| Session Leader Plans |
| Entered: Jan 3 2012 01:48:58:647PM |
| Author: Steve Scott |
| 'Auxiliary' Session Leader Plan for DNB-deuterium operation
Note: There must be no cell access when DNB is actually firing deuterium into the calorimeter. This will be enforced administratively by the Physics Operator. All shots will be: 60-ms beam on, 40-ms beam off. Part 1: DNB into calorimeter. These shots will be taken between actual C-Mod shots. We will only take DNB shots up to 8 minutes past the previous C-Mod plasma shot, so as not to interfere with the C-Mod data acquisition cycle. Part 1a: Perveance scan at 50 kV, with bending magnet OFF. 8-10 pulses per shot, varying the beam current from about 4.5 to about 7.0 amps. Part 1b: At the optimum perveance identified in step 1a, with bending magnet OFF, take 2 shots each at 2, 4, 6, 8, and 10 pulses per shot. Part 1c: with bending magnet ON, take 3 shots at 10 pulses per shot at optimum perveance. Part 2: DNB into plasma. 5-10 shots at 8-10 DNB pulses per shot. We will accept whatever plasma conditions are available at the time. Purpose is to compare measured versus expected neutron emission. Part 2a: between C-Mod plasma shots in Part 2, take a single DNB-into-empty-torus shot. To avoid overheating the inner limiter, restrict the beam to 4 pulses per shot. |
| Entered: Jan 4 2012 03:22:48:230PM |
| Author: Steve Wukitch |
| Use vanilla 5.4 T, 0.8 MA discharges (start with 1111216003) to condition D/E and J antennas.
Since this is the first plasma operation post up to helium for a boroscope inspection of the FA-J antenna, we will use vanilla plasmas to investigate the machine condition. If the H/H+D is high as expected, we will continue to condition the antennas and the machine. Depending on conditions, we may switch to upper single null discharges as on 1111209 (006-010). In piggy back, we will condition J-antenna in its 2-strap configuration to max power in L-mode, and examine its power handling, voltage limit. We will compare J/D/E antennas in terms of heating effectiveness, impurity production and neutral pressure limit if time permits. |
| Entered: Jan 4 2012 05:06:53:930PM |
| Author: Steve Wukitch |
| Use vanilla 5.4 T, 0.8 MA discharges (start with 1120104034) to condition D/E and J antennas.
To increase number of Joules, we will overlap the antennas and bring up the power shot to shot. Depending on conditions, we will switch to upper single null discharges as on 1120104032. |
| Physics Operators Plans |
| Entered: Jan 4 2012 08:26:12:307AM |
| Author: Greg Wallace |
| Set Up for 04 Jan 2012
MP355C ICRF Testing and Conditioning SL: Y. Lin/S. Wukitch PO: G. Wallace ----------------- Engineering Setup ----------------- Run begins at 09:00 and ends at 17:00 Power systems as on: 1111216003 Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled Gas setup: Fill B-Top with 6 psi D2 Hybrid enabled (PG4) fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1) leave B-side upper as is Hybrid DISABLED (PG2) fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3) Leave H-bot as is D2 Hybrid DISABLED (PG5) DO NOT fill B-div, Hybrid DISABLED (PG6) DO NOT fill H-div, Hybrid DISABLED (PG7) Leave NINJA as is, DISABLED Enable gate-valves and shutters: ECE, VUV, HiREX Sr, Xeus + LoWEUS Z-bolo shutter should be closed unless requested by physop Check with the physop before opening other diagnostic gate-valves or shutters. Torvac gatevalve toggle (yes/no): no Boronization(yes/no): no Overnight ECDC (yes/no): YES ICRF(yes/no): yes -- all transmitters LH(yes/no): no power requested, but LH-SOL reflectometer will be used. Cryopump (yes/no): no DNB (yes/no): will be firing between shots with Deuterium beam Vessel temperature: 35/35/35 ------------------------------ ECDC Parameters (if requested) ------------------------------ gas and pressure: D2 at 2e-4 Torr sweep: 44/45/103 cm scan: 20/120 s ================================== Tentative plan: Will load seg 1 from 1111216034 and seg 2 from 1111216003 Then proceed with Session Leader plan to exercise J-port as a 2-strap, etc. |
| Session Leader Summaries |
| Entered: Jan 4 2012 05:01:34:557PM |
| Author: Steve Wukitch |
| Machine and antenna conditioning were not significantly setback as a
result of the up to helium. After some initial issues with USN, we managed to get fairly repeatable USN and were able to switch back to LSN. The H/H+D started <10% but by the end of the day was approaching 15-18%. |
| Physics Operator Summaries |
| Entered: Jan 4 2012 05:17:25:813PM |
| Author: Greg Wallace |
| The run started slowly this morning due to the PG3 gas valve sticking. The PG3 valve started working again after increasing the initial puff to 50ms at 100V on shot 4.
