.5 to 1.5s
Slightly decreasing LN04
3 arcs on ASP
Dec 8 2011 10:46:37:220AM1111208007 NL04~0.3 ASP dwell additional 1mm further in
NE and SE in ion saturation mode
NW and SW in floating mode
Constant outer gap from 0.5 to 1.5s
Samll perturbation on LN04 at t=1.2s

Physics Operator Comments
Dec 8 2011 09:15:11:170AM1111208001Yijun LinRequest: 5.4 T, 0.55 MA, nl04 = 0.35, SNL, fix strike-point, flat-top 0.5-1.5 sec.

To optimize gaps and probe targeting.

PG4 15 ms.

result: plasma, full-length

next: raise 1 ms on PG4. Program 1 cm downward drift on ZXL to compensate the 'natural' upward drift.
Dec 8 2011 09:28:48:150AM1111208002Yijun LinRequest: 5.4 T, 0.55 MA, nl04 = 0.35e20 m^-2, SNL, steady 0.5-1.5 sec.

To optimize gaps and probe targeting.

result: plasma, full-length

next: lower ZXL by 2 cm...
Dec 8 2011 09:41:27:487AM1111208003Yijun LinRequest: 5.4 T, 0.55 MA, nl04 = 0.35e20 m^-2, SNL, steady 0.5-1.5 sec.

To optimize gaps and probe targeting.

result: plasma, full-length

next: raise ZXL by 1 cm...
Dec 8 2011 09:53:21:203AM1111208004Yijun LinRequest: 5.4 T, 0.55 MA, nl04 = 0.35e20 m^-2, SNL, steady 0.5-1.5 sec.

To optimize gaps and probe targeting.

result: plasma, full-length

next: repeat.
Dec 8 2011 10:10:54:537AM1111208005Yijun LinRequest: 5.4 T, 0.55 MA, nl04 = 0.35e20 m^-2, SNL, steady 0.5-1.5 sec.

result: plasma, full-length

next: repeat.
Dec 8 2011 10:43:39:270AM1111208007Yijun LinRequest: 5.4 T, 0.55 MA, nl04 = 0.35e20 m^-2, SNL, steady 0.5-1.5 sec.

result: plasma, full-length

next: raise density to 0.5e20 m^-2
Dec 8 2011 11:03:12:000AM1111208008Yijun LinRequest: 5.4 T, 0.55 MA, nl04 = 0.35e20 m^-2, SNL, steady 0.5-1.5 sec.

result: plasma, full-length

next: repeat.
Dec 8 2011 11:27:49:767AM1111208009Yijun Linshot 9: Request: 5.4 T, 0.55 MA, nl04 = 0.5e20 m^-2, SNL, steady 0.5-1.5 sec.

result: plasma, full-length

next: raise nl to 0.65...
Dec 8 2011 11:27:26:987AM1111208010Yijun Linshot 10: Request: 5.4 T, 0.55 MA, nl04 = 0.65e20 m^-2, SNL, steady 0.5-1.5 sec.

result: plasma, disrupted at 1.45 sec

next: repeat.
Dec 8 2011 11:40:33:320AM1111208011Yijun LinRequest: 5.4 T, 0.55 MA, nl04 = 0.65e20 m^-2, SNL, steady 0.5-1.5 sec.

result: plasma, full-length (no post-disruption fizzle...good)

next: raise density --> 0.8
Dec 8 2011 11:57:54:370AM1111208012Yijun LinRequest: 5.4 T, 0.55 MA, nl04 = 0.8e20 m^-2, SNL, steady 0.5-1.5 sec.

result: plasma, big marfe... after divertor detachment.

next: 0.8 MA, nl04 = 0.45
Dec 8 2011 12:11:18:930PM1111208013Yijun LinRequest: 5.4 T, 0.8 MA, nl04 = 0.45e20 m^-2, SNL, steady 0.5-1.5 sec.

result: plasma, full length (ohmic h-mode near the end)

next: repeat, try to make density more steady..
Dec 8 2011 12:35:32:067PM1111208015Yijun Linpost-disruption fizzle. (high CII light at t = 10 ms)
next: repeat, no pcs change.
Dec 8 2011 12:49:17:310PM1111208016Yijun LinRequest: 5.4 T, 0.8 MA, nl04 = 0.45e20 m^-2, SNL, steady 0.5-1.5 sec.