Shot 5 was the first plasma of 2012. The lower nulls were based on seg 2 from shot 1111216003 with initial seg 1 from 1111216034. The LSN plasmas ran well with plasmas typically running all the way through rampdown to 0 kA. A few early disruptions were attributed to loss of density feedback---the PG3 valve would open full bore when TCI was lost. We switched to USN plasmas starting with shot 15 (loaded seg 2 of 1111209012 into seg 3). These plasmas were vertically unstable with many disruptions at about 0.2s. Steve Wolfe discovered that the RCUR through ZXU predictors had not been recalculated since the coil changes during the last manned access. Performance improved after fixing this, but we still had many fizzles and early disruptions. The CLEARIN ramp was slowed down to keep the plasmas from diverting so quickly. Additional fiddling with the PG3 and PG4 gas programming in seg 1 helped with both the fizzles and early disruptions. By shots 31-32 we had stable USN plasmas. Shots 33-36 went back to LSN. Additional minor fiddling with the PG4 prepuff fixed the fizzle on shot 35. |
| Session Leader Comments | |||
| Jan 4 2012 09:17:28:577AM | 1120104001 | Steve Wukitch | gas test |
| Jan 4 2012 09:17:22:053AM | 1120104002 | Steve Wukitch | gas test |
| Jan 4 2012 09:33:54:430AM | 1120104003 | Steve Wukitch | gas test |
| Jan 4 2012 09:34:15:140AM | 1120104004 | Steve Wukitch | gas test |
| Jan 4 2012 09:53:15:333AM | 1120104005 | Steve Wukitch | 005 request: Bt=5.4 T, Ip=0.8 MA, nl04=0.6, LSN
D : t = [1.25, 1.60] sec, 0.50 to 0.75 MW, 80.5 MHz E : t = [0.90, 1.25] sec, 0.20 to 0.75 MW, 80.0 MHz J4: t = [0.50, 0.90] sec, 0.25 to 0.75 MW, 78.0 MHz result: plasma into rampdown heating with RF -H/H+D starts low but climbs quickly to 10% significant density evolution with antennas next: repeat - staircase RF power |
| Jan 4 2012 09:59:45:970AM | 1120104006 | Steve Wukitch | 006 request: Bt=5.4 T, Ip=0.8 MA, nl04=0.6, LSN
D : t = [1.25, 1.60] sec, 0.50 to 0.75 MW, 80.5 MHz E : t = [0.90, 1.25] sec, 0.20 to 0.75 MW, 80.0 MHz J4: t = [0.50, 0.90] sec, 0.25 to 0.75 MW, 78.0 MHz result: plasma into rampdown heating with all antennas significant density evolution with antennas next: repeat - staircase RF power |
| Jan 4 2012 10:24:23:933AM | 1120104007 | Steve Wukitch | 007 request: Bt=5.4 T, Ip=0.8 MA, nl04=0.6, LSN