result: plasma, full length, density not steady...

next: repeat.
Dec 8 2011 01:13:57:923PM1111208017Yijun LinRequest: 5.4 T, 0.8 MA, nl04 = 0.45e20 m^-2, SNL, steady 0.5-1.5 sec.

result: plasma, Long ELMy ohmic H-mode...disrupted during rampdown...

next: raise nl to 0.7
Dec 8 2011 01:23:55:213PM1111208018Yijun LinRequest: 5.4 T, 0.8 MA, nl04 = 0.7e20 m^-2, SNL, steady 0.5-1.5 sec.

result: plasma, full length
next: repeat
Dec 8 2011 01:40:23:297PM1111208019Yijun LinRequest: 5.4 T, 0.8 MA, nl04 = 0.7e20 m^-2, SNL, steady 0.5-1.5 sec.

result: plasma, full length
next: reload shot 16, with NINJA
Dec 8 2011 01:51:27:337PM1111208020Yijun LinRequest: 5.4 T, 0.8 MA, nl04 = 0.45e20 m^-2, SNL, steady 0.5-1.5 sec.

result: plasma, full length, too much puff from NINJA
next: repeat with less NINJA
Dec 8 2011 02:10:49:057PM1111208021Yijun LinRequest: 5.4 T, 0.8 MA, nl04 = 0.45e20 m^-2, SNL, steady 0.5-1.5 sec.

result: plasma, full length
next: nl --> 0.9
Dec 8 2011 02:18:18:153PM1111208022Yijun LinRequest: 5.4 T, 0.8 MA, nl04 = 0.9e20 m^-2, SNL, steady 0.5-1.5 sec.

result: plasma, disruption 1.5 sec
next: repeat...with NINJA
Dec 8 2011 02:34:30:540PM1111208023Yijun Linanother post-disruption fizzle..

reduce PG4 by 1 ms.
Dec 8 2011 02:45:02:603PM1111208024Yijun Lin2 fizzles in a row.
Increase PG4 puff 3 ms, go the other way...
Dec 8 2011 02:57:35:447PM1111208025Yijun LinRequest: 5.4 T, 0.8 MA, nl04 = 0.9e20 m^-2, SNL, steady 0.5-1.5 sec.

result: plasma,full length.

next: nl04 0.45e20, reload shot 21, without NINJA
Dec 8 2011 03:18:09:000PM1111208026Yijun Linfizzle.

Increase ICEF4U by 10 A.
Dec 8 2011 03:27:27:380PM1111208027Yijun LinRequest: 5.4 T, 0.8 MA, nl04 = 0.45e20 m^-2, SNL, steady 0.5-1.5 sec.

result: plasma,full length. (ohmic H-mode)

next: increase ICEF4U by 10 A more. Raise Ip to 1.1 MA, nl = 0.6 e20m^-2
Dec 8 2011 03:39:52:120PM1111208028Yijun LinRequest: 5.4 T, 1.1 MA, nl04 = 0.6e20 m^-2, SNL, steady 0.5-1.5 sec.

result: plasma, disrupted during ramping down. ELM-free H-mode 1.3-1.5 sec.

next: repeat.
Dec 8 2011 04:01:42:367PM1111208029Yijun Linfizzle (post-disruption)

No pcs change, and hope it can recover. (and it did!)
Dec 8 2011 04:09:35:017PM1111208030Yijun LinRequest: 5.4 T, 1.1 MA, nl04 = 0.6e20 m^-2, SNL, steady 0.5-1.5 sec.

result: plasma, disruption during ramp-down. (h-modes)

next: Increase ICEF4 by 10 A...repeat
Dec 8 2011 04:19:45:300PM1111208031Yijun Linfizzle.

next: no PCS change.
Dec 8 2011 04:29:37:450PM1111208032Yijun Linfizzle. two in a row.

next: reload segment 1 from shot 30.
Dec 8 2011 04:53:42:030PM1111208033Yijun LinRequest: 5.4 T, 1.1 MA, nl04 = 0.6e20 m^-2, SNL, steady 0.5-1.5 sec.

result: plasma, full length..H-modes

next: raise nl to 1.0.
Dec 8 2011 05:05:45:803PM1111208034Yijun LinRequest: 5.4 T, 1.1 MA, nl04 = 1.0e20 m^-2, SNL, steady 0.5-1.5 sec.

result: plasma, disruption at 1.5 sec.