D : t = [1.30, 1.60] sec, 0.30 to 1.10 MW, 80.5 MHz E : t = [0.95, 1.23] sec, 0.30 to 1.10 MW, 80.0 MHz J4: t = [0.60, 0.88] sec, 0.30 to 1.20 MW, 78.0 MHz result: plasma into rampdown some sparkles from FA-Jant during E pulse next: repeat |
| Jan 4 2012 10:36:01:763AM | 1120104008 | Steve Wukitch | 008 request: Bt=5.4 T, Ip=0.8 MA, nl04=0.6, LSN
D : t = [1.30, 1.60] sec, 0.30 to 1.10 MW, 80.5 MHz E : t = [0.95, 1.23] sec, 0.30 to 1.10 MW, 80.0 MHz J4: t = [0.60, 0.88] sec, 0.30 to 1.20 MW, 78.0 MHz result: plasma into rampdown good comparison next: new order E-J-D |
| Jan 4 2012 10:39:55:640AM | 1120104009 | Steve Wukitch | disruption ~ 0.43 s but discharge was ill much earlier |
| Jan 4 2012 11:11:37:167AM | 1120104011 | Steve Wukitch | early disruption ~0.43 s |
| Jan 4 2012 11:36:50:663AM | 1120104012 | Steve Wukitch | 012 request: Bt=5.4 T, Ip=0.8 MA, nl04=0.6, LSN
D : t = [1.30, 1.60] sec, 0.30 to 1.10 MW, 80.5 MHz E : t = [0.60, 0.88] sec, 0.30 to 1.10 MW, 80.0 MHz J4: t = [0.95, 1.23] sec, 0.30 to 1.30 MW, 78.0 MHz result: plasma into rampdown little H-mode during first pulse next: switch order to D-J-E |
| Jan 4 2012 11:52:13:843AM | 1120104013 | Steve Wukitch | 013 request: Bt=5.4 T, Ip=0.8 MA, nl04=0.6, LSN
D : t = [0.60, 0.88] sec, 0.30 to 1.10 MW, 80.5 MHz E : t = [1.30, 1.60] sec, 0.30 to 1.10 MW, 80.0 MHz J4: t = [0.95, 1.23] sec, 0.30 to 1.30 MW, 78.0 MHz result: plasma into rampdown next: repeat |
| Jan 4 2012 11:56:23:333AM | 1120104014 | Steve Wukitch | 014 request: Bt=5.4 T, Ip=0.8 MA, nl04=0.6, LSN
D : t = [0.60, 0.88] sec, 0.30 to 1.10 MW, 80.5 MHz E : t = [1.30, 1.60] sec, 0.30 to 1.10 MW, 80.0 MHz J4: t = [0.95, 1.23] sec, 0.30 to 1.30 MW, 78.0 MHz result: plasma into rampdown next: USN - recall from 1111216012 |
| Jan 4 2012 01:58:22:947PM | 1120104015 | Steve Wukitch | 015 request: Bt=5.4 T, Ip=0.8 MA, nl04=0.6, USN
result: early disruption next: repeat |
| Jan 4 2012 01:58:58:470PM | 1120104016 | Steve Wukitch | 016 request: Bt=5.4 T, Ip=0.8 MA, nl04=0.6, USN
result: early disruption next: repeat |
| Jan 4 2012 01:59:39:473PM | 1120104017 | Steve Wukitch | 017 request: Bt=5.4 T, Ip=0.8 MA, nl04=0.6, USN
result: early disruption next: repeat |
| Jan 4 2012 01:59:50:213PM | 1120104018 | Steve Wukitch | 018 request: Bt=5.4 T, Ip=0.8 MA, nl04=0.6, USN
D : t = [0.60, 0.88] sec, 0.30 to 1.10 MW, 80.5 MHz E : t = [1.30, 1.60] sec, 0.30 to 1.10 MW, 80.0 MHz J4: t = [0.95, 1.23] sec, 0.30 to 1.30 MW, 78.0 MHz result: plasma next: repeat with new RF order J-D-E |
| Jan 4 2012 02:00:01:467PM | 1120104019 | Steve Wukitch | 019 request: Bt=5.4 T, Ip=0.8 MA, nl04=0.6, USN
D : t = [0.95, 1.23] sec, 0.30 to 1.10 MW, 80.5 MHz E : t = [1.30, 1.60] sec, 0.30 to 1.10 MW, 80.0 MHz J4: t = [0.60, 0.88] sec, 0.30 to 1.30 MW, 78.0 MHz result: plasma |
| Jan 4 2012 02:00:10:987PM | 1120104020 | Steve Wukitch | 020 request: Bt=5.4 T, Ip=0.8 MA, nl04=0.6, USN
result: early disruption next: repeat |
| Jan 4 2012 02:00:20:583PM | 1120104021 | Steve Wukitch | 021 request: Bt=5.4 T, Ip=0.8 MA, nl04=0.6, USN
result: early disruption next: repeat |
| Jan 4 2012 02:00:31:563PM | 1120104022 | Steve Wukitch | 022 request: Bt=5.4 T, Ip=0.8 MA, nl04=0.6, USN
result: early disruption next: repeat |
| Jan 4 2012 02:00:39:577PM | 1120104023 | Steve Wukitch | 023 request: Bt=5.4 T, Ip=0.8 MA, nl04=0.6, USN
result: early disruption next: repeat |
| Jan 4 2012 02:38:38:270PM | 1120104024 | Steve Wukitch | 024 request: Bt=5.4 T, Ip=0.8 MA, nl04=0.6, USN
D : t = [0.95, 1.23] sec, 0.30 to 1.10 MW, 80.5 MHz E : t = [0.60, 0.88] sec, 0.30 to 1.10 MW, 80.0 MHz J4: t = [1.30, 1.60] sec, 0.30 to 1.30 MW, 78.0 MHz result: plasma next: repeat with D-E-J order |
| Jan 4 2012 02:38:46:387PM | 1120104025 | Steve Wukitch | 025 early disruption |
| Jan 4 2012 03:06:10:707PM | 1120104026 | Steve Wukitch | no power |
| Jan 4 2012 03:20:28:810PM | 1120104028 | Steve Wukitch | 028 request: Bt=5.4 T, Ip=0.8 MA, nl04=0.6, USN
D : t = [0.95, 1.23] sec, 0.30 to 1.10 MW, 80.5 MHz E : t = [1.30, 1.60] sec, 0.30 to 1.10 MW, 80.0 MHz J4: t = [0.60, 0.88] sec, 0.30 to 1.30 MW, 78.0 MHz result: plasma next: repeat with J-E-D order |
| Jan 4 2012 03:39:29:857PM | 1120104029 | Steve Wukitch | 029 request: Bt=5.4 T, Ip=0.8 MA, nl04=0.6, USN
D : t = [1.30, 1.60] sec, 0.30 to 1.10 MW, 80.5 MHz E : t = [0.95, 1.23] sec, 0.30 to 1.10 MW, 80.0 MHz J4: t = [0.60, 0.88] sec, 0.30 to 1.30 MW, 78.0 MHz result: plasma next: repeat with E-J-D order |
| Jan 4 2012 03:43:09:263PM | 1120104030 | Steve Wukitch | 030 request: Bt=5.4 T, Ip=0.8 MA, nl04=0.6, USN
result: early disruption |
| Jan 4 2012 04:00:22:263PM | 1120104031 | Steve Wukitch | 031 request: Bt=5.4 T, Ip=0.8 MA, nl04=0.6, USN
D : t = [1.30, 1.60] sec, 0.30 to 1.10 MW, 80.5 MHz E : t = [0.60, 0.88] sec, 0.30 to 1.10 MW, 80.0 MHz J4: t = [0.95, 1.23] sec, 0.30 to 1.30 MW, 78.0 MHz result: plasma next: repeat with E-D-J |