End of run.

Engineering Operator Comments
ShotTimeTypeStatusComment
109:00:49:313AMPlasmaOk
209:15:32:330AMPlasmaOk
309:30:51:040AMPlasmaOk
409:45:03:573AMPlasmaOk
510:02:38:837AMPlasmaOk
610:23:51:190AMPlasmaOk
710:36:54:653AMPlasmaOk
810:49:43:197AMPlasmaOk
911:05:52:380AMPlasmaOk
1011:20:01:847AMPlasmaOk
1111:33:05:020AMPlasmaOk
1211:46:08:080AMPlasmaOk
1311:58:49:223AMPlasmaOk
1412:12:29:730PMPlasmaOk
1512:30:55:880PMPlasmaOk
1612:43:21:760PMPlasmaOk
1712:59:42:660PMPlasmaOk
1801:15:34:910PMPlasmaOk
1901:28:19:557PMPlasmaOk
2001:45:19:497PMPlasmaOk
2101:59:13:097PMPlasmaOk
2202:13:00:393PMPlasmaOk
2302:26:10:573PMPlasmaOk
2402:38:51:917PMPlasmaOk
2502:51:16:337PMPlasmaOk
2603:03:57:473PMPlasmaOk
2703:17:31:763PMPlasmaOk
2803:30:34:620PMPlasmaOk
2903:47:34:310PMPlasmaOk
3003:59:51:803PMPlasmaOk
3104:12:32:337PMPlasmaOk
3204:24:53:063PMPlasmaOk
3304:49:09:473PMPlasmaOk
3405:02:35:513PMPlasmaOk

System Availability
Dec 8 2011 09:00:12:063AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is is installed and aligned, but not functional (appears to be a broken cable)Dec 05 2011 02:41PM (marmar)Earl MarmarVisible Bremsstrahlung Imagingmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoDiodes are taking data, but system is not fully operational yet. Post-acquisition data processing code is not yet functional.Dec 02 2011 03:27PM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes.golynyk,granetz,mlreinke,whyte
DNByes Dec 01 2011 11:46AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,mochung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side Ratiomaticyes Dec 02 2011 12:24PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesUsing new preamps.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyessystem is functional and taking dataDec 05 2011 02:42PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesInstalled and aligned. Will be available for Ti/Vr profiles after focusing tests and locked modes are taken.Dec 06 2011 08:21AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSyesLoWEUS working with the shot cycle. Viewing Mo line-emission normally covered by McPherson. Raw data only in tree.Dec 01 2011 02:54PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
Magneticsyes Dec 01 2011 11:51AM (g)Robert GranetzBp coils and flux loops for equilibrium controlgranetz,wolfe
McPhersonnonew turbo pump, installed, McP pumping down. Almost ready to open to machine.Dec 06 2011 12:16PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 4.5e-8 T. Reduced speed for initial operation.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyes Dec 02 2011 12:27PM (toland)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEnono safety risk for in-vessel access as of 4/14/2011Apr 14 2011 11:48AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAyesC-bottom and new F-bottom system ready.Dec 02 2011 12:28PM (toland)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCIyesOperational.Nov 30 2011 12:45PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesnoSecured for vessel entry/work. High voltage power supplies are turned off, all 8 cables HV cables are unplugged at J-port rackApr 14 2011 09:56AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:56AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port rack.Apr 14 2011 09:57AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at A-port and F-port racks.Apr 14 2011 09:58AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVnoSecured for vessel entry. Power supplies turned off, all probe cables unplugged at F-port rack.Apr 14 2011 09:58AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometernooffApr 15 2011 08:24AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoSecured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at A-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPno Secured for vessel entry. Power supplies turned off, air turned off and hose disconnected, all probe cables unplugged at F-port rack.Apr 14 2011 09:59AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoSecured for vessel entry. Power supplies turned off, Kepco cable unplugged, all probe cables unplugged at F-port rack.Apr 14 2011 11:39AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesXEUS working with the shot cycle. Viewing low-Z emission.Dec 01 2011 02:55PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Robert GranetzX-Ray Tomographyfaustian,granetz,mlreinke