| Jan 4 2012 04:20:16:650PM | 1120104032 | Steve Wukitch | 032 request: Bt=5.4 T, Ip=0.8 MA, nl04=0.6, USN
D : t = [0.95, 1.23] sec, 0.30 to 1.10 MW, 80.5 MHz E : t = [0.60, 0.88] sec, 0.30 to 1.10 MW, 80.0 MHz J4: t = [1.30, 1.60] sec, 0.30 to 1.30 MW, 78.0 MHz result: plasma next: LSN D E J |
| Jan 4 2012 04:39:44:120PM | 1120104034 | Steve Wukitch | 034 request: Bt=5.4 T, Ip=0.8 MA, nl04=0.6, LSN
D : t = [0.60, 0.88] sec, 0.30 to 1.10 MW, 80.5 MHz E : t = [0.95, 1.23] sec, 0.30 to 1.10 MW, 80.0 MHz J4: t = [1.30, 1.60] sec, 0.30 to 1.30 MW, 78.0 MHz result: plasma next: J-D-E |
| Jan 4 2012 04:47:40:107PM | 1120104035 | Steve Wukitch | 035 request: Bt=5.4 T, Ip=0.8 MA, nl04=0.6, LSN
fizzle |
| Jan 4 2012 05:02:05:773PM | 1120104036 | Steve Wukitch | 035 request: Bt=5.4 T, Ip=0.8 MA, nl04=0.6, LSN
fizzle 036 request: BT=5.4 T, Ip=0.8, nl04=0.6, LSN D : t = [0.95, 1.23] sec, 0.30 to 1.10 MW, 80.5 MHz E : t = [1.30, 1.60] sec, 0.30 to 1.10 MW, 80.0 MHz J4: t = [0.60, 0.88] sec, 0.30 to 1.30 MW, 78.0 MHz result: plasma - EoR |
| Physics Operator Comments | |||
| Jan 4 2012 09:10:52:510AM | 1120104001 | Greg Wallace | Result: Gas puff test. No gas.
Next shot: Will try again. |
| Jan 4 2012 09:21:33:287AM | 1120104002 | Greg Wallace | Changes: Try gas puff test again.
Result: PG4 worked but no PG3. Next shot: Try again with bigger PG3 puff. |
| Jan 4 2012 09:28:42:750AM | 1120104003 | Greg Wallace | Changes: Try again with bigger PG3 puff. 20ms at 100V.
Result: Still no PG3. Next shot: Increase PG3 puff to 50ms at 100V and try for another gas puff. |
| Jan 4 2012 09:34:03:733AM | 1120104004 | Greg Wallace | Changes: Increase PG3 puff to 50ms at 100V and try for another gas puff.
Result: Gas puff test successful. Next shot: Return to original 20ms PG3 puff from seg 1 of 1111216034. |
| Jan 4 2012 09:52:09:530AM | 1120104005 | Greg Wallace | Changes: Return to original 20ms PG3 puff from seg 1 of 1111216034. Try for plasma.
Result: Plasma! First shot of the new year! Went all the way to the end of rampdown. A few hards at 40ms. Will monitor it but no changes to seg 1 for now. Next shot: Repeat. Enable 50ms Ar puff. |
| Jan 4 2012 10:05:48:520AM | 1120104006 | Greg Wallace | Changes: Repeat. Enable 50ms Ar puff.
Result: Plasma through rampdown again. Early hards went down. No RF faults. Next shot: Repeat. Increase Ar puff from 50ms to 75ms. |
| Jan 4 2012 10:18:31:363AM | 1120104007 | Greg Wallace | Changes: Repeat. Increase Ar puff from 50ms to 75ms.
Result: Plasma through rampdown. Next shot: Repeat. |
| Jan 4 2012 10:33:08:240AM | 1120104008 | Greg Wallace | Changes: Repeat.
Result: Plasma through rampdown again. Next shot: Repeat shot 8. |
| Jan 4 2012 10:47:44:257AM | 1120104009 | Greg Wallace | Changes: Repeat shot 8.
Result: Disruption at 0.43s. Lots of stuff flying around. Things started to go south about 0.15s. TCI was lost which caused gas puff feedback to go full on after 0.15s. Next shot: Try again with same programming. |
| Jan 4 2012 10:53:32:813AM | 1120104010 | Greg Wallace | Changes: Try again with same programming.
Result: Plasma through rampdown. Looks good after disruption on shot 9. Next shot: Repeat. Try for better E and J performance. |
| Jan 4 2012 11:11:03:390AM | 1120104011 | Greg Wallace | Changes: Repeat. Try for better E and J performance.
Result: Disruption at 0.43s. Looks like we lost gas feedback control again due to TCI error. Next shot: Will try to fix TCI. Otherwise repeat same shot. |
| Jan 4 2012 11:40:41:960AM | 1120104012 | Greg Wallace | Changes: Will try to fix TCI. Otherwise repeat same shot.
Result: Plasma through rampdown. H/H+D is under 15%. Next shot: Repeat. |
| Jan 4 2012 11:51:09:837AM | 1120104013 | Greg Wallace | Changes: Repeat.
Result: Plasma through rampdown. Next shot: Repeat. |
| Jan 4 2012 12:01:19:397PM | 1120104014 | Greg Wallace | Changes: Repeat.
Result: Plasma through rampdown. Next shot: Change to upper null. Load seg 2 from 1111209012 into seg 3 and turn off seg 2. |
| Jan 4 2012 12:20:27:380PM | 1120104015 | Greg Wallace | Changes: Change to upper null. Load seg 2 from 1111209012 into seg 3 and turn off seg 2.
Result: Disruption at 0.23s. Vertically unstable before plasma is diverted. Wolfe discovered that RCUR through ZXU are using old predictors and need to be re-called. Next shot: Segment 3 control wires re-called. Try again for USN. |
| Jan 4 2012 12:27:13:763PM | 1120104016 | Greg Wallace | Changes: Segment 3 control wires re-called. Try again for USN.
Result: Dud. Neither PG3 nor PG4 gas puffs went through. Demand for both valves was correct, so looks like a PLC error? Next shot: Try again and hope that gas valves work this time. |
| Jan 4 2012 12:42:03:927PM | 1120104017 | Greg Wallace | Changes: Try again and hope that gas valves work this time.
Result: Startup OK this time but still disrupted at 0.22s. CLEARIN is ramping up too fast during change from limited to diverted. Next shot: Decrease flattop CLEARIN to 0 (nominally 1cm inner gap). Decrease CLEARIN point at 0.25s to -0.01 (nominally 0 inner gap). |
| Jan 4 2012 12:52:40:100PM | 1120104018 | Greg Wallace | Changes: Decrease flattop CLEARIN to 0 (nominally 1cm inner gap). Decrease CLEARIN point at 0.25s to -0.01 (nominally 0 inner gap).
Result: Plasma through rampdown with USN. D and J had no faults, E had faults at higher power. Next shot: Repeat. |
| Jan 4 2012 01:12:01:890PM | 1120104019 | Greg Wallace | Changes: Repeat.
Result: Plasma through rampdown. Next shot: Repeat. |
| Jan 4 2012 01:24:46:657PM | 1120104020 | Greg Wallace | Changes: Repeat.
Result: Fizzle. Everything is same as shot 19 until about 12ms, then current rise stops. Bz0 looks ok, so does pressure. R0 and z0 deviate from shot 19 at about 12ms. Next shot: Try again before making changes. Might just be junk stirred up by previous shot. |
| Jan 4 2012 01:34:54:857PM | 1120104021 | Greg Wallace | Changes: Try again before making changes. Might just be junk stirred up by previous shot.
Result: Hards starting at about 70ms. Disruption at 0.23s. Vertically unstable. Next shot: Move CLEARIN=-0.01 point from 0.25s to 0.3s to slow down change from limited to diverted configuration. |
| Jan 4 2012 01:51:02:020PM | 1120104022 | Greg Wallace | Changes: Move CLEARIN=-0.01 point from 0.25s to 0.3s to slow down change from limited to diverted configuration.
Result: Disruption at 0.2s. Some early runaways, hards really start rising around 60ms. Next shot: Add PG3 control point at t=-0.15, v=100 to increase early PG3 to help control runaways. |
| Jan 4 2012 02:20:31:970PM | 1120104023 | Greg Wallace | Changes: Add PG3 control point at t=-0.15, v=100 to increase early PG3 to help control runaways.
Result: Early hards (t<0.05s) went away but still have runaways after about 0.06s. Plasma disrupts at 0.19s. Vertically unstable. Next shot: Extend PG3 back porch out to 100ms at v=30. |
| Jan 4 2012 02:30:11:000PM | 1120104024 | Greg Wallace | Changes: Extend PG3 back porch out to 100ms at v=30.
Result: Plasma through rampdown, but lots of early runaways. Bounce at 14ms. Next shot: Move CLEARIN=-0.01 point from 300ms to 250ms. Extend early PG3 by 5ms and PG4 pre-puff by 2ms. |
| Jan 4 2012 02:45:49:660PM | 1120104025 | Greg Wallace | Changes: Move CLEARIN=-0.01 point from 300ms to 250ms. Extend early PG3 by 5ms and PG4 pre-puff by 2ms.
Result: Disruption at 0.17s. Vertically unstable again. Bounces at 12ms and 30ms. Next shot: Shorten early PG3 flattop from 10ms back to 5ms in seg 1. Leave extended back porch in place and keep PG4 prepuff at 16ms. |
| Jan 4 2012 03:01:14:010PM | 1120104026 | Greg Wallace | Changes: Shorten early PG3 flattop from 10ms back to 5ms in seg 1. Leave extended back porch in place and keep PG4 prepuff at 16ms.
Result: No power shot. Next shot: Repeat. |
| Jan 4 2012 03:09:50:203PM | 1120104027 | Greg Wallace | Changes: Shorten early PG3 flattop from 10ms back to 5ms in seg 1. Leave extended back porch in place and keep PG4 prepuff at 16ms.
Result: Plasma through rampdown. Seg 1 looks good. Next shot: Repeat same shot. |
| Jan 4 2012 03:29:05:790PM | 1120104028 | Greg Wallace | Changes: Repeat same shot.
Result: Plasma through rampdown. Next shot: Repeat. |
| Jan 4 2012 03:39:18:267PM | 1120104029 | Greg Wallace | Changes: Repeat.
Result: Plasma through rampdown. Current rise is slightly slower, but not bad. Will keep an eye on it. Next shot: Repeat |
| Jan 4 2012 03:53:43:840PM | 1120104030 | Greg Wallace | Changes: Repeat.
Result: Bounce in startup at about 12ms. Next shot: Increase early PG4 from 17 to 18 ms. |
| Jan 4 2012 04:05:29:600PM | 1120104031 | Greg Wallace | Changes: Increase early PG4 from 17 to 18 ms.
Result: Plasma through rampdown. Still have some early hards. Next shot: Increase PG4 prepuff from 18 to 19 ms to help control early runaways. |
| Jan 4 2012 04:14:02:837PM | 1120104032 | Greg Wallace | Changes: Increase PG4 prepuff from 18 to 19 ms to help control early runaways.
Result: Plasma through rampdown. Next shot: Go back to LSN. Turn off seg 3 and turn on seg 2. |
| Jan 4 2012 04:25:57:453PM | 1120104033 | Greg Wallace | Changes: Go back to LSN. Turn off seg 3 and turn on seg 2.
Result: Plasma through rampdown. A little hesitation in the current ramp at 10ms. This shot had DNB firing Deuterium beam into plasma. Next shot: Repeat. |
| Jan 4 2012 04:37:04:780PM | 1120104034 | Greg Wallace | Changes: Repeat.
Result: Plasma through rampdown. Next shot: Repeat with different RF antenna order. |
| Jan 4 2012 04:55:36:270PM | 1120104035 | Greg Wallace | Changes: Repeat with different RF antenna order.
Result: Fizzle. Bounce at 15ms. Neutral pressure is slightly higher than previous shot??? Next shot: Reduce PG4 prepuff from 18ms to 17ms. |
| Jan 4 2012 05:18:23:647PM | 1120104036 | Greg Wallace | Changes: Reduce PG4 prepuff from 18ms to 17ms.
Result: Plasma through rampdown. Last shot of the day. |
| Engineering Operator Comments | ||||
| Shot | Time | Type | Status | Comment |
| 1 | 09:05:46:297AM | Test | Bad | Gas Test (fault not cleared) |
| 2 | 09:15:13:803AM | Test | Bad | Gas Test (B-Main did not fire) |
| 3 | 09:22:52:400AM | Test | Bad | Gas Test (B-Main did not fire) |
| 4 | 09:29:34:963AM | Test | Ok | Gas Test (B-Main worked) |
| 5 | 09:42:15:217AM | Plasma | Ok | |
| 6 | 09:55:32:520AM | Plasma | Ok | |
| 7 | 10:09:25:387AM | Plasma | Ok | |
| 8 | 10:22:03:623AM | Plasma | Ok | |
| 9 | 10:34:49:290AM | Plasma | Ok | |
| 10 | 10:47:58:563AM | Plasma | Ok | |
| 11 | 11:01:27:690AM | Plasma | Ok | |
| 12 | 11:28:25:937AM | Plasma | Ok | |
| 13 | 11:41:14:540AM | Plasma | Ok | |
| 14 | 11:54:11:983AM | Plasma | Ok | |
| 15 | 12:07:09:250PM | Plasma | Ok | |
| 16 | 12:20:47:090PM | Plasma | Ok | |
| 17 | 12:33:52:437PM | Plasma | Ok | |
| 18 | 12:46:44:890PM | Plasma | Ok | |
| 19 | 12:59:35:460PM | Plasma | Ok | |
| 20 | 01:12:30:280PM | Plasma | Ok | |
| 21 | 01:25:16:640PM | Plasma | Ok | |
| 22 | 01:38:03:170PM | Plasma | Ok | |
| 23 | 01:51:21:387PM | Plasma | Ok | |
| 24 | 02:21:13:413PM | Plasma | Ok | |
| 25 | 02:33:57:060PM | Plasma | Ok | |
| 26 | 02:46:42:780PM | Plasma | Bad | OH2 SCR Not Conducting before shot |
| 27 | 03:01:52:957PM | Plasma | Ok | |
| 28 | 03:14:34:240PM | Plasma | Ok | |
| 29 | 03:27:23:030PM | Plasma | Ok | |
| 30 | 03:40:00:240PM | Plasma | Ok | |
| 31 | 03:54:16:410PM | Plasma | Ok | |
| 32 | 04:06:59:550PM | Plasma | Ok | |
| 33 | 04:19:41:153PM | Plasma | Ok | |
| 34 | 04:32:32:510PM | Plasma | Ok | |
| 35 | 04:45:17:160PM | Plasma | Ok | |
| 36 | 04:57:56:597PM | Plasma | Ok | |
| System Availability | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Jan 4 2012 09:05:17:903AM | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||